CN109296955A - A kind of method of efficient LED flashlight assembly - Google Patents

A kind of method of efficient LED flashlight assembly Download PDF

Info

Publication number
CN109296955A
CN109296955A CN201810853296.XA CN201810853296A CN109296955A CN 109296955 A CN109296955 A CN 109296955A CN 201810853296 A CN201810853296 A CN 201810853296A CN 109296955 A CN109296955 A CN 109296955A
Authority
CN
China
Prior art keywords
assembly
rope
stack shell
led flashlight
area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810853296.XA
Other languages
Chinese (zh)
Other versions
CN109296955B (en
Inventor
黄寰
马志鹏
邓婷
吴兴明
李源
余斌
范宣梅
常鸣
黄健
罗子欣
蒋孟璇
陈静
程丙警
白良玉
肖义
陈晓琴
周慧灵
杨梅
王宇
张新帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Univeristy of Technology
Original Assignee
Chengdu Univeristy of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Univeristy of Technology filed Critical Chengdu Univeristy of Technology
Priority to CN201810853296.XA priority Critical patent/CN109296955B/en
Publication of CN109296955A publication Critical patent/CN109296955A/en
Application granted granted Critical
Publication of CN109296955B publication Critical patent/CN109296955B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F21LIGHTING
    • F21KNON-ELECTRIC LIGHT SOURCES USING LUMINESCENCE; LIGHT SOURCES USING ELECTROCHEMILUMINESCENCE; LIGHT SOURCES USING CHARGES OF COMBUSTIBLE MATERIAL; LIGHT SOURCES USING SEMICONDUCTOR DEVICES AS LIGHT-GENERATING ELEMENTS; LIGHT SOURCES NOT OTHERWISE PROVIDED FOR
    • F21K9/00Light sources using semiconductor devices as light-generating elements, e.g. using light-emitting diodes [LED] or lasers
    • F21K9/90Methods of manufacture
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F21LIGHTING
    • F21YINDEXING SCHEME ASSOCIATED WITH SUBCLASSES F21K, F21L, F21S and F21V, RELATING TO THE FORM OR THE KIND OF THE LIGHT SOURCES OR OF THE COLOUR OF THE LIGHT EMITTED
    • F21Y2115/00Light-generating elements of semiconductor light sources
    • F21Y2115/10Light-emitting diodes [LED]

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Physics & Mathematics (AREA)
  • Microelectronics & Electronic Packaging (AREA)
  • Optics & Photonics (AREA)
  • General Engineering & Computer Science (AREA)
  • Automatic Assembly (AREA)

Abstract

The invention discloses a kind of method of efficient LED flashlight assembly, solve the problems, such as that the unreasonable caused working efficiency of operational sequence is low in the prior art.The movement of down tools, the process for resetting the movement for fixing stack shell before dress rope adjust the efficiency for effectively increasing LED flashlight assembly after the present invention fills the movement of pressure valve by merging, resets dress O-ring, and the efficiency of assembly is improved by the workbench of reasonable adjustment assembly, there is preferable practicability.Present invention also improves LED flashlight assembling lines, present invention eliminates the transportation range between second and third station, merge second and third station, save transportation cost, have preferable practicability.The case where present invention realizes personnel's both hands operation simultaneously of assembly and reduces waiting, handles, effectively increases the efficiency of torch assembly, saves cost, have preferable practicability.

Description

A kind of method of efficient LED flashlight assembly
Technical field
The invention belongs to the technical fields of LED flashlight assembly, and in particular to a kind of side of efficient LED flashlight assembly Method.
Background technique
In the prior art, as shown in Figure 1, existing production assembly line is using linear type layout type.Assembly line overall length 20 meters (without the distance for being carried to finished product area), 3 stations are set altogether.Part is all machined needed for assembly finishes or uses Finished product buying, the assembly line only carry out last general assembly.The both ends of assembly line are respectively that material offer area and finished product put area.
In the prior art, whole section of assembly line can be divided into two pieces of regions: general assembly area and inspection area according to functional category.General assembly area Predominantly by each assembling parts general assembly process;Inspection area is broadly divided into two parts of waterproof test and shock test, respectively two A different region carries out, and each region is a station, and each station matches a worker.It is between general assembly area and test block Buggy conveying track.Part needed for first station assembles will provide area by material and provide, and distribute to present position, complete After be put into buggy, second station, i.e. waterproof test block are transported to by track by buggy;Second station worker will be previously assembled Good kinds of goods carry out waterproof test, transport next station to again after qualified;3rd station worker carries out shock test, transports to after qualified Finished product puts area.Transportation range in Fig. 1 before two inspection areas is respectively 5.8 meters and 7 meters.
In 3 stations of entire assembly line, the action of the first station worker is the most complicated, mainly has: dress pressure Valve, set O-ring, tail end fill rope, side dress switchs, dress LED bulb, dress noctilucence rotate lid and inspection etc.;Second and third station work The action of people is that finished product is carried out to waterproof test and shock test respectively, and action is simple but actuating quantity is big, when expending Between it is longer.
According to factual survey, the current annual output of the assembly line is about per tour 75000, and the daily output is about per tour 300 Only (calculated by 250 working days within 1 year).According to existing market condition, the quantum of output of the assembly line is obviously insufficient.According to record Status puts question to technology with " 5W1H ", is divided in terms of operation, inspection, waiting, storage and carrying five respectively on the whole Analysis, discovery production line have the following problems:
(1) temporarily standing time is too long.Further investigation reveals that temporarily placing for the first time is because transport subsequent processing is Buggy, the second step test is 8 flashlights while being tested, in order to which the second step can carry out in batch, before this only Can assemble 8 to transport together later.Third time is temporarily placed same.
(2) waiting personnel's waste.In carrying out waterproof test, due to the needs of process, it is necessary to open flashlight and put Enter in the water of pressurization 30 minutes.Although worker operation 3 waterproof test buckets (every bucket test 8 flashlights), this 30 In minute, worker is still substantially at idle state, greatly reduces production efficiency.
Transportation range before (3) second of inspection area is too long.The distance between test block is 7 meters twice, accounts for entire dress The 35% of wiring, ratio is too high.Transportation range is too long, not only increases moving distance, transportation cost increases, and also takes up very Big space increases the production cycle.
The step of existing assembly section is more simultaneously, content is miscellaneous, is problem common to main assembly process or bottleneck process, And each station rate of utilization of work hour is low, work unreasonable distribution.
Summary of the invention
The purpose of the present invention is to provide a kind of method of efficient LED flashlight assembly, the present invention mainly passes through merging The movement of pressure valve is filled, the movement of down tools after filling 0 type circle is reset, resets the method solution for fixing the movement of stack shell before filling rope The low problem of working efficiency caused by operational sequence in the prior art of having determined is unreasonable;The present invention also passes through reasonably adjustment dress The workbench matched improves the efficiency of assembly, present invention eliminates the transportation range between second and third station, merge second, Three stations, save transportation cost, have preferable practicability.
The present invention is achieved through the following technical solutions: a kind of method of efficient LED flashlight assembly, using assembly System assembles LED flashlight, mainly comprises the steps that
Step S101: picking up pressing device first, then picks up pressure valve, and pressure valve is put into stack shell and formulates position, so Pressure valve is compressed with pressing device afterwards;
Step S102: picking up O-ring first, then picks up stack shell, and O-ring is covered on stack shell;
Step S103: picking up rope first, then picks up rope and hooks, then stack shell is fixed on switch press device;
The assembly system includes general assembly area and trial zone, and the trial zone includes sequentially connected waterproof test area and resists Shake trial zone;The general assembly area is connect with trial zone by smooth conveyer belt or smooth connecting plate;The general assembly area Concave workbench is circumferentially disposed with several storage areas, the left side of the operation position of the concave workbench along operation position It is respectively pressure valve storage area and rope storage area with left front, and front is rotation lid storage area and LED bulb storage area; The operation position of the concave workbench is nearby stack shell storage area and tool storage area, and right preceding for O-ring storage area, the right side End is the switch press machine being sequentially placed and automatically selects machine;The seat of the operation position is using seat, the dual-purpose work chair of standing position.
In order to preferably realize the present invention, further, the distance between the general assembly area and trial zone are 1.8m, described The overall length of general assembly area and trial zone is 7m.
In order to preferably realize the present invention, further, the operation that the right hand picks up pressure valve is turned in the step S101 Left hand is given, and stack shell need not be picked up, and be fixed in compaction pressure valve with left hand.
In order to preferably realize the present invention, further, stack shell is first fixed in the step S102, and with the hands operate, Then pick up the workpiece of dress rope.
In order to preferably realize the present invention, further, stack shell tail end is covered into rope in the step S103 and is knotted, so To switch press button and lower button is pressed afterwards, finally puts down rope and hook.
It in order to preferably realize the present invention, further, in the step S103 holds rope and scratches out and touch the button, and press Rope is put down after button to hook.
The prior art is analyzed as follows:
As shown in table 1, analysis is found, the content of LED flashlight assembly line drafting process is as follows in the prior art:
(1) entire assembling process totally 21 program;
(2) assembly line transportation range adds up to 17.3 meters, without overlapping route;
(3) assembly line processing, the number for checking, carrying, wait, storing are respectively 9 times, 4 times, 3 times, 1 time and 4 times, point Do not account for 42.9%, 19.0%, 14.3%, 4.7% and the 19.1% of project total degree, required time is respectively 152 seconds, 12 seconds, 9.6 seconds, 1800 seconds and 268 seconds;
(4) production cycle is 2241.6 seconds.
Table 1 is LED flashlight assembly line process program table
Assembly line balancing refers to that each station on same assembly line is producing beat required for same product Different situations.
Beat refers to that entire production system produces being averaged for quantification product or part in determining time range Time.For an equipment, refer to the average value the time required to a workpiece output;For a production line, it is Refer to the average value the time required to bottleneck station produces a workpiece.
Assembly line balancing it is blunt it is reversed reflect be enterprise production energy level, be an important index.Assembly line is flat Weighing apparatus rate is higher, and production capacity is also bigger.Assembly line balancing rate calculation formula are as follows:
Assembly line balancing rate=[each process temporal summation ÷ (CT × process number)] × 100%
In formula:
CT --- maximum standard work force, i.e. production line beat in production line procedures.
In actual production assembling process, due to activity duration, operation intensity etc., there are one for assembly line each process Fixed difference, these differences directly affect the efficiency of assembly line to a certain extent, and directly affect the product of worker's work Polarity.As shown in Fig. 2, having counted the specific time of each flow operations, now summarized calculating, counts each process beat point Wei not be 28 seconds, 80.3 seconds and 10 seconds, as shown in Figure 2.
It is obvious that productive temp is the second step beat, it is 80.3 seconds.The balanced ratio of assembly line is calculated:
W=[(28+80.3+10) ÷ (80.3 × 3)] × 100%=49.1%
It can be seen that as a complete unit, assembly line balancing effect be it is very poor, there is considerable room for improvement.
As shown in Figure 2, beat difference is big between each process, and maximum difference reaches 70.3 seconds unexpectedly.From it is whole see mainly because Longer for the waterproof test waiting time, the rate of utilization of work hour is low.It is calculated by current beat, the annual output of the assembly line is (per tour Working time is 420 minutes, is calculated by 250 working days within 1 year):
S=250 × 420 × 60 ÷ 80.3=78455 (only/class)
The calculating of the annual output is obtained in the case where all being complied with standard based on other conditions.It is positive due to operative employee Other reasons, the actual productions such as property, degree of fatigue are lower than calculated, substantially conform to the actual output value of the assembly line.Text " 5W1H " puts question to technology and ECRS principle, process program analysis, balanced ratio analysis, operation point in chapter integrated use Industrial Engineering The methods of analysis, by having assembly line Summary on technology to original and improving.Process program analysis be program analysis in it is most basic, Most important analytical technology, it be using the manufacture overall process of product or part as research object, processing technology be divided into processing, The analytic process that five kinds of states such as inspection, carrying, waiting and storage are recorded.
By analysis, it can be deduced that influence production efficiency the main reason for have:
(1) operating procedure is more, and content is complex
For this is primarily directed to the main assembly section of first step.Step is more, content is miscellaneous, be main assembly process or Problem common to bottleneck process.These stations need the skilled operation of operative employee, need more to train.Due to operating procedure It is more, content is miscellaneous, works heavy, and operative employee is needed to concentrate more attentions, and operative employee can be made to be easier fatigue in this way, long and long It, leads to inefficiency.
Each station job analysis timetable of table 2
(2) each station rate of utilization of work hour is low, and work unreasonable distribution
It as shown in Table 1, is 126 seconds the time required to second station operative employee carries out 8 torches of experiment, so three waterproof examinations Testing bucket and carrying out 24 torch experiments is 378 seconds, is computed its free time up to 1706 seconds unexpectedly.3rd station is due to that will wait until It could start after the completion of second station, so its free time is also quite a lot of, up to 1844 seconds.The first station is reviewed, the operation Worker is 28 seconds the time required to having assembled a torch, and 8 are a batch when due to followed by testing, so processing 8 institutes Taking time is 224 seconds, and processing six batches of times is 1344 seconds.Since waterproof test bucket is 3, the first station manipulation work processes six Second station is transported after batch and forms three batches of accumulations, so its free time is 740 seconds.In order to more intuitively embody each station work Work and idle condition, it is as shown in table 2 to draw each station job analysis figure.By table 2 it can be concluded that, the rate of utilization of work hour of three workers Respectively 64%, 18%, 12%.
Moreover, work distribution is also unreasonable, some station working times seem quite more than needed compared to another process. It is computed, the free time of second station worker is 2.3 times of the first station worker, and 3rd station is 2.5 times of the first station, work Tact balance situation allows of no optimist between sequence.Although the free time of every worker is all very much, for assembly line, affect whole The production capacity of body, and for the operative employee of each station, also affect the enthusiasm of work.
(3) it arranges unreasonable
Transportation range between second and third station is too long, and there is the fortune being not necessarily between second and third station in other words Defeated distance.Transportation cost is not only increased, the operational motion of operative employee is also added, increases the operating time.
Since in bottleneck process, the process that flashlight impregnates 30 minutes in water can not change.For changing for the process Kind can only increase experimental facilities, improve the rate of utilization of work hour of people, can not carry out more further improvement analysis.For main assembly For process, operative employee's action is more and miscellaneous, is the emphasis that job analysis improves, then we will carry out main assembly process Both hands job analysis.
The main improvement of the present invention mainly comprises the steps that
(1) merge the movement of dress pressure valve;
In the operation of dress pressure valve, the right hand picks up pressure valve after picking up pressing device again, has two pieces work simultaneously in a hand Part, it is easy to cause the right hand tired, and the state that handles of left hand seems very easily.It at this time should be by the pressure valve of the right hand picked up Left hand is handed in operation, and stack shell need not be picked up, and be fixed in compaction pressure valve with left hand.
(2) movement of down tools after filling 0 type circle is reset;
When filling O-ring there is no pressing device is put down, tracing it to its cause is used because can use sometimes for dress O-ring Its dealing stack shell edge set.By observing and measuring discovery, pressing device is seldom used when filling O-ring, even if using once in a while, The time of cost is then few unlike no use, also will increase sometimes on the contrary.Pressing device is put down when toward edge set O-ring, is subtracted Hold object in few hand, the degree of fatigue of the right hand can be substantially reduced.
(3) movement that stack shell is fixed before filling rope is reset;
When tail end fills rope, due to needing to fix stack shell and emptying tail end, next program is dress switch, so from However right place stack shell is fixed on switch press machine.By Fig. 7 it is recognised that then operative employee first picks up the workpiece of dress rope Stack shell is fixed again, and is only left-handed operation, and the right hand is in and handles state.Not only it be easy to cause left hand tired under such circumstances The waste that labor, appearance act can also make stack shell fixed effect not good enough (needing stack shell to be fixed well when dress switch), cause to occur Fixed movement is gone in repetition.It is therefore desirable to which the action is reconfigured, i.e., stack shell is first fixed, and with the hands operate, so It goes to pick up the workpiece for filling rope again afterwards.
(4) simplify the movement pressed before and after switch press machine button;
Push switch belongs to Machine automated part, and operative employee only needs stack shell moving to corresponding position, is by lower button Can, machine can move to internal push switch automatically, move back to come again after the completion, operative employee's both hands idle state then occur. Carefully analyze it can be found that the 10th of the right hand acts --- by lower button, belong to simple movement, the attention that needs and It is very small to the fatigue damage of people, so operation can hold rope completely and scratch out and touch the button, and put down the operation that rope hooks be placed on by After lower button, occupy by the waiting time after lower button, to reduce the waste of right hand movement.
(5) adjustment table plane arrangement:
1. cancelling the transportation range between second and third station, merge second and third station it has been mentioned hereinbefore that second and third work The distance between position is 7 meters, accounts for the 35% of entire assembly wire length, haulage time is 2.8 seconds.Come from the action of two stations It sees, integrates the time of two station manipulations, rest, can and then carry out shock test after waterproof test completely, not have Necessity sets up another station again, then also just It is not necessary to set up the conveying track and cargo trolley between two stations again.In this way One, 7 meters of distance between the two is not only reduced, 2.8 seconds haulage times are saved, and also saves and kinds of goods is loaded onto The time of trolley saves the fixed costs such as transport channel and trolley.
2. allowing inspection area against general assembly area
It is best in this way as a result, but practical without transportation range if inspection area and general assembly area are placed in same position Various limitations cause such arrangement can not be achieved.Since cannot cancel, that just reduces distance between the two to the greatest extent.
Present case is that distance between the two is 5.8 meters, is transported using trolley by track, and be in batch (8) It transports.After being analyzed, being measured, distance between the two can be contracted to 1.8 meters or so, small rail car originally is changed to defeated Band (without power, stationary state is smooth) or connecting plate (smooth) are sent, wherein one end is directly connected to first step work top Edge, the other end are extended down to inspection area cache location, are sent finished product to inspection using gravity.So, the first station is grasped Workmanship directly puts finished product to conveyer belt after completing a finished product, saves and bends over temporary or that kinds of goods are put trolley etc. is subsequent dynamic Make, saves the useless time consumed.
Assembly line integral layout adjusted is as shown in Figure 4.7 meters of assembly line overall length adjusted (without test block at The distance in product area), if 2 stations.
As shown in table 3, it is put into pressure (hydraulic) water 30 minutes due to when waterproof is examined, needing to open in flashlight, the operation It can not change.30 minutes free time made one to generate greatly waste when employee.It is previously noted that through the first station both hands After job analysis improves, the whole operation time was reduced to 540 seconds (24, i.e., 3 crowdes, containing improved transport by original 672 seconds Time).
Due to not influencing the last effect of flashlight after the exchange of the sequence of waterproof test and shock test, so, after improvement Personnel's adjustment are as follows:
(1) after the merging of second and third station, still only stay-at-home bit manipulation work not only needs to complete second and third former station Workload, on this basis, also by task amount increase by 3 times, that is, increase by 9 waterproof test buckets, become from original 3 12.Its man-machine operation analyzes as shown in table 3 (regarding 6 test buckets as a machine or an entirety).
Operative employee is respectively put into 6 test buckets after opening 6 batches of flashlights, and other 6 tests are checked after waiting 327 seconds The waterproofness of 48 torches in cylinder carries out shock test, is put into 6 batches of flashlights in water, and then rest carries out after 327 seconds The waterproofness inspection of previous 6 batches of flashlights, shock test.So circulation (waits the time of having a rest that can flexibly pacify by real work Row).
The station manipulation trip is 3126 seconds after improvement, and the working time is 2473 seconds, and the idle time of having a rest is 654 seconds, work When utilization rate 79%.It largely bends over to act due to having in the station operation, it is easily tired, so 79% rate of utilization of work hour is Through comparable height.
(2) first stations are still an operative employee, but in 3126 seconds trips of second station, processing quantity will Increase to 120, i.e., 15 batches (the more 3 batches seamless interfacings with the first and second station of realization).So far, the first station manipulation work works Time is 2700 seconds, and the time of having a rest is 426 seconds, the rate of utilization of work hour 86.4%.Because output product quantity can more than second station Receive quantity, so the time of having a rest is at least 30 seconds between operative employee's every batch of.
Man-machine operation's analysis time table after the adjustment of 3 second station of table
As shown in table 4, it after by being adjusted to main assembly process both hands operation improvement and each station, carries out on the whole following Two operations:
(1) cancel original the 10th, the 15th, the 19th and temporarily place process;
(2) cancel former 16th transportation process, merge second and third station.
Process program analysis is carried out to LED flashlight assembly line, process program is as shown in table 4.
(3) after improving, totally 17 program, transportation range add up to 6.3 meters to entire assembling process, no overlapping route;Processing, Inspection, the number carried, wait, stored are respectively 9 times, 4 times, 2 times, 1 time and 1 time, and required time is respectively 145.5 seconds, 12 Second, 4 seconds, 1800 seconds and 0;Production cycle adds up to 1961.5 seconds.
The LED flashlight assembly line process program of the invention of table 4
Beneficial effects of the present invention:
(1) present invention mainly fills the movement of pressure valve by merging, resets the movement of down tools after filling 0 type circle, resets It is low that the method for the movement for fixing stack shell before dress rope solves the unreasonable caused working efficiency of operational sequence in the prior art The problem of;The present invention also improves the efficiency of assembly by the workbench of reasonable adjustment assembly, present invention eliminates second, Transportation range between three stations merges second and third station, saves transportation cost, has preferable practicability.
(2) step S101: picking up pressing device first, then picks up pressure valve, and pressure valve is put into stack shell and formulates position, Then pressure valve is compressed with pressing device;The prior art is compared, it can be found that right hand operation is 3 in the present invention, left-handed operation It is 2, shortens process, the present invention improves work by the disposing way and adjustment operational sequence of the material of assembly system Make efficiency, there is preferable practicability.
(3) step S102: picking up O-ring first, then picks up stack shell, and O-ring is covered on stack shell;Compare existing skill Art, it can be found that right hand operation is 2 in the present invention, left-handed operation is 1, shortens process;The present invention passes through assembly system Material disposing way and adjustment operational sequence improve work efficiency, have preferable practicability.
(4) step S103: picking up rope first, then picks up rope and hooks, then stack shell is fixed on switch press device;It is right Than the prior art, it can be found that right hand operation is 1 in the present invention, left-handed operation is 2, shortens process;The present invention passes through The disposing way and adjustment operational sequence of the material of assembly system improve work efficiency, and have preferable practicability.
(5) assembly system includes general assembly area and trial zone, and the trial zone includes sequentially connected waterproof test area With shock test area;The concave workbench in the general assembly area is circumferentially disposed with several storage areas along operation position, described The left side and left front of the operation position of concave workbench are respectively pressure valve storage area and rope storage area, and front is rotation Hub cap storage area and LED bulb storage area;It is nearby stored up for stack shell storage area and tool the operation position of the concave workbench Deposit area, and it is right before be O-ring storage area, right end is the switch press machine being sequentially placed and automatically selects machine.Present invention eliminates Transportation range between second and third station merges second and third station, saves transportation cost, has preferable practicability;
(6) the general assembly area is connect with trial zone by smooth conveyer belt or smooth connecting plate;The general assembly area The distance between trial zone is 1.8m, and the overall length of the general assembly area and trial zone is 7m.The present invention is made always by gravity The material for filling area is transported to trial zone by smooth conveyer belt or smooth connecting plate, saves cost, has preferable real The property used.The first station manipulation work directly puts finished product to conveyer belt after completing a finished product in the present invention, save bend over it is temporary or Kinds of goods are put into the subsequent actions such as trolley, save the useless time consumed.
(7) left hand is handed into the operation that the right hand picks up pressure valve in the step S101, and stack shell need not be picked up, and press It is fixed when compaction forces valve with left hand.The disposing way and adjustment operational sequence that the present invention passes through the material of assembly system It improves work efficiency, there is preferable practicability.
(8) stack shell is first fixed in the step S102, and is with the hands operated, and the workpiece of dress rope is then picked up.On past side Edge puts down pressing device when covering O-ring, reduce and hold object in hand, can substantially reduce the degree of fatigue of the right hand;The present invention is logical The disposing way and adjustment operational sequence for crossing the material of assembly system improve work efficiency, and have preferable practicability.
(9) stack shell tail end is covered in the step S103 and rope and is knotted, then to switch press button and press lower button, Rope is finally put down to hook.The present invention solves the problems, such as the waste for be easy to causeing left hand fatigue, appearance to act;The present invention passes through assembly The disposing way and adjustment operational sequence of the material of system improve work efficiency, and have preferable practicability.
(10) rope is held in the step S103 scratch out and touch the button, and hook by rope is put down after lower button.The present invention is put The waiting time occupied after the button press by after lower button is put in the operation that lower rope hooks, to reduce the waste of right hand movement;This Invention is improved work efficiency by the disposing way and adjustment operational sequence of the material of assembly system, is had preferable real The property used.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of assembly system in the prior art;
Fig. 2 is the variation diagram of each process beat in the prior art;
Fig. 3 is the structural schematic diagram of work top in the prior art;
Fig. 4 is the structural schematic diagram of assembly system of the invention;
Fig. 5 is the structural schematic diagram of spill workbench of the invention;
Fig. 6 is process flow functional block diagram of the invention, and by scheming (A), (B) is formed;
Fig. 7 is the process flow functional block diagram of the prior art, and by scheming (A), (B) is formed.
Specific embodiment
Embodiment 1:
A kind of method of efficient LED flashlight assembly, assembles LED flashlight using assembly system, such as Fig. 6 institute Show, mainly comprises the steps that
Step S101: picking up pressing device first, then picks up pressure valve, and pressure valve is put into stack shell and formulates position, so Pressure valve is compressed with pressing device afterwards;
Step S102: picking up O-ring first, then picks up stack shell, and O-ring is covered on stack shell;
Step S103: picking up rope first, then picks up rope and hooks, then stack shell is fixed on switch press device;
As shown in figure 4, the assembly system includes general assembly area and trial zone, the trial zone includes sequentially connected waterproof Trial zone and shock test area;If as shown in figure 5, the concave workbench in the general assembly area is circumferentially disposed with along operation position Dry storage area, the left side and left front of the operation position of the concave workbench are respectively pressure valve storage area and rope storage Area, and front is rotation lid storage area and LED bulb storage area;The operation position of the concave workbench is nearby stack shell Storage area and tool storage area, and it is right before be O-ring storage area, right end is the switch press machine being sequentially placed and is automatically selected Machine.
Turn wiring irrational distribution, production work table top irrational distribution as shown in Figure 1-3, existing in the prior art, from And result in the low of LED assembly efficiency.Compared with the existing technology, the present invention also passes through the workbench of reasonable adjustment assembly The efficiency for improving assembly merges second and third station, saves present invention eliminates the transportation range between second and third station Transportation cost has preferable practicability.
As shown in fig. 7, the problem that the prior art is unreasonable there is also process operations, compared with the existing technology, such as Fig. 6 institute Show, before the present invention mainly passes through the movement of merging dress pressure valve, resets the movement of down tools after filling 0 type circle, resets dress rope The method of the movement of fixed stack shell solves the problems, such as that the unreasonable caused working efficiency of operational sequence is low in the prior art, tool There is preferable practicability.The prior art is compared, right hand operation is 3 in the step S101, and left-handed operation is 2, is shortened Process;Right hand operation is 2 in the step S102, and left-handed operation is 1, shortens process;The right hand in the step S103 Operation is 1, and left-handed operation is 2, shortens process;The disposing way and tune that the present invention passes through the material of assembly system Whole operational sequence improves work efficiency, and has preferable practicability.
Embodiment 2:
The present embodiment is to optimize on the basis of embodiment 1, as shown in figure 4, the general assembly area passes through with trial zone Smooth conveyer belt or the connection of smooth connecting plate;The distance between the general assembly area and trial zone are 1.8m, the general assembly The overall length of area and trial zone is 7m.The seat of the operation position is using seat, the dual-purpose work chair of standing position.
The present invention conveys the material in general assembly area by smooth conveyer belt or smooth connecting plate by gravity To trial zone, cost is saved, there is preferable practicability.The first station manipulation work directly will after completing a finished product in the present invention Finished product is put to conveyer belt, is saved and is bent over temporary or kinds of goods are put the subsequent actions such as trolley, save consume it is useless when Between.
The present invention, which mainly passes through, to be merged the movement of dress pressure valve, resets the movement of down tools after filling 0 type circle, resets dress rope The method that the movement of stack shell is fixed before son solve operational sequence in the prior art it is unreasonable caused by working efficiency is low asks Topic;The present invention also improves the efficiency of assembly by the workbench of reasonable adjustment assembly, and present invention eliminates second and third works Transportation range between position, merges second and third station, saves transportation cost, has preferable practicability.
The other parts of the present embodiment are same as Example 1, and so it will not be repeated.
Embodiment 3:
The present embodiment is optimized on the basis of embodiment 2, as shown in fig. 6, taking the right hand in the step S101 Left hand is handed in the operation for playing pressure valve, and stack shell need not be picked up, and be fixed in compaction pressure valve with left hand.
Stack shell is first fixed in the step S102, and is with the hands operated, and the workpiece of dress rope is then picked up.In past edge set Pressing device is put down when O type circle, is reduced and is held object in hand, can substantially reduce the degree of fatigue of the right hand.
Stack shell tail end is covered in the step S103 and rope and is knotted, then to switch press button and presses lower button, most After put down rope hook.Rope is held in the step S103 scratch out and touch the button, and hook by rope is put down after lower button.The present invention solves The problem of waste for be easy to causeing left hand fatigue, appearance to act;The present invention, which puts down the operation that rope hooks, puts after the button press, It occupies by the waiting time after lower button, to reduce the waste of right hand movement.The pendulum that the present invention passes through the material of assembly system It puts mode and adjustment operational sequence improves work efficiency, there is preferable practicability.
As shown in fig. 6, in operation after improvement:
(1) as a whole, left hand action frequency is 28 times, and right hand action frequency adds up to 37 times, and right hand movement is than left Make manually 9 times more;
(2) movement that handles of left hand is 4 times, and the movement that handles of the right hand is 1 time, and left hand is 3 times more than the right hand;
(3) left-handed operation number is 10 times, and right hand operational motion is 18 times, and left-handed operation number is the 55.6% of the right hand;
(4) the mobile number of left hand and right hand is respectively 10 times and 14 times, is the moving process that can not cancel after improving;
(5) after improving, the average time of measurement one flashlight of assembly is 21.5 seconds.
The other parts of the present embodiment are identical as above-described embodiment 2, and so it will not be repeated.
The above is only presently preferred embodiments of the present invention, not does limitation in any form to the present invention, it is all according to According to technical spirit any simple modification to the above embodiments of the invention, equivalent variations, protection of the invention is each fallen within Within the scope of.

Claims (7)

1. a kind of method of efficient LED flashlight assembly, assembles LED flashlight using assembly system, which is characterized in that It mainly comprises the steps that
Step S101: picking up pressing device first, then picks up pressure valve, and pressure valve is put into stack shell and formulates position, then uses Pressing device compresses pressure valve;
Step S102: picking up O-ring first, then picks up stack shell, and O-ring is covered on stack shell;
Step S103: picking up rope first, then picks up rope and hooks, then stack shell is fixed on switch press device;
The assembly system includes general assembly area and trial zone, and the trial zone includes sequentially connected waterproof test area and antidetonation examination Test area;The concave workbench in the general assembly area is circumferentially disposed with several storage areas, the concave work along operation position The left side and left front of the operation position of platform are respectively pressure valve storage area and rope storage area, and front is rotation lid storage Area and LED bulb storage area;The operation position of the concave workbench is nearby stack shell storage area and tool storage area, and right Preceding is O-ring storage area, right end is the switch press machine being sequentially placed and automatically selects machine.
2. a kind of method of efficient LED flashlight assembly according to claim 1, which is characterized in that the general assembly area It is connect with trial zone by smooth conveyer belt or smooth connecting plate;The distance between the general assembly area and trial zone are The overall length of 1.8m, the general assembly area and trial zone is 7m.
3. a kind of method of efficient LED flashlight assembly according to claim 2, which is characterized in that the operative employee The seat of position is using seat, the dual-purpose work chair of standing position.
4. a kind of method of efficient LED flashlight assembly according to claim 2, which is characterized in that the step Left hand is handed into the operation that the right hand picks up pressure valve in S101, and stack shell need not be picked up, it will with left hand in compaction pressure valve It is fixed.
5. a kind of method of efficient LED flashlight assembly according to claim 4, which is characterized in that the step Stack shell is first fixed in S102, and is with the hands operated, and the workpiece of dress rope is then picked up.
6. a kind of method of efficient LED flashlight assembly according to claim 1-5, which is characterized in that institute It states to cover stack shell tail end in step S103 and rope and knot, then to switch press button and press lower button, finally put down rope hook.
7. a kind of method of efficient LED flashlight assembly according to claim 6, which is characterized in that the step Rope is held in S103 scratch out and touch the button, and hook by rope is put down after lower button.
CN201810853296.XA 2018-07-30 2018-07-30 A kind of method of efficient LED flashlight assembly Expired - Fee Related CN109296955B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810853296.XA CN109296955B (en) 2018-07-30 2018-07-30 A kind of method of efficient LED flashlight assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810853296.XA CN109296955B (en) 2018-07-30 2018-07-30 A kind of method of efficient LED flashlight assembly

Publications (2)

Publication Number Publication Date
CN109296955A true CN109296955A (en) 2019-02-01
CN109296955B CN109296955B (en) 2019-08-09

Family

ID=65172703

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810853296.XA Expired - Fee Related CN109296955B (en) 2018-07-30 2018-07-30 A kind of method of efficient LED flashlight assembly

Country Status (1)

Country Link
CN (1) CN109296955B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2910460Y (en) * 2006-07-06 2007-06-13 上海小糸车灯有限公司 Rotary working bench multi-station assembly integrated machine
CN105243213A (en) * 2015-10-12 2016-01-13 浙江工业大学 Production line layout method facing manually assembled product
CN205914993U (en) * 2016-08-23 2017-02-01 重庆幻速汽车配件有限公司 Overall arrangement of derailleur production line

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2910460Y (en) * 2006-07-06 2007-06-13 上海小糸车灯有限公司 Rotary working bench multi-station assembly integrated machine
CN105243213A (en) * 2015-10-12 2016-01-13 浙江工业大学 Production line layout method facing manually assembled product
CN205914993U (en) * 2016-08-23 2017-02-01 重庆幻速汽车配件有限公司 Overall arrangement of derailleur production line

Also Published As

Publication number Publication date
CN109296955B (en) 2019-08-09

Similar Documents

Publication Publication Date Title
CN106610616B (en) A kind of performance automated tuning method and device based on big data analysis
CN108229782A (en) A kind of visual production management platform based on cloud
CN109240238A (en) The method that production was inspected and returned automatically to multistation based on AGV by random samples
CN107932333A (en) A kind of Production of bearing detecting system based on MES
CN109296955B (en) A kind of method of efficient LED flashlight assembly
CN214096594U (en) Automatic axle box bearing overhaul line of changing
CN113447327A (en) Full-automatic sample preparation analysis system of bauxite robot
CN208721238U (en) A kind of electronic scale automatic inspection line
CN208810597U (en) A kind of longaxones parts detection machine
CN207642927U (en) A kind of Production of bearing detecting system based on MES
CN107030688A (en) The control method for movement and module of a kind of manipulator
CN107309180A (en) A kind of blanking robot and its method of work with function of quality control
CN205506438U (en) Automatic sampler tool hand
CN215953139U (en) Full-automatic sample preparation analysis system of bauxite robot
CN206849813U (en) A kind of photovoltaic cell device for classifying defects
Kitazawa et al. Improving a cellular manufacturing system through real time-simulation and-measurement
CN207204658U (en) High-voltage DC contactor all-round property testing streamline
CN112801371A (en) Flat car route planning method, device, equipment and storage medium
CN205518673U (en) Qualified detection device of trade mark
CN206020284U (en) A kind of comprehensive Non-contact automatic detection device of magnetic element
Fridley et al. An interactive simulation for studying the design of feller-bunchers for forest thinning
Fager et al. Dual Robot Kit preparation in batch preparation of component kits for mixed model assembly
CN108745941A (en) A kind of automobile door handle detection device and its detection method with assembling function
CN219193514U (en) High-end tobacco leaf removing production line
CN204414474U (en) For the new type auto charging & discharging machine of metal Preembedded

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190809