CN209040830U - A kind of Construction of Silo plate device - Google Patents

A kind of Construction of Silo plate device Download PDF

Info

Publication number
CN209040830U
CN209040830U CN201821805932.3U CN201821805932U CN209040830U CN 209040830 U CN209040830 U CN 209040830U CN 201821805932 U CN201821805932 U CN 201821805932U CN 209040830 U CN209040830 U CN 209040830U
Authority
CN
China
Prior art keywords
template
translation
construction
translation template
bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821805932.3U
Other languages
Chinese (zh)
Inventor
周德双
陈燕
周松竹
石黎明
俞小毅
梁庭华
刘奔
宋杰
陈晅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 5 Engineering Group Co Ltd
Fourth Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Steel Structure Branch of Fourth Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Original Assignee
China Railway No 5 Engineering Group Co Ltd
Fourth Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Steel Structure Branch of Fourth Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 5 Engineering Group Co Ltd, Fourth Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd, Steel Structure Branch of Fourth Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd filed Critical China Railway No 5 Engineering Group Co Ltd
Priority to CN201821805932.3U priority Critical patent/CN209040830U/en
Application granted granted Critical
Publication of CN209040830U publication Critical patent/CN209040830U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model relates to a kind of Construction of Silo plate devices, including several pieces of translation templates, several horizontal power push rods and bracket;One end of the horizontal power push rod is fixed on bracket, and other end connection translation template pushes translation template movement to enclose to several pieces of translation template tandem arrays and is set as enclosing.Compared with the existing technology, the Construction of Silo plate device of the utility model is set as enclosing by pushing translation template to enclose, building for template wall is just completed, the construction of vertical shaft inner wall can be completed in casting concrete between the crater wall and template wall dug, it is seen that build process is simple;Similarly, after concrete setting, flexible by horizontal power push rod draws close translation template to bracket, demoulding disassembly process can be completed, it is seen then that demoulding disassembly process is also simple.In addition, due to translation template area it is big, enclose be set as template wall translation template number it is few, therefore formed seam it is few, the borehole wall is smooth.

Description

A kind of Construction of Silo plate device
Technical field
The utility model relates to vertical shaft liner support apparatus, more particularly to a kind of Construction of Silo plate device.
Background technique
Vertical shaft is channel and the plenum ventilation mouth that underground sediment or mud are transported when excavating or clear up karez closed conduit. Few then have a vertical shaft more than ten on one karez, more, there are up to a hundred.In order to avoid crater wall is collapsed in the use process of vertical shaft It falls into, falls into the karez of underground, damage with causing karez, generally crater wall is smeared or casting concrete is to reinforce. In addition, due to the digging process of building of vertical shaft be from ground gradually in depth under, in order to avoid in lower section operation, in the vertical shaft of top Wall slump stone, soil block etc. injure personnel, damage product by a crashing object, cause safety accident, general using segmentation construction mode.I.e. per downwards Certain depth is dug, first the inner wall of this part is smeared or pours upper concrete to reinforce, starts to carry out next depth later again The excavation of degree.
Existing vertical shaft internal-wall concrete pours mode and is, using several pieces of wood board splicings at template wall, what this was spliced into Template wall is more smaller than the mine pit diameter dug;Then to casting concrete between the template wall being spliced into and the crater wall dug;To After concrete setting, one piece of block removes plank, completes demoulding.Since plank and the number of parts for helping it to splice are numerous, and It needs to set up supporting element, therefore builds and demould the disassembly quite time-consuming effort of template wall, slow project progress can be dragged, increase spending; On the other hand, if defective tightness at wood board splicing, concrete can overflow splicing gap and leave seam on the borehole wall, and plank number It measures numerous, causes seam more, borehole wall surface is not smooth enough, and adjacent plank has relative displacement (faulting of slab ends phenomenon), so that together The borehole wall seam of one depth is uneven;In addition, cannot withstand enough pressures if the connection at wood board splicing is not secured enough Power, then during injecting concrete, template wall meeting explosion causes concrete to leak out outside mold (quick-fried mould phenomenon).
Utility model content
To solve the above-mentioned problems, the purpose of the utility model is to provide one kind convenient for building and demoulding disassembly, and perpendicular Well inner wall pours smooth Construction of Silo plate device.
The Construction of Silo plate device of the utility model, including several pieces of translation templates, several horizontal power push rods and Bracket;One end of the horizontal power push rod is fixed on bracket, and other end connection translation template pushes translation template movement extremely Several pieces of translation template tandem arrays enclose and are set as enclosing.
Compared with the existing technology, the Construction of Silo plate device of the utility model is set as enclosing by pushing translation template to enclose, Building for template wall is just completed, building for vertical shaft inner wall can be completed in casting concrete between the crater wall and template wall dug It makes, it is seen that build process is simple;Similarly, after concrete setting, by horizontal power push rod it is flexible make translate template to Bracket is drawn close, and demoulding disassembly process can be completed, it is seen then that demoulding disassembly process is also simple.In addition, due to the area for translating template Greatly, enclose be set as template wall translation template number it is few, therefore formed seam it is few, the borehole wall is smooth.
It further, further include several pieces of adjusting templates, successively spaced enclose sets the adjusting template with translation template Lopping.When translating near template movement to the crater wall dug, adjusting template is inserted between adjacent translation template Complete building for template wall.Since relative to translation template, adjusting template is only one block of plate, and structure is simple, is easy to make, join Expense can be reduced using translation template and adjusting template by closing.
Further, the bracket includes that several support posts and several are set up in adjacent two support posts Between crossbeam, be provided with guide sleeve on the crossbeam;It further include guided in translation bar, one end of the guided in translation bar is fixed on It translates in template, the other end passes through guide sleeve.By the way that guided in translation bar is arranged translation template is carried out in the horizontal direction Movement far from bracket, occurs so as to avoid the case where faulting of slab ends.
It further, further include several lifting drive push rods, the lifting drive push rod is fixed on the support post Bottom.By the support post bottom of bracket be arranged lifting drive push rod, it is ensured that the central axis of device entirety with it is set Vertical shaft center overlapping of axles, avoiding device inclination.So that each crossbeam is in same level height, pass through guided in translation bar The case where ensuring that every piece of translation template is located at same level height, further avoiding faulting of slab ends appearance.
It further, further include several regulating rods, the regulating rod includes adjustment pipe, the first screw rod and the second spiral Bar;The opposite screw thread in direction of rotation, first screw rod and the second screw rod are provided on the both ends inner wall of the adjustment pipe Rotation direction of thread on the contrary, it is described adjustment pipe both ends be threadedly coupled first screw rod and the second screw rod respectively;Institute State the other end connecting cross beam of the first screw rod, the other end connection translation template of second screw rod.It is finely tuned by setting The distance of bar adjustment translation template movement, goes out to improve the case where template encloses the precision for being set as circle, further avoids faulting of slab ends It is existing.
Further, the bracket further includes several sunpenders, and the both ends of the sunpender are separately connected in same pair of horns The top of two support posts on line is provided with lifting hole(eyelet) on the sunpender.Lifting hole(eyelet) is set by setting sunpender and on sunpender, Crane or manpower convenient to use are by steel wire penetrating lifting hole(eyelet), with pipe-hanging hook and the lifting drive being fixed on bracket It push rod and horizontal power push rod, the guided in translation bar being erected on bracket and is connected to by guided in translation bar flat on bracket Shifting formwork plate, moves up and down in the shaft.
