CN109267672A - The structure and assembly method of special-shaped I-steel connection shear wall and coupling beam - Google Patents

The structure and assembly method of special-shaped I-steel connection shear wall and coupling beam Download PDF

Info

Publication number
CN109267672A
CN109267672A CN201811328970.9A CN201811328970A CN109267672A CN 109267672 A CN109267672 A CN 109267672A CN 201811328970 A CN201811328970 A CN 201811328970A CN 109267672 A CN109267672 A CN 109267672A
Authority
CN
China
Prior art keywords
steel
coupling beam
prefabricated
connection
shaped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811328970.9A
Other languages
Chinese (zh)
Inventor
李明
董胜男
吕安安
魏大勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Jianzhu University
Original Assignee
Shenyang Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Jianzhu University filed Critical Shenyang Jianzhu University
Priority to CN201811328970.9A priority Critical patent/CN109267672A/en
Publication of CN109267672A publication Critical patent/CN109267672A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • E04B1/4107Longitudinal elements having an open profile, with the opening parallel to the concrete or masonry surface, i.e. anchoring rails
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • E04B2001/4192Connecting devices specially adapted for embedding in concrete or masonry attached to concrete reinforcing elements, e.g. rods or wires

Abstract

The present invention relates to prefabricated concrete structure field, the specially a kind of structure and assembly method of special-shaped I-steel connection shear wall and coupling beam.It when the link length of shear wall in prefabricated concrete structure is greater than 3m or engineering is distinctly claimed, is split at the both ends of coupling beam and shear wall link position, forms the structure being made of two panels dry wall and a prefabricated coupling beam and split assembled system;Built-in connection is respectively set in the side of dry wall and the two sides of prefabricated coupling beam, prefabricated coupling beam is located between two dry walls, and the built-in connection between prefabricated coupling beam and dry wall is corresponding, passes through special-shaped I-steel connection between the built-in connection being oppositely arranged;The present invention, with the shear wall of coupling beam, will split into the assembled connection method of dry wall, prefabricated coupling beam or two panels prefabricated band beam wall assembly connection structure and proposition, each component fractionation position is reasonable, makes and transports convenient for component in concrete frame shear structure.

Description

The structure and assembly method of special-shaped I-steel connection shear wall and coupling beam
[technical field]
The present invention relates to prefabricated concrete structure field, specially a kind of special-shaped I-steel connection shear wall and coupling beam Structure and assembly method.
[background technique]
Prefabricated concrete structure develops rapidly in China in recent years, and shear wall structure China application in tall buildings is most The assembly method of one of structure type, research assembly concrete shear wall structure has important engineering significance, and is directed at present The assembly method research of Shear-wall Connecting Beam Used is also less.Inventor is directed to the proposition of prefabricated concrete structure frame-shear structure coupling beam before It splits structure and patent " the assembled connection structure of assembly concrete frame-shear structure Shear-wall Connecting Beam Used is shown in assembling scheme, authorization The assembled connection structure and method of (Authorization Notice No. CN204225283U), assembly concrete frame-shear structure Shear-wall Connecting Beam Used (publication number CN104481031A) " mainly utilizes the thought of reinforcing bar equivalent substitution, that is, uses single list in these inventions The equivalent more multiple row reinforcing bars of column reinforcing bar, it is more demanding to grouting technique in construction, and when cross-section of coupling beam or larger arrangement of reinforcement, it should Kind method is not applicable.Later, inventor proposes " a kind of U-shaped steel item-connector connection Shear-wall Connecting Beam Used structure and assembly side again Method " and " the energy-dissipating and shock-absorbing connection structure and assembly method of assembly concrete coupling beam " disclose and have entered patent of invention reality Matter inspection phase.The two patents of invention, in node connection, although using steel structure connection method, finally in junction It is still using grout filling, there are a small amount of wet constructions, and the grouting material filled also functions to the effect of power transmission.Also, it is above-mentioned Connection method is connect primarily directed to the coupling beam in frame-shear structure with shear wall.
For this purpose, the present invention proposes " structure and assembly method of special-shaped I-steel connection shear wall and coupling beam ", which exists Construction site completely without wet construction, and is suitable for connection and the shear wall knot of frame-shear structure shear wall and coupling beam The connection of structure shear wall and coupling beam, construction efficiency is higher, and quality of connection is easier to ensure that, it is wider to try out range.
[summary of the invention]
The purpose of the present invention is to provide the structures and assembly method of a kind of special-shaped I-steel connection shear wall and coupling beam, lead to Cross the connection that shear wall and coupling beam are realized using the method for special-shaped I-steel and built-in fitting.
Technical solution of the present invention:
A kind of structure of abnormity I-steel connection shear wall and coupling beam, including two kinds of structures are as follows:
(1) when the link length of shear wall in prefabricated concrete structure is greater than 3m or engineering is distinctly claimed, even The both ends of beam and shear wall link position are split, and are formed the structure being made of two panels dry wall and a prefabricated coupling beam and are split assembly System;Built-in connection is respectively set in the side of dry wall and the two sides of prefabricated coupling beam, prefabricated coupling beam is located at two dry walls Between, the built-in connection between prefabricated coupling beam and dry wall is corresponding, passes through abnormity between the built-in connection being oppositely arranged I-steel connection;
(2) when the link length of assembly concrete shear wall, which is less than 3m or engineering, to be distinctly claimed, coupling beam across Middle fractionation forms and respectively splits assembled system with the structure that half central sill is oppositely arranged by two panels prefabricated band Liang Qiang;It is prefabricated in two panels Built-in connection is respectively set in central sill opposite side with Liang Qiang, passes through special-shaped I-steel between the built-in connection being oppositely arranged Connection;
Wherein, special-shaped I-steel is made of vertical plate, transverse plate, convex ribs, and the transverse plate setting up and down of vertical plate is in I-shaped Type structure, superposed transverse plate top both ends are wholely set parallel convex ribs, positioned at the transverse plate bottom both ends one of lower part Parallel convex ribs are arranged in body, and the two sides of special-shaped I-steel are connect with built-in connection respectively, and special-shaped I-steel passes through upper and lower two Convex ribs cooperate with two groove insertings up and down of built-in connection respectively, and the center of special-shaped I-steel opens up circular hole.
The structure of special-shaped I-steel the connection shear wall and coupling beam, built-in connection includes anchor bar, company with holes Steel plate, L-type steel plate and connecting hole are connect, the quadrangle of junction steel plate with holes opens up connecting hole respectively, and anchor bar is about two flat Row setting, U-shaped structure, each anchor bar both ends are each passed through connecting hole and junction steel plate with holes forms one, anchor bar Bottom be close to the inside of junction steel plate with holes, weld about two and be arranged in parallel the inner surface of junction steel plate with holes is opposite L-type steel plate, each L-type steel plate is respectively positioned on the inboard of an anchor bar, the L-type steel plate inside with junction steel plate with holes respectively Surface forms groove, and upper and lower two grooves are opposite.
The structure of special-shaped I-steel the connection shear wall and coupling beam, dry wall includes framework of steel reinforcement, built-in connection And concrete, built-in connection are plugged in a upper lateral part of framework of steel reinforcement by anchor bar, concreting is in framework of steel reinforcement Inner side and outer side;Framework of steel reinforcement is that precast shear wall indulges muscle, precast shear wall horizontal bar, precast shear wall lacing wire and prefabricated shearing Wall confined boundary member stirrup composition, two rows of precast shear walls are indulged muscle and are oppositely arranged in parallel, and every row's precast shear wall is indulged between muscle It being connected by precast shear wall horizontal bar, the precast shear wall being oppositely arranged, which is indulged, to be connected between muscle by precast shear wall lacing wire, Two rows of precast shear walls indulge outside between the edge of muscle and precast shear wall confined boundary member stirrup are arranged in parallel up and down.
The structure of special-shaped I-steel the connection shear wall and coupling beam, prefabricated coupling beam includes framework of steel reinforcement, pre-buried connection Part and concrete, built-in connection pass through the two sides that anchor bar is plugged in framework of steel reinforcement respectively, and concreting is in reinforcing bar Frame inner side and outer side;Framework of steel reinforcement is that prefabricated coupling beam indulges muscle and prefabricated coupling beam stirrup composition, the prefabricated coupling beam stirrup parallel of rectangle Cloth, rectangle prefabricated coupling beam stirrup inside quadrangle are respectively set prefabricated coupling beam and indulge muscle.
The Standard method of special-shaped I-steel the connection shear wall and coupling beam, the assembly of prefabricated coupling beam and dry wall Include the following steps:
(1) prefabricated coupling beam is hung between two panels dry wall, two prefabricated special-shaped I-steel is inserted into pre-buried company respectively In the groove that the L-type steel plate and junction steel plate with holes of fitting are formed;
(2) corresponding benzene plate I is installed in special-shaped I-steel surrounding and benzene plate II, two benzene plates I is installed on special-shaped I-steel Upper and lower surface, the upper and lower surface of benzene plate I and special-shaped I-steel uses profile-followed structure, and two benzene plates II are installed on special-shaped I-steel Left and right surface, the left and right surface of benzene plate II and special-shaped I-steel uses profile-followed structure;
(3) benzene plate I and benzene plate II are closely covered into the both ends junction in dry wall and prefabricated coupling beam and then will be prefabricated Good groove profile cover board I and the correspondence of groove profile cover board II are covered in the benzene plate put well, and bolt leads to from the bolt hole of groove profile cover board I The circular hole for crossing special-shaped I-steel center, across the bolt hole of the groove profile cover board II of the other side, and tightens fixation with nut;
(4) after the completion of prefabricated coupling beam is connect with dry wall, glass cement is smeared around nut, guarantees that junction side is flat It is whole.
The Standard method of special-shaped I-steel the connection shear wall and coupling beam, two panels prefabricated band Liang Qiang is respectively with half The assembly of central sill includes the following steps:
(1) two panels prefabricated band Liang Qiang lifting is in place, and pre-buried company is inserted at the both ends of a prefabricated special-shaped I-steel respectively In the groove that the L-type steel plate and junction steel plate with holes of fitting are formed;
(2) corresponding benzene plate I is installed in special-shaped I-steel surrounding and benzene plate II, two benzene plates I is installed on special-shaped I-steel Upper and lower surface, the upper and lower surface of benzene plate I and special-shaped I-steel uses profile-followed structure, and two benzene plates II are installed on special-shaped I-steel Left and right surface, the left and right surface of benzene plate II and special-shaped I-steel uses profile-followed structure;
(3) benzene plate I and benzene plate II are closely covered between prefabricated band beam wall junction and then by prefabricated groove profile Cover board I and the correspondence of groove profile cover board II are covered in the benzene plate put well, and bolt passes through special-shaped work from the bolt hole of groove profile cover board I The circular hole at word steel center across the bolt hole of the groove profile cover board II of the other side, and tightens fixation with nut;
(4) after the completion of two panels prefabricated band Liang Qiang connection, glass cement is smeared around nut, guarantees junction flat side down.
The Standard method of the described connection of special-shaped I-steel shear wall and coupling beam, in step (3), I He of groove profile cover board The size of indent at the bolt hole that groove profile cover board II is arranged, indent is higher than nut height 2mm, and the side length of indent square-section is greater than Head diameter 10mm.
The Standard method of special-shaped I-steel the connection shear wall and coupling beam, the manufacturing process of dry wall are as follows:
(1) binding precast shear wall indulges muscle and precast shear wall confined boundary member stirrup, forms the pact of dry wall end Then beam edge member reinforcing bar binds other precast shear walls and indulges muscle and precast shear wall horizontal bar, finally binds prefabricated shearing Wall lacing wire forms the framework of steel reinforcement of dry wall;
(2) anchor bar of connector is inserted into framework of steel reinforcement, and is overlapped in and closes on precast shear wall constrained edge Component stirrup top, and welded with mutually overlap joint precast shear wall confined boundary member stirrup, it is then pre- in framework of steel reinforcement outer support Shear wall formwork processed, the casting concrete in precast shear wall template conserve 28 days, remove precast shear wall template, are formed pre- Wall processed.
The Standard method of special-shaped I-steel the connection shear wall and coupling beam, the manufacturing process of prefabricated coupling beam is such as Under:
Prefabricated coupling beam is bound first and indulges muscle and prefabricated coupling beam stirrup, forms the framework of steel reinforcement of prefabricated coupling beam;It then will be pre-buried The anchor bar of connector is inserted into framework of steel reinforcement, and anchor bar and prefabricated coupling beam are indulged muscle welding;Then in framework of steel reinforcement The prefabricated coupling beam template of outer support, finally the casting concrete in prefabricated coupling beam template, conserves 28 days, removes prefabricated coupling beam template, Form prefabricated coupling beam.
The invention has the advantages and beneficial effects that:
1. the present invention, with the shear wall of coupling beam, will split into dry wall, prefabricated coupling beam or two panels in concrete frame shear structure The assembled connection method of prefabricated band beam wall assembly connection structure and proposition, it is reasonable that each component splits position, convenient for component production and Transport.
2. the present invention can realize the transmitting of splicing prefabricated components moment of flexure and shearing well in mechanical property, guarantee to connect What is connect is reliable, meets the design requirement of " strong ties " in structure design, while in the web holes of special-shaped I-steel, shaking greatly When, junction is easier to enter plasticity, can better meet energy consumption requirement of the coupling beam as the first line of defence.
3. in structure, the present invention be suitable for any sectional dimension and arrangement of reinforcement coupling beam, be suitable for shear wall structure and The connection of frame-shear structure coupling beam and shear wall, the scope of application are wider.
4. the present invention reduces dress in assembly convenient for component production, transport and lifting installation to greatest extent in construction Easy to operate with space requirement, joint efficiency is high.
5. connecting live wet-less operation between prefabricated components of the present invention, assembly rate is high, improves assembling degree, realizes that energy conservation subtracts Row, raises labour productivity, and improves construction quality, shortens the construction period.
Detailed description of the invention
Fig. 1 is built-in fitting anchor bar three-dimensional figure.
Fig. 2 is built-in fitting troughing plate three-dimensional figure with holes.
Fig. 3 is the three-dimensional figure of built-in fitting.
Fig. 4 is the three-dimensional figure of precast shear wall arrangement of reinforcement.
Fig. 5 is that connector connect the three-dimensional figure completed with Fig. 4.
Fig. 6 is the three-dimensional figure that the shear wall (abbreviation dry wall) of prefabricated band connector completes.
Fig. 7 is the arrangement of reinforcement three-dimensional figure of prefabricated coupling beam.
Fig. 8 is that built-in connection connect the three-dimensional figure completed with Fig. 7.
Fig. 9 is the three-dimensional figure that the coupling beam (referred to as prefabricated coupling beam) of prefabricated band connector completes.
Figure 10 is the three-dimensional figure of the I-shaped connector of abnormity.
Figure 11 is dry wall and the process three-dimensional figure that prefabricated coupling beam is assembled by Figure 10.
Figure 12 is prefabricated coupling beam and the three-dimensional figure that dry wall is completed.
Figure 13 is the three-dimensional figure of benzene plate.Wherein, (a) is benzene plate I, (b) is benzene plate II.
Figure 14 is the three-dimensional figure with hole-and-slot cover board.
Figure 15 is the three-dimensional figure that benzene plate and cover board are fixed on to beam-ends.
Figure 16 is the three-dimensional figure that prefabricated coupling beam and dry wall assemble completion by special-shaped I-steel.
Figure 17 is the three-dimensional figure that the shear wall (abbreviation prefabricated band Liang Qiang) of prefabricated band half coupling beam completes.
Figure 18 is the three-dimensional figure that two panels prefabricated band Liang Qiang is completed.
Figure 19 is the three-dimensional figure that prefabricated band Liang Qiang assembles completion by special-shaped work steel.
Figure 20 is that prefabricated band Liang Qiang assembles completion by special-shaped work steel and smears the three-dimensional figure of glass cement.
In figure, 1, anchor bar;2, junction steel plate with holes;3, L-type steel plate;4, connecting hole;5, built-in connection;6, prefabricated Shear wall indulges muscle;7, precast shear wall horizontal bar;8, precast shear wall lacing wire;9, precast shear wall confined boundary member stirrup; 10, the shear wall (abbreviation dry wall) of prefabricated band connector;11, prefabricated coupling beam indulges muscle;12, prefabricated coupling beam stirrup;13, prefabricated band The coupling beam (referred to as prefabricated coupling beam) of connector;14, special-shaped I-steel;15, benzene plate I;16, benzene plate II;17, groove profile cover board I;18, Bolt;19, glass cement;20, prefabricated band Liang Qiang;21, groove profile cover board II;22, vertical plate;23, transverse plate;24, convex ribs;25 bolts Hole.
Specific embodiment
As shown in fig. 1 to figure 20, the I-shaped steel bar of assembly concrete abnormity of the present invention-connector connects Shear-wall Connecting Beam Used Structure and assembly method, including two kinds of embodiments, specific as follows:
(1) shown in Fig. 1-Figure 16, when the link length of shear wall in prefabricated concrete structure be greater than 3m or engineering have it is bright It when really requiring, is split at the both ends of coupling beam and shear wall link position, forms the shear wall (abbreviation by two panels prefabricated band connector Dry wall) 10 and the structure that constitutes of coupling beam (referred to as prefabricated coupling beam) 13 of a prefabricated band connector split assembled system.
(1) as shown in Fig. 1-Fig. 3, Figure 11, in order to realize the connection of dry wall 10 and prefabricated coupling beam 13, in 10 He of dry wall Built-in connection 5 is set in prefabricated coupling beam 13.
Built-in connection 5 includes anchor bar 1, junction steel plate with holes 2, L-type steel plate 3 and connecting hole 4, junction steel plate with holes 2 quadrangle opens up connecting hole 4 respectively, anchor bar 1 be about two be arranged in parallel, U-shaped structure, each 1 both ends of anchor bar It is each passed through connecting hole 4 and junction steel plate 2 with holes forms one, the interior of junction steel plate 2 with holes is close in the bottom of anchor bar 1 Side, in inner surface about the two L-type steel plates 3 disposed in parallel of opposite welding of junction steel plate 2 with holes, each L-type steel plate 3 is Positioned at the inboard of an anchor bar 1, L-type steel plate 3 respectively with the inner surface of junction steel plate 2 with holes formed groove, upper and lower two A groove is opposite, forms an integral built-in part in this way.The length of anchor bar 1 is transmitted moment of flexure according to prefabricated coupling beam 13 and is caused just The size of stress, which calculates, to be determined.The thickness of junction steel plate 2 with holes, length and width are drawn also according to prefabricated coupling beam 13 transmitting moment of flexure The size for playing direct stress, which calculates, to be determined, while the width of junction steel plate with holes 2 need to be smaller than the width of prefabricated coupling beam 13, the ruler being less than The very little groove profile cover board I 17 with holes more than or equal to Figure 14, II 21 thickness of groove profile cover board.
(2) as shown in Figure 4-Figure 6, dry wall 10 mainly includes framework of steel reinforcement, built-in connection 5 and concrete, pre-buried company Fitting 5 is plugged in a upper lateral part of framework of steel reinforcement by anchor bar 1, and concreting is in framework of steel reinforcement inner side and outer side;Steel Tendons skeleton is that precast shear wall indulges muscle 6, precast shear wall horizontal bar 7, precast shear wall lacing wire 8 and precast shear wall constrained edge Component stirrup 9 forms, and two rows of precast shear walls are indulged muscle 6 and are oppositely arranged in parallel, and every row's precast shear wall is indulged between muscle 6 by prefabricated Shear wall horizontal bar 7 connects, and the precast shear wall being oppositely arranged is indulged and connected between muscle 6 by precast shear wall lacing wire 8, two rows of pre- Shear wall processed indulges outside between the edge of muscle 6 and precast shear wall confined boundary member stirrup 9 is arranged in parallel up and down.
The manufacturing process of dry wall 10 is as follows:
As shown in figure 4, binding precast shear wall first indulges muscle 6 and precast shear wall confined boundary member stirrup 9, formed pre- Then the confined boundary member reinforcing bar of 10 end of wall processed binds other precast shear walls and indulges muscle 6 and precast shear wall horizontal bar 7, Precast shear wall lacing wire 8 is finally bound, the framework of steel reinforcement of dry wall 10 is formed.
As shown in figure 5, the anchor bar 1 of connector 5 is inserted into framework of steel reinforcement, and it is overlapped in and closes on precast shear wall 9 top of confined boundary member stirrup, and welded with mutually overlap joint precast shear wall confined boundary member stirrup 9, then in reinforcing bar Frame outer support precast shear wall template, the casting concrete in precast shear wall template conserve 28 days, remove precast shear wall mould Plate forms dry wall 10, sees Fig. 6.
(3) as shown in figs. 7 to 9, prefabricated coupling beam 13 includes framework of steel reinforcement, built-in connection 5 and concrete, pre-buried connection Part 5 is plugged in the two sides of framework of steel reinforcement by anchor bar 1 respectively, and concreting is in framework of steel reinforcement inner side and outer side;Reinforcing bar Skeleton is that prefabricated coupling beam indulges muscle 11 and prefabricated coupling beam stirrup 12 forms, prefabricated 12 parallel arrangement of coupling beam stirrup of rectangle, and rectangle is prefabricated 12 inside quadrangle of coupling beam stirrup is respectively set prefabricated coupling beam and indulges muscle 11.
The manufacturing process of prefabricated coupling beam 13 is as follows:
As shown in fig. 7, binding prefabricated coupling beam first indulges muscle 11 and prefabricated coupling beam stirrup 12, the reinforcing bar of prefabricated coupling beam is formed Frame;As shown in figure 8, then the anchor bar 1 of built-in connection 5 is inserted into framework of steel reinforcement, by anchor bar 1 and prefabricated company Beam is indulged muscle 11 and is welded;As shown in figure 9, then in the prefabricated coupling beam template of framework of steel reinforcement outer support, finally in prefabricated coupling beam template Casting concrete conserves 28 days, removes prefabricated coupling beam template, form prefabricated coupling beam 13.
(4) dry wall 10 and prefabricated coupling beam 13 are connected using special-shaped I-steel 14.
As shown in Figure 10, special-shaped I-steel 14 is made of vertical plate 22, transverse plate 23, convex ribs 24, above and below vertical plate 22 It is in I-shaped structure that transverse plate 23, which is arranged, and superposed 23 top both ends of transverse plate are wholely set parallel convex ribs 24, are located at The transverse plate bottom both ends of lower part are wholely set parallel convex ribs, and the two sides of special-shaped I-steel 14 connect with built-in connection 5 respectively It connects, special-shaped I-steel 14 is cooperated with two groove insertings up and down of built-in connection 5 respectively by upper and lower two convex ribs, special-shaped work The center of word steel 14 opens up circular hole.
(5) as shown in Figure 11-Figure 16, the assembling process of dry wall 10 and prefabricated coupling beam 13 is as follows:
As shown in figure 11, prefabricated coupling beam 13 is hung between two panels dry wall 10, by two prefabricated special-shaped I-steel 14 In the groove that the L-type steel plate 3 and junction steel plate 2 with holes for being inserted into built-in connection 5 respectively are formed, connection group is formed after connection locking Structure is shown in Figure 12 after conjunction.
As shown in figure 15, corresponding benzene plate I 15 and benzene plate II 16 (see Figure 13) be installed in special-shaped 14 surrounding of I-steel, two Benzene plate I 15 is installed on the upper and lower surface of special-shaped I-steel 14, and benzene plate I 15 and the upper and lower surface of special-shaped I-steel 14 are tied using profile-followed Structure, two benzene plates II 16 are installed on the left and right surface of special-shaped I-steel 14, the left and right surface of benzene plate II 16 and special-shaped I-steel 14 Using profile-followed structure.
It as shown in figure 14, include the groove profile cover board I 17 and groove profile cover board II 21 being oppositely arranged, groove profile lid with hole-and-slot cover board The center of plate I 17 and groove profile cover board II 21 opens up bolt hole 25 respectively.
Benzene plate (benzene plate I 15 and benzene plate II 16) is closely covered the both ends junction of dry wall 10 and prefabricated coupling beam 13 it Afterwards, then by prefabricated groove profile cover board I 17 and groove profile cover board II 21 (see Figure 14) correspondence it covers in the benzene plate put well, bolt Groove profile of 18 (see the Figure 15) from the bolt hole 25 of groove profile cover board I 17, by the circular hole at special-shaped 14 center of I-steel, across the other side The bolt hole 25 of cover board II 21, and fixation is tightened with nut.Wherein, the bolt that groove profile cover board I 17 and groove profile cover board II 21 are arranged Indent at hole, the size of indent are higher than nut height 2mm, and the side length of indent square-section is greater than head diameter 10mm, to meet The requirement of bolt installation.
As shown in Figure 16-Figure 17, after the completion of prefabricated coupling beam 13 is connect with dry wall 10, glass cement is smeared around nut 19, guarantee junction flat side down.
The force-transmission mechanism of this kind of assembly method is moment of flexure and shearing between prefabricated coupling beam 13 and dry wall 10, by pre- Connector 5 and the effectively transmitting of special-shaped I-steel 14 are buried, and the benzene plate of connecting portion and cover board only play maintenance, not power transmission.? When big shake, because of special-shaped 14 web holes of I-steel, it is easier to enter plasticity, can preferably better meet coupling beam as first The energy consumption requirement in road defence line.
(2) as shown in Figure 18-Figure 20, have clearly when the link length of assembly concrete shear wall is less than 3m or engineering It is required that when, it is split in the span centre of coupling beam, is formed and respectively split with the structure that half central sill is oppositely arranged by two panels prefabricated band beam wall 20 Assembled system.
Company of the connection structure of built-in connection 5 and 20 central sill of prefabricated band beam wall with built-in connection 5 and prefabricated coupling beam 13 The same cast-in-place structural of production method of binding structure, prefabricated band beam wall central sill and wall.
When assembling, first two panels prefabricated band beam wall 20 is lifted in place, special-shaped i shaped steel 14 is then mounted on the two Between, installation method is identical with (one).This kind splits erection method, and force-transmission mechanism is identical as above-mentioned (one) mode.
Result of implementation shows that the present invention with the shear wall of coupling beam, will split into dry wall, prefabricated in concrete frame shear structure The assembled connection method of coupling beam or two panels prefabricated band beam wall assembly connection structure and proposition:, can be real well in mechanical property The transmitting for now splicing prefabricated components moment of flexure and shearing, guarantees the reliable of connection, and the design for meeting " strong ties " in structure design is wanted It asks, while in big shake, junction is easier to enter plasticity, and the energy consumption that can better meet coupling beam as the first line of defence is wanted It asks;In structure, suitable for the coupling beam of any sectional dimension and arrangement of reinforcement, be suitable for shear wall structure and frame-shear structure coupling beam and The connection of shear wall, the scope of application are wider;Convenient for component production, transport and lifting installation in construction, when assembly to greatest extent Reduction assembly space demand, easy to operate, joint efficiency is high;Wet-less operation is connected between prefabricated components, assembly rate is high, improves dress It with degree is changed, realizes energy-saving and emission-reduction, raises labour productivity, improve construction quality, shorten the construction period.

Claims (9)

1. a kind of structure of abnormity I-steel connection shear wall and coupling beam, which is characterized in that as follows including two kinds of structures:
(1) when the link length of shear wall in prefabricated concrete structure is greater than 3m or engineering is distinctly claimed, in coupling beam Both ends and shear wall link position are split, and are formed the structure being made of two panels dry wall and a prefabricated coupling beam and are split assembled body System;Be respectively set built-in connection in the side of dry wall and the two sides of prefabricated coupling beam, prefabricated coupling beam be located at two dry walls it Between, the built-in connection between prefabricated coupling beam and dry wall is corresponding, passes through special-shaped work between the built-in connection being oppositely arranged The connection of word steel;
(2) it when the link length of assembly concrete shear wall is less than 3m or engineering is distinctly claimed, is torn open in the span centre of coupling beam Point, it is formed and assembled system is respectively split with the structure that half central sill is oppositely arranged by two panels prefabricated band Liang Qiang;In two panels prefabricated band beam Built-in connection is respectively set in the central sill opposite side of wall, is connected between the built-in connection being oppositely arranged by special-shaped I-steel It connects;
Wherein, special-shaped I-steel is made of vertical plate, transverse plate, convex ribs, and the transverse plate setting up and down of vertical plate is in I-shaped knot Structure, superposed transverse plate top both ends are wholely set parallel convex ribs, and the transverse plate bottom both ends positioned at lower part are integrally set The two sides of the convex ribs of horizontalization row, special-shaped I-steel are connect with built-in connection respectively, and special-shaped I-steel passes through upper and lower two convex ribs Cooperate respectively with two groove insertings up and down of built-in connection, the center of special-shaped I-steel opens up circular hole.
2. the structure of abnormity I-steel connection shear wall and coupling beam described in accordance with the claim 1, which is characterized in that pre-buried connection Part includes anchor bar, junction steel plate with holes, L-type steel plate and connecting hole, and the quadrangle of junction steel plate with holes opens up connecting hole respectively, Anchor bar be about two be arranged in parallel, U-shaped structure, each anchor bar both ends are each passed through connecting hole and connection steel with holes Plate forms one, and the inside of junction steel plate with holes is close in the bottom of anchor bar, opposite in the inner surface of junction steel plate with holes About two L-type steel plates disposed in parallel are welded, each L-type steel plate is respectively positioned on the inboard of an anchor bar, L-type steel plate difference Groove is formed with the inner surface of junction steel plate with holes, upper and lower two grooves are opposite.
3. the structure of abnormity I-steel connection shear wall and coupling beam described in accordance with the claim 1, which is characterized in that dry wall packet Framework of steel reinforcement, built-in connection and concrete are included, built-in connection is plugged in a upper lateral part of framework of steel reinforcement by anchor bar, Concreting is in framework of steel reinforcement inner side and outer side;Framework of steel reinforcement is that precast shear wall indulges muscle, precast shear wall horizontal bar, prefabricated Wall lacing wire and precast shear wall confined boundary member stirrup composition are sheared, two rows of precast shear walls are indulged muscle and are oppositely arranged in parallel, often Row's precast shear wall, which is indulged, to be connected between muscle by precast shear wall horizontal bar, and the precast shear wall being oppositely arranged is indulged to be passed through between muscle Precast shear wall lacing wire connection, two rows of precast shear walls indulge outside between the edge of muscle and precast shear wall constraint are arranged in parallel up and down Edge member stirrup.
4. the structure of abnormity I-steel connection shear wall and coupling beam described in accordance with the claim 1, which is characterized in that prefabricated coupling beam Including framework of steel reinforcement, built-in connection and concrete, built-in connection passes through two that anchor bar is plugged in framework of steel reinforcement respectively Side, concreting is in framework of steel reinforcement inner side and outer side;Framework of steel reinforcement is that prefabricated coupling beam indulges muscle and prefabricated coupling beam stirrup composition, square The prefabricated coupling beam stirrup parallel arrangement of shape, rectangle prefabricated coupling beam stirrup inside quadrangle are respectively set prefabricated coupling beam and indulge muscle.
5. a kind of Standard method of special-shaped I-steel connection shear wall and coupling beam described in claim 1, which is characterized in that The assembly of prefabricated coupling beam and dry wall includes the following steps:
(1) prefabricated coupling beam is hung between two panels dry wall, two prefabricated special-shaped I-steel is inserted into built-in connection respectively L-type steel plate and junction steel plate with holes formed groove in;
(2) corresponding benzene plate I is installed in special-shaped I-steel surrounding and benzene plate II, two benzene plates I is installed on the upper of special-shaped I-steel The upper and lower surface of lower surface, benzene plate I and special-shaped I-steel uses profile-followed structure, and two benzene plates II are installed on a left side for special-shaped I-steel The left and right surface of right surface, benzene plate II and special-shaped I-steel uses profile-followed structure;
(3) benzene plate I and benzene plate II are closely covered into the both ends junction in dry wall and prefabricated coupling beam and then will be prefabricated Groove profile cover board I and the correspondence of groove profile cover board II are covered in the benzene plate put well, and bolt is from the bolt hole of groove profile cover board I, by different The circular hole at shape I-steel center across the bolt hole of the groove profile cover board II of the other side, and tightens fixation with nut;
(4) after the completion of prefabricated coupling beam is connect with dry wall, glass cement is smeared around nut, guarantees junction flat side down.
6. a kind of Standard method of special-shaped I-steel connection shear wall and coupling beam described in claim 1, which is characterized in that Assembly of the two panels prefabricated band Liang Qiang respectively with half central sill includes the following steps:
(1) two panels prefabricated band Liang Qiang lifting is in place, and built-in connection is inserted at the both ends of a prefabricated special-shaped I-steel respectively L-type steel plate and junction steel plate with holes formed groove in;
(2) corresponding benzene plate I is installed in special-shaped I-steel surrounding and benzene plate II, two benzene plates I is installed on the upper of special-shaped I-steel The upper and lower surface of lower surface, benzene plate I and special-shaped I-steel uses profile-followed structure, and two benzene plates II are installed on a left side for special-shaped I-steel The left and right surface of right surface, benzene plate II and special-shaped I-steel uses profile-followed structure;
(3) benzene plate I and benzene plate II are closely covered between prefabricated band beam wall junction and then by prefabricated groove profile cover board I and groove profile cover board II correspondence cover in the benzene plate put well, bolt passes through special-shaped I-steel from the bolt hole of groove profile cover board I The circular hole at center across the bolt hole of the groove profile cover board II of the other side, and tightens fixation with nut;
(4) after the completion of two panels prefabricated band Liang Qiang connection, glass cement is smeared around nut, guarantees junction flat side down.
7. according to the Standard method of special-shaped I-steel connection shear wall and coupling beam described in claim 5 or 6, feature exists In in step (3), the size of indent at the bolt hole that groove profile cover board I and groove profile cover board II are arranged, indent is higher than nut height The side length of 2mm, indent square-section are greater than head diameter 10mm.
8. according to the Standard method of special-shaped I-steel connection shear wall and coupling beam described in claim 5 or 6, feature exists In the manufacturing process of dry wall is as follows:
(1) binding precast shear wall indulges muscle and precast shear wall confined boundary member stirrup, forms the binding side of dry wall end Edge member reinforcing steel bar, then binds other precast shear walls and indulges muscle and precast shear wall horizontal bar, finally binds precast shear wall and draws Muscle forms the framework of steel reinforcement of dry wall;
(2) anchor bar of connector is inserted into framework of steel reinforcement, and is overlapped in and closes on precast shear wall confined boundary member Stirrup top, and with mutually overlap joint precast shear wall confined boundary member stirrup welding, then cut framework of steel reinforcement outer support is prefabricated Power wall form, the casting concrete in precast shear wall template conserve 28 days, remove precast shear wall template, form dry wall.
9. the Standard method of special-shaped I-steel connection shear wall and coupling beam according to claim 5, which is characterized in that The manufacturing process of prefabricated coupling beam is as follows:
Prefabricated coupling beam is bound first and indulges muscle and prefabricated coupling beam stirrup, forms the framework of steel reinforcement of prefabricated coupling beam;Then by pre-buried connection The anchor bar of part is inserted into framework of steel reinforcement, and anchor bar and prefabricated coupling beam are indulged muscle welding;Then it is propped up outside framework of steel reinforcement Prefabricated coupling beam template is supportted, finally the casting concrete in prefabricated coupling beam template, conserve 28 days, remove prefabricated coupling beam template, formed Prefabricated coupling beam.
CN201811328970.9A 2018-11-09 2018-11-09 The structure and assembly method of special-shaped I-steel connection shear wall and coupling beam Pending CN109267672A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811328970.9A CN109267672A (en) 2018-11-09 2018-11-09 The structure and assembly method of special-shaped I-steel connection shear wall and coupling beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811328970.9A CN109267672A (en) 2018-11-09 2018-11-09 The structure and assembly method of special-shaped I-steel connection shear wall and coupling beam

Publications (1)

Publication Number Publication Date
CN109267672A true CN109267672A (en) 2019-01-25

Family

ID=65191903

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811328970.9A Pending CN109267672A (en) 2018-11-09 2018-11-09 The structure and assembly method of special-shaped I-steel connection shear wall and coupling beam

Country Status (1)

Country Link
CN (1) CN109267672A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110273480A (en) * 2019-07-03 2019-09-24 郑州大学 A kind of attachment device of novel concrete frame and precast concrete wall panel

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011064047A (en) * 2009-09-15 2011-03-31 Masahiko Shimizu Construction of mat foundation by connecting precast concrete foundation beam member and precast concrete foundation beam joining member to construct rising part of foundation, and integrating bottom slab with joint part by cast-in-place concrete
CN107524234A (en) * 2017-09-30 2017-12-29 沈阳建筑大学 Steel plate concrete Shear-wall Connecting Beam Used splits structure and preparation method
CN107975160A (en) * 2017-12-01 2018-05-01 沈阳建筑大学 Shear wall structure, making and assembly method with laterally attached keyway
CN207714514U (en) * 2017-11-13 2018-08-10 中国地震局工程力学研究所 The connection structure of assembly concrete shear wall and coupling beam
CN209227824U (en) * 2018-11-09 2019-08-09 沈阳建筑大学 The special-shaped I-shaped steel connection structure of shear wall and coupling beam

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011064047A (en) * 2009-09-15 2011-03-31 Masahiko Shimizu Construction of mat foundation by connecting precast concrete foundation beam member and precast concrete foundation beam joining member to construct rising part of foundation, and integrating bottom slab with joint part by cast-in-place concrete
CN107524234A (en) * 2017-09-30 2017-12-29 沈阳建筑大学 Steel plate concrete Shear-wall Connecting Beam Used splits structure and preparation method
CN207714514U (en) * 2017-11-13 2018-08-10 中国地震局工程力学研究所 The connection structure of assembly concrete shear wall and coupling beam
CN107975160A (en) * 2017-12-01 2018-05-01 沈阳建筑大学 Shear wall structure, making and assembly method with laterally attached keyway
CN209227824U (en) * 2018-11-09 2019-08-09 沈阳建筑大学 The special-shaped I-shaped steel connection structure of shear wall and coupling beam

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110273480A (en) * 2019-07-03 2019-09-24 郑州大学 A kind of attachment device of novel concrete frame and precast concrete wall panel

Similar Documents

Publication Publication Date Title
KR100667921B1 (en) Construction method of pylon using precast concrete beam
CN105143570B (en) Building structure and construction method for same
CN105839836B (en) A kind of precast concrete shear wall component and its construction method
CN206016309U (en) A kind of overall assembled building system
CN106284655A (en) Precast concrete beam stud connects node and method of attachment in succession
CN113006321B (en) Construction method for connecting joints between combined precast concrete wall bodies
CN107060104B (en) Assembled steel frame concrete box type unit structure system and construction method thereof
KR101962853B1 (en) Joint for Precast Beam and Columns
CN108104284B (en) Wallboard connecting structure of shear wall steel arm embedded floor slab and assembly method
CN209227824U (en) The special-shaped I-shaped steel connection structure of shear wall and coupling beam
CN109267673A (en) Steel ribs dislocation dock shear wall vertical connection structure and assembly method
CN111502080A (en) Steel-concrete composite structure frame-cast-in-place concrete shear wall structure system
CN107447873B (en) Device for connecting prefabricated laminated connecting beam and prefabricated shear wall and installation method
CN106193340A (en) Cast-in-place prestressing without bondn ultralong floor combination type reinforcing strip anti-cracking structure and construction method
CN109267585A (en) Assembled prismoid shaped basis and rod structure and assembly method
CN109267672A (en) The structure and assembly method of special-shaped I-steel connection shear wall and coupling beam
CN205677070U (en) A kind of building frame construction
CN105649259B (en) A kind of wallboard structural system of the dark framework of band of precast concrete wall panel and its structure
CN108412036B (en) Assembled H profile steel column-isolated footing-concrete collar tie beam cross connecting node
CN208578226U (en) A kind of modular unit transverse connection structure
CN107023078B (en) Assembled cast-in-situ combined type superposed box net beam floor and construction method
KR101282243B1 (en) A construction method using the column cap for permanent beam form
CN213926774U (en) Prefabricated steel-encased concrete column and concrete beam joint
CN109113171A (en) A kind of Novel bolt connection Precast Concrete Frame
KR20100121865A (en) Method for constructing building using prc integrating method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination