CN109280761A - A kind of field acidic environment carbon steel pipe stress-removal construction operation method - Google Patents

A kind of field acidic environment carbon steel pipe stress-removal construction operation method Download PDF

Info

Publication number
CN109280761A
CN109280761A CN201811423664.3A CN201811423664A CN109280761A CN 109280761 A CN109280761 A CN 109280761A CN 201811423664 A CN201811423664 A CN 201811423664A CN 109280761 A CN109280761 A CN 109280761A
Authority
CN
China
Prior art keywords
carbon steel
steel pipe
clock
heating
construction operation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811423664.3A
Other languages
Chinese (zh)
Other versions
CN109280761B (en
Inventor
张城
李阳
余尚林
李翔
杜和
杨燕
肖景安
张圆
黄勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Petroleum Construction Engineering Co Ltd
Original Assignee
Sichuan Petroleum Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Petroleum Construction Engineering Co Ltd filed Critical Sichuan Petroleum Construction Engineering Co Ltd
Priority to CN201811423664.3A priority Critical patent/CN109280761B/en
Publication of CN109280761A publication Critical patent/CN109280761A/en
Application granted granted Critical
Publication of CN109280761B publication Critical patent/CN109280761B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/50Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for welded joints

Abstract

The present invention provides a kind of field acidic environment carbon steel pipe stress-removal construction operation methods, the described method comprises the following steps: selecting predetermined heat area around weld seam, and arrange heater and thermocouple in predetermined heat area;Predetermined heat area is heated using the heater, thermocouple detects temperature to after 380 DEG C~430 DEG C, predetermined heat area is heated to 600 DEG C~655 DEG C with the heating speed no more than 200 DEG C/h, after keeping the temperature the t period, 380 DEG C~430 DEG C are cooled to the cooling velocity no more than 260 DEG C/h, is cooled to room temperature;Hardness determination is carried out to the zone of influence after weld seam, heating and main pipe respectively.Operational method of the invention can be effectively solved weld seam part residual stress concentrations, lead to the problem of the anti-brittle failure ability difference of welding point;There are hard and crisp tissues for weld dimensions in effective solution welding point, lead to the problem of welding point resistance to corrosion difference.

Description

A kind of field acidic environment carbon steel pipe stress-removal construction operation method
Technical field
The invention belongs to welding technology fields, more particularly, are related to a kind of field acidic environment carbon steel pipe stress-removal and apply Work operational method, acidic environment carbon steel piping butt weld hydrogen sulfide corrosion resistance, which can be improved, can require to want with service performance It asks, it is ensured that the safe handling of pipeline.
Background technique
In recent years with increasingly paying attention to environmental protection, the demand of the natural gas of clean and environmental protection is dramatically increased, Promote that more and more acid-soluble oil gas fields are developed and built.In natural gas process units, carbon steel is using most Extensively, the maximum material of usage amount.And acidic environment carbon steel piping weld seam is since the residual stress generated in welding process is in sulphur Change and be easy to happen hydrogen induced cracking and sulfide corrosion cracking under hydrogen environmental activity and acid carbon steel piping leakage occurs, or even explosion Risk, there are huge security risks.Therefore it is suitable for acidic environment carbon steel piping stress-removal construction operation method to guarantee The safety of acid carbon steel piping and use are particularly important.
Summary of the invention
It is above-mentioned existing in the prior art it is an object of the present invention to solving for the deficiencies in the prior art One or more problems.For example, one of the objects of the present invention is to provide one kind to pass through with from meeting the anti-corruption of acidic environment weld seam Corrosion can set out with the requirement of physicochemical property, study the residual stress and metallographic structure form that influence corrosion, propose one Kind can preferably meet the exploitation and pipe-line construction requirement of petroleum gas acid gas field, can be improved pipeline service life, The acidic environment carbon steel pipe stress-removal construction operation method of maintenance, repair cost can be reduced.
To achieve the goals above, of the invention to provide a kind of field acidic environment carbon steel pipe stress-removal construction operation side Method, the method may include following steps: selecting predetermined heat area around weld seam, and arranges heater in predetermined heat area And thermocouple;Predetermined heat area is heated using the heater, thermocouple detects temperature to after 380 DEG C~430 DEG C, with Predetermined heat area is heated to 600 DEG C~655 DEG C by the heating speed no more than 200 DEG C/h, after keeping the temperature the t period, to be not more than The cooling velocity of 260 DEG C/h is cooled to 380 DEG C~430 DEG C, is cooled to room temperature, wherein when the carbon steel pipe pipe thickness is little When 25mm, the soaking time t is 0.8h~1.2h;
When the carbon steel pipe pipe thickness is greater than 25mm, the soaking time t at least (0.8+ (b-25)/25) h~ (1.2+ (b-25)/25) h, b indicate carbon steel pipe pipe thickness, and unit is millimeter;Respectively to the zone of influence and mother after weld seam, heating Pipe carries out hardness determination.
In an exemplary embodiment of field acidic environment carbon steel pipe stress-removal construction operation method of the invention, when When the carbon steel pipe nominal diameter is greater than or equal to 100mm, carbon steel pipe straight tube is heated, the heater is by the first semicircle arc portion It is formed with the second semicircle arc portion, the first semicircle arc portion and the second semicircle arc portion can enclose carbon steel pipe to heat to it, institute State the first heating layer group of the first semicircle arc portion and the second semicircle arc portion by the first insulating layer of outer layer and on the inside of outer layer At to carbon steel pipe bend pipe and threeway heating, the heater is protected by the second heating layer and second for wrapping up the second heating layer Warm layer composition, second heating layer are rope type heater;When the carbon steel pipe nominal diameter is less than 100mm, the heating Third insulating layer of the device by third heating layer and for wrapping up third heating layer forms, and the third heating layer is rope type heating Device.
In an exemplary embodiment of field acidic environment carbon steel pipe stress-removal construction operation method of the invention, institute State the first insulating layer with a thickness of 42mm~56mm, along carbon steel pipe pipe shaft axial direction, the width of the first insulating layer either side It is 100mm or more wide to spend width more ipsilateral than first heating layer.
In an exemplary embodiment of field acidic environment carbon steel pipe stress-removal construction operation method of the invention, edge Carbon steel pipe pipe shaft axial direction, second heating layer and third heating layer width be 6 times or more of weld width and width not Less than 120mm, second insulating layer is 1 times or more of the second heating layer width, and the third insulating layer is described the 1 times or more of three heating layer width.
In an exemplary embodiment of field acidic environment carbon steel pipe stress-removal construction operation method of the invention, when When the carbon steel pipe outside diameter is greater than or equal to 508mm, thermocouple arranges 2 or more even number roots, is with carbon steel pipe kernel of section The angle in the center of circle, every thermocouple is equal;When the carbon steel pipe outside diameter is less than 508mm, thermocouple arranges 2 or less.
In an exemplary embodiment of field acidic environment carbon steel pipe stress-removal construction operation method of the invention, when When the carbon steel pipe outside diameter is greater than or equal to 508mm, thermocouple arranges 2, and first is located at the carbon steel tube section 6 with thermocouple O'clock position, second thermocouple be located at 2 o'clock of carbon steel tube section position or 10 o'clock position;When outside the carbon steel pipe When diameter is less than 508mm, thermocouple arranges 1, and the thermocouple is located at 2 o'clock of carbon steel tube section or 10 o'clock position.
In an exemplary embodiment of field acidic environment carbon steel pipe stress-removal construction operation method of the invention, point Other includes that butt welding respectively is sewn on 12 o'clock of carbon steel tube section, at 3 points to the zone of influence after weld seam, heating and main pipe progress hardness determination Clock and 6 o'clock position, the zone of influence is in 12 o'clock of carbon steel tube section, 3 o'clock and 6 o'clock position and main pipe in carbon steel pipe after heating 12 o'clock of section, 3 o'clock and 6 o'clock position carry out hardness determination, and the highest hardness value after each test point detection is not more than 210 cloth Family name's hardness, average value are not more than 200 Brinell hardness.
In an exemplary embodiment of field acidic environment carbon steel pipe stress-removal construction operation method of the invention, point Other includes that butt welding respectively is sewn on 12 o'clock of carbon steel tube section, at 9 points to the zone of influence after weld seam, heating and main pipe progress hardness determination Clock and 6 o'clock position, the zone of influence is in 12 o'clock of carbon steel tube section, 9 o'clock and 6 o'clock position and main pipe in carbon steel pipe after heating 12 o'clock of section, 9 o'clock and 6 o'clock position carry out hardness determination, and the highest hardness value after each test point detection is not more than 210 cloth Family name's hardness, average value are not more than 200 Brinell hardness.
In an exemplary embodiment of field acidic environment carbon steel pipe stress-removal construction operation method of the invention, institute It states that heating zone heat and is heated using intelligent temperature control equipment control heater, the intelligent temperature control equipment includes distribution Cabinet, intelligent temperature control unit and output unit, the power distribution cabinet is connect by intelligent temperature control unit with the output unit, described Output unit includes heating power supply conducting wire and compensating wire, and the heating power supply conducting wire is connect with the heater, for being to add Hot device provides power supply, and the compensating wire is connect with the thermocouple.
In an exemplary embodiment of field acidic environment carbon steel pipe stress-removal construction operation method of the invention, institute Stating intelligent temperature control equipment to 2 or more weld bonds while can carry out stress-removal construction operation simultaneously.
Compared with prior art, the beneficial effect of field acidic environment carbon steel pipe stress-removal construction operation method of the invention Include:
(1) effective solution weld seam part residual stress concentrations, lead to the problem of the anti-brittle failure ability difference of welding point;
(2) weld dimensions lead to welding point there are hard and crisp tissue in effective solution welding point The problem of resistance to corrosion difference;
(3) in effective solution weld seam free hydrogen presence, lead to the problem of weld seam resistance to corrosion difference.
Detailed description of the invention
By the description carried out with reference to the accompanying drawing, above and other purpose of the invention and feature will become more clear Chu, in which:
Fig. 1 shows the field acidic environment carbon steel pipe stress-removal construction operation method of an illustrative embodiment of the invention Intelligent temperature control equipment connection plan schematic diagram.
Fig. 2 shows the field acidic environment carbon steel pipe stress-removal construction operation methods of an illustrative embodiment of the invention Threeway and bend pipe heater arrangement schematic diagram, wherein (a) indicate tee joint heater arrangement schematic diagram, (b) indicate bend pipe heating Device arrangement schematic diagram.
Fig. 3 shows the field acidic environment carbon steel pipe stress-removal construction operation method of an illustrative embodiment of the invention Carbon steel pipe straight tube heater arrangement schematic diagram.
Fig. 4 shows the field acidic environment carbon steel pipe stress-removal construction operation method of an illustrative embodiment of the invention Thermocouple arrangement schematic diagram, wherein (a) indicate carbon steel pipe outside diameter be greater than or equal to 508mm carbon steel pipe thermocouple layout drawing, (b) indicate that carbon steel pipe outside diameter is less than the carbon steel pipe thermocouple layout drawing of 508mm.
Fig. 5 shows the field acidic environment carbon steel pipe stress-removal construction operation method of an illustrative embodiment of the invention Construction operation method technological parameter schematic diagram.
Fig. 6 shows the field acidic environment carbon steel pipe stress-removal construction operation method of an illustrative embodiment of the invention Process simplified schematic diagram.
Specific embodiment
Hereinafter, acidic environment carbon in field according to the present invention will be described in detail in conjunction with attached drawing and exemplary embodiment Steel pipe stress-removal construction operation method.
Fig. 1 shows the field acidic environment carbon steel pipe stress-removal construction operation method of an illustrative embodiment of the invention Intelligent temperature control equipment connection plan schematic diagram.Fig. 2 shows the field acidic environments of an illustrative embodiment of the invention The threeway and bend pipe heater arrangement schematic diagram of carbon steel pipe stress-removal construction operation method, wherein (a) indicates tee joint heater cloth Schematic diagram is set, (b) indicates bend pipe heater arrangement schematic diagram.Fig. 3 shows the field acid of an illustrative embodiment of the invention The carbon steel pipe straight tube heater arrangement schematic diagram of property environment carbon steel pipe stress-removal construction operation method.Fig. 4 shows the present invention one The thermocouple arrangement schematic diagram of the field acidic environment carbon steel pipe stress-removal construction operation method of a exemplary embodiment, wherein (a) it indicates that carbon steel pipe outside diameter is greater than or equal to the carbon steel pipe thermocouple layout drawing of 508mm, (b) indicates that carbon steel pipe outside diameter is less than The carbon steel pipe thermocouple layout drawing of 508mm.Fig. 5 shows the field acidic environment carbon steel pipe of an illustrative embodiment of the invention The construction operation method technological parameter schematic diagram of stress-removal construction operation method.Fig. 6 shows an example of the present invention implementation The field acidic environment carbon steel pipe stress-removal construction operation method process simplified schematic diagram of example.
The present invention provides a kind of field acidic environment carbon steel pipe stress-removal construction operation methods.In field acid of the invention In one exemplary embodiment of property environment carbon steel pipe stress-removal construction operation method, the construction operation method may include:
Step (1), heat treatment connecting line select predetermined heat area, arrange heater and thermocouple.
