A kind of rare earth oxide production process precipitating block agitating type washing equipment
Technical field
The present invention relates to a kind of washing equipment more particularly to a kind of precipitating block agitating type washings of rare earth oxide production process
Equipment.
Background technique
Rare earth is the general name of lanthanide series and scandium, yttrium totally ten seven kinds of metallic elements in chemical periodic table.Precipitating block has " industry
The laudatory title of vitamin ".Nowadays extremely important strategic resource is had become.Precipitating block element oxide refers in the periodic table of elements
15 kinds of lanthanide oxides that atomic number is 57 to 71, and totally 17 kinds of scandium similar with lanthanide series chemical property and yttrium
The oxide of element.Precipitating block element all obtains in fields such as petroleum, chemical industry, metallurgy, weaving, ceramics, glass, permanent-magnet materials
It is widely applied, with advances in technology with the continuous breakthrough of application technology, the value for precipitating block oxide will be increasing.
During preparing rare earth oxide, precipitating block can be generated, needs to carry out in next step after this precipitating block washing
Process, when washing now to the precipitating block of generation, typically staff takes water pipe directly to strafe to precipitating block
Water column and washed, the precipitating block of downside in this way is unable to get sufficient washing, and the precipitating block generated is caused to be unable to get and fill
The washing divided.
Summary of the invention
It washes in the prior art less thorough to overcome, compares labor intensive, the low disadvantage of washing efficiency will solve
The technical issues of be: one kind is provided can make to precipitate block and uniformly washed, the thorough rare earth oxide of the comparison of washing is raw
Production process precipitates block agitating type washing equipment.
A kind of rare earth oxide production process precipitating block agitating type washing equipment includes mounting rack, mounting rod, annular cunning
Rail, water washing chamber, crosses sieve, fixed plate, motor, bearing block, bull stick, belt pulley, flat belt, slide-bar, first movement at the first sliding block
Plate, first movement bar, stirring rod, water pipe and liquid discharging bucket, mounting rack bottom or so two are respectively connected with mounting rod, the left and right sides
It is equipped with endless glide between at the top of mounting rod, two slidingtypes of endless glide or so are connected with the first sliding block, and the of the left and right sides
Water washing chamber is installed, water washing chamber bottom was equipped with sieve, crosses screen bottom and is equipped with liquid discharging bucket, liquid discharging bucket is worn between on the upside of one sliding block
It crosses inside endless glide, mounting rack left upper portion is equipped with fixed plate, and left part is equipped with motor, right part on front side of fixed plate on front side of fixed plate
Equipped with bearing block, bearing block and motor are located in same horizontal line, and bull stick, bull stick front side and motor front side are connected in bearing block
Output shaft on be equipped with belt pulley, flat belt is wound between two belt pulleys in left and right, is equipped with slide-bar, mounting rack on front side of flat belt
Left wall top is provided with first through hole, and passing through in first through hole has first movement bar, and first movement bar left end is equipped with first movement plate,
First movement plate is located at the front side of flat belt, is provided with a word hole in the middle part of first movement plate, slide-bar is located in a word hole, slide-bar and one
The cooperation of word hole, first movement bar front side right part are connected with stirring rod, and stirring rod is located in water washing chamber, and first movement bar right end is equipped with
Water pipe, water pipe protrude into water washing chamber.
Furthermore, it is therefore particularly preferred that further include having the second mobile bar, gear ring and rack gear, first movement plate lower right side connects
It is connected to the second mobile bar, the second through-hole is provided in the middle part of mounting rack left wall, the second mobile bar passes through the second through-hole, and the second mobile bar is right
End is connected with rack gear, and washing box outer wall lower part covers rack gear, and gear ring is located on rear side of rack gear, and gear ring is engaged with rack.
Furthermore, it is therefore particularly preferred that further include having torsionspring, placing box, discharge nozzle, first connecting rod, the second movement
Plate, the second connecting rod, contact wheel and the first spring, mounting rack left wall top are connected with torsionspring, are connected on torsionspring
Placing box, placing box left bottom are contacted with fixed plate left side top, are placed right wall of box lower part and are connected with discharge nozzle, discharge nozzle position
Above water washing chamber, left part is connected with first connecting rod on the downside of placing box, and first connecting rod end is equipped with the second movable plate, and second
Movable plate is located above the belt pulley in left side, and motor output shaft front end is connected with the second connecting rod, the rotation of the second connecting rod left end
Formula is connected with contact wheel, and left part is connected with the first spring on the downside of placing box, and the end of the first spring is connected to left on the downside of fixed plate
Portion, the first spring are located at the second movable plate and the second connecting rod rear.
Furthermore, it is therefore particularly preferred that it further include having guide rail, guide sleeve, handle, third mobile bar, second spring and dredging bar,
Discharge nozzle top right side is equipped with guide rail, and slidingtype is connected with guide sleeve on guide rail, and third mobile bar is connected on the downside of guide sleeve, and third is moved
The left end of lever is connected with dredging bar, and dredging bar left end is protruded into inside discharge nozzle, is connected with handle, guide sleeve on the right side of third mobile bar
Left lower is connected with second spring, and second spring left end is connected on the right side of discharge nozzle.
Furthermore, it is therefore particularly preferred that further include having fixed block, wirerope, the first directive wheel and the second directive wheel, placing box
Fixed block is equipped at the top of two walls of left and right, is provided with third through-hole in the middle part of fixed block, and placing box or so outer wall top is equipped with the
One directive wheel, discharge nozzle upside left part are equipped with the second directive wheel, and guide sleeve left upper portion is connected with wirerope, and wirerope is from right to left
Around the first directive wheel of the second directive wheel and right side, it is then passed through the third through-hole of the left and right sides, and first around left side is led
To wheel, the end of wirerope is connected to fixed plate top left side.
People use the equipment water washing and precipitating block when, first the precipitating to be washed it is packaged enter water washing chamber in, then
Water pipe is connected at water outlet, and water is flowed out in water washing chamber and can be washed to precipitating block, is then turned on motor, and motor drives left
The belt pulley of side rotates clockwise, and the belt pulley in left side drives the belt pulley on right side to rotate clockwise by flat belt, flat belt
The slide-bar of front side slides in a word hole therewith, to make the continuous side-to-side movement of first movement plate, first movement plate drives again
One mobile bar moves left and right, stirring rod and water pipe side-to-side movement therewith, stirring rod movement can to the precipitating block in water washing chamber into
Row stirring makes precipitating block wash more thorough, and water pipe moves left and right can be to the precipitating block progress of different piece in water washing chamber
Washing, makes water washing effect more preferably.People can push water washing chamber to rotate simultaneously, and the first sliding block slides in endless glide, in this way
The precipitating block in online each orientation of being sieved thoroughly can be stirred and be washed.Water in water washing chamber can pass through drain
Bucket discharge.Stop pushing water washing chamber after the completion of washing and closes motor.
Because further including having the second mobile bar, gear ring and rack gear, first movement plate lower right side is connected with the second mobile bar,
The second through-hole is provided in the middle part of mounting rack left wall, the second mobile bar passes through the second through-hole, and the second mobile bar right end is connected with rack gear, water
Tank-washer outer wall lower part covers rack gear, and gear ring is located on rear side of rack gear, and gear ring is engaged with rack.So first movement plate side-to-side movement
Meanwhile second mobile bar move left and right therewith, the second mobile bar again band carry-over bar move left and right, rack gear by gear ring drive washing
Case rotation thus pushes water washing chamber rotation without manpower, it is possible to reduce manpower expends.
Because further include have torsionspring, placing box, discharge nozzle, first connecting rod, the second movable plate, the second connecting rod,
Contact wheel and the first spring, mounting rack left wall top are connected with torsionspring, placing box are connected on torsionspring, and placing box is left
Side bottom is contacted with fixed plate left side top, is placed right wall of box lower part and is connected with discharge nozzle, discharge nozzle is located above water washing chamber, puts
It sets left part on the downside of case and is connected with first connecting rod, first connecting rod end is equipped with the second movable plate, and the second movable plate is located at left side
Belt pulley above, motor output shaft front end is connected with the second connecting rod, and the second connecting rod left end rotary type is connected with contact wheel,
Left part is connected with the first spring on the downside of placing box, and the end of the first spring is connected to left part on the downside of fixed plate, and the first spring is located at
Second movable plate and the second connecting rod rear.So people can first the precipitating to be washed it is packaged enter placing box in, electricity
Machine can drive the second connecting rod to rotate clockwise, when the contact wheel and the second movable plate contacts-side-down of the second connecting rod end
When, the second movable plate moves upwards therewith, and the first spring is stretched, the second movable plate by first connecting rod drive placing box to
Right bank, the precipitating block in placing box passes through discharge nozzle immediately and flows out in water washing chamber, when contact wheel is not and under the second movable plate
When side contacts, the second movable plate is moved downward, and the first spring reset, placing box resets therewith, and the precipitating block in placing box stops
Discharge.Motor constantly drives the second connecting rod to move, and the precipitating block intermittence in placing box can be made to flow out, and can achieve more preferable
Water washing effect.
Because further including having guide rail, guide sleeve, handle, third mobile bar, second spring and dredging bar, discharge nozzle top right side
Equipped with guide rail, slidingtype is connected with guide sleeve on guide rail, and third mobile bar, the left end connection of third mobile bar are connected on the downside of guide sleeve
There is dredging bar, dredging bar left end is protruded into inside discharge nozzle, is connected with handle on the right side of third mobile bar, guide sleeve left lower is connected with
Second spring, second spring left end are connected on the right side of discharge nozzle.When discharge nozzle is blocked, people can be pushed away to the left by handle
Dynamic third mobile bar, guide sleeve and dredging bar slide to the left therewith, and second spring is compressed, and after people unclamp hand, second spring is multiple
Position, dredges bar and guide sleeve moves right therewith, and dredging bar, which moves right, can dredge discharge nozzle, prevents precipitating block blocking discharging
Pipe.
Because further including having fixed block, wirerope, the first directive wheel and the second directive wheel, at the top of two wall of placing box or so
Equipped with fixed block, it is provided with third through-hole in the middle part of fixed block, placing box or so outer wall top is equipped with the first directive wheel, discharge nozzle
Upside left part is equipped with the second directive wheel, and guide sleeve left upper portion is connected with wirerope, and wirerope bypasses the second directive wheel from right to left
With first directive wheel on right side, it is then passed through the third through-hole of the left and right sides, and bypasses first directive wheel in left side, the end of wirerope
End is connected to fixed plate top left side.So when placing box tilts, in the pulling force effect of wirerope and the bullet of second spring
Under power effect, guide sleeve horizontally slips, and then makes to dredge bar side-to-side movement, in this way it is prevented that precipitating block blocks discharge nozzle, protects
Demonstrate,prove the smooth washing of rare earth oxide.
Beneficial effects of the present invention: invention achieves can make precipitate block uniformly washed, washing it is more thorough
The effect at bottom.The stirring rod and water pipe of side-to-side movement can be such that precipitating block is adequately washed, and the rack gear of side-to-side movement can make
Gear ring and water washing chamber constantly rotate, so that the precipitating block for being sieved online is made all uniformly to receive washing, the placement to swing
Case can intermittent addition precipitate block, further increase the washing cleanliness of precipitating block, the dredging bar of side-to-side movement can be prevented
Only block discharge nozzle.
Detailed description of the invention
Fig. 1 is the first schematic view of the front view of the invention.
Fig. 2 is second of schematic view of the front view of the invention.
Fig. 3 is the third schematic view of the front view of the invention.
Fig. 4 is the 4th kind of schematic view of the front view of the invention.
Fig. 5 is the 5th kind of schematic view of the front view of the invention.
Figure label title: 1 mounting rack, 2 mounting rods, 3 endless glides, 4 first sliding blocks, 5 water washing chambers, 6 cross sieve, and 7 is solid
Fixed board, 8 motors, 9 bearing blocks, 10 bull sticks, 11 belt pulleys, 12 flat belts, 13 slide-bars, 14 first movement plates, 141 1 word holes, 15
First through hole, 16 first movement bars, 17 stirring rods, 18 water pipes, 181 liquid discharging buckets, 19 second mobile bars, 20 second through-holes, 21 teeth
Circle, 22 rack gears, 23 torsionsprings, 24 placing boxes, 25 discharge nozzles, 26 first connecting rods, 27 second movable plates, 28 second connections
Bar, 29 contact wheels, 30 first springs, 31 guide rails, 32 guide sleeves, 33 handles, 34 third mobile bars, 35 second springs, 351 dredgings
Bar, 36 fixed blocks, 37 third through-holes, 38 wirerope, 39 first directive wheels, 40 second directive wheels.
Specific embodiment
In order to make the objectives, technical solutions and advantages of the present invention clearer, With reference to embodiment and join
According to attached drawing, the present invention is described in more detail.It should be understood that these descriptions are merely illustrative, and it is not intended to limit this hair
Bright range.In addition, in the following description, descriptions of well-known structures and technologies are omitted, to avoid this is unnecessarily obscured
The concept of invention.
Embodiment 1
A kind of rare earth oxide production process precipitating block agitating type washing equipment includes as shown in Figs. 1-5 mounting rack 1, installation
Bar 2, the first sliding block 4, water washing chamber 5, crosses sieve 6, fixed plate 7, motor 8, bearing block 9, bull stick 10, belt pulley at endless glide 3
11, flat belt 12, slide-bar 13, first movement plate 14, first movement bar 16, stirring rod 17, water pipe 18 and liquid discharging bucket 181, installation
1 bottom of frame or so two is respectively connected with mounting rod 2, is equipped with endless glide 3 between 2 top of mounting rod of the left and right sides, annular is sliding
3 or so two slidingtypes of rail are connected with the first sliding block 4, are equipped with water washing chamber 5, water between 4 upside of the first sliding block of the left and right sides
5 bottom of tank-washer was equipped with sieve 6, crosses 6 bottom of sieve and is equipped with liquid discharging bucket 181, liquid discharging bucket 181 passes through inside endless glide 3, installation
1 left upper portion of frame is equipped with fixed plate 7, and 7 front side left part of fixed plate is equipped with motor 8, and 7 front side right part of fixed plate is equipped with bearing block 9, axis
It holds seat 9 and motor 8 is located in same horizontal line, bull stick 10 is connected in bearing block 9,10 front side of bull stick is defeated with 8 front side of motor
It is equipped with belt pulley 11 on shaft, flat belt 12 is wound between two belt pulleys 11 in left and right, is equipped with slide-bar 13 on front side of flat belt 12,
1 left wall top of mounting rack is provided with first through hole 15, and passing through in first through hole 15 has first movement bar 16,16 left end of first movement bar
Equipped with first movement plate 14, first movement plate 14 is located at the front side of flat belt 12, and a word hole is provided in the middle part of first movement plate 14
141, slide-bar 13 is located in a word hole 141, and slide-bar 13 and a word hole 141 cooperate, and 16 front side right part of first movement bar, which is connected with, to be stirred
Bar 17 is mixed, stirring rod 17 is located in water washing chamber 5, and 16 right end of first movement bar is equipped with water pipe 18, and water pipe 18 protrudes into water washing chamber 5.
Embodiment 2
A kind of rare earth oxide production process precipitating block agitating type washing equipment includes as shown in Figs. 1-5 mounting rack 1, installation
Bar 2, the first sliding block 4, water washing chamber 5, crosses sieve 6, fixed plate 7, motor 8, bearing block 9, bull stick 10, belt pulley at endless glide 3
11, flat belt 12, slide-bar 13, first movement plate 14, first movement bar 16, stirring rod 17, water pipe 18 and liquid discharging bucket 181, installation
1 bottom of frame or so two is respectively connected with mounting rod 2, is equipped with endless glide 3 between 2 top of mounting rod of the left and right sides, annular is sliding
3 or so two slidingtypes of rail are connected with the first sliding block 4, are equipped with water washing chamber 5, water between 4 upside of the first sliding block of the left and right sides
5 bottom of tank-washer was equipped with sieve 6, crosses 6 bottom of sieve and is equipped with liquid discharging bucket 181, liquid discharging bucket 181 passes through inside endless glide 3, installation
1 left upper portion of frame is equipped with fixed plate 7, and 7 front side left part of fixed plate is equipped with motor 8, and 7 front side right part of fixed plate is equipped with bearing block 9, axis
It holds seat 9 and motor 8 is located in same horizontal line, bull stick 10 is connected in bearing block 9,10 front side of bull stick is defeated with 8 front side of motor
It is equipped with belt pulley 11 on shaft, flat belt 12 is wound between two belt pulleys 11 in left and right, is equipped with slide-bar 13 on front side of flat belt 12,
1 left wall top of mounting rack is provided with first through hole 15, and passing through in first through hole 15 has first movement bar 16,16 left end of first movement bar
Equipped with first movement plate 14, first movement plate 14 is located at the front side of flat belt 12, and a word hole is provided in the middle part of first movement plate 14
141, slide-bar 13 is located in a word hole 141, and slide-bar 13 and a word hole 141 cooperate, and 16 front side right part of first movement bar, which is connected with, to be stirred
Bar 17 is mixed, stirring rod 17 is located in water washing chamber 5, and 16 right end of first movement bar is equipped with water pipe 18, and water pipe 18 protrudes into water washing chamber 5.
It further include having the second mobile bar 19, gear ring 21 and rack gear 22,14 lower right side of first movement plate is connected with the second shifting
Lever 19,1 left wall of mounting rack middle part are provided with the second through-hole 20, and the second mobile bar 19 passes through the second through-hole 20, the second mobile bar 19
Right end is connected with rack gear 22, and 5 outer wall lower part of water washing chamber covers rack gear 21, and gear ring 21 is located at 22 rear side of rack gear, gear ring 21 and rack gear
22 engagements.
Embodiment 3
A kind of rare earth oxide production process precipitating block agitating type washing equipment includes as shown in Figs. 1-5 mounting rack 1, installation
Bar 2, the first sliding block 4, water washing chamber 5, crosses sieve 6, fixed plate 7, motor 8, bearing block 9, bull stick 10, belt pulley at endless glide 3
11, flat belt 12, slide-bar 13, first movement plate 14, first movement bar 16, stirring rod 17, water pipe 18 and liquid discharging bucket 181, installation
1 bottom of frame or so two is respectively connected with mounting rod 2, is equipped with endless glide 3 between 2 top of mounting rod of the left and right sides, annular is sliding
3 or so two slidingtypes of rail are connected with the first sliding block 4, are equipped with water washing chamber 5, water between 4 upside of the first sliding block of the left and right sides
5 bottom of tank-washer was equipped with sieve 6, crosses 6 bottom of sieve and is equipped with liquid discharging bucket 181, liquid discharging bucket 181 passes through inside endless glide 3, installation
1 left upper portion of frame is equipped with fixed plate 7, and 7 front side left part of fixed plate is equipped with motor 8, and 7 front side right part of fixed plate is equipped with bearing block 9, axis
It holds seat 9 and motor 8 is located in same horizontal line, bull stick 10 is connected in bearing block 9,10 front side of bull stick is defeated with 8 front side of motor
It is equipped with belt pulley 11 on shaft, flat belt 12 is wound between two belt pulleys 11 in left and right, is equipped with slide-bar 13 on front side of flat belt 12,
1 left wall top of mounting rack is provided with first through hole 15, and passing through in first through hole 15 has first movement bar 16,16 left end of first movement bar
Equipped with first movement plate 14, first movement plate 14 is located at the front side of flat belt 12, and a word hole is provided in the middle part of first movement plate 14
141, slide-bar 13 is located in a word hole 141, and slide-bar 13 and a word hole 141 cooperate, and 16 front side right part of first movement bar, which is connected with, to be stirred
Bar 17 is mixed, stirring rod 17 is located in water washing chamber 5, and 16 right end of first movement bar is equipped with water pipe 18, and water pipe 18 protrudes into water washing chamber 5.
It further include having the second mobile bar 19, gear ring 21 and rack gear 22,14 lower right side of first movement plate is connected with the second shifting
Lever 19,1 left wall of mounting rack middle part are provided with the second through-hole 20, and the second mobile bar 19 passes through the second through-hole 20, the second mobile bar 19
Right end is connected with rack gear 22, and 5 outer wall lower part of water washing chamber covers rack gear 21, and gear ring 21 is located at 22 rear side of rack gear, gear ring 21 and rack gear
22 engagements.
It further include thering is torsionspring 23, placing box 24, discharge nozzle 25, first connecting rod 26, the second movable plate 27, second to connect
Extension bar 28, contact wheel 29 and the first spring 30,1 left wall of mounting rack top are connected with torsionspring 23, connect on torsionspring 23
There is placing box 24,24 left bottom of placing box is contacted with 7 left side top of fixed plate, and 24 right wall lower part of placing box is connected with discharge nozzle
25, discharge nozzle 25 is located at 5 top of water washing chamber, and 24 downside left part of placing box is connected with first connecting rod 26,26 end of first connecting rod
End is equipped with the second movable plate 27, and the second movable plate 27 is located above the belt pulley 11 in left side, and 8 output shaft front end of motor is connected with the
Two connecting rods 28,28 left end rotary type of the second connecting rod are connected with contact wheel 29, and 24 downside left part of placing box is connected with the first bullet
Spring 30, the end of the first spring 30 are connected to 7 downside left part of fixed plate, and the first spring 30 is located at the second movable plate 27 and second and connects
28 rear of extension bar.
Embodiment 4
A kind of rare earth oxide production process precipitating block agitating type washing equipment includes as shown in Figs. 1-5 mounting rack 1, installation
Bar 2, the first sliding block 4, water washing chamber 5, crosses sieve 6, fixed plate 7, motor 8, bearing block 9, bull stick 10, belt pulley at endless glide 3
11, flat belt 12, slide-bar 13, first movement plate 14, first movement bar 16, stirring rod 17, water pipe 18 and liquid discharging bucket 181, installation
1 bottom of frame or so two is respectively connected with mounting rod 2, is equipped with endless glide 3 between 2 top of mounting rod of the left and right sides, annular is sliding
3 or so two slidingtypes of rail are connected with the first sliding block 4, are equipped with water washing chamber 5, water between 4 upside of the first sliding block of the left and right sides
5 bottom of tank-washer was equipped with sieve 6, crosses 6 bottom of sieve and is equipped with liquid discharging bucket 181, liquid discharging bucket 181 passes through inside endless glide 3, installation
1 left upper portion of frame is equipped with fixed plate 7, and 7 front side left part of fixed plate is equipped with motor 8, and 7 front side right part of fixed plate is equipped with bearing block 9, axis
It holds seat 9 and motor 8 is located in same horizontal line, bull stick 10 is connected in bearing block 9,10 front side of bull stick is defeated with 8 front side of motor
It is equipped with belt pulley 11 on shaft, flat belt 12 is wound between two belt pulleys 11 in left and right, is equipped with slide-bar 13 on front side of flat belt 12,
1 left wall top of mounting rack is provided with first through hole 15, and passing through in first through hole 15 has first movement bar 16,16 left end of first movement bar
Equipped with first movement plate 14, first movement plate 14 is located at the front side of flat belt 12, and a word hole is provided in the middle part of first movement plate 14
141, slide-bar 13 is located in a word hole 141, and slide-bar 13 and a word hole 141 cooperate, and 16 front side right part of first movement bar, which is connected with, to be stirred
Bar 17 is mixed, stirring rod 17 is located in water washing chamber 5, and 16 right end of first movement bar is equipped with water pipe 18, and water pipe 18 protrudes into water washing chamber 5.
It further include having the second mobile bar 19, gear ring 21 and rack gear 22,14 lower right side of first movement plate is connected with the second shifting
Lever 19,1 left wall of mounting rack middle part are provided with the second through-hole 20, and the second mobile bar 19 passes through the second through-hole 20, the second mobile bar 19
Right end is connected with rack gear 22, and 5 outer wall lower part of water washing chamber covers rack gear 21, and gear ring 21 is located at 22 rear side of rack gear, gear ring 21 and rack gear
22 engagements.
It further include thering is torsionspring 23, placing box 24, discharge nozzle 25, first connecting rod 26, the second movable plate 27, second to connect
Extension bar 28, contact wheel 29 and the first spring 30,1 left wall of mounting rack top are connected with torsionspring 23, connect on torsionspring 23
There is placing box 24,24 left bottom of placing box is contacted with 7 left side top of fixed plate, and 24 right wall lower part of placing box is connected with discharge nozzle
25, discharge nozzle 25 is located at 5 top of water washing chamber, and 24 downside left part of placing box is connected with first connecting rod 26,26 end of first connecting rod
End is equipped with the second movable plate 27, and the second movable plate 27 is located above the belt pulley 11 in left side, and 8 output shaft front end of motor is connected with the
Two connecting rods 28,28 left end rotary type of the second connecting rod are connected with contact wheel 29, and 24 downside left part of placing box is connected with the first bullet
Spring 30, the end of the first spring 30 are connected to 7 downside left part of fixed plate, and the first spring 30 is located at the second movable plate 27 and second and connects
28 rear of extension bar.
It further include having guide rail 31, guide sleeve 32, handle 33, third mobile bar 34, second spring 35 and dredging bar 351, discharging
25 top right side of pipe is equipped with guide rail 31, and slidingtype is connected with guide sleeve 32 on guide rail 31, and third mobile bar is connected on the downside of guide sleeve 32
34, the left end of third mobile bar 34 is connected with dredging bar 351, and dredging 351 left end of bar is protruded into inside discharge nozzle 25, third mobile bar
34 right sides are connected with handle 33, and 32 left lower of guide sleeve is connected with second spring 35, and 35 left end of second spring is connected to discharge nozzle
25 right sides.
Embodiment 5
A kind of rare earth oxide production process precipitating block agitating type washing equipment includes as shown in Figs. 1-5 mounting rack 1, installation
Bar 2, the first sliding block 4, water washing chamber 5, crosses sieve 6, fixed plate 7, motor 8, bearing block 9, bull stick 10, belt pulley at endless glide 3
11, flat belt 12, slide-bar 13, first movement plate 14, first movement bar 16, stirring rod 17, water pipe 18 and liquid discharging bucket 181, installation
1 bottom of frame or so two is respectively connected with mounting rod 2, is equipped with endless glide 3 between 2 top of mounting rod of the left and right sides, annular is sliding
3 or so two slidingtypes of rail are connected with the first sliding block 4, are equipped with water washing chamber 5, water between 4 upside of the first sliding block of the left and right sides
5 bottom of tank-washer was equipped with sieve 6, crosses 6 bottom of sieve and is equipped with liquid discharging bucket 181, liquid discharging bucket 181 passes through inside endless glide 3, installation
1 left upper portion of frame is equipped with fixed plate 7, and 7 front side left part of fixed plate is equipped with motor 8, and 7 front side right part of fixed plate is equipped with bearing block 9, axis
It holds seat 9 and motor 8 is located in same horizontal line, bull stick 10 is connected in bearing block 9,10 front side of bull stick is defeated with 8 front side of motor
It is equipped with belt pulley 11 on shaft, flat belt 12 is wound between two belt pulleys 11 in left and right, is equipped with slide-bar 13 on front side of flat belt 12,
1 left wall top of mounting rack is provided with first through hole 15, and passing through in first through hole 15 has first movement bar 16,16 left end of first movement bar
Equipped with first movement plate 14, first movement plate 14 is located at the front side of flat belt 12, and a word hole is provided in the middle part of first movement plate 14
141, slide-bar 13 is located in a word hole 141, and slide-bar 13 and a word hole 141 cooperate, and 16 front side right part of first movement bar, which is connected with, to be stirred
Bar 17 is mixed, stirring rod 17 is located in water washing chamber 5, and 16 right end of first movement bar is equipped with water pipe 18, and water pipe 18 protrudes into water washing chamber 5.
It further include having the second mobile bar 19, gear ring 21 and rack gear 22,14 lower right side of first movement plate is connected with the second shifting
Lever 19,1 left wall of mounting rack middle part are provided with the second through-hole 20, and the second mobile bar 19 passes through the second through-hole 20, the second mobile bar 19
Right end is connected with rack gear 22, and 5 outer wall lower part of water washing chamber covers rack gear 21, and gear ring 21 is located at 22 rear side of rack gear, gear ring 21 and rack gear
22 engagements.
It further include thering is torsionspring 23, placing box 24, discharge nozzle 25, first connecting rod 26, the second movable plate 27, second to connect
Extension bar 28, contact wheel 29 and the first spring 30,1 left wall of mounting rack top are connected with torsionspring 23, connect on torsionspring 23
There is placing box 24,24 left bottom of placing box is contacted with 7 left side top of fixed plate, and 24 right wall lower part of placing box is connected with discharge nozzle
25, discharge nozzle 25 is located at 5 top of water washing chamber, and 24 downside left part of placing box is connected with first connecting rod 26,26 end of first connecting rod
End is equipped with the second movable plate 27, and the second movable plate 27 is located above the belt pulley 11 in left side, and 8 output shaft front end of motor is connected with the
Two connecting rods 28,28 left end rotary type of the second connecting rod are connected with contact wheel 29, and 24 downside left part of placing box is connected with the first bullet
Spring 30, the end of the first spring 30 are connected to 7 downside left part of fixed plate, and the first spring 30 is located at the second movable plate 27 and second and connects
28 rear of extension bar.
It further include having guide rail 31, guide sleeve 32, handle 33, third mobile bar 34, second spring 35 and dredging bar 351, discharging
25 top right side of pipe is equipped with guide rail 31, and slidingtype is connected with guide sleeve 32 on guide rail 31, and third mobile bar is connected on the downside of guide sleeve 32
34, the left end of third mobile bar 34 is connected with dredging bar 351, and dredging 351 left end of bar is protruded into inside discharge nozzle 25, third mobile bar
34 right sides are connected with handle 33, and 32 left lower of guide sleeve is connected with second spring 35, and 35 left end of second spring is connected to discharge nozzle
25 right sides.
It further include having fixed block 36, wirerope 38, the first directive wheel 39 and the second directive wheel 40,24 or so two wall of placing box
Top is equipped with fixed block 36, and 36 middle part of fixed block is provided with third through-hole 37, and 24 or so outer wall top of placing box is equipped with the
One directive wheel 39,25 upside left part of discharge nozzle are equipped with the second directive wheel 40, and 32 left upper portion of guide sleeve is connected with wirerope 38, steel wire
Rope 38 bypasses the first directive wheel 39 of the second directive wheel 40 and right side from right to left, is then passed through the third through-hole 37 of the left and right sides,
And first directive wheel 39 in left side is bypassed, the end of wirerope 38 is connected to 7 top left side of fixed plate.
People use the equipment water washing and precipitating block when, first the precipitating to be washed it is packaged enter water washing chamber 5 in, then
Water pipe 18 is connected at water outlet, and water is flowed out in water washing chamber 5 and can be washed to precipitating block, is then turned on motor 8, motor 8
The belt pulley 11 in left side is driven to rotate clockwise, the belt pulley 11 in left side drives 11 up time of belt pulley on right side by flat belt 12
The slide-bar 13 of needle rotation, 12 front side of flat belt slides in a word hole 141 therewith, to make the constantly left and right fortune of first movement plate 14
Dynamic, first movement plate 14 drives first movement bar 16 to move left and right again, stirring rod 17 and the side-to-side movement therewith of water pipe 18, stirring rod
17 movements can be stirred the precipitating block in water washing chamber 5, so that precipitating block is washed more thorough, water pipe 18 moves left and right can
It is washed with the precipitating block to different piece in water washing chamber 5, makes water washing effect more preferably.People can push water washing chamber 5 simultaneously
Rotation, the first sliding block 4 slide in endless glide 3, thorough this makes it possible to carry out to the precipitating block for crossing each orientation on sieve 6
Ground stirring and washing.Water in water washing chamber 5 can be discharged by liquid discharging bucket 181.Stop pushing water washing chamber 5 after the completion of washing and close
Close motor 8.
Because further including having the second mobile bar 19, gear ring 21 and rack gear 22,14 lower right side of first movement plate is connected with
Two mobile bars 19,1 left wall of mounting rack middle part are provided with the second through-hole 20, and the second mobile bar 19 passes through the second through-hole 20, and second is mobile
19 right end of bar is connected with rack gear 22, and 5 outer wall lower part of water washing chamber covers rack gear 21, and gear ring 21 is located at 22 rear side of rack gear, gear ring 21 and
Rack gear 22 engages.So the second mobile bar 19 moves left and right therewith, the second mobile bar while first movement 14 side-to-side movement of plate
19 move left and right with carry-over bar 22 again, and rack gear 22 drives water washing chamber 5 to rotate by gear ring 21, thus without manpower promotion washing
Case 5 rotates, it is possible to reduce manpower expends.
Because further including having torsionspring 23, placing box 24, discharge nozzle 25, first connecting rod 26, the second movable plate 27,
Two connecting rods 28, contact wheel 29 and the first spring 30, are connected with torsionspring 23 at the top of mounting rack 1 left wall, on torsionspring 23
It is connected with placing box 24,24 left bottom of placing box is contacted with 7 left side top of fixed plate, and 24 right wall lower part of placing box is connected with out
Expects pipe 25, discharge nozzle 25 are located at 5 top of water washing chamber, and 24 downside left part of placing box is connected with first connecting rod 26, first connecting rod
26 ends are equipped with the second movable plate 27, and the second movable plate 27 is located at 11 top of belt pulley in left side, the connection of 8 output shaft front end of motor
There is the second connecting rod 28,28 left end rotary type of the second connecting rod is connected with contact wheel 29, and 24 downside left part of placing box is connected with
One spring 30, the end of the first spring 30 are connected to 7 downside left part of fixed plate, and the first spring 30 is located at the second movable plate 27 and
Two connecting rods, 28 rear.So people can first the precipitating to be washed it is packaged enter placing box 24 in, motor 8 can drive
Second connecting rod 28 rotates clockwise, when the contact wheel 29 of 28 end of the second connecting rod and the second 27 contacts-side-down of movable plate,
Second movable plate 27 moves upwards therewith, and the first spring 30 is stretched, and the second movable plate 27 is put by the drive of first connecting rod 26
Case 24 is set to be tilted to the right, the precipitating block in placing box 24 passes through discharge nozzle 25 immediately and flows out in water washing chamber 5, when contact wheel 29 not
When with the second 27 contacts-side-down of movable plate, the second movable plate 27 is moved downward, and the first spring 30 resets, and placing box 24 is multiple therewith
, the precipitating block in placing box 24 stops discharge.Motor 8 constantly drives the movement of the second connecting rod 28, can make in placing box 24
Precipitating block intermittence outflow, can achieve better water washing effect.
Because further including having guide rail 31, guide sleeve 32, handle 33, third mobile bar 34, second spring 35 and dredging bar 351,
25 top right side of discharge nozzle is equipped with guide rail 31, and slidingtype is connected with guide sleeve 32 on guide rail 31, and third shifting is connected on the downside of guide sleeve 32
Lever 34, the left end of third mobile bar 34 are connected with dredging bar 351, and dredging 351 left end of bar is protruded into inside discharge nozzle 25, and third is moved
Handle 33 is connected on the right side of lever 34,32 left lower of guide sleeve is connected with second spring 35, and 35 left end of second spring is connected to out
25 right side of expects pipe.When discharge nozzle 25 is blocked, people can push third mobile bar 34,32 He of guide sleeve to the left by handle 33
Dredging bar 351 slides to the left therewith, and second spring 35 is compressed, and after people unclamp hand, second spring 35 resets, and dredges bar 351
It is moved right therewith with guide sleeve 32, dredging bar 351, which moves right, can dredge discharge nozzle 25, prevent precipitating block blocking discharge nozzle
25。
Because further including having fixed block 36, wirerope 38, the first directive wheel 39 and the second directive wheel 40, placing box 24 or so
Fixed block 36 is equipped at the top of two walls, 36 middle part of fixed block is provided with third through-hole 37, and 24 or so outer wall top of placing box is all provided with
There is the first directive wheel 39,25 upside left part of discharge nozzle is equipped with the second directive wheel 40, and 32 left upper portion of guide sleeve is connected with wirerope 38,
Wirerope 38 bypasses the first directive wheel 39 of the second directive wheel 40 and right side from right to left, is then passed through the third through-hole of the left and right sides
37, and first directive wheel 39 in left side is bypassed, the end of wirerope 38 is connected to 7 top left side of fixed plate.So placing box 24
When tilting, under the elastic force effect of the pulling force effect and second spring 35 of wirerope 38, guide sleeve 32 horizontally slips, and then makes
351 side-to-side movement of bar is dredged, in this way it is prevented that precipitating block blocks discharge nozzle 25, guarantees the smooth washing of rare earth oxide.
It should be appreciated that above description is used only for exemplary purpose, it is not intended to limit the present invention.The skill of this field
Art personnel will be understood that variant of the invention form will be included in scope of the claims herein.