CN107524234A - Steel plate concrete Shear-wall Connecting Beam Used splits structure and preparation method - Google Patents

Steel plate concrete Shear-wall Connecting Beam Used splits structure and preparation method Download PDF

Info

Publication number
CN107524234A
CN107524234A CN201710922921.7A CN201710922921A CN107524234A CN 107524234 A CN107524234 A CN 107524234A CN 201710922921 A CN201710922921 A CN 201710922921A CN 107524234 A CN107524234 A CN 107524234A
Authority
CN
China
Prior art keywords
steel
prefabricated
shear wall
wall
coupling beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710922921.7A
Other languages
Chinese (zh)
Other versions
CN107524234B (en
Inventor
李明
郭伟强
杨永强
李爽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha Chengyang Intellectual Property Service Co ltd
Hunan First Engineering Co ltd
Original Assignee
Shenyang Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Jianzhu University filed Critical Shenyang Jianzhu University
Priority to CN201710922921.7A priority Critical patent/CN107524234B/en
Publication of CN107524234A publication Critical patent/CN107524234A/en
Application granted granted Critical
Publication of CN107524234B publication Critical patent/CN107524234B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/185Connections not covered by E04B1/21 and E04B1/2403, e.g. connections between structural parts of different material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • E04B1/4107Longitudinal elements having an open profile, with the opening parallel to the concrete or masonry surface, i.e. anchoring rails
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/29Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures
    • E04C3/293Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures the materials being steel and concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Load-Bearing And Curtain Walls (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

The present invention relates to prefabricated concrete structure field, specially a kind of steel plate concrete Shear-wall Connecting Beam Used splits structure and preparation method.Structure is formed by the coupling beam of coupling beam in precast shear wall, precast shear wall or shear wall with half bridging beam, connection I-steel and splits assembled system, built-in connection on prefabricated coupling beam, dry wall or prefabricated band Liang Qiang.When the coupling beam of assembly concrete Shear Wall in Frame-Shear Wall Structures is longer, is split at the both ends of coupling beam and shear wall link position, make prefabricated coupling beam and the dry wall being connected with prefabricated coupling beam beam-ends respectively;When the coupling beam of assembly concrete Shear Wall in Frame-Shear Wall Structures is shorter, split in the span centre position of coupling beam, two panels prefabricated band Liang Qiang is formed after fractionation, its connection method is same as above.The present invention has the simple easy processing of component, and assemble flow is simple, the advantages that time-saving and efficiency, and has wider applicability.

Description

Steel plate concrete Shear-wall Connecting Beam Used splits structure and preparation method
Technical field
The present invention relates to prefabricated concrete structure field, specially a kind of steel plate concrete Shear-wall Connecting Beam Used splits structure And preparation method.
Background technology
Shear wall structure is effective against horizontal applied force, turns into one of important feature form of reinforced concrete structure. Coupling beam is the beam for connecting shear wall and shear wall, is the important dissipative member of shear wall structure.Built-in steel plate concrete connects Beam is sheared by steel plate and the common resist torque of armored concrete, and compared with normal concrete coupling beam, it is remarkably improved coupling beam Shear-carrying capacity, prevent coupling beam from brittle break occurs, greatly improve the anti-seismic performance of coupling beam.And existing prefabricated concrete structure Technology, it is not directed to this kind of coupling beam.Therefore, the present invention is directed to steel plate concrete Shear-wall Connecting Beam Used, propose that coupling beam splits structure and system Make method.
The content of the invention
It is an object of the invention to provide a kind of steel plate concrete Shear-wall Connecting Beam Used to split structure and preparation method, realizes steel Fractionation, making and the assembling of board concrete Shear-wall Connecting Beam Used.
The technical scheme is that:
A kind of steel plate concrete Shear-wall Connecting Beam Used splits structure, by coupling beam, precast shear wall in precast shear wall or carries The coupling beam of the shear wall of half bridging beam, connection I-steel form structure and split assembled system, wherein:Coupling beam in precast shear wall, Hereinafter referred to as prefabricated coupling beam;Precast shear wall, hereinafter referred to as dry wall;The prefabricated shear wall for carrying half bridging beam, hereinafter referred to as Prefabricated band Liang Qiang;The assembled attachment structure is one of following two structure types:
(1) split in the both ends of prefabricated coupling beam and shear wall link position, make respectively prefabricated coupling beam and with prefabricated company The dry wall of beam beam-ends connection, the common two panels of the dry wall being connected with a prefabricated coupling beam, formed pre- by two panels dry wall and one The structure that coupling beam processed is formed splits assembled system;Anchor plate in the shear wall of connector, prefabricated company are provided with dry wall Be provided with steel plate built in the coupling beam of connector on beam, in the shear wall of band connection part anchor plate with the coupling beam of band connection part Put steel plate to be oppositely arranged by link slot and connection steel bar respectively, the link slot alignment being oppositely arranged is adjacent to, the company being oppositely arranged Connect steel bar alignment to be adjacent to, be directed at the I-shaped groove formed between the link slot being adjacent to and connected by connecting I-steel, alignment is adjacent to Connection steel bar between by connect steel loop connect, make prefabricated coupling beam, dry wall and connection I-steel be connected as entirety;
(2) split in the span centre position of prefabricated coupling beam, the prefabricated shear wall for carrying half bridging beam of two panels is formed after fractionation, i.e., Prefabricated band Liang Qiang, formed and assembled system is split by two panels prefabricated band Liang Qiang structure;Installation point respectively on two panels prefabricated band Liang Qiang Be not provided with anchor plate in the shear wall of connector, in the shear wall of band connection part anchor plate respectively by link slot and Connection steel bar is oppositely arranged, and the link slot alignment being oppositely arranged is adjacent to, and the connection steel bar alignment being oppositely arranged is adjacent to, and alignment is adjacent to Link slot between the I-shaped groove that is formed connected by connecting I-steel, be aligned between the connection steel bar being adjacent to by connecting steel Ring connects, and prefabricated band Liang Qiang and connection I-steel is connected as entirety.
Described steel plate concrete Shear-wall Connecting Beam Used splits structure, in order to realize the connection of dry wall and prefabricated coupling beam, Anchor plate in the shear wall of pre-buried band connection part in dry wall, the steel built in the coupling beam of pre-buried band connection part in prefabricated coupling beam Plate;In order to realize two panels prefabricated band Liang Qiang connection, anchored respectively in the shear wall of pre-buried band connection part within the walls in prefabricated band beam Steel plate.
Described steel plate concrete Shear-wall Connecting Beam Used splits structure, and anchor plate includes shearing in the shear wall of band connection part Anchor plate and I-shaped steel fastener within the walls, the side of anchor plate and I-shaped steel fastener vertical connection are one in shear wall Body, the outside of I-shaped steel fastener set link slot and connection steel bar, and link slot is vertically arranged, in the middle part of vertically arranged link slot Vertical gap is left, connection steel bar is arranged symmetrically in link slot both sides;Connection steel bar is L-shaped, connects one side vertical welding of steel bar It is connected on I-shaped steel fastener, connects the another side of steel bar straight up.
Described steel plate concrete Shear-wall Connecting Beam Used splits structure, and steel plate built in the coupling beam of band connection part is included built in coupling beam Steel plate and I-shaped steel fastener, the both sides of steel plate built in coupling beam are integrated with I-shaped steel fastener vertical connection respectively, I-steel The outside of connector sets link slot and connection steel bar, and link slot is vertically arranged, is left in the middle part of vertically arranged link slot vertical Gap, connection steel bar are arranged symmetrically in link slot both sides;Connection steel bar is L-shaped, and the one side for connecting steel bar is vertically welded in I-shaped On steel fastener, the another side of steel bar is connected straight up.
Described steel plate concrete Shear-wall Connecting Beam Used splits structure, connects inward flange chamfering on the downside of the edge of a wing of I-steel, even The groove inside dimensions of access slot are less than the edge of a wing thickness 1mm of connection I-steel, are installed on the edge of a wing of connection I-steel in link slot When, the two produces larger frictional force.
Described steel plate concrete Shear-wall Connecting Beam Used splits structure, and dry wall includes framework of steel reinforcement, the shearing of band connection part Anchor plate and concrete within the walls, anchor plate is plugged in reinforcing bar by anchor plate in shear wall in the shear wall of band connection part One upper lateral part of skeleton, concreting is around framework of steel reinforcement;Framework of steel reinforcement is that precast shear wall indulges muscle, precast shear wall water Flat muscle, precast shear wall lacing wire and precast shear wall confined boundary member stirrup composition, two row's precast shear walls indulge the parallel phase of muscle To setting, often arrange between precast shear wall indulges muscle and connected by precast shear wall horizontal bar, the precast shear wall being oppositely arranged is indulged Connected between muscle by precast shear wall lacing wire, outside be arranged in parallel prefabricated up and down between the edge of the vertical muscle of two row's precast shear walls Shear wall confined boundary member stirrup.
Described steel plate concrete Shear-wall Connecting Beam Used splits structure, and prefabricated coupling beam includes framework of steel reinforcement, the company of band connection part Steel plate built in beam and concrete, framework of steel reinforcement are arranged between the I-shaped steel fastener of steel plate built in the coupling beam of band connection part, even The periphery of steel plate built in beam, concreting is around framework of steel reinforcement;Framework of steel reinforcement is that prefabricated coupling beam indulges muscle and prefabricated coupling beam hoop Muscle forms, the prefabricated coupling beam stirrup parallel arrangement of rectangle, and corner sets prefabricated coupling beam to indulge muscle respectively on the inside of the prefabricated coupling beam stirrup of rectangle.
Described steel plate concrete Shear-wall Connecting Beam Used splits structure, and prefabricated band Liang Qiang includes framework of steel reinforcement, band connection part Anchor plate and concrete in shear wall, anchor plate is plugged in by anchor plate in shear wall in the shear wall of band connection part One upper lateral part of framework of steel reinforcement, concreting is around framework of steel reinforcement;Framework of steel reinforcement is that precast shear wall indulges muscle, prefabricated shearing Wall horizontal bar, precast shear wall lacing wire and precast shear wall confined boundary member stirrup composition, two row's precast shear walls are indulged muscle and put down Row is oppositely arranged, and is often arranged between precast shear wall indulges muscle and is connected by precast shear wall horizontal bar, the prefabricated shearing being oppositely arranged Wall is connected between indulging muscle by precast shear wall lacing wire, and outside be arranged in parallel up and down between the edge of the vertical muscle of two row's precast shear walls Precast shear wall confined boundary member stirrup.
The preparation method that described steel plate concrete Shear-wall Connecting Beam Used splits structure, the preparation method for it is following two it One:
(1) making of dry wall and prefabricated coupling beam and assembling process
The making of dry wall:Colligation precast shear wall indulges muscle and precast shear wall confined boundary member stirrup first, is formed The confined boundary member reinforcing bar of dry wall end, then the other precast shear walls of colligation indulge muscle and precast shear wall horizontal bar, most Colligation precast shear wall lacing wire afterwards, form the framework of steel reinforcement of dry wall;Anchor plate in the shear wall of band connection part is inserted into In framework of steel reinforcement, and I-shaped steel fastener is weldingly fixed on reserved shear wall horizontal bar;It is prefabricated in framework of steel reinforcement outer support Shear wall formwork, I-shaped steel fastener are located on the outside of precast shear wall template;The casting concrete in precast shear wall template, support Precast shear wall template is removed after shield, forms dry wall;
The making of prefabricated coupling beam:First the prefabricated coupling beam of colligation indulges muscle and prefabricated coupling beam stirrup around steel plate built in coupling beam, And coupling beam is indulged into muscle and is welded on I-shaped steel fastener;In the prefabricated coupling beam template of framework of steel reinforcement outer support, I-shaped steel fastener position On the outside of prefabricated coupling beam template;The casting concrete in prefabricated coupling beam template, prefabricated coupling beam template is removed after maintenance, formed prefabricated Coupling beam;
The assembling of dry wall and prefabricated coupling beam:Between prefabricated coupling beam is hung into two panels dry wall, the I-steel of dry wall connects Link slot on fitting and the alignment of the link slot on the I-shaped steel fastener of prefabricated coupling beam are adjacent to, the connection steel bar of dry wall and pre- The connection steel bar alignment of coupling beam processed is adjacent to, and connection steel loop is inserted in into two on tight connection steel bar, then connection I-steel is inserted In the I-shaped groove for entering two link slot compositions, structure after connection combination is formed after connection locking;In dry wall and prefabricated coupling beam The U-shaped template of outside-supporting of junction, the opening upwards of U-shaped template, and ensure that U-shaped template is connected with prefabricated coupling beam and dry wall Closely, grouting material then is irrigated in U-shaped template, until U-shaped template of the grouting material full of prefabricated components grouting seam, treats grouting material After solidification, U-shaped template is removed, completes the splicing of prefabricated coupling beam and dry wall;
(2) two panels prefabricated band Liang Qiang making and assembling process
Prefabricated band Liang Qiang making:Colligation precast shear wall indulges muscle and precast shear wall confined boundary member stirrup first, The confined boundary member reinforcing bar of prefabricated band Liang Qiang ends is formed, then the other precast shear walls of colligation indulge muscle and precast shear wall water Flat muscle, last colligation precast shear wall lacing wire, formation prefabricated band Liang Qiang framework of steel reinforcement;It will be anchored in the shear wall of band connection part Steel plate is inserted into framework of steel reinforcement, and I-shaped steel fastener is weldingly fixed on reserved shear wall horizontal bar;In framework of steel reinforcement Outer support precast shear wall template, I-shaped steel fastener are located on the outside of precast shear wall template;Poured in precast shear wall template Concrete is built, precast shear wall template is removed after maintenance, forms prefabricated band Liang Qiang;
Two panels prefabricated band Liang Qiang assembling:In place, the two panels prefabricated band Liang Qiang I-steel by two panels prefabricated band Liang Qiang liftings Link slot alignment on connector is adjacent to, and two panels prefabricated band Liang Qiang connection steel bar alignment is adjacent to, and connection steel loop is inserted in into two Insert in the I-shaped groove of two link slots compositions on tight connection steel bar, then by I-steel is connected, formed after connection locking Structure after connection combination;The U-shaped template of outside-supporting in two panels prefabricated band Liang Qiang junctions, the opening upwards of U-shaped template, and protect Demonstrate,prove U-shaped template to be completely embedded with two panels prefabricated band Liang Qiang, then irrigate grouting material in U-shaped template, until grouting material is full of pre- The U-shaped template of component processed grouting seam, after grouting material solidification, removes U-shaped template, the two panels prefabricated band beam wall being oppositely arranged it Between, connected by connecting I-steel with grouting material, complete two panels prefabricated band Liang Qiang splicing.
Shear wall with coupling beam in concrete frame shear structure is had advantages below and beneficial effect by the present invention:
1. the shear wall with coupling beam in concrete structure it is prefabricated to be split into dry wall, prefabricated coupling beam or two panels by the present invention Assembled connection method with beam wall assembly attachment structure and proposition, each component fractionation position is reasonable, is easy to structure manufacture and transport;
2. the present invention in mechanical property, can realize the transmission of splicing prefabricated components moment of flexure and shearing well, ensure to connect What is connect is reliable, while junction uses steel, and junction is survivable, meets in structure design that the design of " strong ties " will Ask;
3. of the invention in structure, prefabricated coupling beam and dry wall pass through the company that I-shaped steel fastener realizes the two built-in steel plate Connect, realize the connection of prefabricated coupling beam and dry wall steel bar stress by connecting steel loop and connection steel bar, attachment structure has certain Ductility, anti-seismic performance is good, meanwhile, the present invention is applied to any sectional dimension and the coupling beam of arrangement of reinforcement, and the scope of application is wider;
4. present invention welding in construction, it is easy to structure manufacture, transport and lifting installation, in assembling to greatest extent Assembly space demand is reduced, easy to operate, joint efficiency is high;
5. grouting material width is small between prefabricated components of the present invention, situ wet operation is few, and assembly rate is high, improves assembling degree, Energy-saving and emission-reduction are realized, are raised labour productivity, improve construction quality, shorten the duration.
Brief description of the drawings
Fig. 1 is anchor plate and link slot graphics in shear wall.
Fig. 2 is connection steel bar graphics.
Fig. 3 is the graphics of the shear wall anchor plate (abbreviation wall steel plate) of band connection part.
Fig. 4 is the graphics of precast shear wall arrangement of reinforcement.
Fig. 5 is that wall steel plate is connected the graphics completed with Fig. 4.
Fig. 6 is the graphics that precast shear wall shuttering supporting is completed.
Fig. 7 is the graphics that the shear wall (abbreviation dry wall) of prefabricated band connector completes.
Fig. 8 is steel plate built in coupling beam and link slot graphics.
Fig. 9 is the graphics of steel plate built in the coupling beam of band connection part (abbreviation joist steel plate).
Figure 10 is the graphics of the reinforcing bar and joist steel plate colligation completion in prefabricated coupling beam.
Figure 11 is the graphics that prefabricated coupling beam shuttering supporting is completed.
Figure 12 is the graphics of the built-in steel plate concrete coupling beam (referred to as prefabricated coupling beam) of prefabricated band connector.
Figure 13 is the graphics for connecting I-steel.
Figure 14 is the graphics for connecting steel loop.
Figure 15 is dry wall and the assembling process graphics of prefabricated coupling beam.
Figure 16 is that dry wall is connected the graphics completed with prefabricated coupling beam.
Figure 17 is the thin portion graphics that even dry wall meets place with prefabricated coupling beam.
Figure 18 is U-shaped template graphics.
Figure 19 is the graphics that U-shaped template is fixed on to beam-ends.
Figure 20 is the graphics that prefabricated coupling beam is completed with dry wall assembling.
Figure 21 is the graphics that the shear wall (abbreviation prefabricated band Liang Qiang) of prefabricated band half coupling beam completes.
Figure 22 is the graphics that two panels prefabricated band Liang Qiang connections are completed.
Figure 23 is the graphics that two panels prefabricated band Liang Qiang assemblings are completed.
In figure, anchor plate in 1 shear wall;2 link slots;3 connection steel bars;4 I-shaped steel fasteners;5 band connection parts are cut Power anchor plate within the walls;6 precast shear walls indulge muscle;7 precast shear wall horizontal bars;8 precast shear wall lacing wires;9 precast shear walls Confined boundary member stirrup;10 precast shear wall templates;The shear wall (abbreviation dry wall) of 11 prefabricated band connectors;In 12 coupling beams Put steel plate;Steel plate built in the coupling beam of 13 band connection parts;14 prefabricated coupling beams indulge muscle;15 prefabricated coupling beam stirrups;16 prefabricated coupling beam templates; The steel plate concrete coupling beam (referred to as prefabricated coupling beam) of 17 prefabricated band connectors;18 connection I-steel;19 connection steel loops;20th, U-shaped mould Plate;21 grouting materials;22 prefabricated band Liang Qiang.
Embodiment
As shown in Fig. 1 to Figure 23, steel plate concrete Shear-wall Connecting Beam Used of the present invention splits structure, making and assembly method, bag Two kinds of embodiments are included, it is specific as follows:
(1) shown in Fig. 1-Figure 20, when the link length of assembly concrete Shear Wall in Frame-Shear Wall Structures is more than 3m or engineering When being distinctly claimed, split, formed pre- by two panels dry wall 11 and one at the both ends of prefabricated coupling beam and shear wall link position The structure that coupling beam 17 processed is formed splits assembled system.
(1) as shown in Fig. 1-Fig. 3 and Fig. 8-Fig. 9, in order to realize the connection of dry wall 11 and prefabricated coupling beam 17, in dry wall Anchor plate 5 in the shear wall of pre-buried band connection part in 11, the steel plate built in the coupling beam of pre-buried band connection part in prefabricated coupling beam 17 13。
As shown in Figure 1-Figure 3, anchor plate 5 includes anchor plate 1 and I-shaped in shear wall in the shear wall of band connection part Steel fastener 4, the side of anchor plate 1 is integrated with the vertical connection of I-shaped steel fastener 4 in shear wall, I-shaped steel fastener 4 Outside link slot 2 and connection steel bar 3 are set, link slot 2 is vertically arranged, and vertical seam is left at the middle part of vertically arranged link slot 2 Gap, connection steel bar 3 are arranged symmetrically in the both sides of link slot 2;Wherein, link slot 2, I-shaped steel fastener 4, anchor plate in shear wall 1 is integral (such as Fig. 1) in factory's making, and connection steel bar 3 is L-shaped, and one side of connection steel bar 3 is vertically welded in I-steel connection On part 4, the another side of steel bar 3 is connected straight up.
As illustrated in figs. 8-9, steel plate 13 built in the coupling beam of band connection part connects including steel plate 12 built in coupling beam with I-steel Part 4, the both sides of steel plate 12 built in coupling beam are integrated with the vertical connection of I-shaped steel fastener 4 respectively, the outside of I-shaped steel fastener 4 Link slot 2 and connection steel bar 3 are set, and link slot 2 is vertically arranged, and vertical gap is left at the vertically arranged middle part of link slot 2, connects Steel bar 3 is arranged symmetrically in the both sides of link slot 2;Wherein, link slot 2, I-shaped steel fastener 4, steel plate 12 built in coupling beam are in factory's system It is integral (such as Fig. 8), connection steel bar 3 is L-shaped, and one side of connection steel bar 3 is vertically welded on I-shaped steel fastener 4, even Connect the another side of steel bar 3 straight up.
The length of anchor plate 1, the thickness of link slot 2 and the light plate of I-shaped steel fastener 4, length and width in shear wall Transmitting moment of flexure according to steel plate built in coupling beam in prefabricated coupling beam 17 causes the size of direct stress to calculate determination, while I-shaped steel fastener 4 width need to be smaller than the width of prefabricated coupling beam 17, and the size being less than is more than or equal to the protection thickness as defined in specification needed for steel plate Degree, with the requirement for meeting slip casting and preventing junction steel plate from corroding.
As shown in figure 13, inward flange chamfering on the downside of the edge of a wing of I-steel 18 is connected, the groove inside dimensions of link slot 2, which are less than, to be connected The edge of a wing thickness 1mm of I-steel 18 is met, when ensureing that the edge of a wing of connection I-steel 18 is installed in link slot 2, the two generation is larger Frictional force;As shown in figure 14, connecting the size and dimension of steel loop 19 need to determine according to the size and dimension of connection steel bar 3.Even Connect I-steel 18 and connect the size and dimension of steel bar 3 according to the size determination of the vertical transmission of muscle 14 moment of flexure of prefabricated coupling beam.
(2) as Figure 4-Figure 7, dry wall 11 mainly includes anchor plate 5 in the shear wall of framework of steel reinforcement, band connection part And concrete, anchor plate 5 is plugged in the side of framework of steel reinforcement by anchor plate in shear wall 1 in the shear wall of band connection part Top, concreting is around framework of steel reinforcement;Framework of steel reinforcement is that precast shear wall indulges muscle 6, precast shear wall horizontal bar 7, pre- System shearing wall lacing wire 8 and precast shear wall confined boundary member stirrup 9 are formed, and the vertical muscle 6 of two row's precast shear walls is parallel to be set relatively Put, often arrange between precast shear wall indulges muscle 6 and connected by precast shear wall horizontal bar 7, the precast shear wall being oppositely arranged indulges muscle 6 Between connected by precast shear wall lacing wire 8, two row's precast shear walls indulge muscle 6 edge between outside up and down be arranged in parallel it is prefabricated Shear wall confined boundary member stirrup 9.
Manufacturing process such as Fig. 4-Fig. 7 of the shear wall (abbreviation dry wall) 11 of prefabricated band connector.
As shown in figure 4, colligation precast shear wall indulges muscle 6 and precast shear wall confined boundary member stirrup 9 first, formed pre- The confined boundary member reinforcing bar of the end of wall 11 processed, then the other precast shear walls of colligation indulge muscle 6 and precast shear wall horizontal bar 7, Last colligation precast shear wall lacing wire 8, form the framework of steel reinforcement of dry wall 11.
As shown in figure 5, anchor plate 5 in the shear wall of band connection part is inserted into framework of steel reinforcement, and I-steel is connected Fitting 4 is weldingly fixed on reserved shear wall horizontal bar 7.
As shown in fig. 6, in framework of steel reinforcement outer support precast shear wall template 10, I-shaped steel fastener 4 is located at prefabricated shearing The outside of wall form 10.
As shown in fig. 7, the casting concrete in precast shear wall template 10, is conserved 28 days, precast shear wall template is removed 10, form dry wall 11.
(3) as shown in Figure 10-Figure 12, prefabricated coupling beam 17 includes the and of steel plate 13 built in the coupling beam of framework of steel reinforcement, band connection part Concrete, framework of steel reinforcement is arranged between the I-shaped steel fastener 4 of steel plate 13 built in the coupling beam of band connection part, steel plate built in coupling beam 12 periphery, concreting is around framework of steel reinforcement;Framework of steel reinforcement is that prefabricated coupling beam indulges 15 groups of muscle 14 and prefabricated coupling beam stirrup Into the prefabricated parallel arrangement of coupling beam stirrup 15 of rectangle, the prefabricated inner side corner of coupling beam stirrup 15 of rectangle sets prefabricated coupling beam to indulge muscle respectively 14。
Manufacturing process such as Figure 10-Figure 12 of the coupling beam (referred to as prefabricated coupling beam) 17 of prefabricated band connector.
As shown in Figure 10, the prefabricated coupling beam of colligation indulges muscle 14 and prefabricated coupling beam stirrup first around steel plate built in coupling beam 12 15, and coupling beam is indulged into muscle 14 and is welded on I-shaped steel fastener 4.
As shown in figure 11, it is located at prefabricated coupling beam mould in the prefabricated coupling beam template 16 of framework of steel reinforcement outer support, I-shaped steel fastener 4 The outside of plate 16.
As shown in figure 12, the casting concrete in prefabricated coupling beam template 16, conserve 28 days, remove prefabricated coupling beam template 16, Form prefabricated coupling beam 17.
(4) as shown in Figure 13-Figure 15, dry wall 11 and prefabricated coupling beam 17 are connected using connection I-steel 18 and connection steel loop 19 Connect, link slot 2 of the connection I-steel 18 respectively with dry wall 11 and the upper lateral part of prefabricated coupling beam 17 1 coordinates, and connection steel loop 19 is distinguished Coordinate with the connection steel bar 3 of dry wall 11 and the upper lateral part of prefabricated coupling beam 17 1.Connection I-steel 18 and connection steel loop 19 are used to pass Pass the moment of flexure between dry wall 11 and prefabricated coupling beam 17, shear.
(5) dry wall 11 and the assembling process of prefabricated coupling beam 17 such as Figure 15-Figure 20.
As shown in figure 15, between prefabricated coupling beam 17 being hung into two panels dry wall 11, on the I-shaped steel fastener 4 of dry wall 11 Link slot 2 and prefabricated coupling beam 17 I-shaped steel fastener 4 on link slot 2 alignment be adjacent to, the He of connection steel bar 3 of dry wall 11 The alignment of connection steel bar 3 of prefabricated coupling beam 17 is adjacent to, and connection steel loop 19 is inserted in into two on tight connection steel bar 3, then will connection I-steel 18 is inserted in the I-shaped groove that two link slots 2 form, and structure after connection combination is formed after connection locking, see Figure 16- Figure 17.
As shown in Figure 18-Figure 20, the U-shaped template 20 of outside-supporting in dry wall 11 and the junction of prefabricated coupling beam 17, U-shaped mould The opening upwards of plate 20, and by glass cement or other materials, ensure that U-shaped template 20 connects with prefabricated coupling beam 17 and dry wall 11 Connect closely, then the perfusion grouting material 21 in U-shaped template 20, the U-shaped template of seam until grouting material 21 is in the milk full of prefabricated components 20, after the solidification of grouting material 21, U-shaped template 20 is removed, completes the splicing of prefabricated coupling beam 17 and dry wall 11.
This kind splits erection method, and force-transmission mechanism is:I-steel 18 is connected to insert in link slot 2, by steel plate built in coupling beam 12 moments of flexure undertaken are delivered to anchor plate 1 in shear wall;The connection steel bar 3 of 11 prefabricated coupling beam of dry wall is by connecting steel loop 19 Locking, the moment of flexure that the vertical muscle 14 of prefabricated coupling beam undertakes is delivered to the precast shear wall horizontal bar 7 welded with I-shaped steel fastener 4; Shearing between prefabricated coupling beam 17 and dry wall 11 passes through the frictional force for the part that grouting material 21 contacts with the surrounding of grouting material 21 and stung With joint efforts, and connection I-steel 18 and I-shaped steel fastener 4 between frictional force transmission.
(2) as shown in Figure 21-Figure 23, when assembly concrete Shear Wall in Frame-Shear Wall Structures link length be less than 3m or When engineering is distinctly claimed, split in the span centre position of prefabricated coupling beam, formed to be split by the structure of two panels prefabricated band beam wall 22 and spelled Dress system.
The steel plate concrete Shear-wall Connecting Beam Used of which, which splits structure, mainly includes prefabricated band beam wall 22, connection I-steel 18th, grouting material 21 etc., concrete structure is as follows:
The alignment of link slot 2 on the I-shaped steel fastener 4 of two panels prefabricated band beam wall 22 is adjacent to, two panels prefabricated band beam wall 22 The connection alignment of steel bar 3 is adjacent to, and connection steel loop 19 is inserted in into two on tight connection steel bar 3, then connection I-steel 18 is inserted In the I-shaped groove that two link slots 2 form, structure after connection combination is formed after connection locking.
As shown in figure 21, the structure of prefabricated band beam wall 22, making and assembly method refer to (one) mode operate, power transmission machine Reason is identical with (one) mode.During assembling, first two panels prefabricated band beam wall 22 is lifted in place, the two panels prefabricated band Liang Qiang being oppositely arranged Between 22, connected by connecting I-steel 18 and grouting material 21.
The U-shaped template 20 of outside-supporting in the junction of two panels prefabricated band beam wall 22, the opening upwards of U-shaped template 20, and By glass cement or other materials, ensure that U-shaped template 20 is completely embedded with two panels prefabricated band beam wall 22, then in U-shaped template 20 Interior perfusion grouting material 21, until U-shaped template 20 of the grouting material 21 full of prefabricated components grouting seam, after the solidification of grouting material 21, tears open Except U-shaped template 20, the splicing of two panels prefabricated band beam wall 22 is completed.
Result of implementation shows that steel plate concrete Shear-wall Connecting Beam Used of the present invention splits structure, making and assembly method, by coagulation Shear wall with coupling beam in soil structure, split into dry wall, prefabricated coupling beam or two panels prefabricated band beam wall assembly attachment structure and carry The assembled connection method gone out:In mechanical property, the transmission of splicing prefabricated components moment of flexure and shearing can be realized well, ensure to connect What is connect is reliable, meets in structure design the design requirement of " strong ties ";In structure, prefabricated coupling beam and dry wall pass through I-steel Connector realizes the connection of the two built-in steel plate, and prefabricated coupling beam and dry wall stress steel are realized by connecting steel loop and connection steel bar The connection of muscle, attachment structure have certain ductility, and anti-seismic performance is good, meanwhile, the present invention is applied to any sectional dimension and arrangement of reinforcement Coupling beam, the scope of application is wider;In construction, welding, it is easy to structure manufacture, transport and lifting installation, it is maximum in assembling The reduction assembly space demand of limit, easy to operate, joint efficiency is high;Grouting material width is small between prefabricated components, situ wet operation Few, assembly rate is high, improves assembling degree, realizes energy-saving and emission-reduction, raise labour productivity, and improves construction quality, shortens the duration.

Claims (9)

1. a kind of steel plate concrete Shear-wall Connecting Beam Used splits structure, it is characterised in that by coupling beam, prefabricated shearing in precast shear wall The coupling beam of wall or shear wall with half bridging beam, connection I-steel form structure and split assembled system, wherein:Precast shear wall Middle coupling beam, hereinafter referred to as prefabricated coupling beam;Precast shear wall, hereinafter referred to as dry wall;The prefabricated shear wall for carrying half bridging beam, with Lower abbreviation prefabricated band Liang Qiang;The assembled attachment structure is one of following two structure types:
(1) split in the both ends of prefabricated coupling beam and shear wall link position, make respectively prefabricated coupling beam and with prefabricated coupling beam beam The dry wall of connection is held, the common two panels of the dry wall being connected with a prefabricated coupling beam, is formed by two panels dry wall and a prefabricated company The structure that beam is formed splits assembled system;Anchor plate in the shear wall of connector is provided with dry wall, in prefabricated coupling beam It is provided with steel plate built in the coupling beam of connector, anchor plate and steel built in the coupling beam of band connection part in the shear wall of band connection part Plate is oppositely arranged by link slot and connection steel bar respectively, and the link slot alignment being oppositely arranged is adjacent to, the connection steel being oppositely arranged Bar alignment is adjacent to, and is directed at the I-shaped groove formed between the link slot being adjacent to and is connected by connecting I-steel, is directed at the company being adjacent to Connect and connected by connecting steel loop between steel bar, prefabricated coupling beam, dry wall and connection I-steel is connected as entirety;
(2) split in the span centre position of prefabricated coupling beam, the prefabricated shear wall for carrying half bridging beam of two panels is formed after fractionation, i.e., it is prefabricated Band Liang Qiang, formed and assembled system is split by two panels prefabricated band Liang Qiang structure;Install on two panels prefabricated band Liang Qiang and pacify respectively respectively Anchor plate in shear wall equipped with band connection part, anchor plate passes through link slot and connection respectively in the shear wall of band connection part Steel bar is oppositely arranged, and the link slot alignment being oppositely arranged is adjacent to, and the connection steel bar alignment being oppositely arranged is adjacent to, and is directed at the company being adjacent to The I-shaped groove formed between access slot is connected by connecting I-steel, is aligned between the connection steel bar being adjacent to by connecting steel loop company Connect, prefabricated band Liang Qiang and connection I-steel is connected as entirety.
2. split structure according to the steel plate concrete Shear-wall Connecting Beam Used described in claim 1, it is characterised in that prefabricated in order to realize The connection of wall and prefabricated coupling beam, anchor plate in the shear wall of pre-buried band connection part, pre-buried in prefabricated coupling beam in dry wall Steel plate built in the coupling beam of band connection part;In order to realize two panels prefabricated band Liang Qiang connection, pre- buried strap is distinguished within the walls in prefabricated band beam Anchor plate in the shear wall of connector.
3. split structure according to the steel plate concrete Shear-wall Connecting Beam Used described in claim 1, it is characterised in that band connection part is cut Anchor plate includes anchor plate and I-shaped steel fastener in shear wall to power within the walls, the side of anchor plate and I-shaped in shear wall Steel fastener vertical connection is integrated, and the outside of I-shaped steel fastener sets link slot and connection steel bar, and link slot is vertically arranged, Vertical gap is left in the middle part of vertically arranged link slot, connection steel bar is arranged symmetrically in link slot both sides;Connection steel bar is L-shaped, One side of connection steel bar is vertically welded on I-shaped steel fastener, connects the another side of steel bar straight up.
4. split structure according to the steel plate concrete Shear-wall Connecting Beam Used described in claim 1, it is characterised in that the company of band connection part Steel plate built in beam includes steel plate built in coupling beam and I-shaped steel fastener, the both sides of steel plate built in coupling beam respectively with I-shaped steel fastener Vertical connection is integrated, and the outside of I-shaped steel fastener sets link slot and connection steel bar, and link slot is vertically arranged, vertically arranged Link slot in the middle part of leave vertical gap, connection steel bar is arranged symmetrically in link slot both sides;Connection steel bar is L-shaped, connects steel bar One side be vertically welded on I-shaped steel fastener, connect the another side of steel bar straight up.
5. split structure according to the steel plate concrete Shear-wall Connecting Beam Used described in claim 1, it is characterised in that connect I-steel Inward flange chamfering on the downside of the edge of a wing, the groove inside dimensions of link slot are less than the edge of a wing thickness 1mm of connection I-steel, in connection I-steel Edge of a wing when being installed in link slot, the two produces larger frictional force.
6. split structure according to the steel plate concrete Shear-wall Connecting Beam Used described in claim 1, it is characterised in that dry wall includes steel Tendons skeleton, band connection part shear wall in anchor plate and concrete, anchor plate passes through shearing in the shear wall of band connection part Anchor plate is plugged in a upper lateral part of framework of steel reinforcement within the walls, and concreting is around framework of steel reinforcement;Framework of steel reinforcement is prefabricated Shear wall is indulged muscle, precast shear wall horizontal bar, precast shear wall lacing wire and precast shear wall confined boundary member stirrup and formed, and two Row's precast shear wall is indulged muscle and is oppositely arranged in parallel, and often arranges between precast shear wall indulges muscle and is connected by precast shear wall horizontal bar, The precast shear wall that is oppositely arranged is connected between indulging muscle by precast shear wall lacing wire, two row's precast shear walls indulge muscle edge it Between outside be arranged in parallel precast shear wall confined boundary member stirrup up and down.
7. split structure according to the steel plate concrete Shear-wall Connecting Beam Used described in claim 1, it is characterised in that prefabricated coupling beam includes Framework of steel reinforcement, band connection part coupling beam built in steel plate and concrete, framework of steel reinforcement is arranged at steel plate built in the coupling beam of band connection part I-shaped steel fastener between, the periphery of steel plate built in coupling beam, concreting is around framework of steel reinforcement;Framework of steel reinforcement is prefabricated Coupling beam indulges muscle and prefabricated coupling beam stirrup composition, the prefabricated coupling beam stirrup parallel arrangement of rectangle, rectangle prefabricated coupling beam stirrup inner side corner Prefabricated coupling beam is set to indulge muscle respectively.
8. split structure according to the steel plate concrete Shear-wall Connecting Beam Used described in claim 1, it is characterised in that prefabricated band Liang Qiangbao Anchor plate and concrete in the shear wall of framework of steel reinforcement, band connection part are included, anchor plate passes through in the shear wall of band connection part Anchor plate is plugged in a upper lateral part of framework of steel reinforcement in shear wall, and concreting is around framework of steel reinforcement;Framework of steel reinforcement is Precast shear wall indulges muscle, precast shear wall horizontal bar, precast shear wall lacing wire and precast shear wall confined boundary member stirrup group Into two row's precast shear walls are indulged muscle and are oppositely arranged in parallel, and often arrange between precast shear wall indulges muscle and pass through precast shear wall horizontal bar Connection, the precast shear wall being oppositely arranged are connected between indulging muscle by precast shear wall lacing wire, and two row's precast shear walls indulge muscle Be arranged in parallel precast shear wall confined boundary member stirrup between edge above and below outside.
9. the preparation method that the steel plate concrete Shear-wall Connecting Beam Used described in a kind of one of claim 1 to 8 splits structure, its feature It is, the preparation method is one of following two:
(1) making of dry wall and prefabricated coupling beam and assembling process
The making of dry wall:Colligation precast shear wall indulges muscle and precast shear wall confined boundary member stirrup first, is formed prefabricated The confined boundary member reinforcing bar of wall end, then the vertical muscle of the other precast shear walls of colligation and precast shear wall horizontal bar, are finally tied up Precast shear wall lacing wire is pricked, forms the framework of steel reinforcement of dry wall;Anchor plate in the shear wall of band connection part is inserted into reinforcing bar In skeleton, and I-shaped steel fastener is weldingly fixed on reserved shear wall horizontal bar;In the prefabricated shearing of framework of steel reinforcement outer support Wall form, I-shaped steel fastener are located on the outside of precast shear wall template;The casting concrete in precast shear wall template, after maintenance Precast shear wall template is removed, forms dry wall;
The making of prefabricated coupling beam:First the prefabricated coupling beam of colligation indulges muscle and prefabricated coupling beam stirrup around steel plate built in coupling beam, and will Coupling beam is indulged muscle and is welded on I-shaped steel fastener;In the prefabricated coupling beam template of framework of steel reinforcement outer support, I-shaped steel fastener is positioned at pre- On the outside of coupling beam template processed;The casting concrete in prefabricated coupling beam template, prefabricated coupling beam template is removed after maintenance, forms prefabricated company Beam;
The assembling of dry wall and prefabricated coupling beam:Between prefabricated coupling beam is hung into two panels dry wall, the I-shaped steel fastener of dry wall On link slot and prefabricated coupling beam I-shaped steel fastener on link slot alignment be adjacent to, the connection steel bar of dry wall and prefabricated company The connection steel bar alignment of beam is adjacent to, and connection steel loop is inserted in into two on tight connection steel bar, then will connection I-steel insertion two In the I-shaped groove of individual link slot composition, structure after connection combination is formed after connection locking;Connected in dry wall with prefabricated coupling beam The U-shaped template of outside-supporting at place, the opening upwards of U-shaped template, and ensure that U-shaped template is connected tightly with prefabricated coupling beam and dry wall It is close, grouting material then is irrigated in U-shaped template, until U-shaped template of the grouting material full of prefabricated components grouting seam, treats that grouting material coagulates Gu after, U-shaped template is removed, completes the splicing of prefabricated coupling beam and dry wall;
(2) two panels prefabricated band Liang Qiang making and assembling process
Prefabricated band Liang Qiang making:Colligation precast shear wall indulges muscle and precast shear wall confined boundary member stirrup first, is formed The confined boundary member reinforcing bar of prefabricated band Liang Qiang ends, then the other precast shear walls of colligation indulge muscle and precast shear wall is horizontal Muscle, last colligation precast shear wall lacing wire, formation prefabricated band Liang Qiang framework of steel reinforcement;Steel will be anchored in the shear wall of band connection part Plate is inserted into framework of steel reinforcement, and I-shaped steel fastener is weldingly fixed on reserved shear wall horizontal bar;Outside framework of steel reinforcement Precast shear wall template is supported, I-shaped steel fastener is located on the outside of precast shear wall template;Poured in precast shear wall template Concrete, precast shear wall template is removed after maintenance, form prefabricated band Liang Qiang;
Two panels prefabricated band Liang Qiang assembling:Two panels prefabricated band Liang Qiang liftings is in place, two panels prefabricated band Liang Qiang I-steel connection Link slot alignment on part is adjacent to, and two panels prefabricated band Liang Qiang connection steel bar alignment is adjacent to, and connection steel loop is inserted in into two to tight Connection steel bar on, then insert I-steel is connected in the I-shaped groove of two link slots composition, connection formed after connection locking Structure after combination;The U-shaped template of outside-supporting in two panels prefabricated band Liang Qiang junctions, the opening upwards of U-shaped template, and ensure U Pattern plate is completely embedded with two panels prefabricated band Liang Qiang, then irrigates grouting material in U-shaped template, until grouting material is full of prefabricated structure The U-shaped template of part grouting seam, after grouting material solidification, removes U-shaped template, between the two panels prefabricated band beam wall being oppositely arranged, leads to Cross connection I-steel to connect with grouting material, complete two panels prefabricated band Liang Qiang splicing.
CN201710922921.7A 2017-09-30 2017-09-30 Connecting beam splitting structure of steel plate concrete shear wall and manufacturing method Active CN107524234B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710922921.7A CN107524234B (en) 2017-09-30 2017-09-30 Connecting beam splitting structure of steel plate concrete shear wall and manufacturing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710922921.7A CN107524234B (en) 2017-09-30 2017-09-30 Connecting beam splitting structure of steel plate concrete shear wall and manufacturing method

Publications (2)

Publication Number Publication Date
CN107524234A true CN107524234A (en) 2017-12-29
CN107524234B CN107524234B (en) 2022-11-22

Family

ID=60683970

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710922921.7A Active CN107524234B (en) 2017-09-30 2017-09-30 Connecting beam splitting structure of steel plate concrete shear wall and manufacturing method

Country Status (1)

Country Link
CN (1) CN107524234B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108301534A (en) * 2018-02-05 2018-07-20 沈阳建筑大学 A kind of card slot type shear wall horizontal connection structure and preparation method thereof, construction method
CN108343175A (en) * 2018-04-26 2018-07-31 华南理工大学建筑设计研究院 A kind of vertical muscle anchor of high strength concrete filled steel tube Shear-wall Connecting Beam Used
CN109267672A (en) * 2018-11-09 2019-01-25 沈阳建筑大学 The structure and assembly method of special-shaped I-steel connection shear wall and coupling beam
CN109296129A (en) * 2018-10-29 2019-02-01 南通龙哲混凝土制品有限公司 A kind of precast beam and its construction method
CN109577515A (en) * 2019-01-30 2019-04-05 沈阳建筑大学 Precast shear wall lattice horizontal connection structure, production and assembly method
CN110863611A (en) * 2019-11-20 2020-03-06 河北水利电力学院 H-shaped steel and channel steel assembled L-shaped special-shaped column connected by latch hook
WO2022099876A1 (en) * 2020-11-13 2022-05-19 广州地铁设计研究院股份有限公司 Fabricated subway station and construction method therefor
CN115434455A (en) * 2022-11-08 2022-12-06 中铁建设集团华北工程有限公司 Assembled close-spliced shell system concrete shear wall structure and design method
US11926982B2 (en) 2020-11-13 2024-03-12 Guangzhou Metro Design & Research Institute Co., Ltd. Assembled subway station and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103147529A (en) * 2013-04-03 2013-06-12 东南大学 Assembly type energy dissipation and seismic mitigation shear wall structure system
CN103290952A (en) * 2013-05-13 2013-09-11 东南大学 Integrated assembled concrete frame and shear wall connection structure and construction method thereof
WO2014193323A1 (en) * 2013-05-27 2014-12-04 Süleyman Bahadir Yüksel Shear and bending reinforcements of coupling beams of coupled shear walls
CN105888077A (en) * 2016-06-17 2016-08-24 福建工程学院 Fabricated shear wall connecting device and construction method thereof
CN107090925A (en) * 2017-05-12 2017-08-25 姚攀峰 Reinforced precast reinforced concrete shear wall, structural system and its construction method
CN107217787A (en) * 2017-05-18 2017-09-29 沈阳建筑大学 A kind of assembled coupling beam of built-in profiled sheet groove structure
CN207660110U (en) * 2017-09-30 2018-07-27 沈阳建筑大学 A kind of steel plate concrete Shear-wall Connecting Beam Used structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103147529A (en) * 2013-04-03 2013-06-12 东南大学 Assembly type energy dissipation and seismic mitigation shear wall structure system
CN103290952A (en) * 2013-05-13 2013-09-11 东南大学 Integrated assembled concrete frame and shear wall connection structure and construction method thereof
WO2014193323A1 (en) * 2013-05-27 2014-12-04 Süleyman Bahadir Yüksel Shear and bending reinforcements of coupling beams of coupled shear walls
CN105888077A (en) * 2016-06-17 2016-08-24 福建工程学院 Fabricated shear wall connecting device and construction method thereof
CN107090925A (en) * 2017-05-12 2017-08-25 姚攀峰 Reinforced precast reinforced concrete shear wall, structural system and its construction method
CN107217787A (en) * 2017-05-18 2017-09-29 沈阳建筑大学 A kind of assembled coupling beam of built-in profiled sheet groove structure
CN207660110U (en) * 2017-09-30 2018-07-27 沈阳建筑大学 A kind of steel plate concrete Shear-wall Connecting Beam Used structure

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108301534A (en) * 2018-02-05 2018-07-20 沈阳建筑大学 A kind of card slot type shear wall horizontal connection structure and preparation method thereof, construction method
CN108301534B (en) * 2018-02-05 2023-12-01 新疆彦鑫建筑安装工程有限责任公司 Clamping groove type shear wall horizontal connection structure, manufacturing method and construction method thereof
CN108343175A (en) * 2018-04-26 2018-07-31 华南理工大学建筑设计研究院 A kind of vertical muscle anchor of high strength concrete filled steel tube Shear-wall Connecting Beam Used
CN108343175B (en) * 2018-04-26 2023-07-14 华南理工大学建筑设计研究院有限公司 Steel pipe high-strength concrete shear wall connecting beam longitudinal bar anchoring device
CN109296129A (en) * 2018-10-29 2019-02-01 南通龙哲混凝土制品有限公司 A kind of precast beam and its construction method
CN109267672A (en) * 2018-11-09 2019-01-25 沈阳建筑大学 The structure and assembly method of special-shaped I-steel connection shear wall and coupling beam
CN109577515A (en) * 2019-01-30 2019-04-05 沈阳建筑大学 Precast shear wall lattice horizontal connection structure, production and assembly method
CN109577515B (en) * 2019-01-30 2024-05-03 河南省鑫淼远大住宅工业有限公司 Prefabricated shear wall lattice type horizontal connection structure, manufacturing and assembling method
CN110863611A (en) * 2019-11-20 2020-03-06 河北水利电力学院 H-shaped steel and channel steel assembled L-shaped special-shaped column connected by latch hook
WO2022099876A1 (en) * 2020-11-13 2022-05-19 广州地铁设计研究院股份有限公司 Fabricated subway station and construction method therefor
US11926982B2 (en) 2020-11-13 2024-03-12 Guangzhou Metro Design & Research Institute Co., Ltd. Assembled subway station and construction method thereof
CN115434455A (en) * 2022-11-08 2022-12-06 中铁建设集团华北工程有限公司 Assembled close-spliced shell system concrete shear wall structure and design method

Also Published As

Publication number Publication date
CN107524234B (en) 2022-11-22

Similar Documents

Publication Publication Date Title
CN107524234A (en) Steel plate concrete Shear-wall Connecting Beam Used splits structure and preparation method
CN104481031B (en) Assembly connection structure and method of coupling beams of shear walls of assembly concrete frame shear structure
CN209227833U (en) The vertical insertion type horizontal connection structure of shear wall
CN107489296A (en) The energy-dissipating and shock-absorbing attachment structure and assembly method of assembly concrete coupling beam
CN105863111A (en) Embedded prefabricated concrete shear wall anti-bending steel frame structure
CN105937274B (en) The prefabricated horizontal piece channel steel of shear wall is welded to connect device and connection method
CN105839836B (en) A kind of precast concrete shear wall component and its construction method
CN107975160A (en) Shear wall structure, making and assembly method with laterally attached keyway
CN108867935A (en) L shape connecting structure of wall and assembled arthitecutral structure system
CN108532751B (en) Assembled concrete beam column joint and construction method
CN207660110U (en) A kind of steel plate concrete Shear-wall Connecting Beam Used structure
CN109267673A (en) Steel ribs dislocation dock shear wall vertical connection structure and assembly method
CN204983662U (en) To drawing screw rod and steel pipe framed bent combination unilateral formwork device
CN214739251U (en) Assembled combination tie-beam window opening component and connection structure thereof
CN208072705U (en) A kind of energy-dissipating and shock-absorbing connection structure of coupling beam
CN107642179A (en) Assembled frame-shear structure steel plate keyway attachment structure and assembling method
CN208668279U (en) Pier cap beam anchor ear girder steel template system
CN113026993B (en) Assembly type combined connecting beam window opening component, structure and manufacturing and construction method
CN206956979U (en) A kind of Linear shear wall with fore-set
CN207260378U (en) A kind of assembled frame-shear structure curved scissors type combines keyway connection structure
CN107503446A (en) A kind of U-shaped steel bar connector connection Shear-wall Connecting Beam Used structure and assembly method
CN207660133U (en) A kind of steel pipe occlusion mode shear wall connection structure
CN105862912A (en) Construction method of protective walls of concrete antiskid piles
CN113356370A (en) Mutual anchoring connection construction method for shear wall, frame column and concrete beam bracket
CN105649259B (en) A kind of wallboard structural system of the dark framework of band of precast concrete wall panel and its structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20221102

Address after: 410011 Building 005, No. 65, Renmin Middle Road, Furong District, Changsha City, Hunan Province

Applicant after: Hunan First Engineering Co.,Ltd.

Address before: No. 106 and 107, Building B7, Daopo Community, Wangyue Street, Yuelu District, Changsha, Hunan 410000

Applicant before: Changsha Chengyang Intellectual Property Service Co.,Ltd.

Effective date of registration: 20221102

Address after: No. 106 and 107, Building B7, Daopo Community, Wangyue Street, Yuelu District, Changsha, Hunan 410000

Applicant after: Changsha Chengyang Intellectual Property Service Co.,Ltd.

Address before: 110168 Liaoning province Shenyang Hunnan Hunnan Road No. 9

Applicant before: SHENYANG JIANZHU University

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant