CN110117959A - One kind closing on rivers base pit stand construction - Google Patents

One kind closing on rivers base pit stand construction Download PDF

Info

Publication number
CN110117959A
CN110117959A CN201910419699.8A CN201910419699A CN110117959A CN 110117959 A CN110117959 A CN 110117959A CN 201910419699 A CN201910419699 A CN 201910419699A CN 110117959 A CN110117959 A CN 110117959A
Authority
CN
China
Prior art keywords
construction
crown beam
concrete
steel sheet
sheet pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910419699.8A
Other languages
Chinese (zh)
Other versions
CN110117959B (en
Inventor
刘磊
殷帅杰
陆超豪
李书信
全有维
沈兴东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Original Assignee
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd filed Critical Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority to CN201910419699.8A priority Critical patent/CN110117959B/en
Publication of CN110117959A publication Critical patent/CN110117959A/en
Application granted granted Critical
Publication of CN110117959B publication Critical patent/CN110117959B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The present invention discloses one kind and closes on rivers base pit stand construction, comprising the following steps: (1) construction of steel sheet pile;(2) crown beam position soil cement is abolished and crown beam periphery earth excavation;(3) crown beam and retaining wall construction;(4) concrete tiltedly throws support bracket construction under crown beam: after the completion of support, support bracket position is tiltedly thrown to concrete under crown beam locally unloads soil to oblique throwing support bracket bottom -500mm, dabbing is carried out to the concrete at interface, rebar surface is cleaned out, mechanical splice connects reinforcing bar, built-in fitting is installed, set up scaffold fixed form, pass through pre-buried pvc pipe casting concrete, concrete is poured using slightly expanded concrete to pre-buried pvc pipe tube top, after the completion of the concrete setting for tiltedly throwing support, removes scaffold fixed form and complete and close on rivers foundation pit support construction.Construction method of the present invention greatly improves work efficiency, and shortens the construction period, and reduces foundation pit risk, evades phenomenon of doing over again, improves supporting construction quality.

Description

One kind closing on rivers base pit stand construction
Technical field
The present invention relates to the technical fields of construction, and in particular to one kind closes on rivers base pit stand construction.
Background technique
With the continuous development of China's economy and the acceleration of urbanization process, each big city starts to build Large Underground one after another Engineering.Play a significant role using the underground space, the development underground space to promotion urban economy and Community health's development.Deep basal pit It is an important component part in underground engineering, how ensures deep pit monitor in the construction process, solves leakage and ensure week Unaffected side structures are must be taken into consideration and solve the problems, such as in construction.
The higher and higher foundation pit sideline of land utilization ratio apart from red line it is more and more compacter in the case where, deep basal pit is in city In excavated, and surrounding situations such as there are traffic main artery, built construction, rivers, periphery supporting, supporting are carried out using fender post There are height differences for top mark height and natural ground elevation.Difficulty of construction is big, and safety coefficient requires high.Southern water source is plentiful, and soil property is mostly Sandy silt, soil property meets aquation sand, and permeability is very high.Subsequent supporting process is solved using slope above supporting before to apply The problem of work, often occur the gradient not enough, collapse, leak, impeded drainage phenomena such as, the drift sand in the case of high water level leads to crown beam The problems such as can not constructing with retaining wall.
Summary of the invention
Goal of the invention: present invention aims in view of the deficiencies of the prior art, provide one kind and close on rivers pattern foundation pit supporting structure to apply Work method, the method for the invention can be used closing on the plentiful soft clay area of rivers or water source.
Technical solution: one kind of the present invention closes on rivers base pit stand construction, comprising the following steps:
(1) construction of steel sheet pile: cause crown beam and retaining wall that can not construct to solve the drift sand in the case of rivers high water level Problem carries out prevention drift sand using steel sheet pile, and steel sheet pile uses 28a channel steel, and length 6m, steel sheet pile is away from concrete retaining wall 300mm, steel sheet pile are inserted into stake position using manipulator, complete in crown beam and retaining wall construction, concrete retaining wall intensity reaches 70% Afterwards, steel sheet pile is pulled out;
(2) crown beam position soil cement is abolished and crown beam periphery earth excavation: after the completion of steel sheet pile construction, abolishing crown beam position immediately The earthwork on the inside of soil cement and excavation pit within the scope of 10 ~ 15m, absolute altitude are excavated to crown beam bottom, inwardly slope, on the outside of crown beam Bright gutter is arranged in side 5m;And be arranged in crown beam bottom and tiltedly throw support bracket, the oblique throwing support is in this step without excavating, wait prop up Secondary construction is carried out after the completion of support;
(3) crown beam and retaining wall construction: in the higher situation of level of ground water, steel sheet pile mainly plays earth-retaining, steel sheet pile gap There are drift sand situations;Construction personnel, material in this construction procedure and face electricity construction element and make adequate preparation in advance, has construction It after condition, constructs immediately, construction segmentation carries out, every segment length 40m, reduces the shadow that drift sand constructs to crown beam and retaining wall It rings;
Crown beam pours in two times with retaining wall concrete, first pours crown beam, the processing of intersection dabbing;To retaining wall concrete strength After reaching 70%, steel sheet pile is extracted, after steel sheet pile is extracted, carries out graded sand and stone backfill, base of constructing after backfill to position soil layer is extracted Cheat perimeter gutter and hardening;
It throws in the support bracket position reserved steel bar insertion soil body in crown beam work progress oblique, before concreting process, is tiltedly throwing Bracket position is supportted, is stayed every 0.5m in crown beam and sets the pre-buried pvc pipe of a DN100, the pre-buried pvc pipe, which extends to, tiltedly throws support ox Leg position;
Install steel purlin: before installation steel purlin, backfill after first fluting installation steel shelf bracket, steel purlin is combined as with template Crown beam template, it is whole with crown beam formation one after concreting with reinforcement welding when steel purlin connect bolt installation with crown beam Body;
(4) concrete tiltedly throws support bracket construction under crown beam: after the completion of support, support bracket position part is tiltedly thrown to concrete under crown beam It unloads soil and throws support bracket bottom -500mm to oblique, dabbing is carried out to the concrete at interface, rebar surface is cleaned out, mechanical splice Reinforcing bar is connected, built-in fitting is installed, scaffold fixed form is set up, by pre-buried pvc pipe casting concrete, concrete is using micro- swollen Swollen concreting after the completion of the concrete setting for tiltedly throwing support, is removed scaffold fixed form and is completed to pre-buried pvc pipe tube top Close on rivers foundation pit support construction.
Preferably, in the step (1), pearl cotton, extruded sheet or sheathing piece are used between crown beam, retaining wall and steel sheet pile It is isolated, reduces influence of the pile pulling in the process to retaining wall.
Preferably, in the step (4), the oblique preparatory embedded bar in both ends and straight thread I grades reserved for throwing support Connector.
The utility model has the advantages that (1) construction method of the present invention is in the construction process, can be solved by the way that steel sheet pile is arranged in advance Foundation pit sideline and red line apart from it is short can not slope, situations such as soil body collapses, leakage, impeded drainage causes what supporting can not construct to ask Topic, greatly improves working efficiency, shortens the construction period.
(2) construction method of the present invention supports oblique throwing and is configured pre-buried pvc pipe and its before carrying out oblique throwing support construction Both ends carry out embedded bar, then the later period pour by pre-buried pvc pipe the concrete for tiltedly throwing support, this construction method is fast square Just, the speed of application for tiltedly throwing support can be accelerated, the present invention can be effectively to closing on the plentiful Soft Deep Foundation Pit of rivers or water source Supporting is constructed, meanwhile, foundation pit risk is reduced, evades phenomenon of doing over again, improve supporting construction quality, certain safety is brought to protect Card and economic benefit.
Detailed description of the invention
Fig. 1 is the supporting construction schematic diagram of construction method of the present invention;
Fig. 2 is the oblique position view for throwing support and pre-buried pvc pipe of the present invention.
In figure, 1- steel sheet pile, 2- crown beam, 3- retaining wall, the pre-buried pvc pipe of 4-, 5- embedded bar, 6- steel purlin, 7- tiltedly thrown Support.
Specific embodiment
Technical solution of the present invention is described in detail below by attached drawing, but protection scope of the present invention is not limited to The embodiment.
Embodiment: one kind closing on rivers base pit stand construction, comprising the following steps:
(1) construction of steel sheet pile 1: cause crown beam 2 that can not construct with retaining wall 3 to solve the drift sand in the case of rivers high water level The problem of, prevention drift sand is carried out using steel sheet pile 1, steel sheet pile 1 uses 28a channel steel, and length 6m, steel sheet pile 1 is away from concrete earth-retaining Wall 3300mm, steel sheet pile 1 are inserted into stake position using manipulator, complete in crown beam 2 and the construction of retaining wall 3,3 intensity of concrete retaining wall After reaching 70%, steel sheet pile 1 is pulled out;
(2) 2 position soil cement of crown beam is abolished and 2 periphery earth excavation of crown beam: after the completion of steel sheet pile 1 is constructed, abolishing crown beam 2 immediately The earthwork on the inside of position soil cement and excavation pit within the scope of 10 ~ 15m, absolute altitude are excavated to 2 bottom of crown beam, and slope, is being preced with inwardly Bright gutter is arranged in 2 outer side edges 5m of beam;And be arranged in 2 bottom of crown beam and tiltedly throw 7 brackets of support, oblique throwings support 7 in this step not into Row excavates, and secondary construction is carried out after the completion of to be supported;
(3) crown beam 2 and retaining wall 3 are constructed: in the higher situation of level of ground water, steel sheet pile 1 mainly plays earth-retaining, steel sheet pile 1 There are drift sand situations in gap;Construction personnel, material in this construction procedure and face electricity construction element and make adequate preparation in advance, has It after execution conditions, constructs immediately, construction segmentation carries out, every segment length 40m, reduces drift sand and constructs to crown beam 2 and retaining wall 3 Influence;
It is isolated between crown beam 2, retaining wall 3 and steel sheet pile 1 using pearl cotton, extruded sheet or sheathing piece, reduces pile pulling process In influence to retaining wall 3, crown beam 2 pours in two times with 3 concrete of retaining wall, first pours crown beam 2, the processing of intersection dabbing; After 3 concrete strength of retaining wall reaches 70%, steel sheet pile 1 is extracted, after steel sheet pile 1 is extracted, carries out gradation to position soil layer is extracted Sandstone backfill, construction foundation pit perimeter gutter and hardening after backfill;
It is thrown in the support 7 bracket position reserved steel bars insertion soil body in 2 work progress of crown beam oblique, before concreting process, oblique 7 bracket positions of support are thrown, is stayed every 0.5m in crown beam 2 and sets the pre-buried pvc pipe 4 of a DN100, the pre-buried pvc pipe 4 extends to tiltedly Throw 7 bracket positions of support;
Install steel purlin 6: before installation steel purlin 6, backfill after first fluting installation steel shelf bracket, steel purlin 6 is in conjunction with template As 2 template of crown beam, when steel purlin 6 connect bolt installation with crown beam 2, with reinforcement welding, formed after concreting with crown beam 2 One entirety;
(4) the lower concrete of crown beam 2 tiltedly throws support 7 brackets construction: after the completion of support, tiltedly throwing 7 bracket positions of support to the lower concrete of crown beam 2 Part unloads soil and throws 7 bracket bottom -500mm of support to oblique, carries out dabbing to the concrete at interface, rebar surface is cleaned out, machine Tool connector connects reinforcing bar, installs built-in fitting, sets up scaffold fixed form, the oblique preparatory embedded bar 5 in both ends for throwing support 7 And reserved straight thread I grades of connectors, by pre-buried 4 casting concrete of pvc pipe, concrete is poured using slightly expanded concrete to pre- 4 tube top of pvc pipe is buried, after the completion of the concrete setting for tiltedly throwing support 7, scaffold fixed form is removed and completes and close on rivers foundation pit Supporting construction.
As described above, must not be explained although the present invention has been indicated and described referring to specific preferred embodiment For the limitation to invention itself.It without prejudice to the spirit and scope of the invention as defined in the appended claims, can be right Various changes can be made in the form and details for it.

Claims (3)

1. one kind closes on rivers base pit stand construction, which comprises the following steps:
(1) construction of steel sheet pile: cause crown beam and retaining wall that can not construct to solve the drift sand in the case of rivers high water level Problem carries out prevention drift sand using steel sheet pile, and steel sheet pile uses 28a channel steel, and length 6m, steel sheet pile is away from concrete retaining wall 300mm, steel sheet pile are inserted into stake position using manipulator, complete in crown beam and retaining wall construction, concrete retaining wall intensity reaches 70% Afterwards, steel sheet pile is pulled out;
(2) crown beam position soil cement is abolished and crown beam periphery earth excavation: after the completion of steel sheet pile construction, abolishing crown beam position immediately The earthwork on the inside of soil cement and excavation pit within the scope of 10 ~ 15m, absolute altitude are excavated to crown beam bottom, inwardly slope, on the outside of crown beam Bright gutter is arranged in side 5m;And be arranged in crown beam bottom and tiltedly throw support bracket, the oblique throwing support is in this step without excavating, wait prop up Secondary construction is carried out after the completion of support;
(3) crown beam and retaining wall construction: in the higher situation of level of ground water, steel sheet pile mainly plays earth-retaining, steel sheet pile gap There are drift sand situations;Construction personnel, material in this construction procedure and face electricity construction element and make adequate preparation in advance, has construction It after condition, constructs immediately, construction segmentation carries out, every segment length 40m, reduces the shadow that drift sand constructs to crown beam and retaining wall It rings;
Crown beam pours in two times with retaining wall concrete, first pours crown beam, the processing of intersection dabbing;To retaining wall concrete strength After reaching 70%, steel sheet pile is extracted, after steel sheet pile is extracted, carries out graded sand and stone backfill, base of constructing after backfill to position soil layer is extracted Cheat perimeter gutter and hardening;
It throws in the support bracket position reserved steel bar insertion soil body in crown beam work progress oblique, before concreting process, is tiltedly throwing Bracket position is supportted, is stayed every 0.5m in crown beam and sets the pre-buried pvc pipe of a DN100, the pre-buried pvc pipe, which extends to, tiltedly throws support ox Leg position;
Install steel purlin: before installation steel purlin, backfill after first fluting installation steel shelf bracket, steel purlin is combined as with template Crown beam template, it is whole with crown beam formation one after concreting with reinforcement welding when steel purlin connect bolt installation with crown beam Body;
(4) concrete tiltedly throws support bracket construction under crown beam: after the completion of support, support bracket position part is tiltedly thrown to concrete under crown beam It unloads soil and throws support bracket bottom -500mm to oblique, dabbing is carried out to the concrete at interface, rebar surface is cleaned out, mechanical splice Reinforcing bar is connected, built-in fitting is installed, scaffold fixed form is set up, by pre-buried pvc pipe casting concrete, concrete is using micro- swollen Swollen concreting after the completion of the concrete setting for tiltedly throwing support, is removed scaffold fixed form and is completed to pre-buried pvc pipe tube top Close on rivers foundation pit support construction.
2. one kind according to claim 1 closes on rivers base pit stand construction, which is characterized in that the step (1) In, it is isolated between crown beam, retaining wall and steel sheet pile using pearl cotton, extruded sheet or sheathing piece, it is right during reduction pile pulling The influence of retaining wall.
3. one kind according to claim 1 closes on rivers base pit stand construction, which is characterized in that the step (4) In, the oblique preparatory embedded bar in both ends and reserved straight thread I grades of connectors for throwing support.
CN201910419699.8A 2019-05-20 2019-05-20 Construction method for foundation pit support near river Active CN110117959B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910419699.8A CN110117959B (en) 2019-05-20 2019-05-20 Construction method for foundation pit support near river

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910419699.8A CN110117959B (en) 2019-05-20 2019-05-20 Construction method for foundation pit support near river

Publications (2)

Publication Number Publication Date
CN110117959A true CN110117959A (en) 2019-08-13
CN110117959B CN110117959B (en) 2020-11-03

Family

ID=67522853

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910419699.8A Active CN110117959B (en) 2019-05-20 2019-05-20 Construction method for foundation pit support near river

Country Status (1)

Country Link
CN (1) CN110117959B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115125963A (en) * 2022-06-24 2022-09-30 中建八局南方建设有限公司 Enclosure structure for soft soil foundation and construction method thereof
CN115217162A (en) * 2022-08-22 2022-10-21 北京建工集团有限责任公司 Protection structure of foundation pit excavation pipeline and construction method thereof
CN116122299A (en) * 2023-01-03 2023-05-16 中国十九冶集团有限公司 A support system and construction method for large and small foundation pits in basements
CN116122303A (en) * 2023-03-15 2023-05-16 中国建筑第八工程局有限公司 Bracket structure for replacing support in large-scale group pit construction and construction method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101420374B1 (en) * 2013-06-26 2014-07-16 부산교통공사 Bracket
CN105756091A (en) * 2016-03-16 2016-07-13 山东理工大学 Metro station foundation pit construction method for controlling deformation of neighboring buildings
CN208088281U (en) * 2018-03-13 2018-11-13 中铁第四勘察设计院集团有限公司 One kind being used for deep sandy soil deep pit digging structure

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101420374B1 (en) * 2013-06-26 2014-07-16 부산교통공사 Bracket
CN105756091A (en) * 2016-03-16 2016-07-13 山东理工大学 Metro station foundation pit construction method for controlling deformation of neighboring buildings
CN208088281U (en) * 2018-03-13 2018-11-13 中铁第四勘察设计院集团有限公司 One kind being used for deep sandy soil deep pit digging structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115125963A (en) * 2022-06-24 2022-09-30 中建八局南方建设有限公司 Enclosure structure for soft soil foundation and construction method thereof
CN115217162A (en) * 2022-08-22 2022-10-21 北京建工集团有限责任公司 Protection structure of foundation pit excavation pipeline and construction method thereof
CN115217162B (en) * 2022-08-22 2023-04-28 北京建工集团有限责任公司 Protection structure of foundation pit excavation pipeline and construction method thereof
CN116122299A (en) * 2023-01-03 2023-05-16 中国十九冶集团有限公司 A support system and construction method for large and small foundation pits in basements
CN116122303A (en) * 2023-03-15 2023-05-16 中国建筑第八工程局有限公司 Bracket structure for replacing support in large-scale group pit construction and construction method thereof

Also Published As

Publication number Publication date
CN110117959B (en) 2020-11-03

Similar Documents

Publication Publication Date Title
CN106499413B (en) A kind of Shallow-buried section tunnel stratum consolidation construction method
CN110821503B (en) Construction method for main body of ultra-deep shield section air shaft after tunnel advance
CN103981898B (en) A kind of inverse underground engineering construction method done of overall open cut node
CN104612162B (en) A kind of Deep Foundation Pit of Metro Stations excavation construction method
CN104264688B (en) Manually digging hole non-uniform pile support construction process
CN109026064B (en) Construction method for large-span multi-arch tunnel with semi-bright and semi-dark
CN110117959A (en) One kind closing on rivers base pit stand construction
CN110700841B (en) Double side wall guide pit excavation method for tunnel excavation
CN107313431A (en) Close on not contour foundation ditch method for synchronously constructing
CN105756091B (en) A Construction Method of Subway Station Foundation Pit Controlling the Deformation of Adjacent Buildings
CN106761778A (en) A kind of underground digging in subway station construction technology suitable for upper-soft lower-hard ground
CN112324458B (en) A repair construction method for a pierced segment of a shield tunnel adjacent to a power transmission tower
CN110566223B (en) Deep-buried PBA subway station section design method
CN105804089A (en) Locally-deepened supporting and protecting system used after original deep foundation pit is constructed and construction method of system
CN105863648A (en) Underground-excavation shallow-covering large-cross-section tunnel construction method
CN111734425A (en) Construction method of underground excavation tunnel for downwards passing through airport terminal building
CN110778328A (en) Construction method of entrance section of loess tunnel crossing landslide mass
CN111779022A (en) New structure and construction method of underground comprehensive pipe gallery in soft soil foundation with anti-settlement and tilt
CN113266392A (en) Pipe jacking construction method for penetrating through existing anchor cable group
CN113431097A (en) Protection structure of shallow foundation building next to deep foundation pit engineering and construction method
CN104131566B (en) A kind of basement is without the construction method of horizontal support foundation ditch
CN206204972U (en) A kind of prefabricated tubular pile as well-points dewatering
CN115595979A (en) Construction method for treating karst cave by bridge pile foundation under geological condition of strong development of karst
CN215858114U (en) Open caisson integrated configuration to existing pipeline transformation that dams
CN110777775A (en) Foundation pit structure and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant