CN109258275A - A kind of administering method controlling the scour of Loess Region ditch - Google Patents

A kind of administering method controlling the scour of Loess Region ditch Download PDF

Info

Publication number
CN109258275A
CN109258275A CN201811262311.XA CN201811262311A CN109258275A CN 109258275 A CN109258275 A CN 109258275A CN 201811262311 A CN201811262311 A CN 201811262311A CN 109258275 A CN109258275 A CN 109258275A
Authority
CN
China
Prior art keywords
ridge
limes marginis
protection
bank
sand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811262311.XA
Other languages
Chinese (zh)
Inventor
张振兴
杨海军
曹丽娜
林晨鹭
李昆
李元
孙彩云
徐亮
马瀞孺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northeastern University China
Northeast Normal University
Original Assignee
Northeast Normal University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northeast Normal University filed Critical Northeast Normal University
Priority to CN201811262311.XA priority Critical patent/CN109258275A/en
Publication of CN109258275A publication Critical patent/CN109258275A/en
Pending legal-status Critical Current

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G17/00Cultivation of hops, vines, fruit trees, or like trees
    • A01G17/005Cultivation methods
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01BSOIL WORKING IN AGRICULTURE OR FORESTRY; PARTS, DETAILS, OR ACCESSORIES OF AGRICULTURAL MACHINES OR IMPLEMENTS, IN GENERAL
    • A01B79/00Methods for working soil
    • A01B79/02Methods for working soil combined with other agricultural processing, e.g. fertilising, planting
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G20/00Cultivation of turf, lawn or the like; Apparatus or methods therefor
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G22/00Cultivation of specific crops or plants not otherwise provided for
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P60/00Technologies relating to agriculture, livestock or agroalimentary industries
    • Y02P60/20Reduction of greenhouse gas [GHG] emissions in agriculture, e.g. CO2

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Environmental Sciences (AREA)
  • Structural Engineering (AREA)
  • Soil Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Botany (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Cultivation Of Plants (AREA)

Abstract

The invention discloses a kind of safeguard structures for controlling the scour of Loess Region ditch, it includes: first of the limes marginis protection ridge (1), the protection of second the limes marginis ridge (2), charcoal band (3), the coating that fixes the sand (4);A kind of administering method controlling the scour of Loess Region ditch, the specific steps are as follows: 1) taking length is 100 ~ 200 meters, the channel that groove gradient is 300 ~ 700 ‰;2) it builds twice limes marginis and protects the ridge;3) between the ridge ground charcoal band, be laid with straw biological charcoal;4) coating uniform that fixes the sand sprays SH series sand fixation material;5) on the ridge on the twice limes marginis protection ridge, vegetation is planted by the plantation of " product " word;6) intermediate zone on first of limes marginis protection ridge and the second limes marginis protection ridge is parallel to below the two rows of shrub shrubs of twice limes marginis protection ridge plantation and uniformly sows herbaceous plant;7) between bank and first of limes marginis protection ridge, uniline shrub, hole planting liana are planted close to bank side close to first of limes marginis ridge.

Description

A kind of administering method controlling the scour of Loess Region ditch
Technical field
The invention belongs to conservation technology fields, and in particular to a kind of improvement side for controlling the scour of Loess Region ditch Method.
Background technique
For rill erosion as a kind of common soil erosion type in Loess Region, erosion amount is big, and erosive velocity is fast, causes to plough Ground area is sharply reduced, and soil fertility decline not only causes local environment to deteriorate and declines with agricultural productive force, and a large amount of It is dangerous to increase potential flood in underwater bed for sediment siltation.The expansion of ditch bank is the significant process of rill erosion development, slope surface It is the main reason for causing ditch bank to be expanded that runoff, which is washed away with ditch bank bank landslip, and limes marginis area is as erosion active in basin Band is endangered seriously by water erosion and mass erosion, and the runoff that slope ground surface generates is right during entering ditch slope and channel Limes marginis generate it is strong wash away and denudation, in order to reduce the expansion of ditch bank from the root, the improvement of limes marginis is particularly important.
Loess Region channel gradient is larger, and the soil texture is sand loam, and loosely organized, corrosion stability is weaker, while by It is low in vegetation coverage, cause seasonal precipitation to take a large amount of silts and agricultural area source pollutants input downstream mainstream, aggravates mainstream The eutrophication of water body.
Currently, the RBS in channel direction of Loess Region has focused largely on ditch head and bottom of trench, it is less to limes marginis erosion research.For The control measures corroded in channel mainly have silt arrester and check dam, can not only prevent bottom of trench incision, while also stable ditch slope, prevention The expansion of ditch bank.But these measures are unable to improve the physicochemical property of bank slope soil, and are in regional allocations, cannot effectively intercept From slope surface runoff washing away and degrading to limes marginis area.Therefore, under the premise of water-saving fix the sand, how work is effectively played The effect of journey measure and biological control measure, control Loess Region ditch scour are of great significance.
Summary of the invention
Object of the present invention is to solve the problems, such as Loess Region soil erosion, and provide a kind of reduction ditch bank expansion, control The administering method of ditch scour in Loess Region processed.
A kind of safeguard structure controlling the scour of Loess Region ditch, it includes: first limes marginis the protection ridge 1, second Limes marginis the protection ridge 2, charcoal band 3, fix the sand coating 4;
1~2m of bottom width, 0.5~0.8m of top width, the high 0.5~1m in the ridge on first of limes marginis protection ridge 1, with bank distance 1~1.5m;Second limes marginis protect the ridge 2 1~2m of bottom width, 0.5~0.8m of top width, the high 0.5~1m in the ridge, with bank distance 5 ~ 6m;Charcoal band 3 is located on the ground between first of limes marginis protection ridge 1 and the second limes marginis protection ridge 2;The coating 4 that fixes the sand is located at Sandy land surface between bank and the second limes marginis protection ridge 2;
The charcoal band 3 with a thickness of 20cm, be laid with charcoal soil than the straw biological charcoal for 3%, partial size 0.15mm;
The coating 4 that fixes the sand sprays SH series sand fixation material;
The coating 4 that fixes the sand with a thickness of 2mm.
A kind of administering method controlling the scour of Loess Region ditch, it includes: to construct one kind in Loess Region limes marginis Control the safeguard structure of Loess Region ditch scour, the specific steps are as follows:
1) gully erosion selects: taking length is 100 ~ 200 meters, the channel that groove gradient is 300 ~ 700 ‰;
2) the compound limes marginis protection ridge is built: first of limes marginis protection ridge is being built at 1 ~ 1.5m of bank, at 5 ~ 6m of bank It builds second limes marginis and protects the ridge, twice limes marginis protects 1~2m of ridge bottom width, 0.5~0.8m of top width, the high 0.5~1m in the ridge;
3) between the ridge charcoal be laid with: the charcoal band on ground between the ridge is laid with charcoal soil and compares the straw biological charcoal for 1 ~ 3%, is laid with thick 18 ~ 25cm is spent, charcoal partial size is 0.15 ~ 0.25mm;
4) spray SH series sand fixation material: the coating that fixes the sand is located on the sand ground between bank and the second limes marginis protection ridge, described The coating uniform that fixes the sand sprays SH series sand fixation material, and spraying concentration is 2%~3%, sprays with a thickness of 2~3mm, and amount of application 0.25~ 0.3L/m2
5) vegetation is planted on the ridge: on the ridge on the twice limes marginis protection ridge, planting vegetation, spacing in the rows 0.5m, line-spacing 0.2 by the plantation of " product " word ~ 0.3m, the vegetation be day lily, caragana microphylla and or sea-buckthorn;Day lily is perennial herb, and caragana microphylla and sea-buckthorn are shrub
6) planting between the ridge: the intermediate zone on first of limes marginis protection ridge and the second limes marginis protection ridge is parallel to twice ditch Frontier defense protects the ridge and plants two rows of shrubs, 1 ~ 1.5m of line-spacing, 0.3 ~ 0.5m of spacing in the rows, and herbaceous plant is uniformly sowed in shrub lower section;
7) bank side vegetation is planted: between bank and first of limes marginis protection ridge, planting close to first of limes marginis ridge close to bank side Uniline shrub, 0.4 ~ 0.6m of spacing in the rows;Away from hole planting liana at 0.5 ~ 1.0m of bank, cave 0.3 ~ 0.5m of diameter, depth 0.3 ~ 0.5m, 0.4 ~ 0.6m of hill spacing;
Channel described in step 1) is Loess Region rill erosion development mid-term stage, the channel that section is " V " type;
Shrub described in step 6) is bluish dogbane, caragana microphylla and or Niu Zhizi, and herbaceous plant is alfalfa, rough leaf astragalus and Or splendid achnatherum;
Shrub described in step 7) be periploca spium, liana be honeysuckle and or kudzu.
The present invention provides a kind of safeguard structures for controlling the scour of Loess Region ditch, it includes: first of ditch frontier defense Protect the ridge 1, second limes marginis protects the ridge 2, charcoal band 3, fix the sand coating 4;A kind of improvement controlling the scour of Loess Region ditch Method, the specific steps are as follows: 1) taking length is 100 ~ 200 meters, the channel that groove gradient is 300 ~ 700 ‰;2) apart from bank 1 First of limes marginis protection ridge is built at ~ 1.5m, protects the ridge away from second limes marginis is built at 5 ~ 6m of bank;3) between the ridge ground biology Charcoal band is laid with charcoal soil and compares the straw biological charcoal for 1 ~ 3%;4) coating uniform that fixes the sand sprays SH series sand fixation material;5) in twice ditch Frontier defense is protected on the ridge on the ridge, plants vegetation by the plantation of " product " word;6) centre on first of limes marginis protection ridge and the second limes marginis protection ridge Area is parallel to below the two rows of shrub shrubs of twice limes marginis protection ridge plantation and uniformly sows herbaceous plant;7) bank and first Limes marginis protects between the ridge, uniline shrub is planted close to bank side close to first of limes marginis ridge, away from hole planting at 0.5 ~ 1.0m of bank Liana;The invention has the advantages that 1) of the invention by engineering measure, plant measures, soil conditioner, water and soil conservation sand fixation material etc. It organically combines, constructs a kind of administering method for controlling the scour of Loess Region ditch, promote soil and water conservation effect Increase ecological benefits simultaneously;2) targetedly selecting is suitable for Loess Region growth, solid-holding capacity is strong and has certain economical The grass-shrub vegetation of value configures, and improves the survival rate of vegetation, has not only consolidated soil but also can generate economic benefit;3) soil conditioner used With water and soil conservation sand fixation material, application is simple, stable and pollution-free, effectively improves the stability and corrosion stability of sand, Gu It is husky to promote soil improvement and plant growth simultaneously.
Detailed description of the invention
A kind of safeguard structure sectional view for controlling the scour of Loess Region ditch of Fig. 1;1, first of limes marginis protection ridge, 2, Second limes marginis protect the ridge, 3, charcoal band, 4, fix the sand coating;
A kind of vegetation for controlling the scour of Loess Region ditch of Fig. 2 plants schematic diagram;1, first of limes marginis protection ridge, 2, second Road limes marginis protects the ridge, 3, charcoal band, 5, shrub growing area field bund economic plants growing area, 6, shrub and herbaceous plant plantation Area, 7, fallen leaves tendril shrub growing area;8, liana growing area.
Specific embodiment
A kind of safeguard structure for controlling the scour of Loess Region ditch of embodiment 1
As shown in Figure 1, it includes: first of limes marginis protection ridge for a kind of safeguard structure for controlling the scour of Loess Region ditch 1, second limes marginis protection the ridge 2, charcoal band 3, fix the sand coating 4;
Bottom width 1m, 0.8 m of top width, high 1m on first of limes marginis protection ridge 1, with bank distance 1m;Second limes marginis Bottom width 1m, 0.8 m of top width, high 1m for protecting the ridge 2, with bank distance 5m;The thickness 20cm of charcoal band 3 is laid with charcoal soil Than the straw biological charcoal for 3%, partial size 0.15mm;The coating 4 that fixes the sand is located at the sand ground between bank and the second limes marginis protection ridge 2 Surface, thickness 2mm spray SH series sand fixation material.
A kind of safeguard structure for controlling the scour of Loess Region ditch of embodiment 2
As shown in Figure 1, it includes: first of limes marginis protection ridge for a kind of safeguard structure for controlling the scour of Loess Region ditch 1, second limes marginis protection the ridge 2, charcoal band 3, fix the sand coating 4;
Bottom width 1.5m, top width 0.5m, the high 0.8m on first of limes marginis protection ridge 1, with bank distance 1.5m;Second ditch Bottom width 1.5m, top width 0.5m, the high 0.5m on the ridge 2 are protected in frontier defense, with bank distance 5m;The thickness 18cm of charcoal band 3 is laid with charcoal soil Than the straw biological charcoal for 2%, partial size 0.15mm;The coating 4 that fixes the sand is located at the sand ground between bank and the second limes marginis protection ridge 2 Surface, thickness 3mm spray SH series sand fixation material.
A kind of safeguard structure for controlling the scour of Loess Region ditch of embodiment 3
As shown in Figure 1, it includes: first of limes marginis protection ridge for a kind of safeguard structure for controlling the scour of Loess Region ditch 1, second limes marginis protection the ridge 2, charcoal band 3, fix the sand coating 4;
Bottom width 2m, top width 0.8m, the high 0.5m on first of limes marginis protection ridge 1, with bank distance 1.5m;Second limes marginis Bottom width 2m, top width 0.8m, the high 0.5m for protecting the ridge 2, with bank distance 6m;The thickness 22cm of charcoal band 3, laying charcoal soil, which compares, is 1% straw biological charcoal, partial size 0.25mm;The coating 4 that fixes the sand is located at the sandy land surface between bank and the second limes marginis protection ridge 2, Its thickness 2mm sprays SH series sand fixation material.
A kind of administering method for controlling the scour of Loess Region ditch of embodiment 4
A kind of administering method controlling the scour of Loess Region ditch, is to construct a kind of control loess mound in Loess Region limes marginis The safeguard structure of mound area ditch scour, the specific steps are as follows:
1, gully erosion selects: selection Loess Region rill erosion develops mid-term stage, and section is " V " type, and length is 100 meters, ditch Bed ratio is reduced to 400 ‰ gully erosion;
2, the compound limes marginis protection ridge is built: the ridge is protected building first of limes marginis apart from bank 1m at, away from build at bank 5m the Two limes marginis protect the ridge, and twice limes marginis protects ridge top width 0.8m, the high 1m in the ridge, bottom width 1m;
3, between the ridge charcoal be laid with: the charcoal band on ground between the ridge, be laid with charcoal soil than the straw biological charcoal for 3%, laying depth 20cm, charcoal partial size are 0.15mm(100 mesh);
4, spray SH series sand fixation material: the coating that fixes the sand is located on the sand ground between bank and the second limes marginis protection ridge, described The coating uniform that fixes the sand sprays SH series sand fixation material, and spraying concentration 3% sprays with a thickness of 2mm, amount of application 0.3L/m2
5, the plantation of vegetation
1) vegetation is planted on the ridge: on the ridge on the twice limes marginis protection ridge, planting vegetation, spacing in the rows 0.5m, line-spacing by the plantation of " product " word 0.3m, the described vegetation selection solid-holding capacity is strong and vegetation with certain economic value, Plant choosing such as: day lily (Hemerocallis citrina), caragana microphylla (Caragana korshinskii) and or sea-buckthorn (Hippophae rhamnoides) etc.;
2) vegetation is planted between the ridge: the intermediate zone on first of limes marginis protection ridge and the second limes marginis protection ridge selects shrub and grass This collocation plantation is parallel to the twice limes marginis protection ridge and plants two rows of shrubs, line-spacing 1m, spacing in the rows 0.5m, and shrub lower section is uniformly sowed Herbaceous plant;
The shrub plant well developed root system, cauline leaf are in great numbers and resistance to sand buries, and can effectively slow down rainwash and rush to limes marginis soil Brush, improve soil while play the role of fixing the sand, conserve water and soil, Plant choosing such as: bluish dogbane (Apocynum venetum), Caragana microphylla (Caragana microphylla) and or Niu Zhizi (Lespedeza potaninii) etc.;
The herbaceous plant is herbaceos perennial, and root system is powerful, drought-enduring and adaptable, is not only good forage, and Be it is good fix the sand and soil-and-water conservation effect, Plant choosing such as: alfalfa (Medicago sativa), rough leaf astragalus (Astragalus scaberrimus) and or splendid achnatherum (Achnatherum splendens) etc..
3) vegetation is planted at bank: bank and first of limes marginis protection ridge inter-planting are planted by selection fallen leaves tendril shrub and liana Object collocation plantation, close to first of limes marginis ridge close to bank side plantation uniline periploca spium (Periploca sepium), spacing in the rows 0.5m; Away from hole planting liana at bank 0.5m, cave diameter 0.5m, depth 0.5m, hill spacing 0.5m, the liana selection bears Winter (Lonicera japonica), kudzu (Argyreia seguinii) etc..
A kind of administering method for controlling the scour of Loess Region ditch of embodiment 5
A kind of administering method controlling the scour of Loess Region ditch, is to construct a kind of control loess mound in Loess Region limes marginis The safeguard structure of mound area ditch scour, the specific steps are as follows:
1, gully erosion selects: selection Loess Region rill erosion develops mid-term stage, and section is " V " type, and length is 200 meters, ditch Bed ratio is reduced to 700 ‰ gully erosion;
2, the compound limes marginis protection ridge is built: the ridge is protected building first of limes marginis apart from bank 1m at, away from build at bank 5m the Two limes marginis protect the ridge, and twice limes marginis protects ridge top width 0.8m, the high 0.5m in the ridge, bottom width 2m;
3, between the ridge charcoal be laid with: the charcoal band on ground between the ridge, be laid with charcoal soil than the straw biological charcoal for 3%, laying depth 18cm, charcoal partial size are 0.25mm(60 mesh);
4, spray SH series sand fixation material: the coating that fixes the sand is located on the sand ground between bank and the second limes marginis protection ridge, described The coating uniform that fixes the sand sprays SH series sand fixation material, and spraying concentration 2% sprays with a thickness of 3mm, amount of application 0.3L/m2
5, the plantation of vegetation
1) vegetation is planted on the ridge: on the ridge on the twice limes marginis protection ridge, planting vegetation, spacing in the rows 0.5m, line-spacing by the plantation of " product " word 0.2m, the described vegetation selection solid-holding capacity is strong and vegetation with certain economic value, Plant choosing such as: day lily (Hemerocallis citrina), caragana microphylla (Caragana korshinskii) and or sea-buckthorn (Hippophae rhamnoides) etc.;
2) vegetation is planted between the ridge: the intermediate zone on first of limes marginis protection ridge and the second limes marginis protection ridge selects shrub and grass This collocation plantation is parallel to the twice limes marginis protection ridge and plants two rows of shrubs, line-spacing 1m, spacing in the rows 0.3m, and shrub lower section is uniformly sowed Herbaceous plant;
The shrub plant well developed root system, cauline leaf are in great numbers and resistance to sand buries, and can effectively slow down rainwash and rush to limes marginis soil Brush, improve soil while play the role of fixing the sand, conserve water and soil, Plant choosing such as: bluish dogbane (Apocynum venetum), Caragana microphylla (Caragana microphylla) and or Niu Zhizi (Lespedeza potaninii) etc.;
The herbaceous plant is herbaceos perennial, and root system is powerful, drought-enduring and adaptable, is not only good forage, and Be it is good fix the sand and soil-and-water conservation effect, Plant choosing such as: alfalfa (Medicago sativa), rough leaf astragalus (Astragalus scaberrimus) and or splendid achnatherum (Achnatherum splendens) etc..
3) vegetation is planted at bank: bank and first of limes marginis protection ridge inter-planting are planted by selection fallen leaves tendril shrub and liana Object collocation plantation, close to first of limes marginis ridge close to bank side plantation uniline periploca spium (Periploca sepium), spacing in the rows 0.5m; Away from hole planting liana at bank 0.8m, cave diameter 0.5m, depth 0.3m, hill spacing 0.4m, the liana selection bears Winter (Lonicera japonica), kudzu (Argyreia seguinii) etc..
A kind of administering method for controlling the scour of Loess Region ditch of embodiment 6
A kind of administering method controlling the scour of Loess Region ditch, is to construct a kind of control loess mound in Loess Region limes marginis The safeguard structure of mound area ditch scour, the specific steps are as follows:
1, gully erosion selects: selection Loess Region rill erosion develops mid-term stage, and section is " V " type, and length is 100 meters, ditch Bed ratio is reduced to 300 ‰ gully erosion;
2, the compound limes marginis protection ridge is built: first of limes marginis protection ridge is being built at bank 1.5m, away from build at bank 5m Second limes marginis protects the ridge, and twice limes marginis protects ridge top width 0.5m, the high 1m in the ridge, bottom width 1m;
3, between the ridge charcoal be laid with: the charcoal band on ground between the ridge, be laid with charcoal soil than the straw biological charcoal for 1%, laying depth 25cm, charcoal partial size are 0.25mm(60 mesh);
4, spray SH series sand fixation material: the coating that fixes the sand is located on the sand ground between bank and the second limes marginis protection ridge, described The coating uniform that fixes the sand sprays SH series sand fixation material, and spraying concentration 2% sprays with a thickness of 3mm, amount of application 0.3L/m2
5, the plantation of vegetation
1) vegetation is planted on the ridge: on the ridge on the twice limes marginis protection ridge, planting vegetation, spacing in the rows 0.5m, line-spacing by the plantation of " product " word 0.3m, the described vegetation selection solid-holding capacity is strong and vegetation with certain economic value, Plant choosing such as: day lily (Hemerocallis citrina), caragana microphylla (Caragana korshinskii) and or sea-buckthorn (Hippophae rhamnoides) etc.;
2) vegetation is planted between the ridge: the intermediate zone on first of limes marginis protection ridge and the second limes marginis protection ridge selects shrub and grass This collocation plantation is parallel to the twice limes marginis protection ridge and plants two rows of shrubs, line-spacing 1.5m, spacing in the rows 0.5m, and shrub lower section is uniformly broadcast Spread herbaceous plant;
The shrub plant well developed root system, cauline leaf are in great numbers and resistance to sand buries, and can effectively slow down rainwash and rush to limes marginis soil Brush, improve soil while play the role of fixing the sand, conserve water and soil, Plant choosing such as: bluish dogbane (Apocynum venetum), Caragana microphylla (Caragana microphylla) and or Niu Zhizi (Lespedeza potaninii) etc.;
The herbaceous plant is herbaceos perennial, and root system is powerful, drought-enduring and adaptable, is not only good forage, and Be it is good fix the sand and soil-and-water conservation effect, Plant choosing such as: alfalfa (Medicago sativa), rough leaf astragalus (Astragalus scaberrimus) and or splendid achnatherum (Achnatherum splendens) etc..
3) vegetation is planted at bank: bank and first of limes marginis protection ridge inter-planting are planted by selection fallen leaves tendril shrub and liana Object collocation plantation, close to first of limes marginis ridge close to bank side plantation uniline periploca spium (Periploca sepium), spacing in the rows 0.5m; Away from hole planting liana at bank 1.0m, cave diameter 0.3m, depth 0.5m, hill spacing 0.6m, the liana selection bears Winter (Lonicera japonica), kudzu (Argyreia seguinii) etc..

Claims (8)

1. a kind of safeguard structure for controlling the scour of Loess Region ditch, it includes: first limes marginis the protection ridge (1), second Limes marginis protects the ridge (2), charcoal band (3), the coating that fixes the sand (4);
1~2m of bottom width, 0.5~0.8m of top width, the high 0.5~1m in the ridge of described first of limes marginis protection ridge (1), with bank away from From 1 ~ 1.5m;Second limes marginis protect the ridge (2) 1~2m of bottom width, 0.5~0.8m of top width, the high 0.5~1m in the ridge, with bank away from From 5 ~ 6m;Charcoal band (3) is located on the ground between first of the limes marginis protection ridge (1) and the second limes marginis protection ridge (2);It fixes the sand Coating (4) is located at the sandy land surface between bank and the second limes marginis protection ridge (2).
2. a kind of safeguard structure for controlling the scour of Loess Region ditch according to claim 1, it is characterised in that: described Charcoal band (3) with a thickness of 20cm, be laid with charcoal soil than the straw biological charcoal for 3%, partial size 0.15mm.
3. a kind of safeguard structure for controlling the scour of Loess Region ditch according to claim 2, it is characterised in that: described The coating that fixes the sand (4) spray SH series sand fixation material.
4. a kind of safeguard structure for controlling the scour of Loess Region ditch according to claim 1,2 or 3, feature exist In: the coating that fixes the sand (4) with a thickness of 2mm.
5. a kind of administering method for controlling the scour of Loess Region ditch, it includes:
1) gully erosion selects: taking length is 100 ~ 200 meters, the channel that groove gradient is 300 ~ 700 ‰;
2) the compound limes marginis protection ridge is built: first of limes marginis protection ridge is being built at 1 ~ 1.5m of bank, at 5 ~ 6m of bank It builds second limes marginis and protects the ridge, twice limes marginis protects 1~2m of ridge bottom width, 0.5~0.8m of top width, the high 0.5~1m in the ridge;
3) between the ridge charcoal be laid with: the charcoal band on ground between the ridge is laid with charcoal soil and compares the straw biological charcoal for 1 ~ 3%, is laid with thick 18 ~ 25cm is spent, charcoal partial size is 0.15 ~ 0.25mm;
4) spray SH series sand fixation material: the coating that fixes the sand is located on the sand ground between bank and the second limes marginis protection ridge, described The coating uniform that fixes the sand sprays SH series sand fixation material, and spraying concentration is 2%~3%, sprays with a thickness of 2~3mm, and amount of application 0.25~ 0.3L/m2
5) vegetation is planted on the ridge: on the ridge on the twice limes marginis protection ridge, planting vegetation, spacing in the rows 0.5m, line-spacing 0.2 by the plantation of " product " word ~ 0.3m, the vegetation be day lily, caragana microphylla and or sea-buckthorn;
6) planting between the ridge: the intermediate zone on first of limes marginis protection ridge and the second limes marginis protection ridge is parallel to twice ditch Frontier defense protects the ridge and plants two rows of shrubs, 1 ~ 1.5m of line-spacing, 0.3 ~ 0.5m of spacing in the rows, and herbaceous plant is uniformly sowed in shrub lower section;
7) bank side vegetation is planted: between bank and first of limes marginis protection ridge, planting close to first of limes marginis ridge close to bank side Uniline shrub, 0.4 ~ 0.6m of spacing in the rows;Away from hole planting liana at 0.5 ~ 1.0m of bank, cave 0.3 ~ 0.5m of diameter, depth 0.3 ~ 0.5m, 0.4 ~ 0.6m of hill spacing.
6. a kind of administering method for controlling the scour of Loess Region ditch according to claim 5, it is characterised in that: step 1) channel described in is Loess Region rill erosion development mid-term stage, the channel that section is " V " type.
7. a kind of administering method for controlling the scour of Loess Region ditch according to claim 6, it is characterised in that: step 6) shrub is bluish dogbane, caragana microphylla and or Niu Zhizi, and herbaceous plant is alfalfa, rough leaf astragalus and or precarious Grass.
8. a kind of administering method for controlling the scour of Loess Region ditch according to claim 7, it is characterised in that: step 7) shrub described in is periploca spium, liana be honeysuckle and or kudzu.
CN201811262311.XA 2018-10-27 2018-10-27 A kind of administering method controlling the scour of Loess Region ditch Pending CN109258275A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811262311.XA CN109258275A (en) 2018-10-27 2018-10-27 A kind of administering method controlling the scour of Loess Region ditch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811262311.XA CN109258275A (en) 2018-10-27 2018-10-27 A kind of administering method controlling the scour of Loess Region ditch

Publications (1)

Publication Number Publication Date
CN109258275A true CN109258275A (en) 2019-01-25

Family

ID=65193849

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811262311.XA Pending CN109258275A (en) 2018-10-27 2018-10-27 A kind of administering method controlling the scour of Loess Region ditch

Country Status (1)

Country Link
CN (1) CN109258275A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110178557A (en) * 2019-03-19 2019-08-30 福建农业职业技术学院 A kind of Intermediate Gray woods layer in the solid native forest belt of three layers of ecological sand prevention and its method of growing into forest

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103650694A (en) * 2013-12-05 2014-03-26 中国科学院东北地理与农业生态研究所 Erosion gully reclamation technology
CN104126343A (en) * 2014-07-14 2014-11-05 中国科学院东北地理与农业生态研究所 Double-ridge area water and soil conservation method
CN206245319U (en) * 2016-11-14 2017-06-13 广东中联兴环保科技有限公司 A kind of anti-rare earth slash side slope water erosion system
CN207639118U (en) * 2017-08-08 2018-07-24 陕西地建土地工程技术研究院有限责任公司 A kind of terraced fields ridge
CN209234485U (en) * 2018-10-27 2019-08-13 东北师范大学 A kind of safeguard structure controlling the scour of Loess Region ditch

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103650694A (en) * 2013-12-05 2014-03-26 中国科学院东北地理与农业生态研究所 Erosion gully reclamation technology
CN104126343A (en) * 2014-07-14 2014-11-05 中国科学院东北地理与农业生态研究所 Double-ridge area water and soil conservation method
CN206245319U (en) * 2016-11-14 2017-06-13 广东中联兴环保科技有限公司 A kind of anti-rare earth slash side slope water erosion system
CN207639118U (en) * 2017-08-08 2018-07-24 陕西地建土地工程技术研究院有限责任公司 A kind of terraced fields ridge
CN209234485U (en) * 2018-10-27 2019-08-13 东北师范大学 A kind of safeguard structure controlling the scour of Loess Region ditch

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张营: ""双层围堰沟头防护好"", 《中国水土保持》, pages 148 *
李崇清 等: ""SH固化剂复配无机材料加固黄土抗侵蚀试验研究"", 《长江科学院院报》, vol. 35, no. 8, pages 90 - 94 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110178557A (en) * 2019-03-19 2019-08-30 福建农业职业技术学院 A kind of Intermediate Gray woods layer in the solid native forest belt of three layers of ecological sand prevention and its method of growing into forest

Similar Documents

Publication Publication Date Title
Tabor Improving crop yields in the Sahel by means of water-harvesting
Bashir et al. Soil and water conservation
CN103314763A (en) Micro-reformation and vegetation restoration method for degraded plateau and lake wetlands
CN105659962B (en) Ecological method for abating agricultural non-point source pollution in rice planting regions
CN102239760B (en) Transverse-furrow and sequential-ridge mellow soil anti-erosion farming method of purple soil slope farmland
Reed Accelerated erosion of arable soils in the United Kingdom by rainfall and run-off
CN209234485U (en) A kind of safeguard structure controlling the scour of Loess Region ditch
CN109258275A (en) A kind of administering method controlling the scour of Loess Region ditch
Saeed et al. Application of film hole irrigation on borders for water saving and sunflower production
CN100402756C (en) Live net mud-stopping dam
CN101168165B (en) Improvement method for saline-alkaline spot soil in farmland
Walia et al. Soil and Water Conservation Techniques in Rainfed Areas
JP3032861B2 (en) Revegetation method of flooded slope using wave-dissipating basket
Singh et al. Ecological engineering measures for ravine slope stabilization and its sustainable productive utilization
Shanks et al. Soil erosion
Zhuo The effects of forest in controlling gully erosion
KR20210143393A (en) Method for making vegetative filter strip
MuUins et al. Approaches to erosion control on Vertisols in Queensland, Australia
CN110959328A (en) Plant sand storage and fixation system for hilly valley land in hilly area
KR100592402B1 (en) Tree-planting construction method and it's structure
Schultze et al. Emergency measures for streambank stabilization: an evaluation
Sowjanya et al. Soil and water conservation problems and measures in hilly area
Finkel et al. Criteria for the choice of irrigation method
US5403118A (en) Optimum water retention system for use in agricultural fields
Spomer et al. Soil and water conservation with western Iowa tillage systems

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination