CN109255488A - A kind of injection molding work order optimization system and method - Google Patents
A kind of injection molding work order optimization system and method Download PDFInfo
- Publication number
- CN109255488A CN109255488A CN201811129102.8A CN201811129102A CN109255488A CN 109255488 A CN109255488 A CN 109255488A CN 201811129102 A CN201811129102 A CN 201811129102A CN 109255488 A CN109255488 A CN 109255488A
- Authority
- CN
- China
- Prior art keywords
- injection molding
- work order
- molding machine
- original
- optimization
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000001746 injection moulding Methods 0.000 title claims abstract description 181
- 238000005457 optimization Methods 0.000 title claims abstract description 43
- 238000000034 method Methods 0.000 title claims abstract description 18
- 238000004519 manufacturing process Methods 0.000 claims abstract description 37
- 238000012544 monitoring process Methods 0.000 claims abstract description 15
- 238000012423 maintenance Methods 0.000 claims description 25
- 238000002347 injection Methods 0.000 claims description 10
- 239000007924 injection Substances 0.000 claims description 10
- 230000008439 repair process Effects 0.000 claims description 9
- 238000001914 filtration Methods 0.000 claims description 6
- 238000000465 moulding Methods 0.000 claims description 5
- 230000001976 improved effect Effects 0.000 abstract description 6
- 238000012216 screening Methods 0.000 description 14
- 238000005516 engineering process Methods 0.000 description 3
- 238000001514 detection method Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000007726 management method Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000000737 periodic effect Effects 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/02—Reservations, e.g. for tickets, services or events
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/04—Manufacturing
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Abstract
The invention discloses a kind of injection molding work order optimization system and methods, belong to injection molding production technical field.The present invention, by the state for monitoring listed injection molding machine in original injection molding work order;It is filtered out according to historical production data apart from matched injection molding machine and is filtered out using the injection molding highest personal information of engine efficiency, and generate optimization injection molding work order;The injection molding machine and personal information be molded in work order to optimization carries out reservation label.To realize according to original injection molding work order demand, injection molding machine is further selected according to place of acceptance nearby, and selects that the highest employee of the injection molding machine service efficiency is reduced cost, improved efficiency.
Description
Technical field
The present invention relates to injection molding technology field, specially a kind of injection molding work order optimization system and method.
Background technique
Injection Industry development potentiality is huge, and with the variation in market, Chinese labour force cost is continuously increased, how violent
It gets the mastery in market competition, all many enterprises need to face.Other than improving technique, optimize production plan, improves
Equipment, manpower sow efficiency of movement, maximally utilize existing production capacity, to reduce the production cost of product, and maximize and meet
Customer demand is a more feasible method.
In Injection Industry, need to each product, define production technology model, workable equipment, required mold,
Operating personnel, beat etc. are all the fundamentals that must be defined.One good production work order, in addition to needing to design reasonable production
Process modeling will also formulate suitable schedule scheme according to the actual needs, and the two, which combines, can be realized as production meter
The effectively layout drawn.One rationally the work order optimization system of intelligence and method are particularly important.
Summary of the invention
In view of the deficiencies of the prior art, the present invention provides a kind of injection molding work order optimization system and method, to realize according to original
Begin injection molding work order demand, further selects injection molding machine nearby according to place of acceptance, and select to the injection molding machine service efficiency highest
Employee, reduce cost, improve efficiency.
In order to achieve the above object, a kind of injection molding work order optimization system and method proposed by the present invention are by following technology
What scheme was realized:
A kind of injection molding work order optimization system, comprising:
Original injection molding work order memory module, for storing original injection molding work order information;
History data store module, for storing historical production data record;
Monitoring modular, for monitoring the state of listed injection molding machine in original injection molding work order;
Optimum management module is imitated for filtering out matched injection molding machine according to historical production data and filtering out using injection molding machine
The highest personal information of rate, and generate optimization injection molding work order;
Reservation module, injection molding machine and personal information for being molded in work order to optimization carry out reservation label.
Further, original injection molding work order information include at least required injection molding machine model, tonnage information, injection amount and/or
Shipping address.
Further, the task work order of listed injection molding machine, failure logging, maintenance in the original injection molding work order of monitoring module monitors
Information and/or geographical location information.
Further, task work order is monitored, the production initial time of task work order is obtained;Monitor failure logging, maintenance note
Record, judge injection molding machine whether in maintenance, or maintenance the deadline;Monitor geographical location information, for judge injection molding machine with
The distance of shipping address.
Further, injection molding machine is sorted by distance from as far as close at a distance from shipping address.
Further, filter out using the injection molding highest personal information of engine efficiency, remembered by traversal history creation data
Record, filters out the personal information most using injection molding machine number.
Further, reservation label is carried out to the injection molding machine and personal information that optimize in injection molding work order, avoids subsequent repetition
Reservation, including mark subscription identification.
A kind of injection molding work order optimization method characterized by comprising
Monitor the state of listed injection molding machine in original injection molding work order;
It is filtered out according to historical production data apart from matched injection molding machine and is filtered out using the highest people of the injection molding engine efficiency
Member's information, and generate optimization injection molding work order;
The injection molding machine and personal information be molded in work order to optimization carries out reservation label.
Further, original injection molding work order information includes at least required injection molding machine model, tonnage information, injection amount, receives
Address, and monitor the task work order of listed injection molding machine, failure logging, repair message, geographical location information in original injection molding work order.
Further, task work order is monitored, the production initial time of task work order is obtained;Monitor failure logging, maintenance note
Record, judge injection molding machine whether in maintenance, or maintenance the deadline;Monitor geographical location information, for judge injection molding machine with
The distance of shipping address, and injection molding machine is sorted by distance from as far as close at a distance from shipping address.
Injection molding work order optimization system and method provided by the invention, by monitoring listed injection molding machine in original injection molding work order
State;It is filtered out according to historical production data apart from matched injection molding machine and is filtered out using the injection molding highest personnel of engine efficiency
Information, and generate optimization injection molding work order;The injection molding machine and personal information be molded in work order to optimization carries out reservation label.To realize
According to original injection molding work order demand, injection molding machine is further selected according to place of acceptance nearby, and selects to use effect to the injection molding machine
The highest employee of rate, reduces cost, improves efficiency.
Detailed description of the invention
Fig. 1 is the structural schematic diagram for being molded work order optimization system;
Fig. 2 is the flow diagram for being molded work order optimization method.
Specific embodiment
The present invention is described in further detail below in conjunction with the accompanying drawings:
A kind of injection molding work order optimization system 100 as shown in Figure 1, comprising:
Original injection molding work order memory module 101, for storing original injection molding work order information;
History data store module 102, for storing historical production data record;
Monitoring modular 103, for monitoring the state of listed injection molding machine in original injection molding work order;
Optimum management module 104, for filtering out apart from matched injection molding machine according to historical production data and filtering out use
It is molded the highest personal information of engine efficiency, and generates optimization injection molding work order;
Reservation module 105, injection molding machine and personal information for being molded in work order to optimization carry out reservation label.
Further, original injection molding work order information include at least required injection molding machine model, tonnage information, injection amount and/or
Shipping address.
In a particular embodiment, original injection molding work order has been generated according to customer order demand, has generally comprised mold size, infused
Moulding material information, time of delivery, and the injection molding machine model, tonnage threshold value, the injection amount size that match with mold, shipping address
Deng.
Further, the task work order of listed injection molding machine, failure logging, maintenance in the original injection molding work order of monitoring module monitors
Information, geographical location information.
In a particular embodiment, injection molding machine itself has GPS positioning module, or according to being fixedly connected on injection molding machine
GPS positioning module in data acquisition box obtains the geographical location information of injection molding machine.In a specific embodiment, injection molding machine
Mold mould monitor described in CN201621389915.7 is installed.
Further, task work order is monitored, the production initial time of task work order is obtained;Monitor failure logging, maintenance note
Record, judge injection molding machine whether in maintenance, or maintenance the deadline;Monitor geographical location information, for judge injection molding machine with
The distance of shipping address.
In a particular embodiment, injection molding machine due to workload it is huge, need periodic detection, maintenance and repair, or artificial damage
Bad to need to repair, Monitoring and maintenance state, maintenance record is repaired the deadline, original to meeting according to time of delivery, production cycle
The injection molding machine being molded in work order carries out postsearch screening, filters out the injection molding machine for meeting time of delivery and production cycle.
Further, injection molding machine is sorted by distance from as far as close at a distance from shipping address.
In specific implementation, the injection molding machine that postsearch screening is gone out is screened three times, filters out the note nearest with shipping address
Molding machine is produced, and logistics cost and time cost are saved.
It is worth noting that, postsearch screening referred to herein, screening three times, understanding is simply facilitated, it is suitable not really to press this
Sequence screening, but according to preset condition listed in text, work order scheme is subjected to various combination, optimizes screening.
Further, filter out using the injection molding highest personal information of engine efficiency, remembered by traversal history creation data
Record, filters out the personal information most using injection molding machine number.
In specific implementation, the production efficiency of injection molding machine is related with the proficiency of operator, uses the injection molding machine number
More personnel are improved effect to injection molding machine production efficiency is improved.
In another embodiment, in practical operation, the bad workpiece of existing injection molding machine production needs artificially to identify, and and
When select away, a condition that is accurate to the bad assurance of workpiece and being in time also screening personal information.
Further, reservation label is carried out to the injection molding machine and personal information that optimize in injection molding work order, avoids subsequent repetition
Reservation, including mark subscription identification.
In specific embodiment, subscription identification can be more clear by the division of the task work order of injection molding machine, and new client is avoided to order
Dan Shi, system kill ergodic data.
As shown in Fig. 2, a kind of injection molding work order optimization method, comprising:
S1 monitors the state of listed injection molding machine in original injection molding work order;
S2 is filtered out apart from matched injection molding machine and is filtered out highest using the injection molding engine efficiency according to historical production data
Personal information, and generate optimization injection molding work order;
S3 carries out reservation label to the injection molding machine and personal information that optimize in injection molding work order.
Further, original injection molding work order information includes at least required injection molding machine model, tonnage information, injection amount, receives
Address.
In a particular embodiment, original injection molding work order has been generated according to customer order demand, has generally comprised mold size, infused
Moulding material information, time of delivery, and the injection molding machine model, tonnage threshold value, the injection amount size that match with mold, shipping address
Deng.
Further, the task work order of listed injection molding machine, failure logging, maintenance in the original injection molding work order of monitoring module monitors
Information, geographical location information.
In a particular embodiment, injection molding machine itself has GPS positioning module, or according to being fixedly connected on injection molding machine
GPS positioning module in data acquisition box obtains the geographical location information of injection molding machine.
Further, task work order is monitored, the production initial time of task work order is obtained;Monitor failure logging, maintenance note
Record, judge injection molding machine whether in maintenance, or maintenance the deadline;Monitor geographical location information, for judge injection molding machine with
The distance of shipping address.
In a particular embodiment, injection molding machine due to workload it is huge, need periodic detection, maintenance and repair, or artificial damage
Bad to need to repair, Monitoring and maintenance state, maintenance record is repaired the deadline, original to meeting according to time of delivery, production cycle
The injection molding machine being molded in work order carries out postsearch screening, filters out the injection molding machine for meeting time of delivery and production cycle.
Further, injection molding machine is sorted by distance from as far as close at a distance from shipping address.
In specific implementation, the injection molding machine that postsearch screening is gone out is screened three times, filters out the note nearest with shipping address
Molding machine is produced, and logistics cost and time cost are saved.
It is worth noting that, postsearch screening referred to herein, screening three times, understanding is simply facilitated, it is suitable not really to press this
Sequence screening, but according to preset condition listed in text, work order scheme is subjected to various combination, optimizes screening.
Further, filter out using the injection molding highest personal information of engine efficiency, remembered by traversal history creation data
Record, filters out the personal information most using injection molding machine number.
In specific implementation, the production efficiency of injection molding machine is related with the proficiency of operator, uses the injection molding machine number
More personnel are improved effect to injection molding machine production efficiency is improved.
In another embodiment, in practical operation, the bad workpiece of existing injection molding machine production needs artificially to identify, and and
When select away, a condition that is accurate to the bad assurance of workpiece and being in time also screening personal information.
Further, reservation label is carried out to the injection molding machine and personal information that optimize in injection molding work order, avoids subsequent repetition
Reservation, including mark subscription identification.
In specific embodiment, subscription identification can be more clear by the division of the task work order of injection molding machine, and new client is avoided to order
Dan Shi, system kill ergodic data.
Injection molding work order optimization system and method provided by the invention, by monitoring listed injection molding machine in original injection molding work order
State;It filters out matched injection molding machine according to historical production data and filters out and believed using the highest personnel of injection molding engine efficiency
Breath, and generate optimization injection molding work order;The injection molding machine and personal information be molded in work order to optimization carries out reservation label.To realize root
According to original injection molding work order demand, injection molding machine is further selected according to place of acceptance nearby, and select to the injection molding machine service efficiency
Highest employee, reduces cost, improves efficiency.
It is of the art it will be recognized by the skilled artisan that above embodiments of the present invention are only of the invention preferred
One of embodiment limits for length, cannot enumerate all embodiments one by one here, any to embody the claims in the present invention
The implementation of technical solution, all within the scope of the present invention.
It should be noted that the above content is combine specific embodiment made for the present invention further specifically
It is bright, and it cannot be said that a specific embodiment of the invention is only limitted to this, under above-mentioned guidance of the invention, those skilled in the art can
To carry out various improvement and deformations on the basis of the above embodiments, and these are improved or deformation falls in protection model of the invention
In enclosing.
Claims (10)
1. a kind of injection molding work order optimization system characterized by comprising
Original injection molding work order memory module, for storing original injection molding work order information;
History data store module, for storing historical production data record;
Monitoring modular, for monitoring the state of listed injection molding machine in the original injection molding work order;
Optimum management module uses the injection molding for filtering out matched injection molding machine according to historical production data and filtering out
The highest personal information of engine efficiency, and generate optimization injection molding work order;
Reservation module, injection molding machine and personal information for being molded in work order to the optimization carry out reservation label.
2. injection molding work order optimization system according to claim 1, which is characterized in that the original injection molding work order information is at least
Including required injection molding machine model, tonnage information, injection amount and/or shipping address.
3. injection molding work order optimization system according to claim 1, which is characterized in that original described in the monitoring module monitors
It is molded task work order, failure logging, repair message and/or the geographical location information of listed injection molding machine in work order.
4. injection molding work order optimization system according to claim 3, which is characterized in that monitor the task work order, obtain and appoint
The production initial time for working single;Monitor the failure logging, maintenance record, judge the injection molding machine whether in maintenance, or
Person repairs the deadline;The geographical location information is monitored, for judging the injection molding machine at a distance from the shipping address.
5. injection molding work order optimization system according to claim 4, which is characterized in that by the injection molding machine and the place of acceptance
The distance of location is by distance from as far as nearly sequence.
6. injection molding work order optimization system according to claim 1, which is characterized in that described filter out uses the injection molding machine
The highest personal information of efficiency is filtered out most using the injection molding machine number by traversal history production data recording
Personal information.
7. injection molding work order optimization system according to claim 1, which is characterized in that the note in the optimization injection molding work order
Molding machine and personal information carry out reservation label, avoid subsequent repetition from reserving, including mark subscription identification.
8. a kind of injection molding work order optimization method characterized by comprising
Monitor the state of listed injection molding machine in original injection molding work order;
It filters out apart from matched injection molding machine and filters out highest using the injection molding engine efficiency according to historical production data
Personal information, and generate optimization injection molding work order;
The injection molding machine and personal information be molded in work order to the optimization carries out reservation label.
9. injection molding work order optimization method according to claim 8, which is characterized in that the original injection molding work order information is at least
Including required injection molding machine model, tonnage information, injection amount, shipping address, and monitor listed injection molding in the original injection molding work order
The task work order of machine, failure logging, repair message, geographical location information.
10. injection molding work order optimization method according to claim 9, which is characterized in that monitor the task work order, obtain and appoint
The production initial time for working single;Monitor the failure logging, maintenance record, judge the injection molding machine whether in maintenance, or
Person repairs the deadline;Monitor the geographical location information, for judge the injection molding machine at a distance from the shipping address, and
The injection molding machine is sorted by distance from as far as close at a distance from the shipping address.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811129102.8A CN109255488A (en) | 2018-09-27 | 2018-09-27 | A kind of injection molding work order optimization system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811129102.8A CN109255488A (en) | 2018-09-27 | 2018-09-27 | A kind of injection molding work order optimization system and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109255488A true CN109255488A (en) | 2019-01-22 |
Family
ID=65047559
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811129102.8A Pending CN109255488A (en) | 2018-09-27 | 2018-09-27 | A kind of injection molding work order optimization system and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109255488A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111438904A (en) * | 2020-04-02 | 2020-07-24 | 宁波弘讯科技股份有限公司 | Injection molding machine injection operation control method, device, equipment and system |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102773981A (en) * | 2012-07-16 | 2012-11-14 | 南京航空航天大学 | Implementation method of energy-saving and optimizing system of injection molding machine |
CN105243498A (en) * | 2015-10-15 | 2016-01-13 | 北京华夏盛想科技有限公司 | Location-based task scheduling method and device |
CN105701596A (en) * | 2015-12-24 | 2016-06-22 | 国家电网公司 | Method for lean distribution network emergency maintenance and management system based on big data technology |
CN106570653A (en) * | 2016-11-10 | 2017-04-19 | 国网山东省电力公司济南供电公司 | Support system for rush-repair work order distributing of distribution network and optimization method |
WO2017118319A1 (en) * | 2016-01-05 | 2017-07-13 | 阿里巴巴集团控股有限公司 | Task allocation method, system and device |
CN107657379A (en) * | 2017-09-26 | 2018-02-02 | 广州平云小匠科技有限公司 | Task preferentially distributing method, device and system |
-
2018
- 2018-09-27 CN CN201811129102.8A patent/CN109255488A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102773981A (en) * | 2012-07-16 | 2012-11-14 | 南京航空航天大学 | Implementation method of energy-saving and optimizing system of injection molding machine |
CN105243498A (en) * | 2015-10-15 | 2016-01-13 | 北京华夏盛想科技有限公司 | Location-based task scheduling method and device |
CN105701596A (en) * | 2015-12-24 | 2016-06-22 | 国家电网公司 | Method for lean distribution network emergency maintenance and management system based on big data technology |
WO2017118319A1 (en) * | 2016-01-05 | 2017-07-13 | 阿里巴巴集团控股有限公司 | Task allocation method, system and device |
CN106570653A (en) * | 2016-11-10 | 2017-04-19 | 国网山东省电力公司济南供电公司 | Support system for rush-repair work order distributing of distribution network and optimization method |
CN107657379A (en) * | 2017-09-26 | 2018-02-02 | 广州平云小匠科技有限公司 | Task preferentially distributing method, device and system |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111438904A (en) * | 2020-04-02 | 2020-07-24 | 宁波弘讯科技股份有限公司 | Injection molding machine injection operation control method, device, equipment and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107862506A (en) | One kind realizes that order performs the visual system and method for whole process | |
CN106779096B (en) | Power distribution network reports situation active forewarning system for repairment | |
Deros et al. | Setup time reduction in an automotive battery assembly line | |
CN107589735A (en) | Photovoltaic O&M robot system | |
CN103955754A (en) | Mold workshop scheduling method based on real-time production data collection | |
CN113450065A (en) | Production operation management system and method for wind power plant | |
CN111047257A (en) | Production order management system based on 5G network | |
CN112561238A (en) | Pumped storage power station auxiliary equipment state health evaluation system and method | |
CN108280532A (en) | A kind of improved power equipment asset management system and method | |
CN105967063B (en) | Maintenance platform fault analysis process system and method | |
CN109858786B (en) | Electromechanical device management system based on Internet of things | |
CN110348775A (en) | Teams and groups, electric system base Warehouse Management System | |
CN110852624A (en) | Intelligent manufacturing management system facing enterprise execution layer and operation method thereof | |
CN111159487A (en) | Predictive maintenance intelligent system for automobile engine spindle | |
CN109255488A (en) | A kind of injection molding work order optimization system and method | |
CN109840601B (en) | Operation management method combining wind power plant equipment monitoring and production management | |
CN112418548B (en) | Intelligent workshop management method and system based on artificial intelligence technology | |
CN108748936A (en) | A kind of injection workshop Intelligent Production Management System and its method | |
CN206133283U (en) | Relay production line monitored control system | |
CN115994734B (en) | Production equipment maintenance part inventory management method and system | |
CN116976865A (en) | Ship maintenance device allocation management system based on big data analysis | |
CN110264075A (en) | A kind of highway workflow management control method and system | |
CN108921308A (en) | A kind of numerically-controlled machine tool total management system | |
CN115401524A (en) | Cutter vibration signal monitoring method, system and medium | |
CN111539642B (en) | Object-oriented power plant data acquisition and processing system and method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190122 |
|
RJ01 | Rejection of invention patent application after publication |