CN109295816A - A kind of small staggered floor vacantly chooses installation method of marking time - Google Patents

A kind of small staggered floor vacantly chooses installation method of marking time Download PDF

Info

Publication number
CN109295816A
CN109295816A CN201811006114.1A CN201811006114A CN109295816A CN 109295816 A CN109295816 A CN 109295816A CN 201811006114 A CN201811006114 A CN 201811006114A CN 109295816 A CN109295816 A CN 109295816A
Authority
CN
China
Prior art keywords
staggered floor
casing
marking time
vacantly
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811006114.1A
Other languages
Chinese (zh)
Inventor
张炳生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI JUTONG DECORATION GROUP Co Ltd
Original Assignee
SHANGHAI JUTONG DECORATION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI JUTONG DECORATION GROUP Co Ltd filed Critical SHANGHAI JUTONG DECORATION GROUP Co Ltd
Priority to CN201811006114.1A priority Critical patent/CN109295816A/en
Publication of CN109295816A publication Critical patent/CN109295816A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/0046Loggias
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • E04B1/4157Longitudinally-externally threaded elements extending from the concrete or masonry, e.g. anchoring bolt with embedded head

Abstract

The invention discloses a kind of small staggered floors vacantly to choose installation method of marking time, it is related to technical field of buildings, the following steps are included: Step 1: choosing part positioning: the lower flat of staggered floor wall is common ground, the upper plane of staggered floor wall is staggered floor ground, common ground and the horizontal setting-out of staggered floor ground finished surface, overhanging part divide equally centralized positioning according to plate thickness of marking time up and down;Step 2: positioning test: step plate centralized positioning drilling, the debugging of horizontal and angle are taken out stand-by;Step 3: integral installation: coating is completed, and expansion sleeve enters staggered floor wall, and expansion sleeve is connected with bolt, back of marking time is located in casing, self-tapping screw is fastened and fixed step plate, casing and overhanging part, and casing is inserted in bolt, and Lip river China fir fastened by screw installs casing part.The present invention can be realized disposable scale, construction production process it is few, material-saving saving of labor, ground completely easily close up the advantages of, have good practical function.

Description

A kind of small staggered floor vacantly chooses installation method of marking time
Technical field
The present invention relates to technical field of buildings, specifically a kind of small staggered floor vacantly chooses installation method of marking time.
Background technique
Cantilevered structure is one of structure type common in engineering structure, as in architectural engineering canopy, cornice, outer sun Platform, overhanging corridor etc., this structure are that beam out or plate are overhang from main structure, form cantilever design, are substantially still contignation.
Traditional overhang installation method is the following steps are included: one, setting-out of marking time: long width positioning;Two, base makes: 1, Build and repair powder, 2, branch module and cast-in-situ and painting, 3, rough ground add basal plate, 4, mark time after the completion of base and take measurements, 5, ground joist Production;Three, mark time installation: 1, entire plate has mounting hole;2, assembled plate end cap has hole for nailing, needs touch-up paint.It is deposited using above-mentioned prevention In multiple scale, long construction period, material of taking a lot of work, close up ugly problem.
Summary of the invention
The purpose of the present invention is to provide a kind of small staggered floors vacantly to choose installation method of marking time, to solve in above-mentioned background technique The problem of proposition.
To achieve the above object, the invention provides the following technical scheme:
A kind of small staggered floor vacantly chooses installation method of marking time, comprising the following steps:
Step 1: choosing part positioning: the lower flat of staggered floor wall is common ground, and the upper plane of staggered floor wall is for staggered floor Face, common ground and the horizontal setting-out of staggered floor ground finished surface, overhanging part divide equally centralized positioning according to plate thickness of marking time up and down;
Step 2: positioning test: step plate centralized positioning drilling, the debugging of horizontal and angle are taken out stand-by;
Step 3: integral installation: coating is completed, and expansion sleeve enters staggered floor wall, and expansion sleeve is connected with bolt, is positioned with casing In back of marking time, self-tapping screw is fastened and fixed step plate, casing and overhanging part, and casing is inserted in bolt, Lip river China fir fastened by screw peace Tubing lower part.
As further scheme of the invention: the upward Tiao MOUNTING-EAR 2% of described sleeve pipe.
As further scheme of the invention: the bolt offers a tooth at staggered floor wall, is screwed on silk tooth Nut.
As further scheme of the invention: being equipped with pad volume between the nut and staggered floor wall.
Compared with prior art, the beneficial effects of the present invention are: the present invention can be realized disposable scale, construction production work The advantages of sequence is few, material-saving saving of labor, and ground is completely easily closed up has good practical function.
Detailed description of the invention
Fig. 1 be a kind of small staggered floor vacantly choose installation method of marking time be installed schematic diagram;
Fig. 2 be Fig. 1 described in small staggered floor vacantly choose mark time installation method along line A-A cross-sectional view.
In figure: 1- staggered floor wall, 2- staggered floor ground, 3- expansion sleeve, 4- pad volume, 5- nut, 6- teeth, 7- overhang part, 8- bolt, 9- casing, the Lip river 10- China fir screw, 11- self-tapping screw, 12- step plate.
Specific embodiment
Combined with specific embodiments below, technical scheme in the embodiment of the invention is clearly and completely described, shows So, described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Based on the reality in the present invention Example is applied, every other embodiment obtained by those of ordinary skill in the art without making creative efforts all belongs to In the scope of protection of the invention.
A kind of small staggered floor vacantly chooses installation method of marking time, as shown in Figs. 1-2, comprising the following steps:
Step 1: choosing part positioning: the lower flat of staggered floor wall 1 is common ground, and the upper plane of staggered floor wall 1 is for staggered floor Face 2, common ground and the horizontal setting-out of 2 finished surface of staggered floor ground, equal branch center is fixed up and down according to 12 thickness of step plate for overhanging part 7 Position;
Step 2: positioning test: 12 centralized positioning of step plate drilling, the upward Tiao MOUNTING-EAR 2% of casing 9, the debugging of horizontal and angle are taken out For use;
Step 3: integral installation: coating is completed, and expansion sleeve 3 enters staggered floor wall 1, and expansion sleeve 3 is connected with bolt 8, uses casing 9 are located in 12 back side of step plate, and self-tapping screw 11 is fastened and fixed step plate 12, casing 9 and overhanging part 7, casing 9 and is inserted in bolt 8, The fastening installation of Lip river China fir screw 10 9 lower part of casing, bolt 8 offer a tooth 6 at staggered floor wall 1, and be screwed on nut 5 on silk tooth 6, Pad volume 4 is equipped between nut 5 and staggered floor wall 1.
The present invention can be realized disposable scale, construction production process it is few, material-saving saving of labor, ground is completely easily closed up excellent Point has good practical function.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims Variation is included within the present invention.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (4)

1. a kind of small staggered floor vacantly chooses installation method of marking time, which comprises the following steps:
Step 1: choosing part positioning: the lower flat of staggered floor wall (1) is common ground, and the upper plane of staggered floor wall (1) is mistake Layer ground (2), common ground and the horizontal setting-out of staggered floor ground (2) finished surface, overhang part (7) according to step plate (12) thickness above and below Respectively centralized positioning;
Step 2: positioning test: step plate (12) centralized positioning drilling, the debugging of horizontal and angle are taken out stand-by;
Step 3: integral installation: coating is completed, and expansion sleeve (3) enters staggered floor wall (1), and expansion sleeve (3) is connected with bolt (8), it is located in step plate (12) back side with casing (9), self-tapping screw (11) is fastened and fixed step plate (12), casing (9) and hangs It chooses part (7), casing (9) is inserted in bolt (8), Lip river China fir screw (10) fastening installation casing (9) lower part.
2. small staggered floor according to claim 1 vacantly chooses installation method of marking time, which is characterized in that described sleeve pipe (9) is upward Tiao MOUNTING-EAR 2%.
3. small staggered floor according to claim 1 or 2 vacantly chooses installation method of marking time, which is characterized in that the bolt (8) is leaned on It is offered a tooth (6) at nearly staggered floor wall (1), be screwed on nut (5) on silk tooth (6).
4. small staggered floor according to claim 3 vacantly chooses installation method of marking time, which is characterized in that the nut (5) and mistake Pad volume (4) is equipped between layer wall (1).
CN201811006114.1A 2018-08-30 2018-08-30 A kind of small staggered floor vacantly chooses installation method of marking time Pending CN109295816A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811006114.1A CN109295816A (en) 2018-08-30 2018-08-30 A kind of small staggered floor vacantly chooses installation method of marking time

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811006114.1A CN109295816A (en) 2018-08-30 2018-08-30 A kind of small staggered floor vacantly chooses installation method of marking time

Publications (1)

Publication Number Publication Date
CN109295816A true CN109295816A (en) 2019-02-01

Family

ID=65165657

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811006114.1A Pending CN109295816A (en) 2018-08-30 2018-08-30 A kind of small staggered floor vacantly chooses installation method of marking time

Country Status (1)

Country Link
CN (1) CN109295816A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4215435A1 (en) * 1992-05-11 1993-11-18 Adolf Bucher Noise damping connector for tread plate and stain check - has blind bore starting from check inside with conical widening towards base for bolt with expansion cone
EP0698701A1 (en) * 1994-08-20 1996-02-28 Treppenmeister Partnergemeinschaft Holztreppenhersteller GmbH Stair step trace
CN1133948A (en) * 1995-03-13 1996-10-23 株式会社游间工房 Anchor unit with expansive anchor member expanded by utilizing turning force of bolt
CN200958512Y (en) * 2006-08-18 2007-10-10 雷钢 Special expansion bolt for hollow brick wall
CN202047408U (en) * 2011-04-21 2011-11-23 中国十七冶集团有限公司 Massif non-damage embedded anchoring device
CN104196152A (en) * 2014-08-22 2014-12-10 同济大学 Connecting structure for steel coupling beam and concrete wall

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4215435A1 (en) * 1992-05-11 1993-11-18 Adolf Bucher Noise damping connector for tread plate and stain check - has blind bore starting from check inside with conical widening towards base for bolt with expansion cone
EP0698701A1 (en) * 1994-08-20 1996-02-28 Treppenmeister Partnergemeinschaft Holztreppenhersteller GmbH Stair step trace
CN1133948A (en) * 1995-03-13 1996-10-23 株式会社游间工房 Anchor unit with expansive anchor member expanded by utilizing turning force of bolt
CN200958512Y (en) * 2006-08-18 2007-10-10 雷钢 Special expansion bolt for hollow brick wall
CN202047408U (en) * 2011-04-21 2011-11-23 中国十七冶集团有限公司 Massif non-damage embedded anchoring device
CN104196152A (en) * 2014-08-22 2014-12-10 同济大学 Connecting structure for steel coupling beam and concrete wall

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
潘睿: "《房屋建筑学(第三版)》", 30 September 2014, 华中科技大学出版社 *

Similar Documents

Publication Publication Date Title
CN208792663U (en) A kind of room finishing system
CN204919828U (en) Archaize building's wooden frame and steel structure column's connection structure
CN104499614A (en) Wall heat-preservation integration point hanging system and mounting method thereof
CN203782997U (en) Pseudo-classic architecture rafter structure
CN205399932U (en) Full aluminum alloy floor panel
CN104120860A (en) Construction method for cement mortar ground leveling
CN103216050A (en) Construction method for mounting eave rafters of antique buildings
CN106437093A (en) Architectural decoration and finishing concealed installation tile skirting structure and construction technology thereof
CN109295816A (en) A kind of small staggered floor vacantly chooses installation method of marking time
CN203961227U (en) Plane floating screed bar for wall plastering
CN104018650B (en) Wall plastering plane rushes muscle bar and using method thereof
CN211774781U (en) External wall insulation decorates intergral template construction structures
CN211448283U (en) Mounting structure of auxiliary frame and window
CN205444798U (en) Floor panel of aluminum alloy
CN203783041U (en) Combined type bathroom wall surface module
CN215670776U (en) Gap bridge structure of floor tiles and wood floors
CN103291093A (en) Stepped stand building surface layer laying method
CN202658838U (en) Exterior wall ornament vitrolite back-bolt type unit hanging and paste structure
CN209040320U (en) A kind of steel construction heat preservation mortar for outer wall retaining design with tension member
CN212002008U (en) Wall brick combination paving and pasting platform
CN106088620A (en) Super thick EPS moulding fluting or the thinning construction technique in hole
CN203034624U (en) Polyphenyl granule insulation board
CN209025338U (en) A kind of small staggered floor vacantly chooses mounting structure of marking time
CN109914812A (en) A kind of floor leveling construction accessory part and its application method
CN205637443U (en) Installation device of movable decorative board

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190201