In this example, stress-removal operation wiring is carried out using intelligent temperature control equipment, as shown in Figure 1, the intelligent temperature control Equipment may include power distribution cabinet, intelligent temperature control unit and output unit.The power distribution cabinet passes through power supply line and the intelligent temperature Control unit connection.The intelligent temperature control unit is connect with the output unit.The output unit includes heating power supply line and benefit Repay conducting wire.The heating power supply line is connect with the heater, for providing electric energy for heater to carry out to predetermined heat area Heating.The compensating wire is connect with the thermocouple.The intelligent temperature control equipment can simultaneously carry out 2 or more weld bonds Stress-removal operation simultaneously, can be such that operating efficiency is maximized.
In this example, when the nominal diameter of the carbon steel pipe is greater than or equal to 100mm when (>=DN100), for carbon When steel pipe straight tube is heated, the heater can be made of the first semicircle arc portion and second semicircle arc portion two parts.It is described First semicircle arc portion and the second semicircle arc portion, which can close up, wraps up the carbon steel pipe for a full circle to heat to it.First semicircle Arc portion and the second semicircle arc portion are made of the first insulating layer of outer layer and the first heating layer of internal layer.First insulating layer and first Heating layer is available to be mechanically combined.Naturally in conjunction with mode it is without being limited thereto, such as compression combine also may be used.It is preferred that , the first insulating layer can be heat-preservation cotton, and the thickness of heat-preservation cotton can be 42mm~56mm, it is preferred that can be 50mm.It is described First heating layer can be crawler type heat block.The width of the first insulating layer either side is more ipsilateral than first heating layer The wide 100mm or more of width.Carbon steel pipe of the heater being arranged using the present invention to nominal diameter more than or equal to 100mm is added Heat is made as semi arch structure, heating tape and insulating layer can be integrated into one.In field construction, not only greatly shorten The hot-treatment heating equipment set-up time, improve heat treatment construction efficiency.And above structure is to preventing the heat loss from having pole Good heat insulation effect, to reducing, energy consumption effect is obvious, while each position of welding line joint is heated evenly and controllably.
In this example, the bend pipe of (>=DN100) and threeway when being greater than or equal to 100mm for the nominal diameter of carbon steel pipe When being heated, as shown in Fig. 2, Fig. 2 (a) indicates tee joint heater arrangement schematic diagram, Fig. 2 (b) indicates bend pipe heater arrangement Heater described in schematic diagram can be the second insulating layer and the second heating layer composition.Second heating layer can be rope type heating Device.During heating, shown rope type heater must be close to carbon steel pipe in wrapping, and the width of wrapping can be weld width 6 times or more, and width cannot be less than 120mm, the advantages of this arrangement are as follows weld seam, heat-treatment zone and base material can be made It is heat-treated simultaneously, has good effect to entire property of welded joint is improved.Second insulating layer can be heat preservation Cotton.The width of the heat-preservation cotton can be 1 times or more of the rope type heater width, for example, it may be rope type heater 1 times of width.The thickness of heat-preservation cotton can be 42mm~56mm, it is preferred that can be 50mm.In the specific implementation process, It can be bound in the outside of heat-preservation cotton with iron wire to be reinforced.
In this example, as shown in figure 3, the heater is by third when the carbon steel pipe nominal diameter is less than 100mm Heating layer and for wrapping up third heating layer third insulating layer composition.The third heating layer can be rope type heater.Together Sample, during heating, shown rope type heater must be close to carbon steel pipe in wrapping, and the width of wrapping can be weld seam 6 times or more of width, and width cannot be less than 120mm.The third insulating layer can be heat-preservation cotton.The width of the heat-preservation cotton Degree can be 1 times or more of the rope type heater width, for example, it may be 1 times of rope type heater width.Heat-preservation cotton Thickness can be 42mm~56mm, it is preferred that can be 48mm.It in the specific implementation process, can be in the outside of heat-preservation cotton It is bound with iron wire to be reinforced.Since the radius of curvature of minor diameter carbon steel pipe is small, minor diameter carbon steel pipe (such as: threeway) Weld bond apart from close, can be achieved at the same time to short distance weld bond while heating using the heater of above-mentioned setting, it is easy for installation Quickly, structure is simple, greatly reduces cost of manufacture.
In this example, when carbon steel pipe outside diameter be greater than or equal to 508mm when, shown thermocouple can be set to two with On, the angle between every thermocouple is equal, is evenly distributed around carbon steel pipe.Further, the thermocouple of setting is even Several thermocouples.Because carbon steel pipe outside diameter is bigger, radiate bigger, is heated more uneven, thermocouple is along carbon steel pipe even circumferential Distribution, this ensures that carbon steel pipe each section is heated evenly and controllably.For example, when carbon steel pipe outside diameter is greater than or equal to 508mm When, shown thermocouple can be two or four.Centered on the cross section center of circle of carbon steel pipe, the angle phase of every thermocouple Deng.Further, described shown in carbon steel pipe thermocouple layout drawing such as Fig. 4 (a) when carbon steel pipe outside diameter is greater than or equal to 508mm Thermocouple can be two, 6 o'clock position of first thermocouple (thermocouple 1) in carbon steel pipe cross section.Second thermocouple The 2 o'clock position or 10 o'clock position of (thermocouple 2) in carbon steel pipe cross section.
In this example, when carbon steel pipe outside diameter is less than 508mm, on carbon steel pipe cross section, shown thermocouple can be 1 Root.For example, as shown in Fig. 4 (b), the position of the thermocouple can be the 2 o'clock position or 10 o'clock position of carbon steel tube section It sets.Setting can make in the position in the welding process, thermocouple it is easy to operate.Certainly, the position of thermocouple of the invention It is without being limited thereto with radical.
More than, for the selected selected according to the standard empirical of those skilled in the art of predetermined heat area.It can be Empirical value or given value.
Step (2), is heat-treated weld seam.
In this example, as shown in figure 5, intelligent temperature control equipment start, heater start to selected predetermined heat area into Row heating.First in t1In period, the temperature in predetermined heat area is warming up to T by environment temperature1.Heating rate can be any Value, such as heating rate can be 210 DEG C/h~240 DEG C/h.t1Period can be confirmed according to heating rate.Temperature T1It can be 380 DEG C~430 DEG C.For example, it is preferable to, temperature T1It can be 397 DEG C~417 DEG C, it is furthermore preferred that can be 400 ℃.It is heated to temperature T1Afterwards, with v1Heating rate heat up, arrive t2Moment is warming up to temperature T2.The heating rate v1≤ 200 DEG C/h, it is preferred that the heating rate v1≤ 185 DEG C/h, for example, can be 180 DEG C/h.Temperature T2Can be 600 DEG C~ 655 DEG C, it is preferred that can be 620 DEG C~630 DEG C, for example, it may be 625 DEG C.It is heated to temperature T2Afterwards, stop heating, heat preservation T period (the t in Fig. 53-t2Period).
When the carbon steel pipe pipe thickness is not more than 25mm, the soaking time t can be 0.8h~1.2h.Further , soaking time can be 0.85h~1.14h.For example, it may be 0.9h.
When the carbon steel pipe pipe thickness is greater than 25mm, the soaking time t can no less than (0.8+ (b-25)/25) H~(1.2+ (b-25)/25) h, b indicate carbon steel pipe pipe thickness, and unit is millimeter.
For example, soaking time can be 1h when the thickness of pipe wall of carbon steel pipe is less than 25mm.When the wall thickness of carbon steel pipe is greater than When 25mm, constant temperature time t can at least increase the time of (b-25)/25 hour accordingly.After keeping the temperature the t period, start to carry out cold But it handles.It can be with v2Cooling velocity cooled down.Cooling velocity v2≤ 260 DEG C/h, it is preferred that v2≤ 240 DEG C/h, for example, It can be 230 DEG C/h.By t4-t3After period, temperature is cooled to T1, that is, it is cooled to 380 DEG C~430 DEG C.It is then turned off electricity Source carries out natural cooling under conditions of not removing insulating layer.
More than, in 0~t1In period, heating rate is set as arbitrary value, because temperature reaches T1Before, heating rate Size is little to carbon atom diffusion.In t1~t2In period, temperature is from T1It is raised to T2, heating rate v1≤200℃/h.Such as Fruit heating rate is excessive, and carbon atom diffusion time is too short, is unfavorable for carbon atom diffusion and heating rate is excessive will cause from carbon Steel pipe seam outer surface generates Thermal Stress Field to inner surface excessive temperature differentials, aggravates stress concentration phenomenon.In t2~t3Period It is interior, holding temperature T2, the thickness of carbon steel pipe is thicker, and soaking time should be configured by above-mentioned formula, can guarantee carbon in this way Outer surface of steel tube is heated more sufficiently and uniform to inner surface, is conducive to carbon atom and sufficiently spreads, grain size and ingredient are more Uniformly.In t3~t4In period, temperature is from T2Drop to T1, cooling rate v2≤ 260 DEG C/h, because cooling rate is to the group of generation It knits and has a direct impact with grain size, cooling rate is excessive, and carbon atom diffusion time is too short, is unfavorable for carbon atom diffusion and holds Brittle tissue (such as martensite, bainite) easily generated, reduces the toughness and plasticity of welding line joint.
Step (3), hardness determination.
In this example, it after heat treatment, needs to carry out hardness determination to weld seam, heat affected area, base material itself.Example Such as, hardness determination is carried out to the weld seam of 12 o'clock of carbon steel pipe, 3 o'clock and 6 o'clock position, heat affected area and base material respectively.I.e. On carbon steel tube section, can 12 o'clock to weld seam, 3 o'clock and 6 o'clock position carry out hardness determination, to the zone of influence after heating 12 o'clock, 3 o'clock and 6 o'clock position carry out hardness determination and 12 o'clock, 3 o'clock and 6 o'clock position to main pipe itself Carry out hardness determination.The highest hardness value of each test point after above-mentioned detection should be not more than 210 Brinell hardness, average hardness value 200 Brinell hardness should be not more than.Preferably, the highest hardness value of each test point should be not more than 195 Brinell hardness (HBW), Average hardness value should be not more than 189 Brinell hardness.It, can 12 o'clock to weld seam, 9 points likewise, on carbon steel tube section Clock and 6 o'clock position carry out hardness determination, and 12 o'clock, 9 o'clock and 6 o'clock position to the zone of influence after heating carry out hardness determination And hardness determination is carried out to 12 o'clock, 9 o'clock and 6 o'clock position of main pipe itself.Above-mentioned detection position is set, respectively generation Table downhand welding, vertical position welding, overhead welding, and these three position welding parameters (electric current, voltage, heat input etc.) are different from so that this three A position grain structure form and difference in size are very big, thus to three positions carry out hardness determinations can than more complete understanding of The hardness situation of entire welding line joint.
Generally, as shown in fig. 6, mainly including weld bond to field acidic environment carbon steel pipe stress-removal construction operation method Inspection, equipment and instrument testing, heat treatment connecting line, galvanic couple arrangement, heating and heat preservation, slow cooling, hardness determination, ultrasonic wave inspection It surveys, completes heat treatment.Be heat-treated continuously after weld bond is examined and equipment, instrument testing are qualified, start after the completion of line The arrangement of thermocouple and heater is carried out, arrangement is heated and is kept the temperature after completing, then slow cooling (i.e. above-mentioned steps (2)), It finally carries out hardness determination and is carried out non-destructive testing using ultrasonic wave, complete carbon steel pipe heat treatment.
In conclusion field acidic environment carbon steel pipe stress-removal construction operation method effective solution of the invention weld seam Local residual stress concentrations lead to the problem of the anti-brittle failure ability difference of welding point;In effective solution welding point weld seam and There are hard and crisp tissues for heat affected area, lead to the problem of welding point resistance to corrosion difference;Dissociate in effective solution weld seam The presence of hydrogen leads to the problem of weld seam resistance to corrosion difference, has a good application prospect.
Although those skilled in the art should be clear above by combining exemplary embodiment to describe the present invention Chu can carry out exemplary embodiment of the present invention each without departing from the spirit and scope defined by the claims Kind modifications and changes.

Claims (10)

1. a kind of field acidic environment carbon steel pipe stress-removal construction operation method, which is characterized in that the method includes following steps It is rapid:
Predetermined heat area is selected around weld seam, and arranges heater and thermocouple in predetermined heat area;
Predetermined heat area is heated using the heater, thermocouple detects temperature to after 380 DEG C~430 DEG C, with little Predetermined heat area is heated to 600 DEG C~655 DEG C in the heating speed of 200 DEG C/h, after keeping the temperature the t period, to be not more than 260 DEG C/cooling velocity of h is cooled to 380 DEG C~430 DEG C, it is cooled to room temperature, wherein
When the carbon steel pipe pipe thickness is not more than 25mm, the soaking time t is 0.8h~1.2h;
When the carbon steel pipe pipe thickness is greater than 25mm, the soaking time t is at least (0.8+ (b-25)/25) h~(1.2+ (b-25)/25) h, b indicate carbon steel pipe pipe thickness, and unit is millimeter;
Hardness determination is carried out to the zone of influence after weld seam, heating and main pipe respectively, completes ultrasonic inspection, is realized to field acidity Environment carbon steel pipe stress-removal construction operation.
2. field acidic environment carbon steel pipe stress-removal construction operation method according to claim 1, which is characterized in that
When the carbon steel pipe nominal diameter is greater than or equal to 100mm, carbon steel pipe straight tube is heated, the heater is by the first half Arc sections and the second semicircle arc portion composition, the first semicircle arc portion and the second semicircle arc portion can enclose carbon steel pipe to add to it Heat, the first semicircle arc portion and the second semicircle arc portion are heated by the first insulating layer of outer layer and first on the inside of outer layer Layer composition;Carbon steel pipe bend pipe and threeway are heated, the heater is by the second heating layer and for wrapping up the second heating layer Two insulating layers composition, second heating layer are rope type heater;
When the carbon steel pipe nominal diameter is less than 100mm, the heater is heated by third heating layer and for wrapping up third The third insulating layer composition of layer, the third heating layer are rope type heater.
3. field acidic environment carbon steel pipe stress-removal construction operation method according to claim 2, which is characterized in that described First insulating layer with a thickness of 42mm~56mm, along carbon steel pipe pipe shaft axial direction, the width of the first insulating layer either side Width more ipsilateral than first heating layer is 100mm or more wide.
4. field acidic environment carbon steel pipe stress-removal construction operation method according to claim 2, which is characterized in that along carbon Steel pipe pipe shaft axial direction, second heating layer and third heating layer width are 6 times or more of weld width and width is not small In 120mm, second insulating layer is 1 times or more of the second heating layer width, and the third insulating layer is the third 1 times or more of heating layer width.
5. field acidic environment carbon steel pipe stress-removal construction operation method according to claim 1, which is characterized in that work as institute When stating carbon steel pipe outside diameter more than or equal to 508mm, thermocouple arranges 2 or more even number roots, is circle with carbon steel pipe kernel of section The angle of the heart, every thermocouple is equal;
When the carbon steel pipe outside diameter is less than 508mm, thermocouple arranges 2 or less.
6. field acidic environment carbon steel pipe stress-removal construction operation method according to claim 1 or 5, which is characterized in that When the carbon steel pipe outside diameter is greater than or equal to 508mm, thermocouple arranges 2, and first, which is located at the carbon steel pipe with thermocouple, cuts 6 o'clock of face position, second thermocouple be located at 2 o'clock of carbon steel tube section position or 10 o'clock position;
When the carbon steel pipe outside diameter is less than 508mm, thermocouple arranges 1, and the thermocouple is located at 2 points of the carbon steel tube section Clock or 10 o'clock position.
7. field acidic environment carbon steel pipe stress-removal construction operation method according to claim 1, which is characterized in that respectively Carrying out hardness determination to the zone of influence after weld seam, heating and main pipe includes that butt welding respectively is sewn on 12 o'clock of carbon steel tube section, 3 o'clock With 6 o'clock position, the zone of influence is cut in 12 o'clock of carbon steel tube section, 3 o'clock and 6 o'clock position and main pipe in carbon steel pipe after heating 12 o'clock of face, 3 o'clock and 6 o'clock position carry out hardness determination, and the highest hardness value after each test point detection is not more than 210 Bu Shi Hardness, average value are not more than 200 Brinell hardness.
8. field acidic environment carbon steel pipe stress-removal construction operation method according to claim 1, which is characterized in that respectively Carrying out hardness determination to the zone of influence after weld seam, heating and main pipe includes that butt welding respectively is sewn on 12 o'clock of carbon steel tube section, 9 o'clock With 6 o'clock position, the zone of influence is cut in 12 o'clock of carbon steel tube section, 9 o'clock and 6 o'clock position and main pipe in carbon steel pipe after heating 12 o'clock of face, 9 o'clock and 6 o'clock position carry out hardness determination, and the highest hardness value after each test point detection is not more than 210 Bu Shi Hardness, average value are not more than 200 Brinell hardness.
9. according to right to go 1 described in field acidic environment carbon steel pipe stress-removal construction operation method, which is characterized in that it is described It carries out heating to heating zone to heat using intelligent temperature control equipment control heater, the intelligent temperature control equipment includes distribution Cabinet, intelligent temperature control unit and output unit, the power distribution cabinet is connect by intelligent temperature control unit with the output unit, described Output unit includes heating power supply conducting wire and compensating wire, and the heating power supply conducting wire is connect with the heater, for being to add Hot device provides power supply, and the compensating wire is connect with the thermocouple.
10. field acidic environment carbon steel pipe stress-removal construction operation method according to claim 9, which is characterized in that institute Stating intelligent temperature control equipment to 2 or more weld bonds while can carry out stress-removal construction operation simultaneously.
CN201811423664.3A 2018-11-27 2018-11-27 Stress-relieving construction operation method for carbon steel pipe in field acidic environment Active CN109280761B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811423664.3A CN109280761B (en) 2018-11-27 2018-11-27 Stress-relieving construction operation method for carbon steel pipe in field acidic environment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811423664.3A CN109280761B (en) 2018-11-27 2018-11-27 Stress-relieving construction operation method for carbon steel pipe in field acidic environment

Publications (2)

Publication Number Publication Date
CN109280761A true CN109280761A (en) 2019-01-29
CN109280761B CN109280761B (en) 2020-10-16

Family

ID=65173289

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811423664.3A Active CN109280761B (en) 2018-11-27 2018-11-27 Stress-relieving construction operation method for carbon steel pipe in field acidic environment

Country Status (1)

Country Link
CN (1) CN109280761B (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58218391A (en) * 1982-06-15 1983-12-19 Kawasaki Steel Corp Circumferential welding method of joint of steel pipes
JPH1034230A (en) * 1996-07-23 1998-02-10 Ishikawajima Harima Heavy Ind Co Ltd Manufacture of steel pillar
CN201435834Y (en) * 2009-04-15 2010-03-31 西北工业大学 Metal resistance heater
JP4912097B2 (en) * 2006-09-08 2012-04-04 東電工業株式会社 MULTILAYER WELDING METHOD FOR STAINLESS STEEL PIPE AND MULTILAYER WELDING
CN102497680A (en) * 2011-11-28 2012-06-13 武汉船用机械有限责任公司 Heating device of lining
CN202951980U (en) * 2012-12-05 2013-05-29 四川石油天然气建设工程有限责任公司 Pipeline preheating system
CN205062139U (en) * 2015-10-20 2016-03-02 西安航空动力股份有限公司 Local heat treatment device
CN105648188A (en) * 2014-11-20 2016-06-08 重庆界威模具股份有限公司 Sulfur recovery process pipe heat treatment construction method
CN105986077A (en) * 2015-01-31 2016-10-05 重庆麦卡瑞机械制造有限公司 Heat treatment operation method
CN105983792A (en) * 2015-01-31 2016-10-05 重庆麦卡瑞机械制造有限公司 Furnace carbon steel large-diameter pipeline welding joint thermal treatment process
CN106702129A (en) * 2017-02-23 2017-05-24 华西能源工程有限公司 Post-weld heat treatment process

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58218391A (en) * 1982-06-15 1983-12-19 Kawasaki Steel Corp Circumferential welding method of joint of steel pipes
JPH1034230A (en) * 1996-07-23 1998-02-10 Ishikawajima Harima Heavy Ind Co Ltd Manufacture of steel pillar
JP4912097B2 (en) * 2006-09-08 2012-04-04 東電工業株式会社 MULTILAYER WELDING METHOD FOR STAINLESS STEEL PIPE AND MULTILAYER WELDING
CN201435834Y (en) * 2009-04-15 2010-03-31 西北工业大学 Metal resistance heater
CN102497680A (en) * 2011-11-28 2012-06-13 武汉船用机械有限责任公司 Heating device of lining
CN202951980U (en) * 2012-12-05 2013-05-29 四川石油天然气建设工程有限责任公司 Pipeline preheating system
CN105648188A (en) * 2014-11-20 2016-06-08 重庆界威模具股份有限公司 Sulfur recovery process pipe heat treatment construction method
CN105986077A (en) * 2015-01-31 2016-10-05 重庆麦卡瑞机械制造有限公司 Heat treatment operation method
CN105983792A (en) * 2015-01-31 2016-10-05 重庆麦卡瑞机械制造有限公司 Furnace carbon steel large-diameter pipeline welding joint thermal treatment process
CN205062139U (en) * 2015-10-20 2016-03-02 西安航空动力股份有限公司 Local heat treatment device
CN106702129A (en) * 2017-02-23 2017-05-24 华西能源工程有限公司 Post-weld heat treatment process

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈泰炜: "《压力容器焊后热处理》", 31 December 2002, 中国石化出版社 *

Also Published As

Publication number Publication date
CN109280761B (en) 2020-10-16

Similar Documents

Publication Publication Date Title
CN104874896B (en) A kind of welding method of the truss jib Q690 high strength steel pipe of large-scale sea work loop wheel machine
CN205741134U (en) Tee pipe fitting scene local heat treatmet device
CN105234527A (en) Method for performing stainless steel strip-electrode submerged-arc build-up welding on low-alloy parent steel
CN107619921B (en) A kind of intermediate-frequency induction heating technique of martensite heat-resistant steel weld bond
JP2004211187A (en) Method and apparatus for heat treatment of piping system
CN108176911A (en) A kind of P91 materials welding and heat treatment method
CN109280761A (en) A kind of field acidic environment carbon steel pipe stress-removal construction operation method
KR20180041313A (en) Heat treatment method for improving residual stress of heterojunction in nuclear power plant
CN103060532A (en) Method for generating stress reduction in erected tube walls of steam generator
CN109593941A (en) A kind of rail induction normalizing method
Rybicki et al. A computational model for improving weld residual stresses in small diameter pipes by induction heating
CN110331273A (en) A kind of weld bond heat treatment method of soft alloy pipeline
CN105643061A (en) Welding method for CO2 gas shielded welding for super-strength thick steel plate
CN112176160B (en) On-site composite heat treatment method for pipe connecting seat
CN105648194A (en) Heat treatment technique for repair of alloy pipeline
JPS5817807B2 (en) Heat treatment method for piping
CN206020239U (en) A kind of corrosion-proof high-temp high-pressure kettle system
CN105648195B (en) A kind of method for improving thermal treatment quality after P91, P92 high-temperature pipe site welding
KR20180111729A (en) Heat treatment method for improving residual stress of heterojunction in nuclear power plant
KR101830532B1 (en) Heat treatment method for improving resistivity of heterojunction in nuclear power plant
CN107619922B (en) A kind of intermediate-frequency induction heating technique of heat-resistant high alloy steel weld bond
CN207672081U (en) 9%~12%Cr martensite heat-resistant steel major diameter posted sides pipeline argon filling heating and thermal insulation toolings
Nebhnani et al. Failure of a martensitic stainless steel pipe weld in a fossil fuel power plant
SE8502646D0 (en) PROCEDURE AND DEVICE FOR RELEASE OF REMOVAL VOLTAGES OF WELDING IN PIPELINES
Romanov et al. High-Temperature Heat-Treatment of the Welded Joints of Du300 Austenitic Pipelines at 900° C

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhang Cheng

Inventor after: Huang Yong

Inventor after: Li Yang

Inventor after: Wang Xuejun

Inventor after: Yu Shanglin

Inventor after: Li Xiang

Inventor after: Du He

Inventor after: Yang Yan

Inventor after: Xiao Jingan

Inventor after: Zhang Yuan

Inventor before: Zhang Cheng

Inventor before: Li Yang

Inventor before: Yu Shanglin

Inventor before: Li Xiang

Inventor before: Du He

Inventor before: Yang Yan

Inventor before: Xiao Jingan

Inventor before: Zhang Yuan

Inventor before: Huang Yong

GR01 Patent grant
GR01 Patent grant