CN110158484A - A kind of high-speed railway packaged type bridges precast assembly structure and construction method - Google Patents

A kind of high-speed railway packaged type bridges precast assembly structure and construction method Download PDF

Info

Publication number
CN110158484A
CN110158484A CN201910594796.0A CN201910594796A CN110158484A CN 110158484 A CN110158484 A CN 110158484A CN 201910594796 A CN201910594796 A CN 201910594796A CN 110158484 A CN110158484 A CN 110158484A
Authority
CN
China
Prior art keywords
prefabricated
cast
cap
cushion cap
precast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910594796.0A
Other languages
Chinese (zh)
Inventor
贾东荣
侯宇飞
吴长发
杨斌
张红乾
郭乐
和辉
潘相辉
薛鸿禧
孙辉
崔文凯
郭存宝
王伟康
高敬民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Design Corp
Shanghai Civil Engineering Co Ltd of CREC
China State Railway Group Co Ltd
Seventh Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Original Assignee
Beijing Shenyang Passenger Dedicated Railway Beijing And Hebei Co Ltd
China Railway Design Corp
Shanghai Civil Engineering Co Ltd of CREC
Seventh Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Shenyang Passenger Dedicated Railway Beijing And Hebei Co Ltd, China Railway Design Corp, Shanghai Civil Engineering Co Ltd of CREC, Seventh Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC filed Critical Beijing Shenyang Passenger Dedicated Railway Beijing And Hebei Co Ltd
Priority to CN201910594796.0A priority Critical patent/CN110158484A/en
Publication of CN110158484A publication Critical patent/CN110158484A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/04Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure

Abstract

The present invention relates to bridge prefabrication assembling construction fields, specifically a kind of high-speed railway packaged type bridges precast assembly structure, including prefabricated tubular pile, cast-in-place cushion cap, precast segment pier stud, prefabricated pier cap and simple supported box beam, the cast-in-place cushion cap is arranged more prefabricated tubular pile upper ends, precast segment pier stud is arranged on cast-in-place cushion cap, prefabricated pier cap is arranged on precast segment pier stud, and cast in situs has prefabricated pier cap pinner on prefabricated pier cap;Simple supported box beam is crossed on prefabricated pier cap, and simple supported box beam is connect by metal support with prefabricated pier cap pinner.Also disclose a kind of construction method of high-speed railway packaged type bridges precast assembly structure.Erecting bed work surface of the present invention is more, facilitates site operation, accelerates speed of application, realizes bridge greenery construction, promotes enterprise's conventional industries transition and upgrade, saves construction material, reduces construction cost, energy-saving, reduces fugitive dust, environmental pollution is smaller.

Description

A kind of high-speed railway packaged type bridges precast assembly structure and construction method
Technical field
The present invention relates to bridge prefabrication assembling construction field, specifically a kind of high-speed railway packaged type bridges precast assembly knot Structure and construction method.
Background technique
During high-speed railway construction, precast segment assembled pier construction method, it is intended to quote emerging, novel assembly Formula building, structures construction technology realize bridge greenery construction, promote enterprise's conventional industries transition and upgrade, save construction material, The construction cost for thoroughly changing traditional construction technique is high, energy consumption is high, environmental pollution construction problem etc..
Existing bridge prefabrication splicing structure (or technique), it is assembled complicated, it causes serious pollution to the environment, erecting bed work surface Few, speed of application is slow, and product members quality cannot be guaranteed.Therefore, for the above status, there is an urgent need to develop a kind of high-speed irons Road packaged type bridges precast assembly structure and construction method, to overcome the shortcomings of in currently practical application.
Summary of the invention
The embodiment of the present invention is designed to provide a kind of high-speed railway packaged type bridges precast assembly structure and construction party Method, to solve the problems mentioned in the above background technology.
To achieve the above object, the embodiment of the present invention provides the following technical solutions:
A kind of high-speed railway packaged type bridges precast assembly structure, including prefabricated tubular pile, cast-in-place cushion cap, precast segment pier Column, prefabricated pier cap and simple supported box beam, the cast-in-place cushion cap setting the more prefabricated tubular pile upper ends, and the prefabricated tubular pile and The connection of core steel reinforcement cage reserved steel bar is filled out by prefabricated tubular pile top between cast-in-place cushion cap;
The precast segment pier stud setting passes through on cast-in-place cushion cap, and between the cast-in-place cushion cap and precast segment pier stud The grout sleeve of reserved screw-thread steel quantity identical as precast segment pier stud bottom is embedded at the top of cast-in-place cushion cap carries out reinforcing bar company It connects;
The prefabricated pier cap setting uses on precast segment pier stud, and between the prefabricated pier cap and precast segment pier stud The pre-buried grout sleeve of pre-buried spiral and prefabricated pier cap bottom at the top of precast segment pier stud carries out reinforcing bar connection, described prefabricated Cast in situs has prefabricated pier cap pinner on pier cap;
The simple supported box beam is crossed on prefabricated pier cap, and the simple supported box beam passes through metal support and prefabricated pier cap pinner Connection;
Precast assembly protecting wall and cable trough are additionally provided on the simple supported box beam.
As a further solution of the present invention: pre-buried inner thread sleeve on the simple supported box beam, precast assembly protecting wall and Cable trough is connect by harness cord screw rod with the inner thread sleeve being embedded on simple supported box beam, the precast assembly protecting wall and cable Slot and simple supported box beam contact surface carry out sitting slurry connection using ordinary mortar.
As a further solution of the present invention: be also alternately arranged on the precast assembly protecting wall and cable trough be equipped with it is general Layout of a page without columns bar and lotus railing.
As a further solution of the present invention: the prefabricated tubular pile is high-strength prestress tubular pole, model PHC-1000- AB-130。
A kind of construction method of high-speed railway packaged type bridges precast assembly structure, includes the following steps:
1) suitable prefabricated tubular pile construction technology is selected according to geological condition, carries out tube pile construction;
2) utilization fills out core steel reinforcement cage reserved steel bar and is reliably connected prefabricated tubular pile and cast-in-place cushion cap, and cast-in-place cushion cap top uses The reserved screw-thread steel of the pre-buried regulatory specifications of positioning tool, model and quantity;
3) filling that reserved reserved screw-thread steel specification, model and the quantity with cast-in-place cushion cap in precast segment pier stud bottom matches Sleeve is starched, screw-thread steel is reserved when assembled using grouting in grout sleeve and forms bond stress connection, concrete members contact surface uses High-intensity fine stone concrete sits sizing process connection;The reserved pre-buried spiral with precast segment pier stud of prefabricated pier cap bottom is advised The grout sleeve that lattice, model and quantity match, pre-buried spiral forms bond stress using grouting in grout sleeve when assembled Connection, concrete members contact surface sit sizing process connection using high-intensity fine stone concrete;
4) in the prefabricated pier cap pinner of prefabricated pier cap top cast in situs, simple supported box beam is crossed on prefabricated pier cap, and letter It is connected between branch box beam and prefabricated pier cap pinner by metal support;Pre-buried inner thread sleeve, passes through harness cord on simple supported box beam Screw rod, bolt connects with integral prefabricated assembled protecting wall and cable trough, concrete surface using ordinary mortar seat sizing process or Grouting method construction;
5) common railing and lotus railing are alternately arranged on precast assembly protecting wall and cable trough.
As a further solution of the present invention: in step 2), prefabricated tubular pile is connect using prefabricated tubular pile with cast-in-place cushion cap 15cm in cast-in-place cushion cap is protruded at top, and the core steel reinforcement cage of filling out of prefabricated tubular pile protrudes into 72.6cm in cast-in-place cushion cap, and expanding is horn mouth Shape, fills out core steel reinforcement cage and cast-in-place cushion cap reinforcement welding or binding connects.
Compared with prior art, the beneficial effect of the embodiment of the present invention is:
The high-speed railway packaged type bridges precast assembly structure and construction method, are mainly used for high-speed railway packaged type bridges Construction, solving conventional borehole stake, cast-in-place pier shaft and protecting wall cable trough, environmental pollution is serious, quality is bad, the construction period Long problem;Erecting bed work surface is more, facilitates site operation, accelerates speed of application, realizes bridge greenery construction, promotes enterprise Conventional industries transition and upgrade saves construction material, reduces construction cost, energy-saving, reduces fugitive dust, environmental pollution is smaller.
Detailed description of the invention
Fig. 1 is the exploded perspective structural schematic diagram of the embodiment of the present invention.
Fig. 2 is the schematic view of the front view of the embodiment of the present invention.
Fig. 3 is the side structure schematic view of the embodiment of the present invention.
In figure: 1- prefabricated tubular pile, 2- fill out core steel reinforcement cage reserved steel bar, the cast-in-place cushion cap of 3-, and 4- reserves screw-thread steel, and the segment 5- is pre- Pier stud processed, the pre-buried spiral of 6-, the prefabricated pier cap of 7-, the prefabricated pier cap pinner of 8-, 9- metal support, 10- simple supported box beam, 11- are pre- Assembled protecting wall and cable trough, 12- harness cord screw rod are made, 13- sits stock tank, the common railing of 14-, 15- lotus railing.
Specific embodiment
The technical solution of the patent is explained in further detail With reference to embodiment.
The embodiment of this patent is described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning to end Same or similar label indicates same or similar element or element with the same or similar functions.Below with reference to attached The embodiment of figure description is exemplary, and is only used for explaining this patent, and cannot be understood as a limitation of this patent.
In the description of this patent, it is to be understood that term " center ", "upper", "lower", "front", "rear", " left side ", The orientation or positional relationship of the instructions such as " right side ", "vertical", "horizontal", "top", "bottom", "inner", "outside" is based on the figure Orientation or positional relationship, be merely for convenience of description this patent and simplify description, rather than the device of indication or suggestion meaning or Element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as the limitation to this patent.
In the description of this patent, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection ", " setting " shall be understood in a broad sense, for example, it may be being fixedly linked, being arranged, may be a detachable connection, set It sets, or is integrally connected, is arranged.For the ordinary skill in the art, above-mentioned art can be understood as the case may be The concrete meaning of language in this patent.
Embodiment 1
Please refer to Fig. 1-3, in the embodiment of the present invention, a kind of high-speed railway packaged type bridges precast assembly structure, including it is pre- Tubulation stake 1, cast-in-place cushion cap 3, precast segment pier stud 5, prefabricated pier cap 7 and simple supported box beam 10, the cast-in-place cushion cap 3 are arranged at more 1 upper end of prefabricated tubular pile, and core steel reinforcement cage is filled out by 1 top of prefabricated tubular pile between the prefabricated tubular pile 1 and cast-in-place cushion cap 3 Reserved steel bar 2 connects.
The precast segment pier stud 5 is arranged on cast-in-place cushion cap 3, and between the cast-in-place cushion cap 3 and precast segment pier stud 5 It is carried out by the grout sleeve of the quantity identical as 5 bottom of precast segment pier stud is embedded in of reserved screw-thread steel 4 at cast-in-place 3 top of cushion cap Reinforcing bar connection, concrete surface have sit stock tank 13 as shown in figure 1 using slurry processes connection is sat.
The prefabricated pier cap 7 is arranged on precast segment pier stud 5, and between the prefabricated pier cap 7 and precast segment pier stud 5 Reinforcing bar connection is carried out using the pre-buried grout sleeve of pre-buried spiral 6 and prefabricated 7 bottom of pier cap at 5 top of precast segment pier stud, Concrete surface is connected using slurry processes are sat;Cast in situs has prefabricated pier cap pinner 8 on the prefabricated pier cap 7, and prefabricated pier cap pinner 8 exists Cast in situs is carried out after the completion of prefabricated pier cap 7 is assembled.
The simple supported box beam 10 is crossed on prefabricated pier cap 7, and the simple supported box beam 10 passes through metal support 9 and prefabricated pier Cap pinner 8 connects.
In the present embodiment, precast assembly protecting wall and cable trough 11, precast assembly are additionally provided on the simple supported box beam 10 Protecting wall and cable trough 11 are by traditional anti-collision wall and cable trough using integral prefabricated technique, using pre-buried on simple supported box beam 10 Inner thread sleeve, precast assembly protecting wall and cable trough 11 pass through harness cord screw rod 12 and the internal screw thread being embedded on simple supported box beam 10 Sleeve connection, and precast assembly protecting wall and cable trough 11 and 10 contact surface of simple supported box beam are sat by slurry connection using ordinary mortar, It is also alternately arranged on precast assembly protecting wall and cable trough 11 and common railing 14 and novel lotus railing 15 is installed, moulding is new Grain husk, beauty, enhance the adaptability with environment.
In the present embodiment, the prefabricated tubular pile 1 is high-strength prestress tubular pole, and model PHC-1000-AB-130 belongs to Large-diameter tubular pile;Prefabricated tubular pile 1, which connect to use with cast-in-place cushion cap 3, protrudes into 15cm in cast-in-place cushion cap 3 at the top of prefabricated tubular pile 1, prefabricated Tubular pole 1 is filled out core and is divided within the scope of the 1 following 6m in top of prefabricated tubular pile, fills out core steel reinforcement cage and protrudes into 72.6cm in cast-in-place cushion cap 3, and expands It is reliable with cast-in-place 3 reinforcement welding of cushion cap or binding for bell mouth shape.
In the present embodiment, bridge is in addition to cushion cap is using cast in place process, prefabricated tubular pile 1, precast segment pier stud 5, prefabricated pier cap 7, simple supported box beam 10, precast assembly protecting wall and cable trough 11, common railing 14 and lotus railing 15 are all using prefabrication Assembling in situ type construction, the connection of cast-in-place cushion cap 3 and precast segment pier stud 5, precast segment pier stud 5 and prefabricated pier cap 7, is divided into steel Muscle connection is connected with concrete component section, and reinforcing bar connection is connected using grout sleeve, and concrete cross section connection is using high-intensitive Pea gravel concreten sits slurry connection.
Embodiment 2
A kind of construction method of high-speed railway packaged type bridges precast assembly structure, includes the following steps:
1) suitable 1 construction technology of prefabricated tubular pile is selected according to geological condition, carries out tube pile construction;
2) utilization fills out core steel reinforcement cage reserved steel bar 2 and is reliably connected prefabricated tubular pile 1 and cast-in-place cushion cap 3, cast-in-place 3 top of cushion cap Using the reserved screw-thread steel 4 of the pre-buried regulatory specifications of positioning tool, model and quantity;
3) reserved 4 specification of reserved screw-thread steel, model and the quantity with cast-in-place cushion cap 3 in 5 bottom of precast segment pier stud matches Grout sleeve, screw-thread steel 4 is reserved when assembled using grouting in grout sleeve and forms bond stress connection, concrete members contact surface Sizing process connection is sat using high-intensity fine stone concrete;The connection of precast segment pier stud 5 and prefabricated pier cap 7 and precast segment pier stud 5 is identical with the connection type of cast-in-place cushion cap 3;
4) the prefabricated pier cap pinner 8 on prefabricated 7 top of pier cap uses cast in place process, the installation of metal support 9 and simple supported box beam 10 It sets up identical as prior art;In addition, precast assembly protecting wall and cable trough 11 use integral prefabricated on-site consolidation, assembly is used The pre-buried inner thread sleeve of beam body is connect by harness cord screw rod 12, bolt with integral prefabricated assembled protecting wall and cable trough 11, coagulation Soil contact face sits sizing process using ordinary mortar, can also be constructed using grouting method;
5) in order to increase building overall beautiful and environment harmony, bridge deck railing use common railing 14 and lotus Railing 15 is alternately arranged construction technology.
The high-speed railway packaged type bridges precast assembly structure and construction method, are mainly used for high-speed railway packaged type bridges Construction, solving conventional borehole stake, cast-in-place pier shaft and protecting wall cable trough, environmental pollution is serious, quality is bad, the construction period Long problem;Erecting bed work surface is more, facilitates site operation, accelerates speed of application, realizes bridge greenery construction, promotes enterprise Conventional industries transition and upgrade saves construction material, reduces construction cost, energy-saving, reduces fugitive dust, environmental pollution is smaller.
The above are merely the preferred embodiment of the present invention, it is noted that for those skilled in the art, not Under the premise of being detached from present inventive concept, several modifications and improvements can also be made, these also should be considered as protection model of the invention It encloses, these all will not influence the effect and patent practicability that the present invention is implemented.

Claims (6)

1. a kind of high-speed railway packaged type bridges precast assembly structure, including prefabricated tubular pile (1), cast-in-place cushion cap (3), precast segment Pier stud (5), prefabricated pier cap (7) and simple supported box beam (10), it is characterised in that:
The cast-in-place cushion cap (3) is arranged in more prefabricated tubular pile (1) upper ends, and the prefabricated tubular pile (1) and cast-in-place cushion cap (3) core steel reinforcement cage reserved steel bar (2) connection is filled out by prefabricated tubular pile (1) top between;
The precast segment pier stud (5) is arranged on cast-in-place cushion cap (3), and the cast-in-place cushion cap (3) and precast segment pier stud (5) Between pass through the filling of reserved screw-thread steel (4) quantity identical as precast segment pier stud (5) bottom is embedded at the top of cast-in-place cushion cap (3) It starches sleeve and carries out reinforcing bar connection;
The prefabricated pier cap (7) is arranged on precast segment pier stud (5), and the prefabricated pier cap (7) and precast segment pier stud (5) Between carried out using the pre-buried grout sleeve of pre-buried spiral (6) and prefabricated pier cap (7) bottom at the top of precast segment pier stud (5) Reinforcing bar connects, and cast in situs has prefabricated pier cap pinner (8) on the prefabricated pier cap (7);
The simple supported box beam (10) is crossed on prefabricated pier cap (7), and the simple supported box beam (10) is by metal support (9) and in advance Pier cap pinner (8) connection processed;
Precast assembly protecting wall and cable trough (11) are additionally provided on the simple supported box beam (10).
2. high-speed railway packaged type bridges precast assembly structure according to claim 1, which is characterized in that the freely-supported case Pre-buried inner thread sleeve on beam (10), precast assembly protecting wall and cable trough (11) are by harness cord screw rod (12) and are embedded in freely-supported Inner thread sleeve connection in box beam (10), the precast assembly protecting wall and cable trough (11) and simple supported box beam (10) contact surface It carries out sitting slurry connection using ordinary mortar.
3. high-speed railway packaged type bridges precast assembly structure according to claim 2, which is characterized in that the prefabricated spelling It is also alternately arranged on dress protecting wall and cable trough (11) and common railing (14) and lotus railing (15) is installed.
4. high-speed railway packaged type bridges precast assembly structure according to claim 1, which is characterized in that the prefabricated pipe Stake (1) is high-strength prestress tubular pole, model PHC-1000-AB-130.
5. a kind of construction method of high-speed railway packaged type bridges precast assembly structure according to any one of claims 1-4, It is characterized by comprising the following steps:
1) suitable prefabricated tubular pile (1) construction technology is selected according to geological condition, carries out tube pile construction;
2) utilization fills out core steel reinforcement cage reserved steel bar (2) and is reliably connected prefabricated tubular pile (1) and cast-in-place cushion cap (3), cast-in-place cushion cap (3) Top uses the reserved screw-thread steel (4) of the pre-buried regulatory specifications of positioning tool, model and quantity;
3) reserved reserved screw-thread steel (4) specification, model and the quantity phase with cast-in-place cushion cap (3) in precast segment pier stud (5) bottom The grout sleeve matched reserves screw-thread steel (4) using grouting in grout sleeve and forms bond stress connection when assembled, concrete members connect Contacting surface sits sizing process connection using high-intensity fine stone concrete;Prefabricated pier cap (7) bottom is reserved pre- with precast segment pier stud (5) Bury spiral (6) specification, the grout sleeve that model and quantity match, pre-buried spiral (6) is using grouting set when assembled Grouting forms bond stress connection in cylinder, and concrete members contact surface sits sizing process connection using high-intensity fine stone concrete;
4) in the prefabricated pier cap pinner (8) of prefabricated pier cap (7) top cast in situs, simple supported box beam (10) is crossed on prefabricated pier cap (7) it on, and is connect between simple supported box beam (10) and prefabricated pier cap pinner (8) by metal support (9);On simple supported box beam (10) Pre-buried inner thread sleeve is connect by harness cord screw rod (12), bolt with integral prefabricated assembled protecting wall and cable trough (11), coagulation Soil contact face sits sizing process or grouting method construction using ordinary mortar;
5) common railing (14) and lotus railing (15) are alternately arranged on precast assembly protecting wall and cable trough (11).
6. the construction method of high-speed railway packaged type bridges precast assembly structure according to claim 5, which is characterized in that In step 2), prefabricated tubular pile (1) is connect with cast-in-place cushion cap (3) to be protruded into cast-in-place cushion cap (3) using prefabricated tubular pile (1) top The core steel reinforcement cage of filling out of 15cm, prefabricated tubular pile (1) protrude into 72.6cm in cast-in-place cushion cap (3), and expanding is bell mouth shape, fills out core steel reinforcement cage It is connected with cast-in-place cushion cap (3) reinforcement welding or binding.
CN201910594796.0A 2019-07-03 2019-07-03 A kind of high-speed railway packaged type bridges precast assembly structure and construction method Pending CN110158484A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910594796.0A CN110158484A (en) 2019-07-03 2019-07-03 A kind of high-speed railway packaged type bridges precast assembly structure and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910594796.0A CN110158484A (en) 2019-07-03 2019-07-03 A kind of high-speed railway packaged type bridges precast assembly structure and construction method

Publications (1)

Publication Number Publication Date
CN110158484A true CN110158484A (en) 2019-08-23

Family

ID=67637889

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910594796.0A Pending CN110158484A (en) 2019-07-03 2019-07-03 A kind of high-speed railway packaged type bridges precast assembly structure and construction method

Country Status (1)

Country Link
CN (1) CN110158484A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111455804A (en) * 2020-04-24 2020-07-28 邢台路桥建设总公司 Assembled bridge and construction method thereof
CN111764291A (en) * 2020-07-09 2020-10-13 中铁六局集团天津铁路建设有限公司 Construction method of separated railway bridge steel-concrete transition section structure
CN111794104A (en) * 2020-06-30 2020-10-20 中铁二十二局集团第三工程有限公司 Support-free assembly construction method for assembly type bent cap construction
CN111877142A (en) * 2020-07-16 2020-11-03 仲恺农业工程学院 Assembled bridge pier column structure
CN111945566A (en) * 2020-08-04 2020-11-17 江苏瑞沃建设集团有限公司 Road and bridge assembly type construction method and manufacturing process of multi-effect foundation assembly
CN112064661A (en) * 2020-09-27 2020-12-11 浙江中天建筑产业化有限公司 Novel prefabricated accessory of overpass approach bridge
CN113481827A (en) * 2021-07-23 2021-10-08 中铁上海工程局集团有限公司 Assembled bridge connection structure
CN113481863A (en) * 2021-07-18 2021-10-08 黄河水利职业技术学院 Bridge construction method
CN113718660A (en) * 2021-09-27 2021-11-30 皖西学院 Large-span quick-connection assembly type prefabricated part and construction method thereof

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20120119214A (en) * 2012-10-15 2012-10-30 아주대학교산학협력단 Block pier
CN104695459A (en) * 2013-12-10 2015-06-10 江苏建华管桩有限公司 Connection method of concrete precast pile and pile foundation cap
CN204456162U (en) * 2015-02-12 2015-07-08 江苏建院营造有限公司 A kind of pulling-resistant type prefabricated tubular pile be connected with cushion cap
CN106245526A (en) * 2016-09-30 2016-12-21 中铁上海工程局集团有限公司 The splicing structure of mining under railways protecting wall, straight wall and shield and construction method
CN106351113A (en) * 2016-08-28 2017-01-25 防灾科技学院 Earthquake control system of high-speed railway bridge
CN106498844A (en) * 2016-12-01 2017-03-15 中铁第四勘察设计院集团有限公司 A kind of high speed railway box beam bridge floor pre-fabricated electric cables groove
CN106677056A (en) * 2017-02-16 2017-05-17 上海市城市建设设计研究总院(集团)有限公司 Prefabricated double-column vase bridge pier and assembling construction method thereof
CN109083003A (en) * 2018-09-21 2018-12-25 上海市隧道工程轨道交通设计研究院 A kind of precast pier pier top connection structure and its construction method
CN109322319A (en) * 2018-11-08 2019-02-12 江苏隆兴建设工程有限公司 The bindiny mechanism of concrete precast pile and pile foundation support table
CN208844565U (en) * 2018-07-25 2019-05-10 中建二局第三建筑工程有限公司 One kind cutting pile section point structure
CN210636312U (en) * 2019-07-03 2020-05-29 中铁上海工程局集团有限公司 Prefabricated structure of assembling of assembled bridge of high-speed railway

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20120119214A (en) * 2012-10-15 2012-10-30 아주대학교산학협력단 Block pier
CN104695459A (en) * 2013-12-10 2015-06-10 江苏建华管桩有限公司 Connection method of concrete precast pile and pile foundation cap
CN204456162U (en) * 2015-02-12 2015-07-08 江苏建院营造有限公司 A kind of pulling-resistant type prefabricated tubular pile be connected with cushion cap
CN106351113A (en) * 2016-08-28 2017-01-25 防灾科技学院 Earthquake control system of high-speed railway bridge
CN106245526A (en) * 2016-09-30 2016-12-21 中铁上海工程局集团有限公司 The splicing structure of mining under railways protecting wall, straight wall and shield and construction method
CN106498844A (en) * 2016-12-01 2017-03-15 中铁第四勘察设计院集团有限公司 A kind of high speed railway box beam bridge floor pre-fabricated electric cables groove
CN106677056A (en) * 2017-02-16 2017-05-17 上海市城市建设设计研究总院(集团)有限公司 Prefabricated double-column vase bridge pier and assembling construction method thereof
CN208844565U (en) * 2018-07-25 2019-05-10 中建二局第三建筑工程有限公司 One kind cutting pile section point structure
CN109083003A (en) * 2018-09-21 2018-12-25 上海市隧道工程轨道交通设计研究院 A kind of precast pier pier top connection structure and its construction method
CN109322319A (en) * 2018-11-08 2019-02-12 江苏隆兴建设工程有限公司 The bindiny mechanism of concrete precast pile and pile foundation support table
CN210636312U (en) * 2019-07-03 2020-05-29 中铁上海工程局集团有限公司 Prefabricated structure of assembling of assembled bridge of high-speed railway

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111455804A (en) * 2020-04-24 2020-07-28 邢台路桥建设总公司 Assembled bridge and construction method thereof
CN111794104A (en) * 2020-06-30 2020-10-20 中铁二十二局集团第三工程有限公司 Support-free assembly construction method for assembly type bent cap construction
CN111764291A (en) * 2020-07-09 2020-10-13 中铁六局集团天津铁路建设有限公司 Construction method of separated railway bridge steel-concrete transition section structure
CN111877142A (en) * 2020-07-16 2020-11-03 仲恺农业工程学院 Assembled bridge pier column structure
CN111945566A (en) * 2020-08-04 2020-11-17 江苏瑞沃建设集团有限公司 Road and bridge assembly type construction method and manufacturing process of multi-effect foundation assembly
CN112064661A (en) * 2020-09-27 2020-12-11 浙江中天建筑产业化有限公司 Novel prefabricated accessory of overpass approach bridge
CN113481863A (en) * 2021-07-18 2021-10-08 黄河水利职业技术学院 Bridge construction method
CN113481827A (en) * 2021-07-23 2021-10-08 中铁上海工程局集团有限公司 Assembled bridge connection structure
CN113481827B (en) * 2021-07-23 2022-09-27 中铁上海工程局集团有限公司 Assembled bridge connection structure
CN113718660A (en) * 2021-09-27 2021-11-30 皖西学院 Large-span quick-connection assembly type prefabricated part and construction method thereof
CN113718660B (en) * 2021-09-27 2023-01-31 皖西学院 Large-span quick-connection assembly type prefabricated part and construction method thereof

Similar Documents

Publication Publication Date Title
CN110158484A (en) A kind of high-speed railway packaged type bridges precast assembly structure and construction method
CN104120647B (en) It is suitable for section assembling concrete frame bridge pier system and the construction method of rapid construction
CN210636312U (en) Prefabricated structure of assembling of assembled bridge of high-speed railway
CN104790424B (en) The hardened system on generation power foundation of wind power ring basis and reinforcement means thereof
CN101831875A (en) Precast assembly process of prestressed concrete cylindrical hollow pier
CN208702444U (en) A kind of prefabricated rail top air channel structure of postposition
CN101936170A (en) Cavern arch mould spraying concrete construction structure and process
CN108708452A (en) The U-shaped integral prefabricated window member that floats, assembled float window joint structure and its construction method
CN201826437U (en) Structure for accurately embedding column pin bolts for steel structures
CN106968270A (en) A kind of reinforcement means that embedded iron parts are lengthened for underground pipe gallery side wall
CN204876199U (en) Restraint overlap joint structure is concentrated to precast shear wall vertical reinforcement
CN208844417U (en) A kind of outer precast construction for pier column and its outer prefabricated interior cast-in-place pier column
CN106149878A (en) Attachment structure at concrete frame structure prefabricated post and beam slab node and method
CN105735470A (en) Precast concrete frame system using high-performance materials differentially
CN106149877A (en) Docking structure at concrete frame structure prefabricated post and beam slab node and method
CN206844316U (en) A kind of assembled steel reinforced concrete column with well and post splicing node
CN206635790U (en) Pile tube and cushion cap attachment structure
CN102936953B (en) Construction method of a bridging-arm stiffened steel structure template
CN209323683U (en) Girder steel and concrete structure connection structure
CN204589831U (en) A kind of rc beam bridge girder reinforcing construction
CN106930308A (en) Pile tube and cushion cap attachment structure
CN109853730A (en) A kind of novel precast reinforced concrete frame joint and its method of construction
CN205591349U (en) Strong prestressing tendons's precast concrete beam post node in adoption
CN108999077A (en) The circumferential weld connection structure and its circumferential weld connection method of prefabricated stand column and adjacent members
CN208395991U (en) The U-shaped integral prefabricated window member that floats, assembled float window joint structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190918

Address after: 200436, No. three, 278 Road, Jingan District, Shanghai

Applicant after: Shanghai Civil Engineering Co., Ltd. of Crec

Applicant after: China National Railway Group Co., Ltd.

Applicant after: China Railway Design Group Limited

Applicant after: China Railway Shanghai Engineering Bureau Group seventh Engineering Co., Ltd.

Address before: 200436, No. three, 278 Road, Jingan District, Shanghai

Applicant before: Shanghai Civil Engineering Co., Ltd. of Crec

Applicant before: Beijing Shenyang Passenger Dedicated Railway Beijing and Hebei Co. Ltd.

Applicant before: China Railway Shanghai Engineering Bureau Group seventh Engineering Co., Ltd.

Applicant before: China Railway Design Group Limited