CN207375654U - A non-closed tower crane climbing frame device - Google Patents

A non-closed tower crane climbing frame device Download PDF

Info

Publication number
CN207375654U
CN207375654U CN201720463926.3U CN201720463926U CN207375654U CN 207375654 U CN207375654 U CN 207375654U CN 201720463926 U CN201720463926 U CN 201720463926U CN 207375654 U CN207375654 U CN 207375654U
Authority
CN
China
Prior art keywords
tower crane
climbing frame
girder
secondary beam
closed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720463926.3U
Other languages
Chinese (zh)
Inventor
林冰
付涛
陈玮
胡衷启
郭敬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Engineering Corp Ltd
China Construction First Group Corp Ltd
Original Assignee
China State Construction Engineering Corp Ltd
China Construction First Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Engineering Corp Ltd, China Construction First Group Corp Ltd filed Critical China State Construction Engineering Corp Ltd
Priority to CN201720463926.3U priority Critical patent/CN207375654U/en
Priority to PCT/CN2018/074114 priority patent/WO2018196451A1/en
Application granted granted Critical
Publication of CN207375654U publication Critical patent/CN207375654U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B66—HOISTING; LIFTING; HAULING
    • B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/26—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
    • B66C23/28—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail constructed to operate at successively higher levels
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B66—HOISTING; LIFTING; HAULING
    • B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62—Constructional features or details

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Transportation (AREA)
  • Jib Cranes (AREA)

Abstract

A non-closed tower crane climbing frame device comprises two C-shaped beams which are symmetrically arranged, wherein C-shaped openings of the two C-shaped beams are oppositely arranged and are mutually independent; each C-shaped beam consists of a main beam in the middle and two secondary beams at the end parts, and the secondary beams are vertically fixed at the end parts of the inner sides of the main beams and are fastened through connecting pieces; the end part of the opposite side of the main beam is provided with a connecting seat which is parallel to or coaxial with the secondary beam; and the main beam and the secondary beam are both provided with a jacking device used for fastening with the main limb of the tower body of the tower crane. The utility model discloses a no tie rod between the secondary beam on the same axis of twice C type roof beam, mechanical device simple structure saves unnecessary restraint tie rod, has reduced and has climbed the frame and has torn open the transportation work load, and material saving, preparation and use construction are all more convenient, are particularly useful for the middle-size and small-size tower crane of high-rise building construction to climb with climbing the frame.

Description

一种非闭合塔吊爬升框装置A non-closed tower crane climbing frame device

技术领域technical field

本实用新型涉及建筑施工塔吊固定技术领域,具体涉及一种非闭合塔吊爬升框装置。The utility model relates to the technical field of building construction tower crane fixing, in particular to a non-closed tower crane climbing frame device.

背景技术Background technique

目前,随着经济建设的实用新型,超高层建筑施工项目越来越多,附着式塔吊作为高达建筑物施工的主要垂直运输机械,在施工作业中起到了巨大作用。塔吊爬升框是连接塔吊与主体结构的一种机械装置,其主要作用是提供塔吊爬升支撑点,并传递塔吊荷载给支撑梁。传统塔吊爬升框由受力C型梁和联系杆组成,当选用中小型塔吊时,联系杆对整个装置的支撑作用甚小,增加爬升框的安拆、倒运工作量,施工耗时耗力,构造复杂,使用不便。At present, with the utility model of economic construction, there are more and more super high-rise building construction projects, and the attached tower crane, as the main vertical transportation machine for high-rise building construction, has played a huge role in construction operations. The tower crane climbing frame is a mechanical device connecting the tower crane and the main structure. Its main function is to provide the climbing support point of the tower crane and transfer the load of the tower crane to the supporting beam. The traditional tower crane climbing frame is composed of a stressed C-shaped beam and a connecting rod. When a small and medium-sized tower crane is selected, the connecting rod has a very small supporting effect on the entire device, which increases the workload of installing and dismantling the climbing frame, and the construction is time-consuming and labor-intensive. The structure is complex and inconvenient to use.

实用新型内容Utility model content

本实用新型的目的是提供一种非闭合塔吊爬升框装置,改变传统爬升框结构复杂、安拆倒运不便、经济性差的问题。The purpose of the utility model is to provide a non-closed tower crane climbing frame device, which can solve the problems of complex structure, inconvenient installation and dismantling, and poor economy of the traditional climbing frame.

为实现上述目的,本实用新型采用如下技术方案:In order to achieve the above object, the utility model adopts the following technical solutions:

一种非闭合塔吊爬升框装置,其特征在于:包括两道对称设置的C型梁,两道C型梁的C形开口相对且互相独立;每根C型梁由中间的主梁和端部的两根次梁组成,所述次梁垂直固定在主梁内侧的端部,并通过连接件紧固;在主梁相背侧的端部,设有与次梁平行或共轴线、用于与支撑结构固定的连接座;所述主梁和次梁上均设有用于与塔吊塔身主肢紧固的顶紧装置。A non-closed tower crane climbing frame device, characterized in that it includes two symmetrically arranged C-shaped beams, the C-shaped openings of the two C-shaped beams are opposite and independent from each other; each C-shaped beam consists of a main beam in the middle and two It is composed of root and secondary beams, and the secondary beams are vertically fixed at the end of the inner side of the main beam and fastened by connectors; at the end of the opposite side of the main beam, there is a The connecting seat with fixed structure; the main beam and the secondary beam are equipped with a jacking device for fastening with the main limb of the tower crane body.

作为本实用新型的优选技术方案,所述连接件为加腋板。As a preferred technical solution of the utility model, the connecting piece is a haunched plate.

进一步优选的,所述加腋板为连接次梁与主梁的1~3块钢板,所述钢板为三角形、梯形、矩形或弧形钢板。Further preferably, the said haunched plate is 1 to 3 steel plates connecting the secondary beam and the main beam, and said steel plates are triangular, trapezoidal, rectangular or arc-shaped steel plates.

进一步优选的,所述主梁的上缘设有一组爬爪垫块,设置数量与塔吊爬爪数量相同。Further preferably, the upper edge of the main girder is provided with a set of climbing claw pads, the number of which is the same as the number of climbing claws of the tower crane.

进一步优选的,所述主梁和次梁的腹板上在塔吊塔身主肢位置开设有预留洞,内设顶紧装置。Further preferably, on the webs of the main beam and the secondary beam, a reserved hole is opened at the position of the main limb of the tower crane body, and a jacking device is arranged inside.

进一步优选的,所述次梁位于主梁上顶紧装置的外端,与主梁内侧垂直连接。Further preferably, the secondary beam is located at the outer end of the clamping device on the main beam, and is vertically connected to the inner side of the main beam.

进一步优选的,所述主梁的截面形式为箱型、H型、槽型、组合截面或格构式。Further preferably, the cross-section of the main girder is box-shaped, H-shaped, trough-shaped, combined cross-section or lattice.

进一步优选的,所述次梁的截面形式为箱型、H型、槽型、组合截面或格构式。Further preferably, the cross-section of the secondary beam is box-shaped, H-shaped, groove-shaped, combined cross-section or lattice.

进一步优选的,所述连接座的底板上开有一组用于固定安装的预留孔,用于与支撑结构连接。Further preferably, a set of reserved holes for fixed installation are opened on the bottom plate of the connection base for connection with the supporting structure.

与现有技术相比,本实用新型的技术优势在于:Compared with the prior art, the technical advantages of the utility model are:

本实用新型涉及的非闭合塔吊爬升框装置构造简单,设计新颖,两道C型梁独立设置,同一轴线上的次梁之间无联系杆,省去多余约束联系杆,节约材料,减少成本的同时,减少了爬升框的安拆倒运工作量,施工更加便捷,对施工人员技术要求低,尤其适用于高层建筑施工中小型塔吊爬升用爬升框。The non-closed tower crane climbing frame device involved in the utility model has a simple structure and a novel design. Two C-shaped beams are set independently, and there is no connecting rod between the secondary beams on the same axis, which saves redundant restraining connecting rods, saves materials and reduces costs. At the same time, the installation and disassembly workload of the climbing frame is reduced, the construction is more convenient, and the technical requirements for construction personnel are low. It is especially suitable for the climbing frame used for climbing small and medium-sized tower cranes in the construction of high-rise buildings.

附图说明Description of drawings

通过结合以下附图所作的详细描述,本实用新型的上述和/或其他方面和优点将变得更清楚和更容易理解,这些附图只是示意性的,并不限制本实用新型,其中:The above-mentioned and/or other aspects and advantages of the present utility model will become clearer and easier to understand through the detailed description in conjunction with the following drawings, which are only schematic and do not limit the utility model, wherein:

图1是本实用新型涉及的非闭合塔吊爬升框装置的实施例的立体结构示意图;Fig. 1 is the three-dimensional structure schematic diagram of the embodiment of the non-closed tower crane climbing frame device that the utility model relates to;

图2是图1的俯视图;Fig. 2 is the top view of Fig. 1;

图3是本实用新型涉及的连接座的结构示意图;Fig. 3 is a structural schematic diagram of the connecting seat involved in the utility model;

图4是本实用新型涉及的非闭合塔吊爬升框装置与塔吊配合的使用状态示意图。Fig. 4 is a schematic diagram of the use state of the non-closed tower crane climbing frame device and the tower crane according to the utility model.

附图标记:附图标记:1-C型梁、2-主梁、3-次梁、4-加腋板、5-连接座、51-底板、52-顶板、53-加劲肋、54-预留孔、6-顶紧装置、7-塔吊塔身、8-支撑结构、9-爬爪垫块。Reference signs: Reference signs: 1-C-shaped beam, 2-main beam, 3-secondary beam, 4-haunched plate, 5-connecting seat, 51-bottom plate, 52-top plate, 53-stiffener, 54- Reserved hole, 6-jacking device, 7-tower crane body, 8-support structure, 9-climbing claw pad.

具体实施方式Detailed ways

在下文中,将参照附图描述本实用新型的非闭合塔吊爬升框装置的实施例。Hereinafter, embodiments of the non-closed tower crane climbing frame device of the present invention will be described with reference to the accompanying drawings.

在此记载的实施例为本实用新型的特定的具体实施方式,用于说明本实用新型的构思,均是解释性和示例性的,不应解释为对本实用新型实施方式及本实用新型范围的限制。除在此记载的实施例外,本领域技术人员还能够基于本申请权利要求书和说明书所公开的内容采用显而易见的其它技术方案,这些技术方案包括采用对在此记载的实施例的做出任何显而易见的替换和修改的技术方案。The embodiments described here are specific specific implementations of the present utility model, and are used to illustrate the concept of the present utility model. They are all explanatory and exemplary, and should not be construed as limitations on the implementation of the present utility model and the scope of the present utility model. limit. In addition to the embodiments described here, those skilled in the art can also adopt other obvious technical solutions based on the claims of the application and the contents disclosed in the description, and these technical solutions include adopting any obvious changes made to the embodiments described here. Replacement and modified technical solutions.

本说明书的附图为示意图,辅助说明本实用新型的构思,示意性地表示各部分的形状及其相互关系。请注意,为了便于清楚地表现出本实用新型实施例的各部件的结构,各附图之间并未按照相同的比例绘制。相同的参考标记用于表示相同的部分。The accompanying drawings in this specification are schematic diagrams, which assist in explaining the concept of the utility model, and schematically represent the shapes of various parts and their interrelationships. Please note that in order to clearly show the structures of the components in the embodiment of the present invention, the drawings are not drawn in the same scale. The same reference numerals are used to designate the same parts.

以下结合附图对本实用新型的原理和特征进行描述,所举实例只用于解释本实用新型,并非用于限定本实用新型的范围。以下结合附图对本实用新型的具体实施方式作进一步详细的说明。The principles and features of the present utility model are described below in conjunction with the accompanying drawings, and the examples given are only used to explain the utility model, and are not used to limit the scope of the utility model. Below in conjunction with accompanying drawing, the specific embodiment of the present utility model is described in further detail.

参见图1和图2,一种非闭合塔吊爬升框装置,包括两道对称设置的C型梁1,两道C型梁1的C形开口相对设置且互相独立;每根C型梁1由中间的主梁2和端部的两根次梁3组成,所述次梁3垂直设置在主梁2相对侧的端部,所述次梁3与主梁2之间通过连接件紧固;在主梁2相背侧的端部,对应次梁3的位置设有用于与支撑结构8连接固定的连接座5;所述主梁2和次梁3上均设有用于与塔吊塔身7主肢紧固的顶紧装置6,在主梁2和次梁3的腹板上开设有预留洞,所述预留洞内设顶紧装置6,每根梁体上顶紧装置6的个数可以为1~4个。所述主梁2的上缘还设有一组爬升垫块,设置数量与塔吊爬爪数量相同。Referring to Figures 1 and 2, a non-closed tower crane climbing frame device includes two symmetrically arranged C-shaped beams 1, and the C-shaped openings of the two C-shaped beams 1 are arranged opposite to each other and are independent of each other; each C-shaped beam 1 is composed of The main beam 2 in the middle is composed of two secondary beams 3 at the end, the secondary beam 3 is vertically arranged at the end of the opposite side of the main beam 2, and the secondary beam 3 and the main beam 2 are fastened by a connecting piece; At the end of the opposite side of the main beam 2, the position corresponding to the secondary beam 3 is provided with a connecting seat 5 for connecting and fixing with the support structure 8; The jacking device 6 fastened by the main limb is provided with a reserved hole on the web of the main beam 2 and the secondary beam 3, and the jacking device 6 is arranged in the reserved hole, and the jacking device 6 on each beam body The number may be 1 to 4. The upper edge of the main beam 2 is also provided with a group of climbing pads, the number of which is the same as the number of climbing claws of the tower crane.

其中,连接件优选为加腋板4,所述加腋板4可以为连接次梁3与主梁2的1~3块钢板,钢板性格装形状可以为三角形、梯形、矩形或弧形,主梁2的截面形式为箱型、H型、槽型、组合截面或格构式;次梁3的截面形式为箱型、H型、槽型、组合截面或格构式;如图3,所述连接座5与次梁3的中轴线重合;连接座5包括水平平行设置的底板51和顶板52,以及垂直设于两者之间的加劲肋53,所述底板51上开有一组用于固定安装的预留孔54,用于与支撑结构8螺栓连接。Among them, the connector is preferably a haunched plate 4, which can be 1 to 3 steel plates connecting the secondary beam 3 and the main beam 2, and the shape of the steel plate grid can be triangular, trapezoidal, rectangular or arc-shaped, and the main beam The section form of beam 2 is box, H, trough, combined section or lattice; the section of secondary beam 3 is box, H, trough, combined section or lattice; as shown in Figure 3, the The connecting seat 5 coincides with the central axis of the secondary beam 3; the connecting seat 5 includes a bottom plate 51 and a top plate 52 arranged in parallel horizontally, and a stiffening rib 53 vertically arranged between the two, and a group of bottom plates 51 are provided for The reserved holes 54 for fixed installation are used for bolt connection with the support structure 8 .

本实施例中,加腋板4每组有上中下三块,主梁2和次梁3均优选为H型钢,腹板竖直设置,多段短钢利用连接板拼装形成长的主梁,并保证拼装后各短钢的上翼缘板平整;连接板与翼缘板焊接固定。In this embodiment, each group of armpit plates 4 has three upper, middle and lower pieces, the main girder 2 and the secondary girder 3 are preferably H-shaped steel, the webs are arranged vertically, and multiple sections of short steel are assembled by connecting plates to form a long main girder. And ensure that the upper flange plates of each short steel are flat after assembly; the connecting plate and the flange plate are welded and fixed.

此外,本实用新型还提供上述非闭合塔吊爬升框装置的制作方法,如图4是本实用新型涉及的非闭合塔吊爬升框装置与塔吊配合的使用状态示意图,其特征在于,包括如下步骤:In addition, the utility model also provides a manufacturing method of the non-closed tower crane climbing frame device, as shown in Figure 4, which is a schematic diagram of the use state of the non-closed tower crane climbing frame device and the tower crane involved in the utility model, which is characterized in that it includes the following steps:

步骤一、确定C型梁1尺寸:依据塔吊尺寸,确定C型梁1的尺寸,进而确定各部件的尺寸;Step 1. Determine the size of the C-beam 1: according to the size of the tower crane, determine the size of the C-beam 1, and then determine the size of each component;

步骤二、材料准备:按照确定的尺寸进行各部件的准备,将各部件连接制作成主梁2、次梁3、连接座5;Step 2. Material preparation: Prepare each component according to the determined size, and connect each component to form the main beam 2, the secondary beam 3, and the connecting seat 5;

步骤三、C型梁1的制备:包括顶紧装置6安装位置预设、主次梁的固定和连接座5的固定,主梁2和次梁3的腹板上在塔吊塔身主肢位置开设有预留洞,内设顶紧装置6;Step 3. Preparation of C-shaped beam 1: including presetting the installation position of the jacking device 6, fixing the primary and secondary beams, and fixing the connecting seat 5, the webs of the main beam 2 and the secondary beam 3 are at the main limb position of the tower crane body A reserved hole is provided, and a jacking device 6 is installed inside;

步骤四、底层非闭合塔吊爬升框的布置:将准备的两道C型梁1对称布置在支撑结构8上,形成非闭合塔吊爬升框装置;Step 4. Arrangement of the non-closed tower crane climbing frame at the bottom: symmetrically arrange the prepared two C-shaped beams 1 on the support structure 8 to form a non-closed tower crane climbing frame device;

步骤五、底层非闭合塔吊爬升框的固定:将C型梁1的主梁2与底部的支撑结构8螺栓连接,实现非闭合塔吊爬升框的固定;Step 5. Fixing of the non-closed tower crane climbing frame at the bottom: connect the main beam 2 of the C-shaped beam 1 with the bottom support structure 8 bolts to realize the fixing of the non-closed tower crane climbing frame;

步骤六、上层非闭合塔吊爬升框的吊装:将上层非闭合塔吊爬升框的C型梁1吊装至预设高度;Step 6. Hoisting of the upper non-closed tower crane climbing frame: Hoist the C-beam 1 of the upper non-closed tower crane climbing frame to the preset height;

步骤七、上层非闭合塔吊爬升框的布置与固定:参照步骤四和步骤五,并调节顶紧装置6顶紧塔吊塔身7的加强节主肢;Step 7. Arrangement and fixation of the climbing frame of the upper non-closed tower crane: refer to steps 4 and 5, and adjust the jacking device 6 to tighten the main limb of the reinforcing joint of the tower crane body 7;

步骤八、整体质检:对整个结构体系的施工质量进行质检,至此,非闭合塔吊爬升框装置安装就位。Step 8. Overall quality inspection: Carry out quality inspection on the construction quality of the entire structural system. So far, the non-closed tower crane climbing frame device is installed in place.

以上所述仅为本实用新型的较佳实施例,并不用以限制本实用新型,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only preferred embodiments of the present utility model, and are not intended to limit the present utility model. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present utility model shall be included in this utility model. within the scope of protection of utility models.

Claims (8)

1. a kind of non-closed tower crane climbing frame apparatus, it is characterised in that:Including the symmetrically arranged C-type beam of twice(1), twice c-type Beam(1)C-shaped opening it is opposite and independent mutually;Every C-type beam(1)By intermediate girder(2)With two secondary beams of end(3)Group Into the secondary beam(3)It is vertically fixed on girder(2)The end of inside, and pass through haunched slab(4)Fastening;In girder(2)Phase back side End, be equipped with and secondary beam(3)Parallel or coaxial line is used for and support construction(8)Fixed connecting seat(5);The girder(2) And secondary beam(3)On be equipped with for tower crane tower body(7)The holding device of main limb fastening(6).
2. a kind of non-closed tower crane climbing frame apparatus according to claim 1, it is characterised in that:The haunched slab(4)For Connect secondary beam(3)With girder(2)1~3 block of steel plate, the steel plate be triangle, trapezoidal, rectangle or curved plate.
3. a kind of non-closed tower crane climbing frame apparatus according to claim 1, it is characterised in that:The girder(2)It is upper Edge climbs palmula block equipped with one group(9), quantity is set with tower crane to climb pawl quantity identical.
4. a kind of non-closed tower crane climbing frame apparatus according to claim 1, it is characterised in that:The girder(2)With it is secondary Beam(3)Web in the main limb position of tower crane tower body offer hole to be provided, inside set holding device(6).
5. a kind of non-closed tower crane climbing frame apparatus according to claim 1, it is characterised in that:The secondary beam(3)It is located at Girder(2)The outer end of upper holding device, with girder(2)Inner vertical connects.
6. a kind of non-closed tower crane climbing frame apparatus according to claim 1, it is characterised in that:The girder(2)Cut Face form is box, H-type, groove profile, compound section or lattice.
7. a kind of non-closed tower crane climbing frame apparatus according to claim 1, it is characterised in that:The secondary beam(3)Cut Face form is box, H-type, groove profile, compound section or lattice.
8. a kind of non-closed tower crane climbing frame apparatus according to claim 1-7 any one, it is characterised in that:The company Joint chair(5)Bottom plate on be provided with one group for fixed installation preformed hole(54), it is used for and support construction(8)Connection.
CN201720463926.3U 2017-04-28 2017-04-28 A non-closed tower crane climbing frame device Expired - Fee Related CN207375654U (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201720463926.3U CN207375654U (en) 2017-04-28 2017-04-28 A non-closed tower crane climbing frame device
PCT/CN2018/074114 WO2018196451A1 (en) 2017-04-28 2018-01-25 Non-closed tower crane climbing frame device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720463926.3U CN207375654U (en) 2017-04-28 2017-04-28 A non-closed tower crane climbing frame device

Publications (1)

Publication Number Publication Date
CN207375654U true CN207375654U (en) 2018-05-18

Family

ID=62298409

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720463926.3U Expired - Fee Related CN207375654U (en) 2017-04-28 2017-04-28 A non-closed tower crane climbing frame device

Country Status (2)

Country Link
CN (1) CN207375654U (en)
WO (1) WO2018196451A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114955903A (en) * 2022-06-01 2022-08-30 广东省洲际建工集团有限公司 Steel structure roof beam integral hoisting device and construction method thereof

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117552333B (en) * 2023-11-10 2026-05-26 广东云成智能装备有限公司 Climbing device for cap beam construction and its assembly/disassembly method

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005022819A (en) * 2003-07-02 2005-01-27 Yoshinaga Kikai Kk Tower crane support device
CN101143689B (en) * 2007-09-14 2010-05-19 胡建锋 Internal climbing tower crane double-beam shape internal climbing foundation and internal climbing jacket frame
JP2010265727A (en) * 2009-05-18 2010-11-25 Shimizu Corp Building demolition method using floor climbing type tower crane
CN202022675U (en) * 2011-04-22 2011-11-02 上海庞源建筑机械租赁有限公司 Double-layer vertically-crossed steel beam arrangement structure of internal climbing tower crane
CN203345972U (en) * 2013-06-18 2013-12-18 山东丰汇设备技术有限公司 Climbing belt side hang jacking device
CN106429896B (en) * 2016-10-12 2019-04-02 中国建筑第四工程局有限公司珠海分公司 A special-shaped C-beam for tower crane
CN106966307B (en) * 2017-04-28 2018-12-04 中国建筑股份有限公司 A non-closed tower crane climbing frame device and its application method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114955903A (en) * 2022-06-01 2022-08-30 广东省洲际建工集团有限公司 Steel structure roof beam integral hoisting device and construction method thereof
CN114955903B (en) * 2022-06-01 2024-10-25 广东省洲际建工集团有限公司 An integral hoisting device for steel structure roof beams and a construction method thereof

Also Published As

Publication number Publication date
WO2018196451A1 (en) 2018-11-01

Similar Documents

Publication Publication Date Title
CN114215170B (en) Lifting method for ultrahigh-altitude giant-suspension multilayer conjoined structure
CN208122301U (en) A kind of floor support plate supporting apparatus
CN203808484U (en) Integrated cantilevered and attached external scaffolding
CN105239765A (en) Foldable multifunctional overhanging unloading platform
CN107355037A (en) Assembling type steel structure builds self-bearing type steel truss form bracing system and construction method
CN111335610A (en) High-altitude large-span cantilever formwork operation platform and erection method thereof
CN107161884A (en) Mechanical device combining tower crane climbing frame and structural support beam and using method thereof
CN104818675B (en) Assembling method for steel bar segments
CN206827973U (en) One kind plus drag-line tower crane climbing frame apparatus
CN105088971B (en) Mid-span closure construction method of corrugated steel web PC box girder cable-stayed bridge
CN107032241B (en) One kind plus drag-line tower crane climbing frame apparatus and its application method
CN106966307A (en) A non-closed tower crane climbing frame device and its application method
CN210918165U (en) Multi-row overhanging support frame for high-rise building
CN201865116U (en) Temporary construction platform of pile leg for self-climbing well drilling platform
CN112064489A (en) External steel anchor pipe of novel cable-girder anchoring system of cable-stayed bridge and operation method of external steel anchor pipe
CN106276630A (en) A kind of internal-climbing tower crane supporting construction of band shearing frame
CN110552495A (en) assembled building combined tool type outer protective frame system and construction method thereof
WO2018196451A1 (en) Non-closed tower crane climbing frame device
CN108374321A (en) Lateral bracing and the coefficient steel girder bridge structure of main truss and method can be reduced
CN216516786U (en) Flexible structure of encorbelmenting of dismantling of peripheral protection circulation of superelevation layer
CN218912192U (en) Clamp type operation platform suitable for box girder
CN207330181U (en) A mechanical device combining a tower crane climbing frame and a structural support beam
CN115341701B (en) Hanging formwork construction method for high-altitude overhanging steel bar truss floor support plate
CN217924327U (en) Fixing structure for end of steel bar truss floor bearing plate
CN112942777A (en) Ultrahigh-layer periphery protection cyclic telescopic detachable cantilever structure and mounting method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180518

CF01 Termination of patent right due to non-payment of annual fee