CN207672081U - 9%~12%Cr martensite heat-resistant steel major diameter posted sides pipeline argon filling heating and thermal insulation toolings - Google Patents

9%~12%Cr martensite heat-resistant steel major diameter posted sides pipeline argon filling heating and thermal insulation toolings Download PDF

Info

Publication number
CN207672081U
CN207672081U CN201721340955.7U CN201721340955U CN207672081U CN 207672081 U CN207672081 U CN 207672081U CN 201721340955 U CN201721340955 U CN 201721340955U CN 207672081 U CN207672081 U CN 207672081U
Authority
CN
China
Prior art keywords
major diameter
heat
posted sides
heating
pipe support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721340955.7U
Other languages
Chinese (zh)
Inventor
王林
张君发
李汉华
苗慧霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SEPCO1 Electric Power Construction Co Ltd
Original Assignee
SEPCO1 Electric Power Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SEPCO1 Electric Power Construction Co Ltd filed Critical SEPCO1 Electric Power Construction Co Ltd
Priority to CN201721340955.7U priority Critical patent/CN207672081U/en
Application granted granted Critical
Publication of CN207672081U publication Critical patent/CN207672081U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Heat Treatment Of Articles (AREA)

Abstract

The utility model discloses one kind 9%~12%Cr martensite heat-resistant steel major diameter posted sides pipeline argon filling heating and thermal insulation toolings, including 9%~12%Cr martensite heat-resistant steel major diameters posted sides pipeline, heating tooling and heat preservation closure plate, it is respectively equipped with heating tooling in the weld bond at martensite heat-resistant steel major diameter posted sides pipeline both ends, it includes major diameter pipe support to heat tooling, major diameter pipe support upper edge circumferencial direction is evenly arranged the symmetrical square hole of two row, the outer wall of major diameter pipe support is equipped with multiple tracklayer heaters, and multiple high temperature resistant load-bearing pulleys are additionally provided on the outer wall of major diameter pipe support;Cross supporting rack is provided in major diameter pipe support, cross supporting rack includes support tube and hollow steel pipe, and running through in hollow steel pipe has a rigid drawstring, and one end of rigid drawstring is fixedly connected with a heat preservation closure plate, and the other end extends another heat preservation closure plate.The utility model is combined using heating tooling and heat preservation closure plate, has both the effect of argon filling gas chamber and inner wall heating and thermal insulation, ensure that the safety of the welding thermal treatment quality and construction personnel of weld bond.

Description

9%~12%Cr martensite heat-resistant steel major diameter posted sides pipeline argon filling heating and thermal insulation toolings
Technical field
The utility model is related to the welding of martensite heat-resistant steel pipeline and Field of Heat-treatment, and in particular to and one kind 9%~ 12%Cr martensite heat-resistant steel major diameter posted sides pipeline argon filling heating and thermal insulation toolings.
Background technology
9%~12%Cr martensite heat-resistant steels are higher due to its alloying element content, it is necessary to be protected in root of weld applying argon gas Shield, prevents the oxidation of weld seam;Since it is welded, tendency of hardenability is big, and necessary electrical heating preheating, postwelding must carry out postwelding heat before welding Processing, to eliminate internal stress, obtains tempered martensite.
At present according to technical regulation and construction experience, using traditional paperboard argon-filled protection gas chamber come prevent 9%~ The oxidation of 12%Cr martensite heat-resistant steel weld seams is not thorough the cleaning of remaining argon filling gas chamber material after construction, does not meet clean Purify the requirement of construction;Weld preheating and post weld heat treatment are carried out using armoured thermocouple and ceramic tracklayer heater, but It is that wall temperature difference inside and outside post weld heat treatment can not be reduced to minimum or be reduced to the range of standard requirement.
There is guidance for the purifying construction of 9%~12%Cr martensite heat-resistant steel weld bonds and the control of inside and outside wall temperature difference at present The data of property is not very much, and method for arranging and heater about thermocouple are wherein pointed out in thermal power plant welding technique regulation Method for arranging, for major diameter heavy wall high alloy weld bond, (caliber is more than 800, and wall thickness is more than poor, the Bu Nengyou of directiveness 60) Wall temperature difference inside and outside the reduction of effect, technological design temperature is not achieved in observed temperature, even more so for special piece, if only logical Cross the increment control algorithm of heater promote weld bond observed temperature and technological temperature close to, such method not only takes time and effort, and Post weld heat treatment effect is poor, can not meet live pipe fitting specification, form site operation complicated and changeable, and construction finishes Afterwards, inside remaining argon filling gas chamber trap material pipeline, the objective of purifying construction is not met.
In conclusion weld bond inside and outside wall when being heat-treated in the prior art for 9%~12%Cr martensite heat-resistant steel pipelines The problem of temperature difference is larger, purifying welding still lacks effective solution scheme.
Utility model content
In order to overcome the above-mentioned deficiencies of the prior art, it is heat-resisting to provide one kind 9%~12%Cr martensites for the utility model Steel major diameter posted sides pipeline argon filling heating and thermal insulation tooling is combined using heating tooling and heat preservation closure plate, has both argon filling gas chamber and inner wall Heater installing is set inside 9%~12%Cr martensite heat-resistant steel major diameter posted sides pipelines, is solved by the effect of heating and thermal insulation The larger problem of wall temperature difference inside and outside weld bond, has been effectively ensured weld bond when 9%~12%Cr martensite heat-resistant steel pipelines are heat-treated Weld the safety of thermal treatment quality and construction personnel.
Technical solution used by the utility model is:
One kind 9%~12%Cr martensite heat-resistant steel major diameter posted sides pipeline argon filling heating and thermal insulation toolings, including 9%~12% Cr martensite heat-resistant steel major diameters posted sides pipeline, heating tooling and heat preservation closure plate, characterized in that in 9%~12%Cr geneva The heating tooling is respectively equipped in the weld bond at body heat resisting steel major diameter posted sides pipeline both ends, the heating tooling includes large-diameter pipe Frame, tracklayer heater and high temperature resistant load-bearing pulley, it is symmetrical that the major diameter pipe support upper edge circumferencial direction has been evenly arranged two row Square hole, the heat preservation closure plate is provided on the outside of the major diameter pipe support, wherein being provided with centre bore on a heat preservation closure plate;It is described big It is provided with alumina silicate heat-preservation cotton on the inner wall of diameter pipe support, multiple crawler types have been evenly arranged on the outer wall of the major diameter pipe support Heater has also been evenly arranged multiple high temperature resistant load-bearing pulleys, the high temperature resistant load-bearing on the outer wall of the major diameter pipe support Pulley is between two adjacent tracklayer heaters;Middle part in the major diameter pipe support is provided with cross supporting rack, institute It includes vertically disposed support tube and the hollow steel pipe for being horizontally set on the support tube hub, the sky to state cross supporting rack Through having a rigid drawstring, one end of the rigidity drawstring to be fixedly connected with a heat preservation closure plate in heart steel pipe, the other end passes through another Centre bore on one heat preservation closure plate extends 9%~12%Cr martensite heat-resistant steel major diameter posted sides pipelines, and another heat preservation is stifled It is inserted with argon gas pipeline in the centre bore of plate.
Further, the major diameter pipe support is made of the upper pipe support of semi-cylindrical and the cradle of semi-cylindrical, it is described on It is bolted to connection between pipe support and cradle.
Further, the edge of the heat preservation closure plate is provided with heat safe rubber pad, the rubber pad and 9%~12% The inner wall of Cr martensite heat-resistant steel major diameter posted sides pipelines is close together.
Further, further include being disposed in the position while weldings of 9%~12%Cr martensite heat-resistant steel major diameter posted sides pipelines Temperature-control heat couple.
Further, further include being set respectively in the weld seam both sides of 9%~12%Cr martensite heat-resistant steel major diameter posted sides pipelines It is equipped with temperature thermocouple.
Further, the lead-out wire of the tracklayer heater is drawn by square hole, and is connect with temperature-control heat couple.
Further, the temperature thermocouple and temperature-control heat couple are connect with temperature measurer respectively.
Further, the heat preservation closure plate uses galvanized iron sheet.
Further, the support tube uses telescoping tube.
Compared with prior art, the utility model has the beneficial effects that:
(1) the utility model is combined using heating tooling and heat preservation closure plate, has both argon filling gas chamber and inner wall heating and thermal insulation Heater installing is set inside 9%~12%Cr martensite heat-resistant steel major diameter posted sides pipelines, solves 9%~12% by effect The welding heat treatment of weld bond has been effectively ensured in the larger problem of wall temperature difference inside and outside weld bond when Cr martensite heat-resistant steel pipelines are heat-treated The safety of quality and construction personnel;It is uniformly arranged multiple tracklayer heaters by being loaded onto in heater so that weld preheating temperature Degree can be rapidly achieved wall temperature difference inside and outside technological temperature and post weld heat treatment weld bond and be reduced to standard requirement, eliminate planted agent The phenomenon that power, base material burning caused by avoiding post weld heat treatment heat preservation section temperature deviation or inside and outside wall port welding performance difference;
(2) the heating tooling of the utility model and heat preservation closure plate combine can be used as argon filling gas chamber, can protect weld seam not by Oxidation;
(3) the utility model uses telescopic cross supporting rack, and heating tooling is enable to be suitable for any diameter 9%~12%Cr martensite heat-resistant steel major diameter posted sides pipelines;It can in real time be adjusted and added by nut with the variation of pipe diameter size The major diameter pipe support size of thermal technology's dress, it is not necessary to make repeatedly, more measuring technique personnel need not be occupied, common construction personnel is It is operable;
(4) the utility model on major diameter pipe support by being evenly arranged 4 groups of high temperature resistant load-bearing pulleys so that processing unit (plant) can It is slided along 9%~12%Cr martensite heat-resistant steel major diameter posted sides pipeline inner walls with freedom;
(5) the utility model heats toolings from 9%~12%Cr martensite heat-resistant steel major diameters using rigid drawstring by two It is taken out in posted sides pipeline, can effectively avoid draft gear high temperature failure, be climbed into without construction personnel, improve pipeline construction Safety, and after heating tooling use, which is taken out using rigid drawstring in time, residue will not be detained In the purpose in pipeline, realizing purifying welding, the quality of purifying construction is improved, it is easy to operate, it is easy to use;
(6) the utility model improves construction quality, shortens the construction period, is conducive to save construction cost.
Description of the drawings
The accompanying drawings which form a part of this application are used for providing further understanding of the present application, and the application's shows Meaning property embodiment and its explanation do not constitute the improper restriction to the application for explaining the application.
Fig. 1 is that 9%~12%Cr martensite heat-resistant steels major diameter posted sides pipeline heating disclosed in the utility model embodiment is protected Warm tool structure schematic diagram;
Fig. 2 is that 9%~12%Cr martensite heat-resistant steels major diameter posted sides pipeline heating disclosed in the utility model embodiment is protected Warm tooling explosive view.
Specific implementation mode
It is noted that following detailed description is all illustrative, it is intended to provide further instruction to the application.Unless another It indicates, all technical and scientific terms used herein has usual with the application person of an ordinary skill in the technical field The identical meanings of understanding.
It should be noted that term used herein above is merely to describe specific implementation mode, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singulative It is also intended to include plural form, additionally, it should be understood that, when in the present specification using term "comprising" and/or " packet Include " when, indicate existing characteristics, step, operation, device, component and/or combination thereof.
As background technology is introduced, the heat treatment of 9%~12%Cr martensite heat-resistant steel pipelines exists in the prior art When weld bond inside and outside wall temperature difference it is larger, purifying welding is insufficient, and in order to solve technical problem as above, it is suitable that present applicant proposes one kind For the welding of 9%~12%Cr martensite heat-resistant steel pipelines and heat treatment tooling and method, solves 9%~12%Cr geneva The larger problem of wall temperature difference inside and outside weld bond when body heat resisting steel pipeline is heat-treated, be effectively ensured weld bond welding thermal treatment quality and The safety of construction personnel so that weld preheating temperature can be rapidly achieved technological temperature and post weld heat treatment weld bond inside and outside wall The temperature difference is reduced to standard requirement, avoids base material burning or inside and outside wall weld bond caused by post weld heat treatment heat preservation section temperature deviation The phenomenon that performance difference, while can ensure the primary Cheng You of the post weld heat treatment of weld bond, avoid the phenomenon that being heat-treated again;Also Solves the problems, such as purifying welding, i.e., it is not oxidized to can be used as argon filling gas chamber protection weld seam for the tooling, the built-in argon filling and adds Hot tool locating setting is reasonable, facilitates taking-up, is pulled out after being finished, it is purifying in pipeline, realizing will not to be detained residue The purpose of welding.
In a kind of typical embodiment of the application, as shown in Figs. 1-2, one kind 9%~12%Cr martensites are provided Heat resisting steel major diameter posted sides pipeline argon filling heating and thermal insulation tooling, the tooling include 9%~12%Cr martensite heat-resistant steel major diameter heavy walls Pipeline 1, heating tooling I, heating tooling II, heat preservation closure plate I 7 and heat preservation closure plate II 3;Wherein, heating tooling I and heating tooling II It is separately positioned in the weld bond at 9%~12%Cr martensite heat-resistant steels major diameter posted sides pipeline, 1 both ends, the heating tooling I Including major diameter pipe support I 8, the heat preservation closure plate I 7 is arranged in the outside of major diameter pipe support I, and the heating tooling II includes major diameter pipe support II 9, the heat preservation closure plate II 3 is arranged is provided with centre bore, the guarantor on the outside of major diameter pipe support II, the heat preservation closure plate II 3 The centre bore of warm closure plate II is for being inserted into argon gas pipeline 4;On the major diameter pipe support I 8 and major diameter pipe support II 9 respectively along the circumferential direction It is evenly arranged the symmetrical square hole 10 of two row;It is both provided with alumina silicate on the inner wall of the major diameter pipe support I and major diameter pipe support II It has been evenly arranged 4 tracklayer heaters 11 respectively on the outer wall of heat-preservation cotton, the major diameter pipe support I and major diameter pipe support II, High temperature resistant load-bearing pulley 12 described in being also evenly arranged 4 groups respectively on the outer wall of the major diameter pipe support I and major diameter pipe support II, it is described High temperature resistant load-bearing pulley 12 is between two adjacent tracklayer heaters;In the major diameter pipe support I and major diameter pipe support II Middle part is provided with cross supporting rack 13, and the cross supporting rack 13 includes vertically disposed support tube and is horizontally set on institute The hollow steel pipe of support tube hub is stated, running through in the hollow steel pipe has a rigid drawstring 14, one end of the rigidity drawstring 14 It is fixedly connected with heat preservation closure plate I 7, it is resistance to extend 9%~12%Cr martensites by the centre bore of heat preservation closure plate II 3 for the other end Hot steel major diameter posted sides pipeline 1.Tooling will be heated from 9%~12%Cr martensite heat-resistant steel major diameter heavy walls by being facilitated using rigid drawstring It is taken out in pipeline, is climbed into without construction personnel, improve the safety of pipeline construction.
In the present embodiment, the major diameter pipe support I and major diameter pipe support II are respectively by the upper pipe support and semicolumn of semi-cylindrical The cradle of shape forms, and is bolted to connection between the upper pipe support and cradle, and major diameter pipe support is adjusted by nut Diameter.The application can in real time be adjusted with the variation of the pipe diameter size of 9%~12%Cr martensite heat-resistant steel major diameter posted sides pipelines Section heating tooling size, it is not necessary to make repeatedly, more measuring technique personnel need not be occupied, common construction personnel can grasp Make.
In the present embodiment, the edge of the heat preservation closure plate is provided with heat safe rubber pad, and the rubber pad and 9%~ The inner wall of 12%Cr martensite heat-resistant steel major diameter posted sides pipelines is close together, and prevents argon gas from escaping.
In the present embodiment, in the control of the position while welding of 9%~12%Cr martensite heat-resistant steel major diameter posted sides pipelines arrangement Warm galvanic couple 6,9%~12%Cr martensite heat-resistant steel major diameter posted sides pipelines weld seam both sides be arranged temperature thermocouple 5, The temperature thermocouple 5 and temperature-control heat couple 6 are connect with temperature measurer respectively.
In the present embodiment, the lead-out wire of the tracklayer heater 11 is drawn by square hole, and is connected with temperature-control heat couple It connects.
In the present embodiment, the heat preservation closure plate I 7 and heat preservation closure plate II 3 use galvanized iron sheet.
In the present embodiment, the support tube uses telescoping tube.
9%~12%Cr martensite heat-resistant steel major diameter posted sides pipeline heating and thermal insulation toolings that the present embodiment proposes, using adding Thermal technology fills and heat preservation closure plate combines, and has both the effect of argon filling gas chamber and inner wall heating and thermal insulation, solves 9%~12%Cr martensites The larger problem of wall temperature difference inside and outside weld bond when heat resisting steel pipeline is heat-treated, has been effectively ensured the welding thermal treatment quality of weld bond and has applied The safety of worker person is uniformly arranged multiple tracklayer heaters so that weld preheating temperature can be fast by being loaded onto in heater Speed reaches wall temperature difference inside and outside technological temperature and post weld heat treatment weld bond and is reduced to standard requirement, avoids post weld heat treatment guarantor Base material burning caused by temperature deviation or the phenomenon that inside and outside wall port welding performance difference between warm area, while can ensure the postwelding of weld bond It is heat-treated primary Cheng You, avoids the phenomenon that being heat-treated again;The heating tooling of the utility model and heat preservation closure plate combination can be made For argon filling gas chamber, weld seam can be protected not oxidized;Using telescopic cross supporting rack, heating tooling is enable to be suitable for 9%~12%Cr martensite heat-resistant steel major diameter posted sides pipelines;It is slided by being evenly arranged 4 groups of high temperature resistant load-bearing on major diameter pipe support Wheel so that processing unit (plant) can be slided freely along 9%~12%Cr martensite heat-resistant steel major diameter posted sides pipeline inner walls;Using rigid Property drawstring by two heating toolings taken out out of 9%~12%Cr martensite heat-resistant steel major diameter posted sides pipelines, can effectively keep away Exempt from draft gear high temperature failure, climbed into without construction personnel, improves the safety of pipeline construction, and use in heating tooling After, which is taken out using rigid drawstring in time, residue will not be detained in pipeline, realizing purifying welding Purpose;The utility model improves the quality of purifying construction, easy to operate, easy to use;The utility model improves construction matter Amount, shortens the construction period, is conducive to save construction cost.
The application method of 9%~12%Cr martensite heat-resistant steel major diameter posted sides pipeline argon filling heating and thermal insulation toolings, including Following steps:
(1) before the weld bond at positioning welding 9%~12%Cr martensite heat-resistant steel major diameter posted sides pipeline ontologies both ends, by two A heater is put in the weld bond of 9%~12%Cr martensite heat-resistant steel major diameter posted sides pipelines both sides;
(2) positioning welding is carried out to the weld bond at 9%~12%Cr martensite heat-resistant steel major diameter posted sides pipelines both ends, by rigid Property drawstring by two heaters being placed in martensite heat-resistant steel major diameter posted sides pipeline dress be connected and fixed;
(3) heater is used to be heat-treated to martensite heat-resistant steel major diameter posted sides pipeline mounted in be welded and postwelding;
(4) it after being heat-treated, is drawn from one end of 9%~12%Cr martensite heat-resistant steel major diameter posted sides pipelines using rigidity Rope takes out two heating toolings.
It can be seen from the above description that the application the above embodiments realize following technique effect:
(1) the utility model is combined using heating tooling and heat preservation closure plate, has both argon filling gas chamber and inner wall heating and thermal insulation Heater installing is set inside 9%~12%Cr martensite heat-resistant steel major diameter posted sides pipelines, solves 9%~12% by effect The welding heat treatment of weld bond has been effectively ensured in the larger problem of wall temperature difference inside and outside weld bond when Cr martensite heat-resistant steel pipelines are heat-treated The safety of quality and construction personnel;It is uniformly arranged multiple tracklayer heaters by being loaded onto in heater so that weld preheating temperature Degree can be rapidly achieved wall temperature difference inside and outside technological temperature and post weld heat treatment weld bond and be reduced to standard requirement, eliminate planted agent The phenomenon that power, base material burning caused by avoiding post weld heat treatment heat preservation section temperature deviation or inside and outside wall port welding performance difference;
(2) the heating tooling of the utility model and heat preservation closure plate combine can be used as argon filling gas chamber, can protect weld seam not by Oxidation;
(3) the utility model uses telescopic cross supporting rack, and heating tooling is enable to be suitable for any diameter 9%~12%Cr martensite heat-resistant steel major diameter posted sides pipelines;It can in real time be adjusted and added by nut with the variation of pipe diameter size The major diameter pipe support size of thermal technology's dress, it is not necessary to make repeatedly, more measuring technique personnel need not be occupied, common construction personnel is It is operable;
(4) the utility model on major diameter pipe support by being evenly arranged 4 groups of high temperature resistant load-bearing pulleys so that processing unit (plant) can It is slided along 9%~12%Cr martensite heat-resistant steel major diameter posted sides pipeline inner walls with freedom;
(5) the utility model heats toolings from 9%~12%Cr martensite heat-resistant steel major diameters using rigid drawstring by two It is taken out in posted sides pipeline, can effectively avoid draft gear high temperature failure, be climbed into without construction personnel, improve pipeline construction Safety, and after heating tooling use, which is taken out using rigid drawstring in time, residue will not be detained In the purpose in pipeline, realizing purifying welding, the quality of purifying construction is improved, it is easy to operate, it is easy to use;
(6) the utility model improves construction quality, shortens the construction period, is conducive to save construction cost.
It is above-mentioned although specific embodiments of the present invention are described with reference to the accompanying drawings, but not to this practicality newly The limitation of type protection domain, those skilled in the art should understand that, based on the technical solution of the present invention, ability Field technique personnel need not make the creative labor the various modifications or changes that can be made still in the protection model of the utility model Within enclosing.

Claims (9)

1. one kind 9% ~ 12%Cr martensite heat-resistant steel major diameter posted sides pipeline argon filling heating and thermal insulation toolings, including 9% ~ 12%Cr martensites Heat resisting steel major diameter posted sides pipeline, heating tooling and heat preservation closure plate, characterized in that in 9% ~ 12%Cr martensite heat-resistant steels major diameter The heating tooling is respectively equipped in the weld bond at posted sides pipeline both ends, the heating tooling includes major diameter pipe support, crawler type heating Device and high temperature resistant load-bearing pulley, the major diameter pipe support upper edge circumferencial direction is evenly arranged the symmetrical square hole of two row, described big The heat preservation closure plate is provided on the outside of diameter pipe support, wherein being provided with centre bore on a heat preservation closure plate;The inner wall of the major diameter pipe support On be provided with alumina silicate heat-preservation cotton, multiple tracklayer heaters have been evenly arranged on the outer wall of the major diameter pipe support, it is described Multiple high temperature resistant load-bearing pulleys are also evenly arranged on the outer wall of major diameter pipe support, the high temperature resistant load-bearing pulley is located at two Between adjacent tracklayer heater;Middle part in the major diameter pipe support is provided with cross supporting rack, the cross support Frame includes vertically disposed support tube and the hollow steel pipe for being horizontally set on the support tube hub, is run through in the hollow steel pipe There are a rigid drawstring, one end of the rigidity drawstring to be fixedly connected with a heat preservation closure plate, the other end passes through on another heat preservation closure plate Centre bore extend 9% ~ 12%Cr martensite heat-resistant steel major diameter posted sides pipelines, be inserted in the centre bore of another heat preservation closure plate Argon gas pipeline.
2. 9% ~ 12%Cr martensite heat-resistant steels major diameter posted sides pipeline argon filling heating and thermal insulation tooling according to claim 1, It is characterized in, the major diameter pipe support is made of the upper pipe support of semi-cylindrical and the cradle of semi-cylindrical, the upper pipe support and down tube It is bolted to connection between frame.
3. 9% ~ 12%Cr martensite heat-resistant steels major diameter posted sides pipeline argon filling heating and thermal insulation tooling according to claim 1, It is characterized in, the edge of the heat preservation closure plate is provided with heat safe rubber pad, and the rubber pad and 9% ~ 12%Cr martensites are heat-resisting The inner wall of steel major diameter posted sides pipeline is close together.
4. 9% ~ 12%Cr martensite heat-resistant steels major diameter posted sides pipeline argon filling heating and thermal insulation tooling according to claim 1, It is characterized in, further includes the temperature-control heat couple in the position while welding arrangement of 9% ~ 12%Cr martensite heat-resistant steel major diameter posted sides pipelines.
5. 9% ~ 12%Cr martensite heat-resistant steels major diameter posted sides pipeline argon filling heating and thermal insulation tooling according to claim 4, It is characterized in, further includes the temperature thermocouple being arranged in the weld seam both sides of 9% ~ 12%Cr martensite heat-resistant steel major diameter posted sides pipelines.
6. 9% ~ 12%Cr martensite heat-resistant steels major diameter posted sides pipeline argon filling heating and thermal insulation tooling according to claim 5, It is characterized in, the lead-out wire of the tracklayer heater is drawn by square hole, and is connect with temperature-control heat couple.
7. 9% ~ 12%Cr martensite heat-resistant steels major diameter posted sides pipeline argon filling heating and thermal insulation tooling according to claim 5, It is characterized in, the temperature thermocouple and temperature-control heat couple are connect with temperature measurer respectively.
8. 9% ~ 12%Cr martensite heat-resistant steels major diameter posted sides pipeline argon filling heating and thermal insulation tooling according to claim 1, It is characterized in, the heat preservation closure plate uses galvanized iron sheet.
9. 9% ~ 12%Cr martensite heat-resistant steels major diameter posted sides pipeline argon filling heating and thermal insulation tooling according to claim 1, It is characterized in, the support tube uses telescoping tube.
CN201721340955.7U 2017-10-16 2017-10-16 9%~12%Cr martensite heat-resistant steel major diameter posted sides pipeline argon filling heating and thermal insulation toolings Active CN207672081U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721340955.7U CN207672081U (en) 2017-10-16 2017-10-16 9%~12%Cr martensite heat-resistant steel major diameter posted sides pipeline argon filling heating and thermal insulation toolings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721340955.7U CN207672081U (en) 2017-10-16 2017-10-16 9%~12%Cr martensite heat-resistant steel major diameter posted sides pipeline argon filling heating and thermal insulation toolings

Publications (1)

Publication Number Publication Date
CN207672081U true CN207672081U (en) 2018-07-31

Family

ID=62953331

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721340955.7U Active CN207672081U (en) 2017-10-16 2017-10-16 9%~12%Cr martensite heat-resistant steel major diameter posted sides pipeline argon filling heating and thermal insulation toolings

Country Status (1)

Country Link
CN (1) CN207672081U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107557541A (en) * 2017-10-16 2018-01-09 山东电力建设第工程公司 The big footpath posted sides pipeline argon filling heating and thermal insulation frock of 9% ~ 12%Cr martensite heat-resistant steels and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107557541A (en) * 2017-10-16 2018-01-09 山东电力建设第工程公司 The big footpath posted sides pipeline argon filling heating and thermal insulation frock of 9% ~ 12%Cr martensite heat-resistant steels and method

Similar Documents

Publication Publication Date Title
CN207176027U (en) Heat treatment mechanism after a kind of site welding of thermal power plant's header pipe angle seam
CN207672081U (en) 9%~12%Cr martensite heat-resistant steel major diameter posted sides pipeline argon filling heating and thermal insulation toolings
WO2019076208A1 (en) Welding and heat treatment process for medium-to-large diameter pipeline of novel cb2 heat-resistant steel
CN107557541A (en) The big footpath posted sides pipeline argon filling heating and thermal insulation frock of 9% ~ 12%Cr martensite heat-resistant steels and method
CN104120241A (en) Local post weld heat treatment method for adapter tube seat butt joint
CN207749153U (en) A kind of pipeline-weld heat treatment heating and heat insulation integrated device
CN104789749B (en) Method for heat treatment of welded joint in tube panel
CN104515393A (en) Atmosphere passing cover type mobile trolley furnace
CN207176024U (en) A kind of new and effective heat-treatment furnace
CN207944125U (en) A kind of Equipment for Heating Processing of alloy material
CN104073609B (en) A kind of continuous type vacuum atmosphere heat treatment furnace
CN105624387A (en) Heating and cooling method for post-weld heat treatment of pipe fittings
CN201390766Y (en) Annealing heat treatment device for super-huge roller chain gate leaves and integral gate slots
CN202090028U (en) Heating device used for realizing thermal treatment of fillet welds of small-diameter tubes
CN112176160B (en) On-site composite heat treatment method for pipe connecting seat
CN213086050U (en) High-temperature heating surface welded junction and fin weld seam postweld heat treatment device
CN205893340U (en) Wheel hub heat treatment device
CN209545896U (en) A kind of heating device for the experiment of piping thermal (temperature difference) stress
CN206176372U (en) W type gas fired radiant tubes of solar heat protection crackle
CN207176030U (en) A kind of annealing furnace spout device for more specification coiled materials
CN205289281U (en) Flexible ribbed steel bar stress relieving formula production line of adjusting dephosphorization
CN209178438U (en) A kind of wound form heat treatment tooling
CN109280761B (en) Stress-relieving construction operation method for carbon steel pipe in field acidic environment
CN108754113A (en) A kind of local heat dissipation type pipe group weld seam heat treatment process of whole heating
CN203890407U (en) Detachable split internal insulation device of large-diameter thick-wall pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant