CN109208605A - A kind of circulation bottom-sitting type concrete side walls casting method - Google Patents

A kind of circulation bottom-sitting type concrete side walls casting method Download PDF

Info

Publication number
CN109208605A
CN109208605A CN201710513166.7A CN201710513166A CN109208605A CN 109208605 A CN109208605 A CN 109208605A CN 201710513166 A CN201710513166 A CN 201710513166A CN 109208605 A CN109208605 A CN 109208605A
Authority
CN
China
Prior art keywords
concrete
layer
underground space
formwork
placing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710513166.7A
Other languages
Chinese (zh)
Inventor
牛子久
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Cattle Longitudinal Down Space Technology Development Co Ltd
Original Assignee
Tianjin Cattle Longitudinal Down Space Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Cattle Longitudinal Down Space Technology Development Co Ltd filed Critical Tianjin Cattle Longitudinal Down Space Technology Development Co Ltd
Priority to CN201710513166.7A priority Critical patent/CN109208605A/en
Publication of CN109208605A publication Critical patent/CN109208605A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Abstract

The invention discloses a kind of circulation bottom-sitting type concrete side walls casting methods, comprising the following steps: excavates the underground space of certain depth in advance, and installs formwork for placing outside exposed side wall;A circle concrete is poured between the exposed side wall and template for the underground space dug, and obtains first layer concrete layer;Continue to excavate the underground space downwards, and formwork for placing is installed;The successively casting concrete from the bottom up in mounted template, docks until with the first layer concrete layer completion completed, obtains second layer concrete layer;It repeats the above steps, until the concrete side walls depth poured reaches the underground space depth of design, pouring for underground space underplate concrete can be carried out.The present invention overcomes traditional Base hole supporting technology drawbacks, reduce the risk that collapses, and break through the existing underground space depth limit constructed vertically downward.

Description

A kind of circulation bottom-sitting type concrete side walls casting method
Technical field
The present invention relates to technical field of building construction more particularly to a kind of circulation bottom-sitting type concrete side walls casting methods.
Background technique
The underground space be for aboveground space, refer to earth's surface or less by natural or pick appearance at the underground space. China is populous nation, and occupied area is considerably less per capita.The meaning of the underground space is farmland saving, and urban underground space resource is wide Wealthy, Urban Underground Space Excavation Utilization prospects are wide.The existing underground space mainly includes underground residential architecture, underground is public builds It builds, underground industrial building, underground traffic are built, underground is taken precautions against natural calamities, and protective zone, subsurface utility space engineering and underground are comprehensive Body etc..
When building the underground space, it is necessary to assure side wall stabilization does not collapse.In order to guarantee that side wall stabilization does not collapse, the prior art The support technology of middle use is multifarious, there is the slope wall support technology of single building, the pipe of pile foundation support technology and subway Chip technology etc..However above-mentioned support technology is difficult to break through existing depth when constructing Deep underground space perpendicular to horizontal direction Spend the limit of building.Based on above statement, the invention proposes a kind of circulation bottom-sitting type concrete side walls casting methods.
Summary of the invention
The purpose of the present invention is to solve disadvantages existing in the prior art, and a kind of circulation bottom-sitting type coagulation proposed Native side wall casting method.
A kind of circulation bottom-sitting type concrete side walls casting method, comprising the following steps:
S1, reference underground space design drawing, preparatory cutting depth is the underground space of 2~3m, and in the underground dug Formwork for placing is installed at the outer 500~600mm of the exposed side wall in space;
S2, it will pour and be poured into blender with concrete material and swelling agent, add water and stir after mixing, using automobile Blanking is pumped, a circle concrete is poured between the exposed side wall and formwork for placing for the underground space dug, uses and vibrates when pouring Stick vibrates no longer significantly to sink to concrete, obtains first layer concrete layer;
After S3, the first layer concrete layer initial set after be poured in step S2, formwork for placing is removed, the behaviour in step S1 is repeated Make, continues the underground space that downward cutting depth is 2~3m, and 500~600mm outside the exposed side wall for the underground space dug Place's installation formwork for placing;
S4, the underground space dug in step s3 side wall and formwork for placing between successively pour coagulation from the bottom up Soil docks until with the first layer concrete layer completion completed in step S2, obtains second layer concrete layer;
S5, it repeats the above steps, until the concrete side walls depth poured reaches the underground space depth of design, Ji Kejin Row underground space underplate concrete pours.
Preferably, in the step S1 formwork for placing installation method are as follows: first the underground space dug exposed side wall Then upper pop-up building axis line pops up middle line by the one side of proximal wall in formwork for placing, splice template and with supporting and diagonal brace branch Support jail, is finally fixed with scaffold.
Preferably, the vibrating spear in the step S2 totally 4, and the vibration point spacing of vibrating spear is 300~500mm.
Preferably, after the formwork for placing in the step S3 is removed, curing fluid should be sprayed to concrete surface immediately, and cover Lid insulation film carries out insulated curing.
Preferably, the first layer concrete layer, second layer concrete layer are up to underground space bottom concrete layer Layer is high identical with thickness.
A kind of circulation bottom-sitting type concrete side walls casting method proposed by the present invention, compared to existing single building Slope wall support technology, pile foundation support technology and section of jurisdiction technology of subway etc. have construction safety performance high, and support technology is simple The advantages that single, difficulty of construction is low, and building depth is deep, and construction cost is low, and construction quality is high, the present invention overcomes traditional pattern foundation pit supporting structures Technology drawback reduces the risk that collapses, and breaks through the existing underground space depth limit constructed vertically downward, is worthy to be popularized.
Specific embodiment
Combined with specific embodiments below the present invention is made further to explain.
Embodiment one
A kind of circulation bottom-sitting type concrete side walls casting method proposed by the present invention, comprising the following steps:
S1, reference underground space design drawing, preparatory cutting depth is the underground space of 2m, first in the underground space dug Exposed side wall on pop up building axis line, then formwork for placing by proximal wall one side pop up middle line, has dug underground sky Between the outer 500mm place's splice template of exposed side wall and firm with diagonal brace branch support with supporting, installation finally is fixed with scaffold Formwork for placing;
S2, it will pour and be poured into blender with concrete material and swelling agent, add water and stir after mixing, using automobile Blanking is pumped, a circle concrete is poured between the exposed side wall and formwork for placing for the underground space dug, uses and vibrates when pouring Stick vibrate vibrating spear totally 4, and the vibration point spacing of vibrating spear is 300mm, until concrete no longer significantly sinks, obtains first Layer concrete layer;
After S3, the first layer concrete layer initial set after pour in step S2, formwork for placing is removed, and in the first layer concrete Layer surface sprays curing fluid, and covering and heat insulating film carries out insulated curing, repeats the operation in step S1, continues to excavate downwards deep Degree is the underground space of 2m, and installs formwork for placing at 500mm outside the exposed side wall for the underground space dug;
S4, the underground space dug in step s3 side wall and formwork for placing between successively pour coagulation from the bottom up Soil docks until with the first layer concrete layer completion completed in step S2, obtains second layer concrete layer;
S5, it repeats the above steps, until the concrete side walls depth poured reaches the underground space depth of design, Ji Kejin Row underground space underplate concrete pours, and above-mentioned first layer concrete layer, second layer concrete layer are until the underground space most bottom The layer height of layer concrete layer is identical with thickness.
Embodiment two
A kind of circulation bottom-sitting type concrete side walls casting method proposed by the present invention, comprising the following steps:
S1, reference underground space design drawing, preparatory cutting depth is the underground space of 3m, first in the underground space dug Exposed side wall on pop up building axis line, then formwork for placing by proximal wall one side pop up middle line, has dug underground sky Between the outer 600mm place's splice template of exposed side wall and firm with diagonal brace branch support with supporting, installation finally is fixed with scaffold Formwork for placing;
S2, it will pour and be poured into blender with concrete material and swelling agent, add water and stir after mixing, using automobile Blanking is pumped, a circle concrete is poured between the exposed side wall and formwork for placing for the underground space dug, uses and vibrates when pouring Stick vibrate vibrating spear totally 4, and the vibration point spacing of vibrating spear is 500mm, until concrete no longer significantly sinks, obtains first Layer concrete layer;
After S3, the first layer concrete layer initial set after pour in step S2, formwork for placing is removed, and in the first layer concrete Layer surface sprays curing fluid, and covering and heat insulating film carries out insulated curing, repeats the operation in step S1, continues to excavate downwards deep Degree is the underground space of 3m, and installs formwork for placing at 600mm outside the exposed side wall for the underground space dug;
S4, the underground space dug in step s3 side wall and formwork for placing between successively pour coagulation from the bottom up Soil docks until with the first layer concrete layer completion completed in step S2, obtains second layer concrete layer;
S5, it repeats the above steps, until the concrete side walls depth poured reaches the underground space depth of design, Ji Kejin Row underground space underplate concrete pours, and above-mentioned first layer concrete layer, second layer concrete layer are until the underground space most bottom The layer height of layer concrete layer is identical with thickness.
Embodiment three
A kind of circulation bottom-sitting type concrete side walls casting method proposed by the present invention, comprising the following steps:
S1, reference underground space design drawing, preparatory cutting depth are the underground space of 2.5m, first empty in the underground dug Between exposed side wall on pop up building axis line, then formwork for placing by proximal wall one side pop up middle line, in the underground dug The outer 550mm place's splice template of the exposed side wall in space is simultaneously firm with diagonal brace branch support with supporting, and peace finally is fixed with scaffold Fill formwork for placing;
S2, it will pour and be poured into blender with concrete material and swelling agent, add water and stir after mixing, using automobile Blanking is pumped, a circle concrete is poured between the exposed side wall and formwork for placing for the underground space dug, uses and vibrates when pouring Stick vibrate vibrating spear totally 4, and the vibration point spacing of vibrating spear is 400mm, until concrete no longer significantly sinks, obtains first Layer concrete layer;
After S3, the first layer concrete layer initial set after pour in step S2, formwork for placing is removed, and in the first layer concrete Layer surface sprays curing fluid, and covering and heat insulating film carries out insulated curing, repeats the operation in step S1, continues to excavate downwards deep Degree is the underground space of 2.5m, and installs formwork for placing at 550mm outside the exposed side wall for the underground space dug;
S4, the underground space dug in step s3 side wall and formwork for placing between successively pour coagulation from the bottom up Soil docks until with the first layer concrete layer completion completed in step S2, obtains second layer concrete layer;
S5, it repeats the above steps, until the concrete side walls depth poured reaches the underground space depth of design, Ji Kejin Row underground space underplate concrete pours, and above-mentioned first layer concrete layer, second layer concrete layer are until the underground space most bottom The layer height of layer concrete layer is identical with thickness.
The slope wall support technology for using single building in the prior art is respectively adopted, from the bottom up the method for placement layer by layer The underground space of same specification is built with the circulation bottom-sitting type concrete side walls casting method in the embodiment of the present invention one~tri-, it is right Than it is found that construction period, construction cost and inspection of quality qualification rate in the embodiment of the present invention one~tri- be above the prior art, Design parameter is as follows:
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (5)

1. a kind of circulation bottom-sitting type concrete side walls casting method, which comprises the following steps:
S1, reference underground space design drawing, preparatory cutting depth is the underground space of 2~3m, and in the underground space dug The outer place the 500~600mm installation formwork for placing of exposed side wall;
S2, it will pour and be poured into blender with concrete material and swelling agent, add water and stir after mixing, using under automotive pump Material, a circle concrete is poured between the exposed side wall and formwork for placing for the underground space dug, when pouring with vibrating spear into Row vibrates no longer significantly to sink to concrete, obtains first layer concrete layer;
After S3, the first layer concrete layer initial set after be poured in step S2, formwork for placing is removed, the operation in step S1 is repeated, Continue the underground space that downward cutting depth is 2~3m, and outside the exposed side wall for the underground space dug at 500~600mm Formwork for placing is installed;
S4, the underground space dug in step s3 side wall and formwork for placing between successively casting concrete from the bottom up, directly It is docked to the first layer concrete layer completion completed in step S2, obtains second layer concrete layer;
S5, it repeats the above steps, until the concrete side walls depth poured reaches the underground space depth of design, can carry out ground Down space underplate concrete pours.
2. a kind of circulation bottom-sitting type concrete side walls casting method according to claim 1, which is characterized in that the step The installation method of formwork for placing in S1 are as follows: first pop up building axis line on the exposed side wall for the underground space dug, then pouring Building mould pops up middle line by the one side of proximal wall, and splice template is simultaneously firm with diagonal brace branch support with supporting, and is finally carried out with scaffold It is fixed.
3. a kind of circulation bottom-sitting type concrete side walls casting method according to claim 1, which is characterized in that the step Vibrating spear in S2 totally 4, and the vibration point spacing of vibrating spear is 300~500mm.
4. a kind of circulation bottom-sitting type concrete side walls casting method according to claim 1, which is characterized in that the step After formwork for placing in S3 is removed, curing fluid should be sprayed to concrete surface immediately, and covering and heat insulating film carries out heat preservation and supports Shield.
5. a kind of circulation bottom-sitting type concrete side walls casting method according to claim 1, which is characterized in that described first Layer concrete layer, second layer concrete layer are until the layer of underground space bottom concrete layer is high identical with thickness.
CN201710513166.7A 2017-06-29 2017-06-29 A kind of circulation bottom-sitting type concrete side walls casting method Pending CN109208605A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710513166.7A CN109208605A (en) 2017-06-29 2017-06-29 A kind of circulation bottom-sitting type concrete side walls casting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710513166.7A CN109208605A (en) 2017-06-29 2017-06-29 A kind of circulation bottom-sitting type concrete side walls casting method

Publications (1)

Publication Number Publication Date
CN109208605A true CN109208605A (en) 2019-01-15

Family

ID=64960450

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710513166.7A Pending CN109208605A (en) 2017-06-29 2017-06-29 A kind of circulation bottom-sitting type concrete side walls casting method

Country Status (1)

Country Link
CN (1) CN109208605A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110761288A (en) * 2019-10-30 2020-02-07 中国铁建重工集团股份有限公司 Concrete pouring method for deep foundation pit

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110761288A (en) * 2019-10-30 2020-02-07 中国铁建重工集团股份有限公司 Concrete pouring method for deep foundation pit
CN110761288B (en) * 2019-10-30 2021-09-10 中国铁建重工集团股份有限公司 Concrete pouring method for deep foundation pit

Similar Documents

Publication Publication Date Title
CN203320532U (en) Protection device of nearby pile foundation close to deep foundation pit
CN107700496B (en) The inverse suitable combining construction method of deep basal pit
CN103122642B (en) Construction method of vertical post support change
CN204825923U (en) Relay formula underground structure
CN106978810A (en) A kind of concrete inner support end uses the construction method of shaped steel tectonic system
CN104196032A (en) Subway station supporting plate and inversed operation combined construction method
CN109208605A (en) A kind of circulation bottom-sitting type concrete side walls casting method
CN104131570B (en) Steel case enclosure device and its construction method for foundation pit construction
CN103374915B (en) Continuous closed hanging-upside-down shotcreting supporting system and construction method thereof
CN206591535U (en) Combined type cofferdam
CN114263187B (en) Foundation pit bottom plate force transmission structure and construction method thereof
CN103437360B (en) A kind of not support replacement construction method in deep-foundation pit engineering
CN107165170B (en) A kind of foundation ditch construction method
CN110117959A (en) One kind closing on rivers base pit stand construction
CN102926403B (en) Roof construction method by cover-excavation method
CN110093929A (en) A kind of underground engineering is along practice construction method and structure
CN208056066U (en) A kind of shearing slot structure for underwater concrete back cover
CN105220699B (en) Cofferdam construction method
CN108612129A (en) Based on the top-down construction method that can have enough to meet the need steel platform
CN107059841B (en) Underground space supporting construction and construction method
CN105507350B (en) Damping ditch and its construction method with light well point and shockproof plate
KR101862761B1 (en) the method of constructing underground basic structure
CN203821459U (en) High frigid area outdoor apron deformation joint structure
TWI550162B (en) Construction method of underground retaining wall
CN220768168U (en) Construction structures of cable inspection well foundation pouring template support combination protection

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190115

WD01 Invention patent application deemed withdrawn after publication