CN109277713A - Torsion beam welding procedure after a kind of CS9 - Google Patents

Torsion beam welding procedure after a kind of CS9 Download PDF

Info

Publication number
CN109277713A
CN109277713A CN201710588595.0A CN201710588595A CN109277713A CN 109277713 A CN109277713 A CN 109277713A CN 201710588595 A CN201710588595 A CN 201710588595A CN 109277713 A CN109277713 A CN 109277713A
Authority
CN
China
Prior art keywords
welding
assembly
welded
torsion beam
crossbeam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710588595.0A
Other languages
Chinese (zh)
Inventor
刘登发
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hengyang Fengshun Automobile Axle Co Ltd
Original Assignee
Hengyang Fengshun Automobile Axle Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hengyang Fengshun Automobile Axle Co Ltd filed Critical Hengyang Fengshun Automobile Axle Co Ltd
Priority to CN201710588595.0A priority Critical patent/CN109277713A/en
Publication of CN109277713A publication Critical patent/CN109277713A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K31/00Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups
    • B23K31/02Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups relating to soldering or welding

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)
  • Vehicle Body Suspensions (AREA)
  • Automobile Manufacture Line, Endless Track Vehicle, Trailer (AREA)

Abstract

Torsion beam welding procedure after a kind of CS9, it is characterized in that carry out sequence welding after first being cleaned each relay part to be welded.Product can guarantee the consistency of torsion beam assembly weld size and each portion's shape, easy to operate, safety, high production efficiency, at low cost, have application value.

Description

Torsion beam welding procedure after a kind of CS9
Technical field
The present invention relates to a kind of metal parts welding procedure, torsion beam welding procedure after especially a kind of CS9.
Background technique
Torsion beam is an important component on automobile rear chassis, and the two sides of torsion beam are mounted with wheel hub and brake disc etc. zero Part is mounted with damping device and swing arm on its four angles of front-rear direction respectively, is connected by damping device and swing arm with vehicle body It connects, when vehicle traveling is in flat road surface, torsion beam quadrangle stress balance, automobile balance traveling, torsion beam middle section is substantially Do not play twisting action;When running car is at uneven road surface, automobile back wheel is one high and one low, and twisting states are presented in body of a motor car, The torsional moment of vehicle body is transmitted in torsion beam at this time, and the torsion of vehicle body is eliminated by the rigid torsion of torsion beam, makes automobile still The state of energy board balance traveling.
The welding procedure of current torsion beam is that all punching parts are all uniformly installed on welding tooling, after spot welding, Unify full weldering again, due to the difference of welding sequence and welding parameter, causes the torsion dye assembly of welding in shape and size, installation Size is inconsistent, influences the assembly of rear process, and inconvenient for operation, and production efficiency is low, at high cost.
Summary of the invention
The purpose of the invention is to overcome the above-mentioned shortcoming of the prior art, and it is consistent to provide a kind of shape, size Good, easy to operate, the torsion beam welding procedure after high production efficiency, CS9 at low cost of property.
For achieving the above object, the concrete technology method that the present invention uses is first to clean each relay part to be welded Carry out sequence welding afterwards: the part that equal group is welded, such as conduit, trailing arm outside plate, trailing arm inner plate, side rail are installed to special welding On fixture, with each group welding piece of Robot Spot Welding, each group welding piece is then welded entirely again;By crossbeam, brake pipe bracket is reinforced under crossbeam Part, torsion bar assembly are installed on welding fixture special, with each group welding piece of Robot Spot Welding, then weld each group welding piece entirely again;It will weldering Connect trailing arm component, crossbeam assembly, shock absorber support assembly, spring mounting seat, buffer limit seat, reinforcer on crossbeam stays dynamic draw Lock support, flange connections assembly are installed on welding fixture special, and with each weld assembly of Robot Spot Welding, then full weldering is each again Component;Torsion beam assembly will have been welded and carried out artificial full inspection, the position not being soldered to carries out artificial repair welding, manually removes welding slag, welds At seam exhaustive test and label is performed with marking pen;By the good torsion beam assembly of repair welding, it is special that processing is installed to crane hanging The processing of flange both ends of the surface is carried out on machine, guarantees the angle of mounting surface and the size of each fitting machine;Manually each processing is removed with file The burr at position.
For the present invention due to using process above method, product can guarantee the one of torsion beam assembly weld size and each portion's shape Cause property, easy to operate, safety is high production efficiency, at low cost, has application value.
Specific embodiment
Torsion beam welding procedure after a kind of CS9, carry out sequence welding after first being cleaned each relay part to be welded: by etc. groups The part of weldering, such as conduit, trailing arm outside plate, trailing arm inner plate, side rail is installed on welding fixture special, each with Robot Spot Welding Then group welding piece welds each group welding piece entirely again;By crossbeam, brake pipe bracket, reinforcer under crossbeam, torsion bar assembly is installed to dedicated On welding fixture, with each group welding piece of Robot Spot Welding, each group welding piece is then welded entirely again;Trailing arm component will be welded, crossbeam assembly subtracts Shake device bracket assembly, spring mounting seat, buffer limit seat, reinforcer on crossbeam stays dynamic zipper bracket, flange connections assembly peace It is attached on welding fixture special, with each weld assembly of Robot Spot Welding, then welds each component entirely again;Torsion beam assembly will have been welded Artificial full inspection is carried out, the position not being soldered to carries out artificial repair welding, manually removes welding slag, and commissure exhaustive test simultaneously uses marking pen Perform label;By the good torsion beam assembly of repair welding, it is installed on special machine tool with crane hanging and carries out flange both ends of the surface processing, Guarantee the angle of mounting surface and the size of each fitting machine;The burr of each working position is manually removed with file.

Claims (1)

1. torsion beam welding procedure after a kind of CS9, it is characterized in that carry out sequence welding after first being cleaned each relay part to be welded: The part that equal group is welded, such as conduit, trailing arm outside plate, trailing arm inner plate, side rail are installed on welding fixture special, use robot Each group welding piece of spot welding, then welds each group welding piece entirely again;By crossbeam, brake pipe bracket, reinforcer under crossbeam, the installation of torsion bar assembly Onto welding fixture special, with each group welding piece of Robot Spot Welding, each group welding piece is then welded entirely again;Trailing arm component, crossbeam will be welded Assembly, shock absorber support assembly, spring mounting seat, buffer limit seat, reinforcer on crossbeam stay dynamic zipper bracket, flange connection Part assembly is installed on welding fixture special, with each weld assembly of Robot Spot Welding, then welds each component entirely again;Torsion will have been welded Power beam assembly carries out artificial full inspection, and the position not being soldered to carries out artificial repair welding, manually removes welding slag, commissure exhaustive test is simultaneously Label is performed with marking pen;By the good torsion beam assembly of repair welding, it is installed on special machine tool with crane hanging and carries out flange two End face processing, guarantees the angle of mounting surface and the size of each fitting machine;The burr of each working position is manually removed with file.
CN201710588595.0A 2017-07-19 2017-07-19 Torsion beam welding procedure after a kind of CS9 Pending CN109277713A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710588595.0A CN109277713A (en) 2017-07-19 2017-07-19 Torsion beam welding procedure after a kind of CS9

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710588595.0A CN109277713A (en) 2017-07-19 2017-07-19 Torsion beam welding procedure after a kind of CS9

Publications (1)

Publication Number Publication Date
CN109277713A true CN109277713A (en) 2019-01-29

Family

ID=65184790

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710588595.0A Pending CN109277713A (en) 2017-07-19 2017-07-19 Torsion beam welding procedure after a kind of CS9

Country Status (1)

Country Link
CN (1) CN109277713A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114131294A (en) * 2021-11-26 2022-03-04 四川建安工业有限责任公司 Method for manufacturing rear torsion beam suspension

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114131294A (en) * 2021-11-26 2022-03-04 四川建安工业有限责任公司 Method for manufacturing rear torsion beam suspension

Similar Documents

Publication Publication Date Title
CN207013924U (en) For welding the fixture of front longitudinal assembly
CN207106626U (en) Truck Frame Structure
CN208558933U (en) A kind of rear torsion beam of automobile
CN205834472U (en) A kind of automobile tail light puppet's welder
CN103818209A (en) Automobile, rear torsion beam assembly of same and processing technique of rear torsion beam assembly
CN207683600U (en) Fore sub frame and automobile
CN203519327U (en) Endurance test device for automobile steering knuckle
CN109277713A (en) Torsion beam welding procedure after a kind of CS9
CN202879188U (en) Automobile rear torsion beam
CN207657829U (en) A kind of combination installation holder structure for installing tread cleaner and brake clamp
CN102615411B (en) Punching weldering hoof hot-riveting device and hot riveting technique thereof
CN103068667A (en) Method for mounting a front axle/cradle assembly to a body part of a motor vehicle
CN217344261U (en) Turnover tool suitable for welding middle floor of body in white
CN204398790U (en) Trailing arm assembly after a kind of
CN106379122B (en) Swing arm assembly, suspension and automobile
CN206086259U (en) Shock absorber support turns round roof beam assembly after and
CN204893294U (en) Front longitudinal assembly welds anchor clamps
CN205097197U (en) Car braking maneuver manipulator
CN205290209U (en) New forms of energy car B post beam assembly welding jig
CN209062327U (en) A kind of rosin joint leak inductance device for robot automatic arc stud welding machine
CN203713467U (en) Back torsion beam assembly of automobile and automobile
CN105436789A (en) Welding clamp of B pillar cross beam assembly of new energy vehicle
CN210587913U (en) Automotive suspension welding tool
CN217493230U (en) Oil pipe support, support assembly, pipe clamp and bridge body point fixing tool
CN204893295U (en) Automobile threshold assembly welding jig

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190129