Further, the translation template is towards being provided with several link blocks, the horizontal power on the inner wall of bracket One end of push rod is fixed on the crossbeam of bracket, and the other end is fixed on the link block of translation template;Second screw rod The other end is connected on the link block of translation template.
Further, the lower end of the support post is provided with support base, and the lifting drive push rod is fixed on support base On.
Further, the center of the adjustment pipe is provided with adjustment circular hole;The section of the guided in translation bar is polygon, Draw runner is provided on each side of the guided in translation bar.Adjustment pipe can be rotated by the way that circular hole is arranged, with most laborsaving simplicity Ground mode changes the moving direction of adjustment pipe, realizes the adjustment to translation template movement distance.By in the side of guided in translation bar Draw runner is arranged in face, it is possible to reduce the friction of itself and guide sleeve.
Further, the translation template includes the first translation template and the second translation template, the first translation template It is spaced with the second translation template;A guided in translation bar is fixed on the link block of the first translation template, described the Two guided in translation bars are fixed on the link block of two translation templates.Pass through spaced first translation template and the second translation mould Plate, avoids the case where guided in translation bar intersects congestion in the bracket appearance, that is, avoid can not adjust translation template movement away from From the case where occur.
In order to better understand and implement, according to the present invention will be described in detail below with reference to the accompanying drawings.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the Construction of Silo plate device of the utility model;
Fig. 2 is the structural schematic diagram of the bracket of the utility model;
Fig. 3 is the structural schematic diagram of the first translation template of the utility model;
Fig. 4 is the structural schematic diagram of the second translation template of the utility model;
Fig. 5 is the structural schematic diagram of the regulating rod of the utility model;
Fig. 6 is the structural schematic diagram of the translation template of the utility model and the template wall of adjusting template composition;
Fig. 7 is the assembling process schematic diagram of the Construction of Silo plate device of the utility model.
Specific embodiment
Referring to Fig. 1, its structural schematic diagram for the Construction of Silo plate device of the utility model.The utility model erects Well construction plate device includes bracket 10, translation template 20, horizontal power push rod 30, guided in translation bar 40, lifting drive push rod 50, regulating rod 60 and adjusting template 70.Described 30 one end of horizontal power push rod is fixed over the mount 10, other end connection translation mould Plate 20 pushes translation template 20 to be moved on the circumference being adapted with itself radian, is then inserted into phase in the adjusting template 70 The gap of neighbour's translation template 20, and spliced with translation template 20, it can tentatively complete building for template wall.
Referring to Fig. 2, its structural schematic diagram for the bracket of the utility model.The bracket 10 includes four support posts 11, four crossbeams 12 have been set up between every two adjacent support posts 11, two support posts in diagonal positions 11 top is fixed with sunpender 13.It counts from top to bottom, is provided with rectangular guide sleeve 121 on first and Article 3 crossbeam 12. The lower end of the support post 11 is provided with support base 11, for fixing the lifting drive push rod 50.The two of the sunpender 13 End is provided with lifting hole(eyelet) 131, for bracket, and the fixed and translation template being connected on bracket etc. to be hung in vertical shaft, and It is hung up and down in vertical shaft.
Please refer to Fig. 3 and Fig. 4, wherein Fig. 3 is the structural schematic diagram of the first translation template of the utility model;Fig. 4 For the structural schematic diagram of the second translation template of the utility model.Specifically, the translation template 20 includes two piece of first translation Three companies are respectively and fixedly provided in template 21 and two piece of second translation template 22, the first translation template 21 and the second translation template 22 Block 23 is connect, the level height of every link block 23 is identical as the level height of three crossbeams 12 of 10 top of bracket respectively.It is described First, which translates first of template 21, is fixed with a rectangular guided in translation bar 40 with the center of Article 3 link block 23, with institute The center for stating the first translation template 21 opposite first and Article 3 crossbeam 12 is provided with rectangular guide sleeve 121.Described Two rectangular guided in translation bars 40 are fixed on two translations first of templates 22 and Article 3 link block 23, with described second Translating setting on template 21 opposite first and Article 3 crossbeam 12, there are two rectangular guide sleeves 121.
One end of the guided in translation bar 40 is fixed on the link block 23 of translation template 20, and the other end passes through the crossbeam Guide sleeve 121 on 12, so that translation template 20 is moved along guided in translation bar 40, it is ensured that translation template 20 is in level It is moved on direction.The each side of the guided in translation bar 40 is provided with draw runner 41, for reducing its rubbing between guide sleeve 121 Power is wiped, in order to the movement of itself and translation template 20.
Described 30 one end of horizontal power push rod is fixed on bracket 10 and counts on Article 2 crossbeam 12 from top to bottom, and the other end is fixed On the Article 2 link block 23 of translation template 20, pushed for template 20 will to be translated to the direction far from bracket.The level Power push-rod 30 and lifting drive push rod 50 can be hydraulic power push rod, can also be with other power push-rods.If hydraulic power Push rod, specifically, in horizontal power push rod 30, hydraulic oil cylinder barrel is fixed on crossbeam, and oil cylinder provides push rod and the company of power It connects block to be connected, for pushing translation template distally to move;In lifting drive push rod 50, hydraulic oil cylinder barrel is fixed on support base On, oil cylinder provides the push rod support of power on the ground, central axis and set vertical shaft central axis for adjusting body It is overlapped, avoiding device inclination, so that each crossbeam is located at same level height, ensures to translate template by guided in translation bar It moves horizontally.
Referring to Fig. 5, its structural schematic diagram for the regulating rod of the utility model.The regulating rod 60 includes adjustment pipe 61, the first screw rod 62 and the second screw rod 63.The opposite spiral shell in direction of rotation is provided on the both ends inner wall of the adjustment pipe 61 The rotation direction of thread of line, first screw rod 62 and the second screw rod 63 is on the contrary, spiral shell is distinguished at the both ends of the adjustment pipe 61 Line connects first screw rod 62 and the second screw rod 63.Specifically, the adjustment pipe 61 is left-handed with the first screw rod 62 It is threadedly coupled, the adjustment pipe 61 is that right-handed thread is connect with the second screw rod 63.The center of the adjustment pipe 61 is provided with tune The other end of full-round hole 611, first screw rod 62 connects first or Article 3 crossbeam 12, second screw rod 63 The other end connects first and Article 3 link block 23.The specifically used mode of regulating rod 60 are as follows: if translation template 20 and bracket When the distance at 10 centers and the radius difference of required template wall, then by the adjustment circular hole 611 of a steel bar insertion adjustment pipe 61 In, rotation steel bar drives adjustment pipe 61 to rotate, if rotated to the left, adjustment pipe 61 moves right, adjustment translation template 20 Close to bracket 10;If rotated to the right, adjustment pipe 61 is moved to the left, and adjustment translation template 20 is far from bracket 10.
Referring to Fig. 6, its structural schematic diagram for the template wall of translation template and the adjusting template composition of the utility model. The adjusting template 70 is one block of steel plate with radian, and circumference corresponding to radian is corresponding with the translation radian of template 20 Circumference is identical.Adjusting template 70 and translation spaced enclose of template 20 are set as a circle, form a complete template wall.
The assembling process and usage mode of the shaft template device of the utility model are explained below.Referring to Fig. 7, it is this The assembling process schematic diagram of the shaft template device of utility model.Firstly, guided in translation bar 40 is fixed to translation on the ground On the link block 23 of template 20, then by the corresponding guide sleeve 121 penetrated on crossbeam 12 of guided in translation bar 40, and by press horizontal mobile It pushes bar 30 to be articulated on link block 23, completes the preliminary assembling of plate device;Then, with hanging on steel wire penetrating sunpender 13 Preliminary assembled plate device is hung in the hole for a certain depth dug by wirerope by hole 131, crane or manpower Bottom;Then, adjusting lifting drive push rod 50 by control system makes each circle crossbeam 12 all holdings of bracket 10 horizontal, and leads to Crossing control system adjusting adjusting horizontal power push rod 30 pushes translation template 20 to be moved to scheduled (required) mould far from bracket On wooden partition circumference;Next, regulating rod 60 is articulated on crossbeam 12 and link block 23, pipe 61 is adjusted with a steel bar insertion It adjusts in circular hole 611, rotation steel bar drives adjustment pipe 61 to rotate, imperceptibly to adjust translation template 20 to scheduled position;Most Afterwards, it is inserted into adjusting template 70 between translation template 20 and is secured with nuts to form complete template wall.
After having built template wall, from concreting mouth to the template of translation template 20 formation alternate with adjusting template 70 Casting concrete between wall and crater wall.
After concrete setting, adjusting template 70 is first removed;Then regulating rod 60 is removed, then controlled level power push-rod 30 is mobile to bracket 10, drives translation template 20 to draw close to bracket 10, that is, completes demoulding disassembly process.Dress after demoulding It sets and is restored to preliminary assembled state, hang go back to ground.After the vertical shaft of next depth hole dig it is good after, then by the device of preliminary assembled state Hole bottom is hung in, above-mentioned assembling is repeated, pours and demould disassembly process, until vertical shaft construction finishes.
Above-mentioned drawings and examples are one of embodiment of the shaft template device of the utility model, except this it There are also multiple types for the shaft template device of outer the utility model.Such as the application of the Construction of Silo plate device of the utility model Be not limited to Circular Shaft, can also be the vertical shaft of other shapes, such as polygon, ellipse, it is corresponding change translation template with The shape of adjusting template and the shape of bracket;Furthermore it is possible to adjusting template not used, only with translation template composition Template wall;Translation template and adjusting template can not use steel plate, can use the plate of other materials;Same guided in translation bar, Bracket and regulating rod can not also use Steel material, and are made using other materials;It is fixed on the first translation template link block Guided in translation bar can be more than one, the guided in translation bar being fixed on the second translation template link block can be more than two Item is correspondingly arranged the guide sleeve of respective numbers, and when mobile to carriage center direction, will not stop from each other.
Compared with the existing technology, the shaft template device of the utility model is set as enclosing by pushing translation template to enclose, just complete At building for template wall, the construction of vertical shaft inner wall is can be completed in casting concrete between the crater wall and template wall dug, can See that build process is simple;After concrete setting, flexible by horizontal power push rod draws close translation template to bracket Complete demoulding disassembly process, it is seen then that demoulding disassembly process is also simple.In addition, enclosing since the area of translation template is big and being set as template The translation template number of wall is few, therefore the seam formed is few, and the borehole wall is smooth;And since translation template and adjusting template are steel plates, And linked together by nut, endurance is strong, will be greatly reduced the probability that quick-fried mould phenomenon occurs.In addition, passing through setting lifting Regulating device and translation guide rod enable translation template accurately to move in same level height, thus greatly reduce There is the probability of faulting of slab ends phenomenon in the borehole wall poured.
Above-described embodiments merely represent several embodiments of the utility model, the description thereof is more specific and detailed, But it cannot be understood as the limitations to utility model patent range.It should be pointed out that for the common skill of this field For art personnel, without departing from the concept of the premise utility, various modifications and improvements can be made, these are belonged to The protection scope of the utility model.

Claims (10)

1. a kind of Construction of Silo plate device, it is characterised in that: several pieces of translation templates, several horizontal power push rods and branch Frame;One end of the horizontal power push rod is fixed on bracket, other end connection translation template, if pushing translation template movement extremely Dry block translation template tandem array, which encloses, to be set as enclosing.
2. Construction of Silo plate device according to claim 1, it is characterised in that: further include several pieces of adjusting templates, institute Stating adjusting template, successively spaced enclose is set as enclosing with translation template.
3. according to claim 1 or Construction of Silo plate device described in 2 any one, it is characterised in that: the bracket includes Several support posts and several crossbeams being set up between adjacent two support posts are provided on the crossbeam and lead To set;It further include guided in translation bar, one end of the guided in translation bar is fixed in translation template, and the other end passes through guide sleeve.
4. Construction of Silo plate device according to claim 3, it is characterised in that: further include that several lifting drives push away Bar, the lifting drive push rod are fixed on the bottom of the support post.
5. Construction of Silo plate device according to claim 3, it is characterised in that: it further include several regulating rods, it is described Regulating rod includes adjustment pipe, the first screw rod and the second screw rod;Direction of rotation is provided on the both ends inner wall of the adjustment pipe The rotation direction of thread of opposite screw thread, first screw rod and the second screw rod is on the contrary, the both ends of the adjustment pipe are distinguished It is threadedly coupled first screw rod and the second screw rod;The other end connecting cross beam of first screw rod, second spiral shell The other end connection translation template of spinner handle.
6. Construction of Silo plate device according to claim 3, it is characterised in that: the bracket further includes several and hangs Bar, the both ends of the sunpender are separately connected the top of two support posts on same diagonal line, are arranged on the sunpender There is lifting hole(eyelet).
7. Construction of Silo plate device according to claim 5, it is characterised in that: the translation template is towards in bracket Several link blocks are provided on wall, one end of the horizontal power push rod is fixed on the crossbeam of bracket, and the other end is fixed on On the link block for translating template;The other end of second screw rod is connected on the link block of translation template.
8. Construction of Silo plate device according to claim 4, it is characterised in that: the lower end of the support post is provided with Support base, the lifting drive push rod are fixed on support base.
9. Construction of Silo plate device according to claim 5, it is characterised in that: the center of the adjustment pipe is provided with tune Full-round hole;The section of the guided in translation bar is polygon, is provided with draw runner on each side of the guided in translation bar.
10. the Construction of Silo plate device according to any claim in claim 4 to 9, it is characterised in that: described flat Shifting formwork plate includes the first translation template and the second translation template, and the first translation template and the second translation template are spaced; It is fixed with a guided in translation bar on the link block of the first translation template, is fixed on the link block of the second translation template There are two guided in translation bars.
CN201821805932.3U 2018-11-02 2018-11-02 A kind of Construction of Silo plate device Active CN209040830U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821805932.3U CN209040830U (en) 2018-11-02 2018-11-02 A kind of Construction of Silo plate device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821805932.3U CN209040830U (en) 2018-11-02 2018-11-02 A kind of Construction of Silo plate device

Publications (1)

Publication Number Publication Date
CN209040830U true CN209040830U (en) 2019-06-28

Family

ID=67039248

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821805932.3U Active CN209040830U (en) 2018-11-02 2018-11-02 A kind of Construction of Silo plate device

Country Status (1)

Country Link
CN (1) CN209040830U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109209388A (en) * 2018-11-02 2019-01-15 中铁五局集团第四工程有限责任公司 A kind of Construction of Silo plate device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109209388A (en) * 2018-11-02 2019-01-15 中铁五局集团第四工程有限责任公司 A kind of Construction of Silo plate device
CN109209388B (en) * 2018-11-02 2024-06-25 中铁五局集团第四工程有限责任公司 Shaft construction template device

Similar Documents

Publication Publication Date Title
CN109209388A (en) A kind of Construction of Silo plate device
CN106593472B (en) lining trolley suitable for construction of main tunnel and branch tunnel in parallel tunnel
CN206538790U (en) Interior mould trolley is used in a kind of cast-in-place pipe gallery construction
CN210482284U (en) Steel reinforcement cage positioner of bored concrete pile
CN114559534B (en) Prefabricated component production line
CN109869164B (en) Construction method for pouring porous separation type tunnel by combined type hydraulic template trolley
CN114481874B (en) Prefabricated door type frame assembled box culvert and construction method
CN110039641A (en) Precast stair shaping mould and application method
CN209040830U (en) A kind of Construction of Silo plate device
CN204983642U (en) Revenue and expenditure mould mechanism, interior tube formwork and lift well formwork device
CN112878330A (en) Precast pile sinking equipment and construction method thereof
CN106759478A (en) A kind of prefabricated piping lane construction method
CN114542079A (en) Efficient shaft creeping formwork construction system
CN205152946U (en) Manual hole digging pile dado steel form
CN208293613U (en) A kind of city integrated piping lane Quick Release die set device of running type
CN204212157U (en) Supper-fast buffering dichotomous concreting string pipe
CN109137952B (en) Reinforcing device and reinforcing method for open caisson in weak soil layer section
CN111335317A (en) Tubular pile perpendicularity adjusting device
CN211597706U (en) Single side wall formwork device
CN203730011U (en) Formwork limiting device
CN108005684B (en) Separated steel mould trolley and construction method thereof
CN205969435U (en) Piping lane mould is assembled in horizontal many storehouses
CN213382182U (en) Annular full-automatic production line transportation platform
CN212406744U (en) Template platform truck is filled to high-speed railway tunnel center ditch secondary