CN109209388A - A kind of Construction of Silo plate device - Google Patents

A kind of Construction of Silo plate device Download PDF

Info

Publication number
CN109209388A
CN109209388A CN201811298508.9A CN201811298508A CN109209388A CN 109209388 A CN109209388 A CN 109209388A CN 201811298508 A CN201811298508 A CN 201811298508A CN 109209388 A CN109209388 A CN 109209388A
Authority
CN
China
Prior art keywords
template
translation
construction
bracket
silo
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811298508.9A
Other languages
Chinese (zh)
Inventor
周德双
陈燕
周松竹
石黎明
俞小毅
梁庭华
刘奔
宋杰
陈晅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 5 Engineering Group Co Ltd
Fourth Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Steel Structure Branch of Fourth Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Original Assignee
China Railway No 5 Engineering Group Co Ltd
Fourth Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Steel Structure Branch of Fourth Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 5 Engineering Group Co Ltd, Fourth Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd, Steel Structure Branch of Fourth Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd filed Critical China Railway No 5 Engineering Group Co Ltd
Priority to CN201811298508.9A priority Critical patent/CN109209388A/en
Publication of CN109209388A publication Critical patent/CN109209388A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D5/00Lining shafts; Linings therefor
    • E21D5/12Accessories for making shaft linings, e.g. suspended cradles, shutterings

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The present invention relates to a kind of Construction of Silo plate devices, including several pieces of translation templates, several horizontal power push rods and bracket;One end of the horizontal power push rod is fixed on bracket, and other end connection translation template pushes translation template movement to enclose to several pieces of translation template tandem arrays and is set as enclosing.Compared with the existing technology, Construction of Silo plate device of the invention is set as enclosing by pushing translation template to enclose, and just completes building for template wall, the construction of vertical shaft inner wall can be completed in casting concrete between the crater wall and template wall dug, it is seen that build process is simple;Similarly, after concrete setting, flexible by horizontal power push rod draws close translation template to bracket, demoulding disassembly process can be completed, it is seen then that demoulding disassembly process is also simple.In addition, due to translation template area it is big, enclose be set as template wall translation template number it is few, therefore formed seam it is few, the borehole wall is smooth.

Description

A kind of Construction of Silo plate device
Technical field
The present invention relates to vertical shaft liner support apparatus, more particularly to a kind of Construction of Silo plate device.
Background technique
Vertical shaft is channel and the plenum ventilation mouth that underground sediment or mud are transported when excavating or clear up karez closed conduit. Few then have a vertical shaft more than ten on one karez, more, there are up to a hundred.In order to avoid crater wall is collapsed in the use process of vertical shaft It falls into, falls into the karez of underground, damage with causing karez, generally crater wall is smeared or casting concrete is to reinforce. In addition, due to the digging process of building of vertical shaft be from ground gradually in depth under, in order to avoid in lower section operation, in the vertical shaft of top Wall slump stone, soil block etc. injure personnel, damage product by a crashing object, cause safety accident, general using segmentation construction mode.I.e. per downwards Certain depth is dug, first the inner wall of this part is smeared or pours upper concrete to reinforce, starts to carry out next depth later again The excavation of degree.
Existing vertical shaft internal-wall concrete pours mode and is, using several pieces of wood board splicings at template wall, what this was spliced into Template wall is more smaller than the mine pit diameter dug;Then to casting concrete between the template wall being spliced into and the crater wall dug;To After concrete setting, one piece of block removes plank, completes demoulding.Since plank and the number of parts for helping it to splice are numerous, and It needs to set up supporting element, therefore builds and demould the disassembly quite time-consuming effort of template wall, slow project progress can be dragged, increase spending; On the other hand, if defective tightness at wood board splicing, concrete can overflow splicing gap and leave seam on the borehole wall, and plank number It measures numerous, causes seam more, borehole wall surface is not smooth enough, and adjacent plank has relative displacement (faulting of slab ends phenomenon), so that together The borehole wall seam of one depth is uneven;In addition, cannot withstand enough pressures if the connection at wood board splicing is not secured enough Power, then during injecting concrete, template wall meeting explosion causes concrete to leak out outside mold (quick-fried mould phenomenon).
Summary of the invention
To solve the above-mentioned problems, the object of the present invention is to provide one kind convenient for building and demoulding disassembly, and in vertical shaft Wall pours smooth Construction of Silo plate device.
Construction of Silo plate device of the invention, including several pieces of translation templates, several horizontal power push rods and bracket; One end of the horizontal power push rod is fixed on bracket, and other end connection translation template pushes translation template movement to several Block translation template tandem array, which encloses, to be set as enclosing.
Compared with the existing technology, Construction of Silo plate device of the invention is set as enclosing by pushing translation template to enclose, just complete At building for template wall, the construction of vertical shaft inner wall is can be completed in casting concrete between the crater wall and template wall dug, can See that build process is simple;Similarly, after concrete setting, flexible by horizontal power push rod leans on translation template to bracket Hold together, demoulding disassembly process can be completed, it is seen then that demoulding disassembly process is also simple.In addition, being enclosed since the area of translation template is big The translation template number for being set as template wall is few, therefore the seam formed is few, and the borehole wall is smooth.
It further, further include several pieces of adjusting templates, successively spaced enclose sets the adjusting template with translation template Lopping.When translating near template movement to the crater wall dug, adjusting template is inserted between adjacent translation template Complete building for template wall.Since relative to translation template, adjusting template is only one block of plate, and structure is simple, is easy to make, join Expense can be reduced using translation template and adjusting template by closing.
Further, the bracket includes that several support posts and several are set up in adjacent two support posts Between crossbeam, be provided with guide sleeve on the crossbeam;It further include guided in translation bar, one end of the guided in translation bar is fixed on It translates in template, the other end passes through guide sleeve.By the way that guided in translation bar is arranged translation template is carried out in the horizontal direction Movement far from bracket, occurs so as to avoid the case where faulting of slab ends.
It further, further include several lifting drive push rods, the lifting drive push rod is fixed on the support post Bottom.By the support post bottom of bracket be arranged lifting drive push rod, it is ensured that the central axis of device entirety with it is set Vertical shaft center overlapping of axles, avoiding device inclination.So that each crossbeam is in same level height, pass through guided in translation bar The case where ensuring that every piece of translation template is located at same level height, further avoiding faulting of slab ends appearance.
It further, further include several regulating rods, the regulating rod includes adjustment pipe, the first screw rod and the second spiral Bar;The opposite screw thread in direction of rotation, first screw rod and the second screw rod are provided on the both ends inner wall of the adjustment pipe Rotation direction of thread on the contrary, it is described adjustment pipe both ends be threadedly coupled first screw rod and the second screw rod respectively;Institute State the other end connecting cross beam of the first screw rod, the other end connection translation template of second screw rod.It is finely tuned by setting The distance of bar adjustment translation template movement, goes out to improve the case where template encloses the precision for being set as circle, further avoids faulting of slab ends It is existing.
Further, the bracket further includes several sunpenders, and the both ends of the sunpender are separately connected in same pair of horns The top of two support posts on line is provided with lifting hole(eyelet) on the sunpender.Lifting hole(eyelet) is set by setting sunpender and on sunpender, Crane or manpower convenient to use are by steel wire penetrating lifting hole(eyelet), with pipe-hanging hook and the lifting drive being fixed on bracket It push rod and horizontal power push rod, the guided in translation bar being erected on bracket and is connected to by guided in translation bar flat on bracket Shifting formwork plate, moves up and down in the shaft.
Further, the translation template is towards being provided with several link blocks, the horizontal power on the inner wall of bracket One end of push rod is fixed on the crossbeam of bracket, and the other end is fixed on the link block of translation template;Second screw rod The other end is connected on the link block of translation template.
Further, the lower end of the support post is provided with support base, and the lifting drive push rod is fixed on support base On.
Further, the center of the adjustment pipe is provided with adjustment circular hole;The section of the guided in translation bar is polygon, Draw runner is provided on each side of the guided in translation bar.Adjustment pipe can be rotated by the way that circular hole is arranged, with most laborsaving simplicity Ground mode changes the moving direction of adjustment pipe, realizes the adjustment to translation template movement distance.By in the side of guided in translation bar Draw runner is arranged in face, it is possible to reduce the friction of itself and guide sleeve.
Further, the translation template includes the first translation template and the second translation template, the first translation template It is spaced with the second translation template;A guided in translation bar is fixed on the link block of the first translation template, described the Two guided in translation bars are fixed on the link block of two translation templates.Pass through spaced first translation template and the second translation mould Plate, avoids the case where guided in translation bar intersects congestion in the bracket appearance, that is, avoid can not adjust translation template movement away from From the case where occur.
In order to better understand and implement, the invention will now be described in detail with reference to the accompanying drawings.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of Construction of Silo plate device of the invention;
Fig. 2 is the structural schematic diagram of bracket of the invention;
Fig. 3 is the structural schematic diagram of the first translation template of the invention;
Fig. 4 is the structural schematic diagram of the second translation template of the invention;
Fig. 5 is the structural schematic diagram of regulating rod of the invention;
Fig. 6 is the structural schematic diagram of the template wall of translation template of the invention and adjusting template composition;
Fig. 7 is the assembling process schematic diagram of Construction of Silo plate device of the invention.
Specific embodiment
Referring to Fig. 1, it is the structural schematic diagram of Construction of Silo plate device of the invention.Construction of Silo mould of the invention Panel assembly includes bracket 10, translation template 20, horizontal power push rod 30, guided in translation bar 40, lifting drive push rod 50, regulating rod 60 and adjusting template 70.Described 30 one end of horizontal power push rod is fixed over the mount 10, and other end connection translation template 20 pushes Translation template 20 is moved on the circumference being adapted with itself radian, is then inserted into adjacent flat shifting formwork plate in the adjusting template 40 Between 20 neutral gear, and spliced with translation template 20, can tentatively complete building for template wall.
Referring to Fig. 2, it is the structural schematic diagram of bracket of the invention.The bracket 10 includes four support posts 11, Four crossbeams 12 have been set up between every two adjacent support posts 11, two support posts 11 in diagonal positions Top is fixed with sunpender 13.It counts from top to bottom, is provided with rectangular guide sleeve 121 on first and Article 3 crossbeam 12.It is described The lower end of support post 11 is provided with support base 11, for fixing the lifting drive push rod 50.The both ends of the sunpender 13 are set It is equipped with lifting hole(eyelet) 131, for hanging in bracket, and the fixed and translation template being connected on bracket etc. in vertical shaft, and in vertical shaft In up and down hang.
Please refer to Fig. 3 and Fig. 4, wherein Fig. 3 is the structural schematic diagram of the first translation template of the invention;Fig. 4 is this The structural schematic diagram of second translation template of invention.Specifically, the translation template 20 includes two piece of first translation 21 He of template Three link blocks 23 are respectively and fixedly provided in two piece of second translation template 22, the first translation template 21 and the second translation template 22, The level height of every link block 23 is identical as the level height of three crossbeams 12 of 10 top of bracket respectively.First translation First of template 21 is fixed with a rectangular guided in translation bar 40 with the center of Article 3 link block 23, flat with described first The center of shifting formwork plate 21 opposite first and Article 3 crossbeam 12 is provided with rectangular guide sleeve 121.The second translation mould Two rectangular guided in translation bars 40 are fixed on first of plate 22 and Article 3 link block 23, with the second translation template There are two rectangular guide sleeves 121 for setting on 21 opposite first and Article 3 crossbeams 12.
One end of the guided in translation bar 40 is fixed on the link block 23 of translation template 20, and the other end passes through the crossbeam Guide sleeve 121 on 12, so that translation template 20 is moved along guided in translation bar 40, it is ensured that translation template 20 is in level side It moves up.The each side of the guided in translation bar 40 is provided with draw runner 41, for reducing its friction between guide sleeve 121 Power, in order to the movement of itself and translation template 20.
Described 30 one end of horizontal power push rod is fixed on bracket 10 and counts on Article 2 crossbeam 12 from top to bottom, and the other end is fixed On the Article 2 link block 23 of translation template 20, pushed for template 20 will to be translated to the direction far from bracket.The level Power push-rod 30 and lifting drive push rod 50 can be hydraulic power push rod, can also be with other power push-rods.If hydraulic power Push rod, specifically, in horizontal power push rod 30, hydraulic oil cylinder barrel is fixed on crossbeam, and oil cylinder provides push rod and the company of power It connects block to be connected, for pushing translation template distally to move;In lifting drive push rod 50, hydraulic oil cylinder barrel is fixed on support base On, oil cylinder provides the push rod support of power on the ground, central axis and set vertical shaft central axis for adjusting body It is overlapped, avoiding device inclination, so that each crossbeam is located at same level height, ensures to translate template by guided in translation bar It moves horizontally.
Referring to Fig. 5, it is the structural schematic diagram of regulating rod of the invention.The regulating rod 60 includes adjustment pipe 61, the One screw rod 62 and the second screw rod 63.The opposite screw thread in direction of rotation, institute are provided on the both ends inner wall of the adjustment pipe 61 The rotation direction of thread of the first screw rod 62 and the second screw rod 63 is stated on the contrary, the both ends of the adjustment pipe 61 are threadedly coupled respectively First screw rod 62 and the second screw rod 63.Specifically, the adjustment pipe 61 and the first screw rod 62 are left hand thread company It connects, the adjustment pipe 61 is that right-handed thread is connect with the second screw rod 63.The center of the adjustment pipe 61 is provided with adjustment circular hole 611, the other end of first screw rod 62 connects first or Article 3 crossbeam 12, the other end of second screw rod 63 Connection first and Article 3 link block 23.The specifically used mode of regulating rod 60 are as follows: if translation template 20 and 10 center of bracket Distance and required template wall radius difference when, then by the adjustment circular hole 611 of steel bar insertion adjustment pipe 61, rotation Steel bar drives adjustment pipe 61 to rotate, if rotated to the left, adjustment pipe 61 moves right, and adjustment translation template 20 is close to bracket 10;If rotated to the right, adjustment pipe 61 is moved to the left, and adjustment translation template 20 is far from bracket 10.
Referring to Fig. 6, its structural schematic diagram for translation template of the invention and the template wall of adjusting template composition.It is described Adjusting template 70 is one block of steel plate with radian, the circumference corresponding with the translation radian of template 20 of circumference corresponding to radian It is identical.Adjusting template 70 and translation spaced enclose of template 20 are set as a circle, form a complete template wall.
The assembling process and usage mode of shaft template device of the invention are explained below.Referring to Fig. 7, it is the present invention Shaft template device assembling process schematic diagram.Firstly, guided in translation bar 40 is fixed to translation template 20 on the ground On link block 23, then by the corresponding guide sleeve 121 penetrated on crossbeam 12 of guided in translation bar 40, and horizontal power push rod 30 is hung It connects on link block 23, completes the preliminary assembling of plate device;Then, with the lifting hole(eyelet) 131 on steel wire penetrating sunpender 13, lifting Preliminary assembled plate device is hung in the hole bottom for a certain depth dug by wirerope by machine or manpower;Then, pass through Control system adjusts lifting drive push rod 50 and makes each circle crossbeam 12 all holdings of bracket 10 horizontal, and passes through control system tune Section adjusts horizontal power push rod 30 and translation template 20 is pushed to be moved on scheduled (required) template wall circumference far from bracket;It connects Get off, regulating rod 60 is articulated on crossbeam 12 and link block 23, with the adjustment circular hole 611 of a steel bar insertion adjustment pipe 61 In, rotation steel bar drives adjustment pipe 61 to rotate, imperceptibly to adjust translation template 20 to scheduled position;Finally, in translation mould It is inserted into adjusting template 70 between plate 20 and is secured with nuts to form complete template wall.
After having built template wall, from concreting mouth to the template of translation template 20 formation alternate with adjusting template 70 Casting concrete between wall and crater wall.
After concrete setting, adjusting template 70 is first removed;Then regulating rod 60 is removed, then controlled level power push-rod 30 is mobile to bracket 10, drives translation template 20 to draw close to bracket 10, that is, completes demoulding disassembly process.Device after demoulding It is restored to preliminary assembled state, hangs go back to ground.It is hung after the vertical shaft of next depth hole is dug well, then by the device of preliminary assembled state Enter and cheat bottom, repeat above-mentioned assembling, pour and demould disassembly process, until vertical shaft construction finishes.
Above-mentioned drawings and examples are one of embodiment of shaft template device of the invention, in addition to this originally There are also multiple types for the shaft template device of invention.Such as the application of Construction of Silo plate device of the invention is not limited to round erect Well can also be the vertical shaft of other shapes, such as polygon, ellipse, the corresponding shape for changing translation template and adjusting template The shape of shape and bracket;Furthermore it is possible to not use adjusting template, template wall is formed only with translation template;Translate mould Plate and adjusting template can not use steel plate, can use the plate of other materials;Same guided in translation bar, bracket and regulating rod Steel material can not be used, and is made using other materials;The guided in translation bar being fixed on the first translation template link block can To be more than one, the guided in translation bar being fixed on the second translation template link block can be more than two, be correspondingly arranged phase The guide sleeve of quantity is answered, and when mobile to carriage center direction, will not be stopped from each other.
Compared with the existing technology, shaft template device of the invention is set as enclosing by pushing translation template to enclose, and just completes Template wall is built, and the construction of vertical shaft inner wall can be completed in casting concrete between the crater wall and template wall dug, it is seen that takes It is simple to build process;After concrete setting, flexible by horizontal power push rod draws close translation template to bracket, can be completed Demould disassembly process, it is seen then that demoulding disassembly process is also simple.In addition, enclosing since the area of translation template is big and being set as template wall Translation template number is few, therefore the seam formed is few, and the borehole wall is smooth;And since translation template and adjusting template are steel plates, and it is logical It crosses nut to link together, endurance is strong, will be greatly reduced the probability that quick-fried mould phenomenon occurs.In addition, passing through setting lift adjustment Device and translation guide rod enable translation template accurately to move in same level height, thus greatly reduce and pour The borehole wall there is the probability of faulting of slab ends phenomenon.
The embodiments described above only express several embodiments of the present invention, and the description thereof is more specific and detailed, but simultaneously It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to protection of the invention Range.

Claims (10)

1. a kind of Construction of Silo template, it is characterised in that: several pieces of translation templates, several horizontal power push rods and bracket;Institute The one end for stating horizontal power push rod is fixed on bracket, and other end connection translation template pushes translation template movement to several pieces Translation template tandem array, which encloses, to be set as enclosing.
2. Construction of Silo template according to claim 1, it is characterised in that: further include several pieces of adjusting templates, the tune Successively spaced enclose is set as enclosing section template with translation template.
3. according to claim 1 or Construction of Silo template described in 2 any one, it is characterised in that: the bracket includes several Root support post and several crossbeams being set up between adjacent two support posts are provided with guide sleeve on the crossbeam; It further include guided in translation bar, one end of the guided in translation bar is fixed in translation template, and the other end passes through guide sleeve.
4. Construction of Silo template according to claim 3, it is characterised in that: further include several lifting drive push rods, institute State the bottom that lifting drive push rod is fixed on the support post.
5. Construction of Silo template according to claim 3, it is characterised in that: further include several regulating rods, the fine tuning Bar includes adjustment pipe, the first screw rod and the second screw rod;It is opposite that direction of rotation is provided on the both ends inner wall of the adjustment pipe Screw thread, the rotation direction of thread of first screw rod and the second screw rod is on the contrary, screw thread is distinguished at the both ends of the adjustment pipe Connect first screw rod and the second screw rod;The other end connecting cross beam of first screw rod, second screw rod The other end connection translation template.
6. Construction of Silo template according to claim 3, it is characterised in that: the bracket further includes several sunpenders, institute The both ends for stating sunpender are separately connected the top of two support posts on same diagonal line, are provided with and hang on the sunpender Hole.
7. Construction of Silo template according to claim 5, it is characterised in that: the translation template is towards on the inner wall of bracket Several link blocks are provided with, one end of the horizontal power push rod is fixed on the crossbeam of bracket, and the other end is fixed on translation On the link block of template;The other end of second screw rod is connected on the link block of translation template.
8. Construction of Silo template according to claim 4, it is characterised in that: the lower end of the support post is provided with support Seat, the lifting drive push rod are fixed on support base.
9. Construction of Silo template according to claim 5, it is characterised in that: the center of the adjustment pipe is provided with adjustment circle Hole;The section of the guided in translation bar is polygon, is provided with draw runner on each side of the guided in translation bar.
10. the Construction of Silo template according to claim 4-9 any one, it is characterised in that: the translation template includes First translation template and the second translation template, the first translation template and the second translation template are spaced;Described first is flat It is fixed with a guided in translation bar on the link block of shifting formwork plate, is fixed with two translations on the link block of the second translation template Guide rod.
CN201811298508.9A 2018-11-02 2018-11-02 A kind of Construction of Silo plate device Pending CN109209388A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811298508.9A CN109209388A (en) 2018-11-02 2018-11-02 A kind of Construction of Silo plate device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811298508.9A CN109209388A (en) 2018-11-02 2018-11-02 A kind of Construction of Silo plate device

Publications (1)

Publication Number Publication Date
CN109209388A true CN109209388A (en) 2019-01-15

Family

ID=64998425

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811298508.9A Pending CN109209388A (en) 2018-11-02 2018-11-02 A kind of Construction of Silo plate device

Country Status (1)

Country Link
CN (1) CN109209388A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110671114A (en) * 2019-11-01 2020-01-10 中国地质大学(北京) Recovery type circular shaft supporting device and method
CN111608662A (en) * 2020-04-30 2020-09-01 北京中煤矿山工程有限公司 Shaft oversized-diameter integral moving metal template
WO2021135038A1 (en) * 2019-12-30 2021-07-08 中铁二局集团有限公司 Method for construction of shaft lining
CN113882862A (en) * 2021-11-15 2022-01-04 中煤第一建设有限公司 High strength tunnel ventilation shaft pit shaft structure
CN115182734A (en) * 2022-08-25 2022-10-14 煤炭工业合肥设计研究院有限责任公司 Full hydraulic formwork device for building wall of vertical shaft

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201574761U (en) * 2010-01-04 2010-09-08 中煤第三建设(集团)有限责任公司 Correcting and strengthening device for screw rod of inner wall formwork of mine shaft
CN102787850A (en) * 2012-08-29 2012-11-21 中铁二十三局集团第一工程有限公司 Inverted arch formwork for tunnel inverted arch construction
CN202832562U (en) * 2012-08-29 2013-03-27 中铁二十三局集团第一工程有限公司 Inverted arch mold support used for tunnel inverted arch construction
CN103850686A (en) * 2014-03-21 2014-06-11 中煤矿山建设集团有限责任公司 Vertical shaft sleeve wall integral hydraulic template
CN104453217A (en) * 2014-11-14 2015-03-25 富于安(福建)环保模板有限公司 Elevator shaft whole formwork lifting construction method
CN204386615U (en) * 2014-12-24 2015-06-10 中铁四局集团第五工程有限公司 A kind of self-propelled tunnel invert construction trolley
CN204475841U (en) * 2015-02-05 2015-07-15 中国水利水电第八工程局有限公司 Self lift type shaft template device
CN105134220A (en) * 2015-08-25 2015-12-09 三峡大学 Hydraulic sliding formwork for vertical shaft lining
CN204941569U (en) * 2015-09-07 2016-01-06 中铁四局集团第四工程有限公司 Tunnel invert trolley formwork system
CN205243527U (en) * 2015-12-23 2016-05-18 北京东风世景模板有限公司 Tunnel invert platform truck of being under construction
RU164010U1 (en) * 2014-12-10 2016-08-20 Александр Александрович Кисель SELF-PROPELLED FORMWORK FOR THE CONSTRUCTION OF CONCRETE Lining of the trunks of vertical mining and the METHOD of CONSTRUCTION of the lining of the trunks of vertical mining
CN206668286U (en) * 2017-04-25 2017-11-24 乌鲁木齐市永兴顺发钢模板有限公司 A kind of needle beam type lining trolley
CN209040830U (en) * 2018-11-02 2019-06-28 中铁五局集团第四工程有限责任公司 A kind of Construction of Silo plate device

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201574761U (en) * 2010-01-04 2010-09-08 中煤第三建设(集团)有限责任公司 Correcting and strengthening device for screw rod of inner wall formwork of mine shaft
CN102787850A (en) * 2012-08-29 2012-11-21 中铁二十三局集团第一工程有限公司 Inverted arch formwork for tunnel inverted arch construction
CN202832562U (en) * 2012-08-29 2013-03-27 中铁二十三局集团第一工程有限公司 Inverted arch mold support used for tunnel inverted arch construction
CN103850686A (en) * 2014-03-21 2014-06-11 中煤矿山建设集团有限责任公司 Vertical shaft sleeve wall integral hydraulic template
CN104453217A (en) * 2014-11-14 2015-03-25 富于安(福建)环保模板有限公司 Elevator shaft whole formwork lifting construction method
RU164010U1 (en) * 2014-12-10 2016-08-20 Александр Александрович Кисель SELF-PROPELLED FORMWORK FOR THE CONSTRUCTION OF CONCRETE Lining of the trunks of vertical mining and the METHOD of CONSTRUCTION of the lining of the trunks of vertical mining
CN204386615U (en) * 2014-12-24 2015-06-10 中铁四局集团第五工程有限公司 A kind of self-propelled tunnel invert construction trolley
CN204475841U (en) * 2015-02-05 2015-07-15 中国水利水电第八工程局有限公司 Self lift type shaft template device
CN105134220A (en) * 2015-08-25 2015-12-09 三峡大学 Hydraulic sliding formwork for vertical shaft lining
CN204941569U (en) * 2015-09-07 2016-01-06 中铁四局集团第四工程有限公司 Tunnel invert trolley formwork system
CN205243527U (en) * 2015-12-23 2016-05-18 北京东风世景模板有限公司 Tunnel invert platform truck of being under construction
CN206668286U (en) * 2017-04-25 2017-11-24 乌鲁木齐市永兴顺发钢模板有限公司 A kind of needle beam type lining trolley
CN209040830U (en) * 2018-11-02 2019-06-28 中铁五局集团第四工程有限责任公司 A kind of Construction of Silo plate device

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110671114A (en) * 2019-11-01 2020-01-10 中国地质大学(北京) Recovery type circular shaft supporting device and method
CN110671114B (en) * 2019-11-01 2024-05-03 中国地质大学(北京) Recovery type round vertical shaft supporting device and method
WO2021135038A1 (en) * 2019-12-30 2021-07-08 中铁二局集团有限公司 Method for construction of shaft lining
CN111608662A (en) * 2020-04-30 2020-09-01 北京中煤矿山工程有限公司 Shaft oversized-diameter integral moving metal template
CN111608662B (en) * 2020-04-30 2021-11-12 北京中煤矿山工程有限公司 Shaft oversized-diameter integral moving metal template
CN113882862A (en) * 2021-11-15 2022-01-04 中煤第一建设有限公司 High strength tunnel ventilation shaft pit shaft structure
CN113882862B (en) * 2021-11-15 2024-04-16 中煤第一建设有限公司 High strength tunnel ventilation shaft pit shaft structure
CN115182734A (en) * 2022-08-25 2022-10-14 煤炭工业合肥设计研究院有限责任公司 Full hydraulic formwork device for building wall of vertical shaft

Similar Documents

Publication Publication Date Title
CN109209388A (en) A kind of Construction of Silo plate device
CN210482284U (en) Steel reinforcement cage positioner of bored concrete pile
CN114481874B (en) Prefabricated door type frame assembled box culvert and construction method
CN109869164B (en) Construction method for pouring porous separation type tunnel by combined type hydraulic template trolley
CN114559534B (en) Prefabricated component production line
CN106223980A (en) A kind of construction method of tunnel ditch cable trough construction trolley
CN110513125A (en) Inside and outside mould trolley shoring system for open cut closed conduit
CN209040830U (en) A kind of Construction of Silo plate device
CN213296424U (en) Reverse construction method wall of a well concrete device of putting in storage
CN205152946U (en) Manual hole digging pile dado steel form
CN109137952B (en) Reinforcing device and reinforcing method for open caisson in weak soil layer section
CN108005684B (en) Separated steel mould trolley and construction method thereof
CN106050271A (en) Ditch formwork device for tunnel and construction method of ditch formwork device
CN211597706U (en) Single side wall formwork device
CN106089256A (en) Ditch cable trench construction trolley and construction method, tunnel cable die set device
CN213175661U (en) A mould for tunnel reinforced concrete center ditch construction
CN213382182U (en) Annular full-automatic production line transportation platform
CN206035501U (en) Tunnel water ditch die carrier device
CN212406744U (en) Template platform truck is filled to high-speed railway tunnel center ditch secondary
CN206053965U (en) A kind of tunnel ditch cable trough construction trolley
CN204225904U (en) Can overturn and the rectangular shield of quick-assembling rectangle section of jurisdiction by low-angle
CN114542079A (en) Efficient shaft creeping formwork construction system
CN107780386A (en) For building the template construction machinery and its application method of tidal channel
CN209384265U (en) The light trolley of early stripping formwork system
CN106760486A (en) Exterior wall mould and its erection method in foundation ditch

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination