CN109322319A CN201811329464.1A CN201811329464A CN109322319A CN 109322319 A CN109322319 A CN 109322319A CN 201811329464 A CN201811329464 A CN 201811329464A CN 109322319 A CN109322319 A CN 109322319A
Authority
CN
China
Prior art keywords
pile
end plate
support table
foundation support
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811329464.1A
Other languages
Chinese (zh)
Inventor
章朝根
申洋
穆保岗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Longxing Construction Engineering Co Ltd
Original Assignee
Jiangsu Longxing Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Longxing Construction Engineering Co Ltd filed Critical Jiangsu Longxing Construction Engineering Co Ltd
Priority to CN201811329464.1A priority Critical patent/CN109322319A/en
Publication of CN109322319A publication Critical patent/CN109322319A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles

Abstract

The invention discloses the bindiny mechanisms of a kind of concrete precast pile and pile foundation support table, including end plate, the end plate is located at the top of prefabricated pile, dowel hole is provided on the end plate, the end plate side is connected with sleeve, the sleeve lining is provided with screw thread, and the hollow parts of the prefabricated pile are provided with steel reinforcement cage.The present invention and pile foundation support table stable connection, it is easy to operate, it effectively prevent filling out core and is pulled out, sleeve is directly welded at stake core side on end plate, and reasonable stress is easy to operate, does not need recasting end plate mold, it is only necessary to open up several dowel holes on prefabricated pile end plate.

Description

The bindiny mechanism of concrete precast pile and pile foundation support table
Technical field
The present invention relates to architectural engineering stakes, and in particular to a kind of bindiny mechanism of concrete precast pile and pile foundation support table.
Background technique
Concrete prefabricated hollow pile is used as uplift pile using more and more extensive in practical projects, but prefabricated pile and cushion cap Connect still problematic presence.Now construction mostly uses concrete to fill out core, is transmitted to buoyancy suffered by cushion cap by wadding weft variation mixed On solidifying soil prefabricated pile.But due to factors such as site operation environment, causes concrete to fill out core quality and be difficult to ensure, exist and fill out core and pulled out Danger out.
In addition, there are also the sides for connecting prefabricated pile main reinforcement and cushion cap anchor rib simultaneously using sleeve for the connection of prefabricated pile and cushion cap Prefabricated pile main reinforcement is located in sleeve by method, this method, is unfavorable for applying prestressing force to prestressed concrete prefabricated pile.And prefabricated pile During stake processed, since main reinforcement is longer, it is more difficult that main reinforcement is located at the construction in sleeve.
Summary of the invention
Goal of the invention: the object of the present invention is to provide the bindiny mechanisms of a kind of concrete precast pile and pile foundation support table, solve The problem of existing prefabricated pile connect inconvenience with pile foundation support table, be easy to cause and fills out core and be pulled out, constructional difficulties.
Technical solution: the bindiny mechanism of concrete precast pile and pile foundation support table of the present invention, including end plate, the end Plate is located at the top of prefabricated pile, is provided with dowel hole and cage bar holes on the end plate, the end plate side is connected with sleeve, the set Cylinder inner wall is provided with screw thread, and the prefabricated pile hollow parts are provided with steel reinforcement cage.
The risk that wadding weft variation is pulled out is effectively reduced, the telescopic screw is connected with anchor bar, the anchoring steel Muscle passes through dowel hole and connect with pile foundation support table.
Facilitate transmitting uplift force and construction, the steel reinforcement cage includes filling out core main reinforcement, fill out core stirrup and filling out core bottom plate, described to fill out Core main reinforcement, which is vertically arranged in, fills out on core bottom plate, it is described fill out core stirrup and be horizontally installed on fill out between core main reinforcement.It is poured in the steel reinforcement cage It has built concrete and has filled out core.
Core is filled out in order to which superstructure uplift force is passed to concrete, core main reinforcement one end stretching prefabricated pile of filling out is anchored in In pile foundation support table.
In order to simple to operate, sleeve alignment dowel hole is welded on end plate by pile body side.
The utility model has the advantages that the present invention and pile foundation support table stable connection, easy to operate, it effectively prevent filling out core and is pulled out, sleeve is straight It connects and is welded on stake core side on end plate, reasonable stress is easy to operate, does not need recasting end plate mold, it is only necessary in prefabricated pile end plate On open up several dowel holes.
Detailed description of the invention
Fig. 1 is attachment structure schematic diagram;
Fig. 2 is square endplate schematic diagram;
Fig. 3 is circular end plate schematic diagram;
Fig. 4 is reinforced bar sleeve sectional view.
Specific embodiment
Invention is further explained with reference to the accompanying drawing.
As shown in Figs 1-4, the bindiny mechanism of concrete precast pile and pile foundation support table includes concrete prefabricated hollow pile 1, is mixed It is equipped with end plate 3 at the top of solidifying soil Prefabricated hollow pile 1, end plate 3 is welded with sleeve 4 in stake core side, 31 He of dowel hole is provided on end plate 3 Cage bar holes 32, pre-buried anchor bar 5 in pile foundation support table 2, anchor bar 5 pass through dowel hole 31 and connect with 4 spiral of sleeve, concrete The hollow parts of Prefabricated hollow pile 1 are provided with steel reinforcement cage 6 and casting concrete fills out core 7, and steel reinforcement cage 6 includes filling out core main reinforcement 61, filling out Core stirrup 62 and fill out core bottom plate 63.Wherein, sleeve lining is helicitic texture, and anchor bar is spiral.
In using the present invention, firstly, opening dowel hole in advance in end plate and in the stake core side welded sleeve of end plate, work as pile foundation It will include filling out at the steel reinforcement cage merging hollow pile hollow parts of core bottom plate, then poured to hollow pile hollow parts after the completion of construction Wadding weft variation will be connected to coagulation with the anchor bar of pile foundation support table connection within the wadding weft variation strength enhancing time On the prefabricated pile end plate of soil in pre-buried sleeve, to realize the connection of part pile cap steel muscle and prefabricated pile, reach to wadding weft variation After some strength, pile foundation support table is poured, the final connection for realizing concrete precast pile and pile foundation support table.

Claims (5)

1. the bindiny mechanism of a kind of concrete precast pile and pile foundation support table, which is characterized in that including end plate (3), the end plate (3) It is located at the top of prefabricated pile (1), dowel hole (31) and cage bar holes (32) is provided on the end plate (3), end plate (3) side connects It is connected to sleeve (4), sleeve (4) inner wall is provided with screw thread, and prefabricated pile (1) hollow parts are provided with steel reinforcement cage (6).
2. the bindiny mechanism of concrete precast pile according to claim 1 and pile foundation support table, which is characterized in that the sleeve (4) spiral is connected with anchor bar (5), and the anchor bar (5) passes through dowel hole (31) and connect with pile foundation support table (2).
3. the bindiny mechanism of concrete precast pile according to claim 1 and pile foundation support table, which is characterized in that the reinforcing bar Cage (6) includes filling out core main reinforcement (61), filling out core stirrup (62) and fill out core bottom plate (63), it is described fill out core main reinforcement (61) and be vertically arranged in fill out On core bottom plate (63), it is described fill out core stirrup (62) and be horizontally installed on fill out between core main reinforcement (61), has been poured in the steel reinforcement cage (6) Wadding weft variation (7).
4. the bindiny mechanism of concrete precast pile according to claim 3 and pile foundation support table, which is characterized in that described to fill out core Main reinforcement (61) one end is stretched out prefabricated pile (1) and is anchored in pile foundation support table (2).
5. the bindiny mechanism of concrete precast pile according to claim 1 and pile foundation support table, which is characterized in that the sleeve (4) alignment dowel hole (31) is welded on end plate (3) by pile body side.
CN201811329464.1A 2018-11-08 2018-11-08 The bindiny mechanism of concrete precast pile and pile foundation support table Pending CN109322319A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811329464.1A CN109322319A (en) 2018-11-08 2018-11-08 The bindiny mechanism of concrete precast pile and pile foundation support table

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811329464.1A CN109322319A (en) 2018-11-08 2018-11-08 The bindiny mechanism of concrete precast pile and pile foundation support table

Publications (1)

Publication Number Publication Date
CN109322319A true CN109322319A (en) 2019-02-12

Family

ID=65261036

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811329464.1A Pending CN109322319A (en) 2018-11-08 2018-11-08 The bindiny mechanism of concrete precast pile and pile foundation support table

Country Status (1)

Country Link
CN (1) CN109322319A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158484A (en) * 2019-07-03 2019-08-23 中铁上海工程局集团有限公司 A kind of high-speed railway packaged type bridges precast assembly structure and construction method
CN115404900A (en) * 2022-10-14 2022-11-29 国网河南省电力公司经济技术研究院 Pole tower pile foundation of power transmission line and construction method thereof

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013253378A (en) * 2012-06-05 2013-12-19 Toyo Asano Found Co Ltd Auxiliary tool for forming pile head space, hollow precast pile having the same, pile head treatment method using the hollow precast pile, and method for forming pile head space
CN103590414A (en) * 2013-11-19 2014-02-19 中铁第四勘察设计院集团有限公司 Structure for connecting concrete tubular pile with bearing platform
CN203701125U (en) * 2014-01-24 2014-07-09 陈家冬 Connection structure of preformed pile and pile cap and pile feeder of connection structure
CN204112354U (en) * 2013-12-10 2015-01-21 江苏建华管桩有限公司 The syndeton of concrete precast pile and pile foundation support table
CN105464073A (en) * 2015-12-25 2016-04-06 苏州汤始建华管桩有限公司 Enhanced solid preformed pile structure and method for connecting and fixing enhanced solid preformed pile structure and foundation
CN205475298U (en) * 2016-01-28 2016-08-17 建华建材投资有限公司 A precast concrete post for photovoltaic engineering
JP2017095888A (en) * 2015-11-19 2017-06-01 大成建設株式会社 Steel column-pile junction structure
CN207194000U (en) * 2017-09-14 2018-04-06 国家电网公司 A kind of transmission line of electricity prefabricated tubular pile cushion cap anchor
CN209243750U (en) * 2018-11-08 2019-08-13 江苏隆兴建设工程有限公司 The bindiny mechanism of concrete precast pile and pile foundation support table

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013253378A (en) * 2012-06-05 2013-12-19 Toyo Asano Found Co Ltd Auxiliary tool for forming pile head space, hollow precast pile having the same, pile head treatment method using the hollow precast pile, and method for forming pile head space
CN103590414A (en) * 2013-11-19 2014-02-19 中铁第四勘察设计院集团有限公司 Structure for connecting concrete tubular pile with bearing platform
CN204112354U (en) * 2013-12-10 2015-01-21 江苏建华管桩有限公司 The syndeton of concrete precast pile and pile foundation support table
CN203701125U (en) * 2014-01-24 2014-07-09 陈家冬 Connection structure of preformed pile and pile cap and pile feeder of connection structure
JP2017095888A (en) * 2015-11-19 2017-06-01 大成建設株式会社 Steel column-pile junction structure
CN105464073A (en) * 2015-12-25 2016-04-06 苏州汤始建华管桩有限公司 Enhanced solid preformed pile structure and method for connecting and fixing enhanced solid preformed pile structure and foundation
CN205475298U (en) * 2016-01-28 2016-08-17 建华建材投资有限公司 A precast concrete post for photovoltaic engineering
CN207194000U (en) * 2017-09-14 2018-04-06 国家电网公司 A kind of transmission line of electricity prefabricated tubular pile cushion cap anchor
CN209243750U (en) * 2018-11-08 2019-08-13 江苏隆兴建设工程有限公司 The bindiny mechanism of concrete precast pile and pile foundation support table

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158484A (en) * 2019-07-03 2019-08-23 中铁上海工程局集团有限公司 A kind of high-speed railway packaged type bridges precast assembly structure and construction method
CN115404900A (en) * 2022-10-14 2022-11-29 国网河南省电力公司经济技术研究院 Pole tower pile foundation of power transmission line and construction method thereof

Similar Documents

Publication Publication Date Title
CN105113389B (en) Assembled type bridge pier column member with steel-concrete composite structure
CN107905363B (en) A kind of full assembled concrete nodal point connecting and connection method based on energy consumption with shearing resistance
CN205894313U (en) Prefabricated assembled steel pipe retrains frame node entirely
CN203569582U (en) Connecting structure of concrete pipe pile and bearing platform
CN106284655A (en) Precast concrete beam stud connects node and method of attachment in succession
CN109505297A (en) A kind of resistance to compression resistance to plucking variable diameters steel reinforcement cage club-footed pile
CN103590414A (en) Structure for connecting concrete tubular pile with bearing platform
CN209243750U (en) The bindiny mechanism of concrete precast pile and pile foundation support table
CN109208825A (en) A kind of assembled arthitecutral structure convenient for docking and being in the milk
CN208701729U (en) A kind of offshore wind farm High-Rise Pile Cap Foundation using prefabricated cushion cap
CN108678218A (en) Assembly concrete shear wall and its method of construction based on multipurpose thin-wall steel tube
CN109322319A (en) The bindiny mechanism of concrete precast pile and pile foundation support table
CN206844315U (en) A kind of hollow column joint structure of assembly concrete framework
CN210151599U (en) Hollow slab beam
CN108060789A (en) A kind of wall support and change method of existing masonry structure base isolation reinforcement
CN108316513A (en) A kind of rapid construction assembly of shear wall structure and its construction method
CN205531016U (en) Precast concrete post component and connected node
CN208121795U (en) A kind of connection structure of overhead transmission line PHC pipe pile foundation foundation pile and cushion cap
CN208136903U (en) A kind of precast prestressed formula diaphram wall
CN203701125U (en) Connection structure of preformed pile and pile cap and pile feeder of connection structure
CN209114733U (en) A kind of assembled arthitecutral structure convenient for docking and being in the milk
CN105951987A (en) Sub-frame post-cast joint with external permanent aluminum plate outer mold
CN211974074U (en) Novel vertical steel bar connection structure of precast shear wall
CN213952209U (en) PSB finish rolling screw-thread steel pipe pile prestressing force anti-floating pile structure
CN107724384A (en) A kind of stake and stake attachment structure and its construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination