CN107975160A - Shear wall structure, making and assembly method with laterally attached keyway - Google Patents

Shear wall structure, making and assembly method with laterally attached keyway Download PDF

Info

Publication number
CN107975160A
CN107975160A CN201711250582.9A CN201711250582A CN107975160A CN 107975160 A CN107975160 A CN 107975160A CN 201711250582 A CN201711250582 A CN 201711250582A CN 107975160 A CN107975160 A CN 107975160A
Authority
CN
China
Prior art keywords
steel
wall
shear wall
prefabricated
key
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711250582.9A
Other languages
Chinese (zh)
Other versions
CN107975160B (en
Inventor
李明
唐元昊
赵唯坚
杨永强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Tianhe Construction And Installation Co ltd
Original Assignee
Shenyang Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Jianzhu University filed Critical Shenyang Jianzhu University
Priority to CN201711250582.9A priority Critical patent/CN107975160B/en
Publication of CN107975160A publication Critical patent/CN107975160A/en
Application granted granted Critical
Publication of CN107975160B publication Critical patent/CN107975160B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/02Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements
    • E04B1/04Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements the elements consisting of concrete, e.g. reinforced concrete, or other stone-like material
    • E04B1/043Connections specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • E04B1/4107Longitudinal elements having an open profile, with the opening parallel to the concrete or masonry surface, i.e. anchoring rails
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/30Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2002/001Mechanical features of panels
    • E04C2002/004Panels with profiled edges, e.g. stepped, serrated

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Reinforcement Elements For Buildings (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

The present invention relates to prefabricated concrete structure field, is specially a kind of shear wall structure, making and the assembly method of the laterally attached keyway of band, the two panels shear wall of this kind of Standard, can assemble in vertical or horizontal direction.Link position between two shear walls is split, prefabricated keyed wall and prefabricated trough of belt wall are made respectively, wherein, side steel plate and dry wall reinforcing bar are worn reinforced hole and are connected by reserved, and are left and weakened steel plate rigidity hole, and steel tank is welded with side steel plate of the steel key respectively with two panels dry wall, and prepared screw-bolt hole, steel tank is connected with steel key by shank of bolt, and then completes the connection of two dry walls, is formed overall.Steel key and steel tank are set in shear wall side wall, by being connected for bolt and steel key and steel tank, realize the horizontal connection of precast shear wall and precast shear wall.The advantages that invention has the simple easy processing of component, and assemble flow is simple, time-saving and efficiency, and there is wider applicability.

Description

Shear wall structure, making and assembly method with laterally attached keyway
Technical field
The present invention relates to prefabricated concrete structure field, be specially a kind of shear wall structure of the laterally attached keyway of band, Making and assembly method, the two panels shear wall of this kind of Standard, can assemble in vertical or horizontal direction.
Background technology
Assembly concrete building has the advantages that speed of application fast, energy-saving and environmental protection, saving labour, becomes future and builds One of important directions of development are built, shear wall structure is one of important feature form of prefabricated concrete structure.Work as shear wall Length it is very big when, a piece of shear wall need to be split into 2 or multi-disc shear wall, the shear wall after fractionation, needs at the construction field (site) Will assembly connection in the horizontal direction.The connection of existing shear wall horizontal direction is mainly connected using cast-in-situ steel reinforced concrete, is applied Work technique is cumbersome, and construction quality is also difficult to ensure that.For this reason, the present invention provides a kind of shear wall knot of the laterally attached keyway of band Structure, making and assembly method, this kind connection have the advantages that construction technology is simple, construction quality is easily guaranteed that, anti-seismic performance is good.
The content of the invention
It is an object of the invention to provide a kind of shear wall structure of the laterally attached keyway of band, making and assembly method, Shear wall side wall sets steel key and steel tank, by being connected for bolt and steel key and steel tank, realize precast shear wall with it is prefabricated The horizontal connection of shear wall.The advantages that invention has the simple easy processing of component, and assemble flow is simple, time-saving and efficiency, and have Wider applicability.
Technical scheme:
A kind of shear wall structure of the laterally attached keyway of band, by the shear wall of the laterally attached key of prefabricated band, hereinafter referred to as in advance The fractionation assembly system of the hereinafter referred to as prefabricated trough of belt wall composition of shear wall of keyed wall and the laterally attached groove of prefabricated band is made, wherein: Shear wall side perforated steel plate, hereinafter referred to as side steel plate;It is welded in the steel tank of side steel plate, hereinafter referred to as steel tank;It is welded in The steel key of side steel plate, hereinafter referred to as steel key;The assembly connection structure form is as follows:
Link position between two shear walls is split, and makes prefabricated keyed wall and prefabricated trough of belt wall respectively, wherein, side Steel plate and dry wall reinforcing bar are worn reinforced hole and are connected by reserved, and are left and weakened steel plate rigidity hole, and steel tank and steel key are respectively with two The side steel plate welding of piece dry wall, and prepared screw-bolt hole, steel tank are connected with steel key by shank of bolt, and then complete two dry walls Connection, forms overall.
The shear wall structure of the laterally attached keyway of the band, bottom surface and the side steel plate of steel tank weld, side steel plate edge Longitudinal direction, which opens up to reserve, wears reinforced hole, is symmetrically opened up on the steel plate of side and weakens steel plate rigidity hole;Steel tank is baltimore groove, two of steel tank Side opens up steel tank prepared screw-bolt hole respectively.
The shear wall structure of the laterally attached keyway of the band, steel key are welded with side steel plate, and steel key is square frame-shaped, steel key Two opposite flanks open up steel key prepared screw-bolt hole, steel key is smaller than the inboard width of side steel plate, and the steel key of steel key reserves spiral shell The distributed number and size of keyhole are identical with the steel tank prepared screw-bolt hole of steel tank.
The shear wall structure of the laterally attached keyway of the band, the framework of steel reinforcement structure of prefabricated trough of belt wall are as follows:Two rows are flat The opposite precast shear wall horizontal bar of row indulges muscle composition frame structure, precast shear wall with two rows of parallel opposite precast shear walls The both ends of horizontal bar are installed by the side steel plate with steel tank respectively;Precast shear wall positioned at precast shear wall horizontal bar end is indulged Between muscle, connected by precast shear wall confined boundary member stirrup;Opposite precast shear wall is cut between indulging muscle by prefabricated Power wall lacing wire connects.
The shear wall structure of the laterally attached keyway of the band, the framework of steel reinforcement structure of prefabricated keyed wall are as follows:Two rows are flat The opposite precast shear wall horizontal bar of row indulges muscle composition frame structure, precast shear wall with two rows of parallel opposite precast shear walls The both ends of horizontal bar are installed by the side steel plate with steel key respectively;Precast shear wall positioned at precast shear wall horizontal bar end is indulged Between muscle, connected by precast shear wall confined boundary member stirrup;Opposite precast shear wall is cut between indulging muscle by prefabricated Power wall lacing wire connects.
The production method of the shear wall structure of the laterally attached keyway of the band, detailed process are as follows:
(1) manufacturing process of prefabricated trough of belt wall
Binding precast shear wall first indulges muscle and precast shear wall confined boundary member stirrup, forms dry wall edge constraint Member reinforcing steel bar;Then dry wall horizontal bar is worn into reinforced hole through the reserved of side steel plate, and with dry wall edge constraint component Reinforcing bar completes binding;Precast shear wall lacing wire is finally bound, forms the framework of steel reinforcement of prefabricated trough of belt wall;In framework of steel reinforcement outer support Precast shear wall template, finally the casting concrete in the template, conserves 20~30 days, removes precast shear wall template, shape Into prefabricated trough of belt wall;
(2) manufacturing process of prefabricated keyed wall
Binding precast shear wall first indulges muscle and precast shear wall confined boundary member stirrup, forms dry wall edge constraint Member reinforcing steel bar;Then dry wall horizontal bar is worn into reinforced hole through the reserved of side steel plate, and with dry wall edge constraint component Reinforcing bar completes binding;Precast shear wall lacing wire is finally bound, forms the framework of steel reinforcement of prefabricated keyed wall;In framework of steel reinforcement outer support Precast shear wall template, finally the casting concrete in the template, conserves 20~30 days, removes precast shear wall template, shape Into prefabricated keyed wall.
The production method of the shear wall structure of the laterally attached keyway of the band, rectangle is placed weakening at steel plate rigidity hole Steel shoe, to prevent concrete from being leaked out from weakening steel plate rigidity hole, rectangle steel shoe is clipped in side steel plate and precast shear wall Between horizontal bar.
The assembly method of the shear wall structure of the laterally attached keyway of the band, during assembling, lifts fixed prefabricated band first Groove wall, then by prefabricated keyed wall from vertical or horizontal direction, is lifted on the side of prefabricated trough of belt wall, prefabricated keyed wall passes through steel key Docked with the steel tank of prefabricated trough of belt wall, and ensure steel key in steel tank, the bolt hole alignment between the two;Finally by one end band nut Shank of bolt through the prepared screw-bolt hole of steel tank and steel key, and tightened with nut;
Steel form is supported between prefabricated trough of belt wall and prefabricated keyed wall, is consolidated between steel form with steel form chain connecting bolt It is fixed, and the gap between template and prefabricated trough of belt wall and prefabricated keyed wall is smeared with marine glue, make steel form and dry wall close Not spillage is connected, grouting material is then irrigated in steel form, until grouting material is full of steel form and prefabricated trough of belt wall and prefabricated band Space between key wall;The form removal after grouting material solidification, completes prefabricated trough of belt wall and is connected with the assembly of prefabricated keyed wall.
The assembly method of the shear wall structure of the laterally attached keyway of the band, comprises the following steps that:
The first step, steel tank and steel key are welded with two panels side steel plate respectively;
Second step, precast shear wall horizontal bar is reserved through side steel plate and wears reinforced hole, and is completed dry wall reinforcing bar and tied up Prick, dry wall reinforcing bar is formed framework of steel reinforcement with side steel plate, in framework of steel reinforcement outer support precast shear wall template;
3rd step, the casting concrete in template, and conserve, concrete reaches form removal after design strength, is formed pre- Make keyed wall and prefabricated trough of belt wall;
4th step, steel key is docked with steel tank, and shank of bolt is tightened through steel tank prepared screw-bolt hole and steel key prepared screw-bolt hole Connection is completed after bolt;
5th step, the support shuttering between keyed shear wall and trough of belt shear wall, and smeared between template and shear wall Glass cement, makes template be completely embedded not spillage with shear wall;
6th step, grouting material is irrigated between two dry walls, until template of the grouting material full of the seam that is in the milk between two dry walls;
7th step, the form removal after grouting material solidification, completes the splicing of prefabricated trough of belt wall and prefabricated keyed wall;
Seven steps more than implementing can complete the lateral assembled connection of assembly concrete Shear Wall in Frame-Shear Wall Structures.
Advantages of the present invention and beneficial effect are:
1. the shear wall that the present invention assembles, can be from horizontally and vertically assembling, assembly method is more flexible.Each Components Shape rule Then, easy to producing in batches and shipping storage;
2. assemble method of the present invention, easy to operate, not high to personnel and environmental requirement, operating process is few, and speed of application is fast, It is time saving and energy saving;
3. in mechanical property, the present invention can realize the horizontal shear of assembled prefabricated components, the biography sheared vertically well Pass, ensure the reliable of connection;
4. when static load of the present invention and small earthquake, shear wall horizontal distortion is small, since the grouting material between shear wall is with higher Intensity, undertake the shearing between prefabricated trough of belt wall and prefabricated keyed wall at the same time with steel key and steel tank, can preferably realize " small shake It is not bad " aseismic fortification objects;During big shake, shear wall horizontal distortion is big, due to not having reinforcing bar in grouting material, can destroy first, At this time mainly by the shearing between steel key and the steel tank prefabricated trough of belt wall of transmission and prefabricated keyed wall, because steel key and steel tank are steel Make, there is preferable energy dissipation capacity, can preferably realize the aseismic fortification objects of " no collapsing with strong earthquake ", this kind connection anti-seismic performance It is good;
5. steel tank of the present invention and steel key can according to calculating, design it is shorter, i.e., coupling part distance can be compared between shear wall It is small, therefore assembly rate is high, situ wet operation is few.
Brief description of the drawings
Fig. 1 is the graphics of side steel plate.
Fig. 2 is the graphics for the steel tank for being welded in side steel plate.
Fig. 3 is the graphics that steel tank is welded in side steel plate.
Fig. 4 is the graphics that precast shear wall reinforcing bar is completed with Fig. 3.
Fig. 5 is the graphics that Fig. 4 completes support shuttering.
Fig. 6 is the graphics of the shear wall (referred to as prefabricated trough of belt wall) of the laterally attached groove of prefabricated band.
Fig. 7 is the graphics for the steel key for being welded in side steel plate.
Fig. 8 is the graphics that steel key is welded in side steel plate.
Fig. 9 is the graphics that precast shear wall reinforcing bar is completed with Fig. 8.
Figure 10 is the graphics that Fig. 9 completes support shuttering.
Figure 11 is the graphics of the shear wall (referred to as prefabricated keyed wall) of the laterally attached key of prefabricated band.
Figure 12 is the graphics that keyed dry wall is completed with trough of belt dry wall by connector bolt.
Figure 13 is the graphics that steel form is fixed on to Figure 11 junctions.
Figure 14 is the graphics that keyed dry wall is completed with trough of belt dry wall.
In figure, 1 side steel plate;2 reserved wear reinforced hole;3 weaken steel plate rigidity hole;4 steel tanks;5 steel tank prepared screw-bolt holes;6 Steel key;7 steel key prepared screw-bolt holes;8 precast shear wall confined boundary member stirrups;9 precast shear wall lacing wires;10 precast shear walls Horizontal bar;11 precast shear walls indulge muscle;12 precast shear wall templates;13 rectangle steel shoes;The laterally attached groove of 14 prefabricated bands is cut Power wall (referred to as prefabricated trough of belt wall);The shear wall (referred to as prefabricated keyed wall) of the laterally attached key of 15 prefabricated bands;16 steel forms;17 steel Template connects bolt;18 grouting materials.
Embodiment
As shown in Fig. 1-Figure 14, the shear wall structure of the laterally attached keyway of band of the invention, making and assembly method are as follows:
(1) manufacturing process of prefabricated trough of belt wall
1. as shown in Figure 1-Figure 3, the bottom surface of steel tank 4 and side steel plate 1 are welded, wherein:Side steel plate 1 is opened up along longitudinal direction It is reserved to wear reinforced hole 2, symmetrically opened up on side steel plate 1 and weaken steel plate rigidity hole 3;Steel tank 4 is baltimore groove, two sides of steel tank 4 Face opens up steel tank prepared screw-bolt hole 5 respectively.
Wherein, the specification of steel tank 4 should be sheared by the vertical direction of precast shear wall transmission and determined, the width of side steel plate 1 Should be smaller than shear wall width, which should be greater than or equal to the protective layer thickness needed for steel plate as defined in specification, with full The anticorrosive requirement of sufficient side steel plate, the number size of steel tank prepared screw-bolt hole 5 and distribution should according to bolt shank diameter quantity and Distribution determines that the quantity of steel tank 4 and the diameter quantity of shank of bolt and distribution should be by the big subtotals sheared vertically of shear wall transmission Calculate and determine.
2. as Figure 4-Figure 6, two rows of parallel opposite precast shear wall horizontal bars 10 and two rows are parallel opposite prefabricated Shear wall indulges muscle 11 and forms frame structure, and the side steel plate with steel tank 4 is installed at the both ends of precast shear wall horizontal bar 10 respectively 1;Between the precast shear wall of 10 end of precast shear wall horizontal bar indulges muscle 11, pass through precast shear wall confined boundary member Stirrup 8 connects;Opposite precast shear wall is connected between indulging muscle 11 by precast shear wall lacing wire 9.
As shown in figure 4, the manufacturing process of prefabricated trough of belt wall 14 is as follows:Binding precast shear wall first is indulged muscle 11 and prefabricated is cut Power wall confined boundary member stirrup 8, forms dry wall edge constraint member reinforcing steel bar;Then dry wall horizontal bar 10 is passed through into side Reinforced hole 2 is worn in the reserved of steel plate 1, and completes to bind with dry wall edge constraint member reinforcing steel bar;Precast shear wall is finally bound to draw Muscle 9, forms the framework of steel reinforcement of prefabricated trough of belt wall 14.As shown in Fig. 5-Fig. 6, in framework of steel reinforcement outer support precast shear wall template 12, finally the casting concrete in the template, conserves 28 days, removes precast shear wall template 12, forms prefabricated trough of belt wall 14.
Need weakening placement rectangle steel shoe 13 at steel plate rigidity hole 3, to prevent concrete from weakening steel plate rigidity hole 3 In leak out, rectangle steel shoe 13 should be clipped between side steel plate 1 and precast shear wall horizontal bar 10.
(2) manufacturing process of prefabricated keyed wall
1. shown in Fig. 7-Fig. 8, steel key 6 and side steel plate 1 are welded, wherein:Steel key 6 is square frame-shaped, two phases of steel key 6 Steel key prepared screw-bolt hole 7 is opened up to side, 6 width of steel key should be smaller than the inboard width of side steel plate 1, and the steel key of steel key 6 is reserved The distributed number and size of bolt hole 7 are identical with steel tank 4.
2. as Figure 9-Figure 11, two rows of parallel opposite precast shear wall horizontal bars 10 and two rows are parallel opposite prefabricated Shear wall indulges muscle 11 and forms frame structure, and the side steel plate with steel key 6 is installed at the both ends of precast shear wall horizontal bar 10 respectively 1;Between the precast shear wall of 10 end of precast shear wall horizontal bar indulges muscle 11, pass through precast shear wall confined boundary member Stirrup 8 connects;Opposite precast shear wall is connected between indulging muscle 11 by precast shear wall lacing wire 9.
The manufacturing process of prefabricated keyed wall 15 is as follows:Binding precast shear wall first indulges muscle 11 and precast shear wall binding side Edge component stirrup 8, forms dry wall edge constraint member reinforcing steel bar;Then dry wall horizontal bar 10 is passed through into the pre- of side steel plate 1 Stay and wear reinforced hole 2, and complete to bind with dry wall edge constraint member reinforcing steel bar;Precast shear wall lacing wire 9 is finally bound, is formed pre- Make the framework of steel reinforcement of keyed wall 15.In framework of steel reinforcement outer support precast shear wall template 12, finally poured in the template mixed Solidifying soil, conserves 28 days, removes precast shear wall template 12, forms prefabricated keyed wall 15.
Need weakening placement rectangle steel shoe 13 at steel plate rigidity hole 3, to prevent concrete from weakening steel plate rigidity hole 3 In leak out, rectangle steel shoe 13 should be clipped between side steel plate 1 and precast shear wall horizontal bar 10.
(3) assembling process of prefabricated trough of belt wall and prefabricated keyed wall
As shown in Figure 12-Figure 14, during assembling, the fixed prefabricated trough of belt wall 14 of lifting first, then by prefabricated keyed wall 15 from Vertical or horizontal direction, is lifted on the side of prefabricated trough of belt wall 14, and prefabricated keyed wall 15 passes through steel key 6 and the steel of prefabricated trough of belt wall 14 Groove 4 docks, and ensures steel key 6 in steel tank 4, the bolt hole alignment between the two;Finally one end nut bolt bar is passed through The prepared screw-bolt hole of steel tank 4 and steel key 6, and tightened with nut.
Steel form 16 is supported between prefabricated trough of belt wall 14 and prefabricated keyed wall 15, is linked between steel form 16 with steel form Bolt 17 is fixed, and smears the gap between template and dry wall (prefabricated trough of belt wall 14 and prefabricated keyed wall 15) with marine glue, Steel form 16 and dry wall is set closely to connect not spillage, then the perfusion grouting material 18 in steel form 16, until grouting material 18 fills Full space between steel form 16 and prefabricated trough of belt wall 14 and prefabricated keyed wall 15.The form removal 16 after the solidification of grouting material 18, Prefabricated trough of belt wall 14 is completed to be connected with the assembly of prefabricated keyed wall 15.
When static load and small earthquake, shear wall horizontal distortion is small, since grouting material 18 has higher intensity, with steel key 6 and Steel tank 4 undertakes the shearing between prefabricated trough of belt wall 14 and prefabricated keyed wall 15 at the same time, can preferably realize the anti-of " no damage in small earthquake " Shake is set up defences target, and during big shake, shear wall horizontal distortion is big, due to not having reinforcing bar in grouting material, can destroy first, at this time mainly by Steel key 6 and steel tank 4 transmit the shearing between prefabricated trough of belt wall 14 and prefabricated keyed wall 15, because steel key 6 and steel tank 4 are steel systems Make, therefore there is preferable energy dissipation capacity, can preferably realize the aseismic fortification objects of " no collapsing with strong earthquake ".This kind connects shock resistance Can be good.
Embodiment the result shows that, in the present invention, the lateral assembled connection method of dry wall:1. each Components Shape rule, just In batch production and shipping storage;2. assemble method, easy to operate, not high to personnel and environmental requirement, operating process is few, construction Speed is fast, time saving and energy saving;3. the transmission sheared vertically of assembled prefabricated components can be realized well, ensure the reliable of connection;④ Anti-seismic performance is good, can preferably realize " no damage in small earthquake ", the aseismic fortification objects of " no collapsing with strong earthquake ";5. assembly rate is high, situ wet Operation is few.

Claims (9)

  1. A kind of 1. shear wall structure of the laterally attached keyway of band, it is characterised in that by the shear wall of the laterally attached key of prefabricated band, with The fractionation assembly body of the hereinafter referred to as prefabricated trough of belt wall composition of the shear wall of the prefabricated keyed wall of lower abbreviation and the laterally attached groove of prefabricated band System, wherein:Shear wall side perforated steel plate, hereinafter referred to as side steel plate;It is welded in the steel tank of side steel plate, hereinafter referred to as steel Groove;It is welded in the steel key of side steel plate, hereinafter referred to as steel key;The assembly connection structure form is as follows:
    Link position between two shear walls is split, and makes prefabricated keyed wall and prefabricated trough of belt wall respectively, wherein, side steel plate Wear reinforced hole by reserved with dry wall reinforcing bar and be connected, and leave and weaken steel plate rigidity hole, steel tank is pre- with two panels respectively with steel key The side steel plate welding of wall processed, and prepared screw-bolt hole, steel tank are connected with steel key by shank of bolt, and then complete two dry walls and connect Connect, formed overall.
  2. 2. the shear wall structure of the laterally attached keyway of band described in accordance with the claim 1, it is characterised in that the bottom surface and side of steel tank Face steel plate welding, side steel plate opens up to reserve along longitudinal direction wears reinforced hole, is symmetrically opened up on the steel plate of side and weakens steel plate rigidity hole;Steel Groove is baltimore groove, and two sides of steel tank open up steel tank prepared screw-bolt hole respectively.
  3. 3. according to shear wall structure of the claim 1 with laterally attached keyway, it is characterised in that steel key is welded with side steel plate, Steel key is square frame-shaped, and two opposite flanks of steel key open up steel key prepared screw-bolt hole, and steel key is smaller than the inboard width of side steel plate, The distributed number and size of the steel key prepared screw-bolt hole of steel key are identical with the steel tank prepared screw-bolt hole of steel tank.
  4. 4. according to shear wall structure of the claim 1 with laterally attached keyway, it is characterised in that the framework of steel reinforcement of prefabricated trough of belt wall Structure is as follows:Two rows of parallel opposite precast shear wall horizontal bars indulge muscle composition frame with two rows of parallel opposite precast shear walls The side steel plate with steel tank is installed at structure, the both ends of precast shear wall horizontal bar respectively;Positioned at precast shear wall horizontal bar end Between the precast shear wall in portion indulges muscle, connected by precast shear wall confined boundary member stirrup;Opposite precast shear wall is indulged Connected between muscle by precast shear wall lacing wire.
  5. 5. according to shear wall structure of the claim 1 with laterally attached keyway, it is characterised in that the framework of steel reinforcement of prefabricated keyed wall Structure is as follows:Two rows of parallel opposite precast shear wall horizontal bars indulge muscle composition frame with two rows of parallel opposite precast shear walls The side steel plate with steel key is installed at structure, the both ends of precast shear wall horizontal bar respectively;Positioned at precast shear wall horizontal bar end Between the precast shear wall in portion indulges muscle, connected by precast shear wall confined boundary member stirrup;Opposite precast shear wall is indulged Connected between muscle by precast shear wall lacing wire.
  6. 6. the production method of the shear wall structure of the laterally attached keyway of band described in a kind of claim 1, it is characterised in that specific Process is as follows:
    (1) manufacturing process of prefabricated trough of belt wall
    Binding precast shear wall first indulges muscle and precast shear wall confined boundary member stirrup, forms dry wall edge constraint component Reinforcing bar;Then dry wall horizontal bar is worn into reinforced hole through the reserved of side steel plate, and with dry wall edge constraint member reinforcing steel bar Complete binding;Precast shear wall lacing wire is finally bound, forms the framework of steel reinforcement of prefabricated trough of belt wall;It is prefabricated in framework of steel reinforcement outer support Shear wall formwork, finally the casting concrete in the template, conserves 20~30 days, removes precast shear wall template, is formed pre- Trough of belt wall processed;
    (2) manufacturing process of prefabricated keyed wall
    Binding precast shear wall first indulges muscle and precast shear wall confined boundary member stirrup, forms dry wall edge constraint component Reinforcing bar;Then dry wall horizontal bar is worn into reinforced hole through the reserved of side steel plate, and with dry wall edge constraint member reinforcing steel bar Complete binding;Precast shear wall lacing wire is finally bound, forms the framework of steel reinforcement of prefabricated keyed wall;It is prefabricated in framework of steel reinforcement outer support Shear wall formwork, finally the casting concrete in the template, conserves 20~30 days, removes precast shear wall template, is formed pre- Make keyed wall.
  7. 7. the production method of the shear wall structure according to the laterally attached keyway of band described in claim 6, it is characterised in that cutting Rectangle steel shoe is placed at weak steel plate rigidity hole, to prevent concrete from being leaked out from weakening steel plate rigidity hole, rectangle steel shoe folder Between side steel plate and precast shear wall horizontal bar.
  8. 8. the assembly method of the shear wall structure of the laterally attached keyway of band described in a kind of one of claim 1 to 7, its feature exist When, assembling, then prefabricated keyed wall is lifted on prefabricated band by the fixed prefabricated trough of belt wall of lifting first from vertical or horizontal direction The side of groove wall, prefabricated keyed wall is docked by steel key with the steel tank of prefabricated trough of belt wall, and ensures steel key in steel tank, between the two Bolt hole alignment;Finally by one end nut bolt bar through steel tank and the prepared screw-bolt hole of steel key, and tightened with nut;
    Steel form is supported between prefabricated trough of belt wall and prefabricated keyed wall, is fixed between steel form with steel form chain connecting bolt, and The gap between template and prefabricated trough of belt wall and prefabricated keyed wall is smeared with marine glue, steel form and dry wall is closely connected not Spillage, then irrigates grouting material in steel form, until grouting material full of steel form and prefabricated trough of belt wall and prefabricated keyed wall it Between space;The form removal after grouting material solidification, completes prefabricated trough of belt wall and is connected with the assembly of prefabricated keyed wall.
  9. 9. the assembly method of the shear wall structure according to the laterally attached keyway of band described in claim 8, it is characterised in that specific Step is as follows:
    The first step, steel tank and steel key are welded with two panels side steel plate respectively;
    Second step, precast shear wall horizontal bar is reserved through side steel plate and wears reinforced hole, and completes the binding of dry wall reinforcing bar, is made Dry wall reinforcing bar forms framework of steel reinforcement with side steel plate, in framework of steel reinforcement outer support precast shear wall template;
    3rd step, the casting concrete in template, and conserve, concrete reaches form removal after design strength, forms prefabricated band Key wall and prefabricated trough of belt wall;
    4th step, steel key is docked with steel tank, and shank of bolt tightens bolt through steel tank prepared screw-bolt hole and steel key prepared screw-bolt hole Connection is completed afterwards;
    5th step, the support shuttering between keyed shear wall and trough of belt shear wall, and glass is smeared between template and shear wall Glue, makes template be completely embedded not spillage with shear wall;
    6th step, grouting material is irrigated between two dry walls, until template of the grouting material full of the seam that is in the milk between two dry walls;
    7th step, the form removal after grouting material solidification, completes the splicing of prefabricated trough of belt wall and prefabricated keyed wall;
    Seven steps more than implementing can complete the lateral assembled connection of assembly concrete Shear Wall in Frame-Shear Wall Structures.
CN201711250582.9A 2017-12-01 2017-12-01 Shear wall structure with lateral connecting key groove, manufacturing and assembling method Active CN107975160B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711250582.9A CN107975160B (en) 2017-12-01 2017-12-01 Shear wall structure with lateral connecting key groove, manufacturing and assembling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711250582.9A CN107975160B (en) 2017-12-01 2017-12-01 Shear wall structure with lateral connecting key groove, manufacturing and assembling method

Publications (2)

Publication Number Publication Date
CN107975160A true CN107975160A (en) 2018-05-01
CN107975160B CN107975160B (en) 2023-11-24

Family

ID=62008724

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711250582.9A Active CN107975160B (en) 2017-12-01 2017-12-01 Shear wall structure with lateral connecting key groove, manufacturing and assembling method

Country Status (1)

Country Link
CN (1) CN107975160B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108673714A (en) * 2018-06-15 2018-10-19 中建四局第六建筑工程有限公司 Mold is arranged in a kind of assembled architecture precast concrete wall side keyway
CN109267672A (en) * 2018-11-09 2019-01-25 沈阳建筑大学 The structure and assembly method of special-shaped I-steel connection shear wall and coupling beam
CN109577515A (en) * 2019-01-30 2019-04-05 沈阳建筑大学 Precast shear wall lattice horizontal connection structure, production and assembly method
CN109723167A (en) * 2018-12-21 2019-05-07 山东大学 A kind of fabricated concrete filled steel tube edge constraint overlapped shear wall combination
CN112144699A (en) * 2020-09-28 2020-12-29 华北理工大学 Shear wall vertical joint connecting structure, shear wall structure and construction method
CN112761310A (en) * 2020-12-21 2021-05-07 西安建筑科技大学 Fabricated shear wall lateral steel bar connecting device and application method
CN112942626A (en) * 2021-02-22 2021-06-11 山东建筑大学 Formwork-supporting-free assembled shear wall structure and connecting method
CN113356405A (en) * 2021-06-30 2021-09-07 西安建筑科技大学 Prefabricated composite wall structure based on embedded profile steel and construction method thereof
CN114753693A (en) * 2022-03-19 2022-07-15 北京工业大学 Assembly type cross-shaped column and ecological inner wall self-tapping nail cluster connecting structure and method

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3038862A1 (en) * 1980-10-15 1982-04-29 Lindhorst, Alfred, 5678 Wermelskirchen DEVICE FOR ASSEMBLING SOUND PROTECTION WALLS
CN103046670A (en) * 2012-12-10 2013-04-17 北京工业大学 Prefabricated recycled concrete shear wall with energy dissipation connector and fabrication method
CN103243838A (en) * 2013-04-28 2013-08-14 中国十七冶集团有限公司 Connection structure of integrally assembled concrete frame and shear wall
CN104790566A (en) * 2015-04-30 2015-07-22 华东建筑设计研究院有限公司 Prefabricated embedded column overlapped plate type shear wall component with end sealing plates
CN105040855A (en) * 2015-07-10 2015-11-11 华南理工大学建筑设计研究院 Assembled prefabricated shear wall welding end plate and horizontal steel combination connecting device
CN105256917A (en) * 2015-11-18 2016-01-20 福建工程学院 Prestressed shear wall and vertical joint combining-connecting structure and construction method thereof
CN105484388A (en) * 2015-11-18 2016-04-13 福建工程学院 Prefabricated assembly type shear wall vertical slit connecting structure and construction method thereof
CN105926808A (en) * 2016-06-22 2016-09-07 福建工程学院 Prefabricated shear wall novel vertical joint connection structure and construction method
CN106639037A (en) * 2017-01-23 2017-05-10 青岛理工大学 Energy-dissipation and shock-absorption oblique prestressed shear wall structure system suitable for prefabricated assembly
CN107190881A (en) * 2017-06-26 2017-09-22 东南大学 A kind of fabricated shear wall vertical abutment joint mild-steel energy-consumption attachment means
CN207525929U (en) * 2017-12-01 2018-06-22 沈阳建筑大学 A kind of shear wall structure of the laterally attached keyway of band

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3038862A1 (en) * 1980-10-15 1982-04-29 Lindhorst, Alfred, 5678 Wermelskirchen DEVICE FOR ASSEMBLING SOUND PROTECTION WALLS
CN103046670A (en) * 2012-12-10 2013-04-17 北京工业大学 Prefabricated recycled concrete shear wall with energy dissipation connector and fabrication method
CN103243838A (en) * 2013-04-28 2013-08-14 中国十七冶集团有限公司 Connection structure of integrally assembled concrete frame and shear wall
CN104790566A (en) * 2015-04-30 2015-07-22 华东建筑设计研究院有限公司 Prefabricated embedded column overlapped plate type shear wall component with end sealing plates
CN105040855A (en) * 2015-07-10 2015-11-11 华南理工大学建筑设计研究院 Assembled prefabricated shear wall welding end plate and horizontal steel combination connecting device
CN105256917A (en) * 2015-11-18 2016-01-20 福建工程学院 Prestressed shear wall and vertical joint combining-connecting structure and construction method thereof
CN105484388A (en) * 2015-11-18 2016-04-13 福建工程学院 Prefabricated assembly type shear wall vertical slit connecting structure and construction method thereof
CN105926808A (en) * 2016-06-22 2016-09-07 福建工程学院 Prefabricated shear wall novel vertical joint connection structure and construction method
CN106639037A (en) * 2017-01-23 2017-05-10 青岛理工大学 Energy-dissipation and shock-absorption oblique prestressed shear wall structure system suitable for prefabricated assembly
CN107190881A (en) * 2017-06-26 2017-09-22 东南大学 A kind of fabricated shear wall vertical abutment joint mild-steel energy-consumption attachment means
CN207525929U (en) * 2017-12-01 2018-06-22 沈阳建筑大学 A kind of shear wall structure of the laterally attached keyway of band

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108673714A (en) * 2018-06-15 2018-10-19 中建四局第六建筑工程有限公司 Mold is arranged in a kind of assembled architecture precast concrete wall side keyway
CN109267672A (en) * 2018-11-09 2019-01-25 沈阳建筑大学 The structure and assembly method of special-shaped I-steel connection shear wall and coupling beam
CN109723167A (en) * 2018-12-21 2019-05-07 山东大学 A kind of fabricated concrete filled steel tube edge constraint overlapped shear wall combination
CN109723167B (en) * 2018-12-21 2024-03-05 山东大学 Assembled steel pipe concrete edge constraint superimposed shear wall combination
CN109577515A (en) * 2019-01-30 2019-04-05 沈阳建筑大学 Precast shear wall lattice horizontal connection structure, production and assembly method
CN109577515B (en) * 2019-01-30 2024-05-03 河南省鑫淼远大住宅工业有限公司 Prefabricated shear wall lattice type horizontal connection structure, manufacturing and assembling method
CN112144699A (en) * 2020-09-28 2020-12-29 华北理工大学 Shear wall vertical joint connecting structure, shear wall structure and construction method
CN112761310A (en) * 2020-12-21 2021-05-07 西安建筑科技大学 Fabricated shear wall lateral steel bar connecting device and application method
CN112942626A (en) * 2021-02-22 2021-06-11 山东建筑大学 Formwork-supporting-free assembled shear wall structure and connecting method
CN112942626B (en) * 2021-02-22 2022-03-18 山东建筑大学 Formwork-supporting-free assembled shear wall structure and connecting method
CN113356405A (en) * 2021-06-30 2021-09-07 西安建筑科技大学 Prefabricated composite wall structure based on embedded profile steel and construction method thereof
CN114753693A (en) * 2022-03-19 2022-07-15 北京工业大学 Assembly type cross-shaped column and ecological inner wall self-tapping nail cluster connecting structure and method

Also Published As

Publication number Publication date
CN107975160B (en) 2023-11-24

Similar Documents

Publication Publication Date Title
CN107975160A (en) Shear wall structure, making and assembly method with laterally attached keyway
CN105569224B (en) Concrete filled steel tube edge constraint overlaps monoblock type shear wall and preparation and installation method
CN105863111B (en) The steel frame construction of embedded precast concrete shear wall bending resistance simultaneously
CN209457194U (en) Steel ribs dislocation dock shear wall vertical connection structure
CN203066232U (en) Building structure without form removal
CN108729564A (en) Assembled architecture system
CN206428853U (en) Energy-dissipation and shock-absorption oblique prestressed shear wall structure system suitable for prefabricated assembly
CN107489296A (en) The energy-dissipating and shock-absorbing attachment structure and assembly method of assembly concrete coupling beam
CN107130715A (en) Teeth groove is poured after a kind of to be linked and packed the construction method of formula building roof system
CN106284655A (en) Precast concrete beam stud connects node and method of attachment in succession
CN207660133U (en) A kind of steel pipe occlusion mode shear wall connection structure
CN208072705U (en) A kind of energy-dissipating and shock-absorbing connection structure of coupling beam
CN109267673A (en) Steel ribs dislocation dock shear wall vertical connection structure and assembly method
CN109555252B (en) Floor slab with rectangular ribs extending outwards, shear wall structure and connecting method
CN106760036A (en) A kind of prefabricated steel combined concrete shear wall
CN209760513U (en) Shear wall column structure with concrete filled steel tube key connection
CN107503446A (en) A kind of U-shaped steel bar connector connection Shear-wall Connecting Beam Used structure and assembly method
CN209227836U (en) Prefabricated concrete structure wall-column all steel is keyed structure
CN207660110U (en) A kind of steel plate concrete Shear-wall Connecting Beam Used structure
CN207260378U (en) A kind of assembled frame-shear structure curved scissors type combines keyway connection structure
CN207525929U (en) A kind of shear wall structure of the laterally attached keyway of band
CN206769150U (en) After pour teeth groove and be linked and packed formula building roof system
CN107447873A (en) Connect the device and installation method of prefabricated overlapping coupling beam and precast shear wall
CN108179826A (en) A kind of bolt pin type shear wall horizontal connection structure and preparation method thereof, construction method
CN209760544U (en) Floor slab with overhanging rectangular ribs and shear wall structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20231102

Address after: 841500 East of National Highway 218 and North of Tourist Road in Yuli County, Bayingolin Mongolian Autonomous Prefecture, Xinjiang Uygur Autonomous Region (2nd Floor, Commercial Building 4, Wanxing Garden, Yuli)

Applicant after: Xinjiang Tianhe Construction and Installation Co.,Ltd.

Address before: 110168 Liaoning province Shenyang Hunnan Hunnan Road No. 9

Applicant before: SHENYANG JIANZHU University

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant