CN109236013A - Lattice column crossing frame and erection method - Google Patents

Lattice column crossing frame and erection method Download PDF

Info

Publication number
CN109236013A
CN109236013A CN201811346516.6A CN201811346516A CN109236013A CN 109236013 A CN109236013 A CN 109236013A CN 201811346516 A CN201811346516 A CN 201811346516A CN 109236013 A CN109236013 A CN 109236013A
Authority
CN
China
Prior art keywords
pole
crossing frame
lattice column
joining part
arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811346516.6A
Other languages
Chinese (zh)
Inventor
景文川
武斌
易实
兰宏
李崇斌
李刚
李品
王毅
刘新川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Electric Power Transmission And Transfer Construction Co Ltd
State Grid Corp of China SGCC
State Grid Sichuan Electric Power Co Ltd
Original Assignee
Sichuan Electric Power Transmission And Transfer Construction Co Ltd
State Grid Corp of China SGCC
State Grid Sichuan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Electric Power Transmission And Transfer Construction Co Ltd, State Grid Corp of China SGCC, State Grid Sichuan Electric Power Co Ltd filed Critical Sichuan Electric Power Transmission And Transfer Construction Co Ltd
Priority to CN201811346516.6A priority Critical patent/CN109236013A/en
Publication of CN109236013A publication Critical patent/CN109236013A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/20Side-supporting means therefor, e.g. using guy ropes or struts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/24Cross arms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The invention discloses lattice column crossing frame and erection methods, solve single principal post lattice crossing frame structural instability, and bearing capacity is poor, high to the flatness requirement of ground, and the problem of cross-arm length trouble is adjusted according to voltage class.The present invention includes two columns being oppositely arranged, the column includes being in conplane pole, cross-arm and goat's horn bar, the symmetrical connecting stay wire in the two sides of the pole is simultaneously fixed by bracing wire and ground, one end of the cross-arm is vertical at the top of the pole to be connect, the goat's horn bar is connected to the cross-arm upper surface, removably it is flexible coupling between the top of two poles using flexible joining part, the middle part of two column carries out Hard link, the present invention has stable structure, bearing capacity is strong, it is not high to topography flatness requirement, and it can be by adjusting the advantages that the distance between two column of length adjustment of flexible joining part is to adapt to different voltages level requirements.

Description

Lattice column crossing frame and erection method
Technical field
The present invention relates to the present invention relates to power circuit capital construction technical fields, and in particular to lattice column crossing frame And erection method.
Background technique
In power construction line construction, it is related to living across constructing and often takes the technological measure set up across rack, Such as Moso bamboo crossing frame, steel pipe crossing frame etc..All there is the deficiency of some aspects in these traditional crossing frames, cannot be well adapted for Under the new situation live across construction requirement.If Moso bamboo crossing frame land occupation is big, require high to landform is set up, it is long to set up the period, fits It is low with voltage class;Steel pipe crossing frame is from great, transport and installation inconvenience etc..
In order to solve problem above, there is lattice column crossing frame, have stability high, transport, set up conveniently, peace Full blast is nearly low, solid and reliable feature, and whole to use high strength steel structure composition, traditional lattice column crossing frame is by singly leading Column realizes that structure is there are unstable, and bearing capacity is limited, and higher to the flatness requirement for setting up ground, the early period used Engineering trouble, it is necessary to the stronger lattice column crossing frames of the more firm bearing capacity of invention thus to meet existing line work The requirement of journey crossing construction.
Summary of the invention
The technical problems to be solved by the present invention are: single principal post lattice crossing frame structural instability, bearing capacity is poor, It is high to the flatness requirement of ground, cross-arm length trouble is adjusted according to voltage class.
The present invention provides the lattice column crossing frames to solve the above problems.
The present invention is achieved through the following technical solutions:
Lattice column crossing frame, including two columns being oppositely arranged, the column includes being in conplane armful Bar, cross-arm and goat's horn bar, the symmetrical connecting stay wire in the two sides of the pole are simultaneously fixed by bracing wire and ground, one end of the cross-arm It is connect at the top of the pole, the goat's horn bar is connected to the cross-arm upper surface, uses soft company between the top of two poles Fitting is removably flexible coupling.
The pole, cross-arm and goat's horn bar are located at same perpendicular.
Design principle of the present invention are as follows: two poles of setting compare single pole, improve the total bearing capacity of lattice frame, Meet bigger voltage class and cross over the needs of block construction, and be flexible coupling between pole by flexible joining part, integrally by In construction site topography out-of-flatness, it is flexible coupling and can effectively solve the problem that two principal posts can not be not easy in the misalignment of same level Cause lattice frame lateral stressed excessive.Simultaneously as its cross-arm length of overhead line structures different voltages grade is different, so that across applying The width of block can also change therewith in work, and being flexible coupling can according to the actual situation, adjustment length, so that lattice frame applicability is more Add extensively.
Currently preferred lattice column crossing frame, the middle part of described two poles are carried out detachable using Hard link part Hard link, Hard link makes dual beam configuration more firm, and using being detachably connected, and it is very convenient to transport and tear open assembling, Hard link is detachable, in this way when carrying out distance adjustment according to voltage class, can be convenient the length of replacement Hard link part.
Currently preferred lattice column crossing frame, the flexible joining part are wirerope.
Preferably, the length of the flexible joining part is greater than the horizontal distance between the pole, so that two poles In the case where topography out-of-flatness, not tight flexible joining part, which can play, adjusts the problem of misplacing between two poles, reduction pair The requirement of topography flatness.
Currently preferred lattice column crossing frame, the flexible joining part are connect by shackle with the pole, shackle Dismount it is very convenient, voltage class difference in the case where, can according to block width select different length flexible joining part from And adapt to the requirement of different voltages grade.
Currently preferred lattice column crossing frame, the Hard link part are angle steel.
The erection method of lattice column crossing frame, includes the following steps:
Step 1: stud location;
Step 2: column assembling;
Step 3: flexible joining part is installed between the top of two poles;
Step 4: installation bracing wire.
Currently preferred lattice column crossing frame erection method further includes in installation flexible joining part in the step 3 Later, Hard link part is installed at the middle part of two poles.
Currently preferred lattice column crossing frame erection method installs the specific step of flexible joining part in the step 3 Suddenly are as follows: four-way flange is installed on two tops of pole, and four metal shackles are installed in the four-way flange mounting hole, and shackle is curved Head is unified inside, then the software connector of suitable length is mounted on to unload and is buckled, and the flexible joining part is not tight, in this way can be with Guarantee that flexible joining part plays the bring dislocation due to topography injustice of two poles of adjustment, reduces structure installation to topography flatness Strict demand.
Currently preferred lattice column crossing frame erection method, the specific steps of the installation Hard link part are as follows: Mounting hole is arranged in the middle part of the pole, and Hard link part is detachably connected in mounting hole, pacifies after installing flexible joining part Hard link part is filled, guarantees further to consolidate overall mechanism in the case where pole position is formed.
Currently preferred lattice column crossing frame erection method installs the specific steps of bracing wire in the step 4 Are as follows: two sides are symmetrical arranged 2 bracing wires at the top of every pole, and angle is not greater than 45 ° over the ground for the bracing wire, and bracing wire projects angle It is 90 °, is symmetrical arranged 2 groups of 4 bracing wires in every pole on both sides of the middle.Symmetrically arranged bracing wire can be further ensured that the perpendicular of pole Directly, the stability of total is ensured.
The present invention have it is following the utility model has the advantages that
1. the present invention, as supporter, improves the bearing capacity and stability of entire crossing frame by two poles of setting.
2. the top of two poles of the invention is using being flexible coupling, it is adjustable because two poles caused by topography is uneven it Between dislocation, and the distance between pole can be adjusted by adjusting the length that is flexible coupling, to meet different voltages grade Block width requirement.Hard link is used between the middle part of two poles, guarantees the stability of structure.
Detailed description of the invention
Attached drawing described herein is used to provide to further understand the embodiment of the present invention, constitutes one of the application Point, do not constitute the restriction to the embodiment of the present invention.In the accompanying drawings:
Fig. 1 is the structural diagram of the present invention.
Label and corresponding parts title in attached drawing:
1- flat base, cap connecting fork under 2-, 3- metal parts of pull wire, 4- cross-arm, 5- flexible joining part, 6- Hard link part, 7- connect Connect box, 8- bearing diagonal one, 9- bearing diagonal two, 10- bearing diagonal three, 11- goat's horn bar, 12- four-way flange, 13- pole, 14- drawing Line.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention clearer, below with reference to embodiment and attached drawing, to this Invention is described in further detail, and exemplary embodiment of the invention and its explanation for explaining only the invention, are not made For limitation of the invention.
Embodiment 1
As shown in Figure 1, lattice column crossing frame, including two columns being oppositely arranged, the column includes in same Pole 13, cross-arm 4 and the goat's horn bar 11 of one plane, the symmetrical connecting stay wire 14 in the two sides of the pole 13 simultaneously pass through bracing wire 14 and ground Face is fixed, and one end of the cross-arm 4 is vertical with 13 top of pole to be connect, and the goat's horn bar 11 is connected on the cross-arm 4 Surface is removably flexible coupling between the top of two poles 13 using flexible joining part 5.
Two root posts are set, compares single upright column, improves the total bearing capacity of lattice frame, meet bigger voltage class across The more needs of block construction, and be flexible coupling between pole 13 by flexible joining part 5, integrally not due to construction site topography It is smooth, be flexible coupling can effectively solve the problem that two principal posts can not in the misalignment of same level, do not easily cause lattice frame laterally by Power is excessive.Simultaneously as 4 length of its cross-arm of overhead line structures different voltages grade is different so that in crossing construction block width Also can change therewith, being flexible coupling can according to the actual situation, adjustment length, so that lattice frame applicability is more extensive.
The middle part of described two poles 13 carries out dismountable Hard link using Hard link part 6, and Hard link makes twin columns knot Structure is more firm, and using being detachably connected, and transports and tear open that assembling is very convenient, and Hard link is detachable, in this way according to electricity When pressing grade to carry out distance adjustment, the length of replacement Hard link part 6 can be convenient.
The flexible joining part 5 is wirerope.
The length of the flexible joining part 5 is greater than the horizontal distance between the pole 13, so that two poles 13 exist In the case where topography out-of-flatness, not tight flexible joining part 5, which can play, adjusts the problem of misplacing between two poles 13, reduction pair The requirement of topography flatness.
The flexible joining part 5 is connect by shackle with the pole 13, and shackle dismounting is very convenient, in voltage class difference In the case where, the flexible joining part 5 of different length can be selected to adapt to the requirement of different voltages grade according to block width.
Four-way flange 12 is installed in two cross-arms 4 end close to each other, installs in the mounting hole of the four-way flange 12 Shackle, the zone circle shape rope end of the flexible joining part 5, which is connected to unload, to be buckled.
The Hard link part 6 is angle steel.
The pole 13 is connect by flat base 1 with ground, and lower cap connecting fork 2 is arranged on the flat base 1, described Pole 13 divides for multistage, the junction setting connection box 7 of different sections, be arranged on pole 13 14 fitting 3 of bracing wire and with bracing wire 14 Connection is arranged bearing diagonal 1 between pole 13 and cross-arm 4 and is supported, in bearing diagonal to guarantee the stability of cross-arm 4 Bearing diagonal 29 is connected between one 8 and the connecting pin of cross-arm 4, in order to guarantee the stability of goat's horn bar 11, in the free end of cross-arm 4 Bearing diagonal 3 10 is arranged between portion and goat's horn bar 11 to be supported.
Embodiment 2
As shown in Figure 1, the erection method of lattice column crossing frame, includes the following steps:
Step 1: stud location;
Step 2: column assembling;
Step 3: flexible joining part 5 is installed between the top of two poles 13;
Step 4: installation bracing wire 14.
The operating procedure of the step 1 stud location are as follows: projected using theodolite according to wire center, every pole grounded-line, Determine upright post of spanning frame position, cross-arm 4 is vertical with conducting wire projection, and grounded-line projection is located among the encapsulated idler wheel of cross-arm 4.
The concrete operation step of the step 2 column assembling are as follows: column is first assembled to specified length on ground by construction personnel Degree hangs the aluminium alloy coaster of 100kN in 4 end of cross-arm of two heel posts by 150kN shackle.Then 25 tonnes of automobiles are selected Hang whole column.Quasi- to select 25.9 meters of SANYISTC250 type suspension arm of crane, when hanging 4.5 meters, specified hoisting weight is 9150kg, using two o'clock, system is hung, and suspension centre height is not less than the 2/3 of stem height.
The concrete operation step of flexible joining part 5 is installed are as follows: after column assembling, push up at pole 13 two in step 3 12 mounting hole of four-way flange at end installs the metal shackle of four 100kN, and shackle elbow is unified inside, then by the two of suitable length Root is mounted on to unload and buckle with the wirerope of ring rope end A19.5, and paying attention to being flexible coupling wirerope cannot be tight.
It is flexible coupling in four mounting holes after the installation is completed, being arranged in the middle part of two poles 13, is connected by high-strength bolt The angle steel of two appropriate lengths is connect, Hard link installs.
The specific steps of bracing wire 14 are installed in step 4 are as follows: the two sides at every 13 top of pole are symmetrical arranged 2 bracing wires 14, Bracing wire 14 uses 15 wirerope of Φ, and angle is not greater than 45 ° over the ground for bracing wire 14, and it is 90 ° that bracing wire 14, which projects angle, using dedicated drawing The connection of 14 fitting 3 of line.It is monitored using theodolite, adjustment bracing wire 14 keeps pole 13 in a vertical state, and makes 2 14 stress of bracing wire Unanimously.2 groups of 4 bracing wires 14 are finally symmetrical arranged in the middle part of pole 13, all earth anchor specifications are 100kN.
Above-described specific embodiment has carried out further the purpose of the present invention, technical scheme and beneficial effects It is described in detail, it should be understood that being not intended to limit the present invention the foregoing is merely a specific embodiment of the invention Protection scope, all within the spirits and principles of the present invention, any modification, equivalent substitution, improvement and etc. done should all include Within protection scope of the present invention.

Claims (10)

1. lattice column crossing frame, which is characterized in that including two columns being oppositely arranged, the column includes in same Pole (13), cross-arm (4) and the goat's horn bar (11) of plane, the symmetrical connecting stay wire in two sides (14) of the pole (13) simultaneously pass through drawing Line (14) is fixed with ground, is connect at the top of one end of the cross-arm (4) and the pole (13), the goat's horn bar (11) is connected to Cross-arm (4) upper surface is removably flexible coupling between the top of two poles (13) using flexible joining part (5).
2. lattice column crossing frame according to claim 1, which is characterized in that adopted in the middle part of described two poles (13) Dismountable Hard link is carried out with Hard link part (6).
3. lattice column crossing frame according to claim 1 or 2, which is characterized in that the flexible joining part (5) is steel wire Rope.
4. lattice column crossing frame according to claim 1 or 2, which is characterized in that the flexible joining part (5) is by unloading Button is connect with the pole (13).
5. lattice column crossing frame according to claim 1 or 2, which is characterized in that the length of the flexible joining part (5) Greater than the horizontal distance between the pole (13).
6. the erection method of lattice column crossing frame, for setting up such as claim 1,2 or 5 described in any item lattice columns Formula crossing frame, which comprises the steps of:
Step 1: stud location;
Step 2: column assembling;
Step 3: flexible joining part (5) are installed between the top of two poles (13);
Step 4: installation bracing wire (14).
7. lattice column crossing frame erection method according to claim 6, which is characterized in that also wrapped in the step 3 It includes after flexible joining part (5) are installed, Hard link part (6) is installed at the middle part of two poles (13).
8. lattice column crossing frame erection method according to claim 6 or 7, which is characterized in that in the step 3 The specific steps of flexible joining part (5) are installed are as follows: (13) two top installations four-way flange (12) of pole, and in the four-way flange (12) four metal shackles are installed, shackle elbow is unified inside, then the software connector of suitable length is mounted in mounting hole It unloads and buckles, and the flexible joining part (5) is not tight.
9. lattice column crossing frame according to claim 7, which is characterized in that the tool of installation Hard link part (6) Body step are as follows: mounting hole is set at the middle part of the pole (13), and is detachably connected Hard link part (6) in mounting hole.
10. wanting the described in any item lattice column crossing frames in 6,7 or 9 according to right, which is characterized in that pacify in the step 4 The specific steps of anchoring (14) are as follows: two sides are symmetrical arranged four bracing wires (14) at the top of pole (13), and the bracing wire (14) is right Ground angle is not greater than 45 °, and it is 90 ° that bracing wire (14), which projects angle, is symmetrical arranged 2 bracing wires in pole (13) on both sides of the middle (14)。
CN201811346516.6A 2018-11-13 2018-11-13 Lattice column crossing frame and erection method Pending CN109236013A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811346516.6A CN109236013A (en) 2018-11-13 2018-11-13 Lattice column crossing frame and erection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811346516.6A CN109236013A (en) 2018-11-13 2018-11-13 Lattice column crossing frame and erection method

Publications (1)

Publication Number Publication Date
CN109236013A true CN109236013A (en) 2019-01-18

Family

ID=65078247

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811346516.6A Pending CN109236013A (en) 2018-11-13 2018-11-13 Lattice column crossing frame and erection method

Country Status (1)

Country Link
CN (1) CN109236013A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114094492A (en) * 2021-11-22 2022-02-25 国网湖北省电力有限公司咸宁供电公司 Crossing frame combination device and using method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2813610A1 (en) * 1978-03-30 1979-10-04 Bbc Brown Boveri & Cie Overhead protective suspension net erection - uses slider mechanism mounted between masts in first row of support uprights to pull net up into required position
CN2412301Y (en) * 2000-01-19 2000-12-27 国营群峰机械厂 Four-column bridge live-wire work crossing rack
CN201056879Y (en) * 2007-06-14 2008-05-07 冯海潮 First-aid tower for electrical accident
CN101736935A (en) * 2010-03-01 2010-06-16 国网电力科学研究院武汉南瑞有限责任公司 Easy-to-transport electric power accident rush-repairing tower
CN202611306U (en) * 2012-05-07 2012-12-19 云南电网公司昆明供电局 Multifunctional combined aluminum alloy rush-repair tower for power transmission line
CN202831765U (en) * 2012-04-27 2013-03-27 陕西秦能电力科技有限公司 Hinged cross arm rush repair tower
CN206789980U (en) * 2017-05-23 2017-12-22 陈勇 A kind of live crossing frame with pulley routing device
CN207144594U (en) * 2017-07-28 2018-03-27 嘉善三方电力器材有限责任公司 A kind of emergent repairing tower

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2813610A1 (en) * 1978-03-30 1979-10-04 Bbc Brown Boveri & Cie Overhead protective suspension net erection - uses slider mechanism mounted between masts in first row of support uprights to pull net up into required position
CN2412301Y (en) * 2000-01-19 2000-12-27 国营群峰机械厂 Four-column bridge live-wire work crossing rack
CN201056879Y (en) * 2007-06-14 2008-05-07 冯海潮 First-aid tower for electrical accident
CN101736935A (en) * 2010-03-01 2010-06-16 国网电力科学研究院武汉南瑞有限责任公司 Easy-to-transport electric power accident rush-repairing tower
CN202831765U (en) * 2012-04-27 2013-03-27 陕西秦能电力科技有限公司 Hinged cross arm rush repair tower
CN202611306U (en) * 2012-05-07 2012-12-19 云南电网公司昆明供电局 Multifunctional combined aluminum alloy rush-repair tower for power transmission line
CN206789980U (en) * 2017-05-23 2017-12-22 陈勇 A kind of live crossing frame with pulley routing device
CN207144594U (en) * 2017-07-28 2018-03-27 嘉善三方电力器材有限责任公司 A kind of emergent repairing tower

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张跃洲等: ""伸缩臂式跨越架在特高压线路跨越施工中的应用"", 《河北电力技术》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114094492A (en) * 2021-11-22 2022-02-25 国网湖北省电力有限公司咸宁供电公司 Crossing frame combination device and using method thereof
CN114094492B (en) * 2021-11-22 2023-07-18 国网湖北省电力有限公司咸宁供电公司 Crossing frame combination device and application method thereof

Similar Documents

Publication Publication Date Title
CN204662661U (en) The two rope truss string structure system of the two case beam of large span
CN102359303B (en) Extra-high voltage common circuit iron tower assembling method
WO2021052142A1 (en) Cable-supported large-span structure and construction method therefor
CN103821075B (en) Long span oblique pull assembly type steel bridge on highway
CN211691069U (en) Installation and displacement monitoring structure of spoke type beam string
CN207919363U (en) A kind of Filled Steel Tubular Arch Bridge low level assembly lifting system
CN109236013A (en) Lattice column crossing frame and erection method
CN219677937U (en) Power pipeline hangs protection device
CN103806373B (en) Oblique pull assembly type steel bridge on highway suspension cable anchor system
CN206309004U (en) A kind of corner of strut-framed I-steel for disk buckle scaffold is encorbelmented girder construction
CN203487767U (en) Cross plate scaffold
CN208479032U (en) A kind of cantilever crossing frame from lifting rotary type
CN208981167U (en) Suspension type constructing tie beam device
CN206512607U (en) Steel truss beam bolt applies stubborn operating platform
CN106495026B (en) Construction tower crane temporarily builds attachment
CN207846186U (en) A kind of bridge with load-bearing deformation structure
CN217028088U (en) Cantilever tripod template support
CN207827648U (en) A kind of counterweight of tracking-driven elevator
CN110040632A (en) A kind of segmental hoisting construction method of large span section steel beam
CN205706666U (en) A kind of Light-duty Quick-installation goods ropeway supporting trestle
CN203065046U (en) Self-stabilizing double-rocker-arm lifting device for installation of high-rise tower
CN114319070A (en) Cable-stayed bridge with single-column type leaning tower structure
CN209079700U (en) One kind is firmly across mounting structure
CN204060116U (en) Detachable paulin room structure
CN209855018U (en) Annular cable supporting structure and suspended dome

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190118