CN109191063A - A kind of architectural electricity operational system based on BIM model - Google Patents

A kind of architectural electricity operational system based on BIM model Download PDF

Info

Publication number
CN109191063A
CN109191063A CN201810843670.8A CN201810843670A CN109191063A CN 109191063 A CN109191063 A CN 109191063A CN 201810843670 A CN201810843670 A CN 201810843670A CN 109191063 A CN109191063 A CN 109191063A
Authority
CN
China
Prior art keywords
model
parameter
request
module
generation module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810843670.8A
Other languages
Chinese (zh)
Inventor
胡明
宋晴
陈旭亚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Aviation Construction Group Equipment Ltd By Share Ltd
Original Assignee
China Aviation Construction Group Equipment Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Aviation Construction Group Equipment Ltd By Share Ltd filed Critical China Aviation Construction Group Equipment Ltd By Share Ltd
Priority to CN201810843670.8A priority Critical patent/CN109191063A/en
Publication of CN109191063A publication Critical patent/CN109191063A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Engineering & Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Data Mining & Analysis (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a kind of architectural electricity operational systems based on BIM model, including model generation module, database, application system and electric member, model generation is used to generate model corresponding with model request according to model request with module, database is used for the parameter and operation/maintenance data of stored electricity component, application system includes parameter management system, parameter management system includes request generation module and parameter management module, generation module is requested to issue model request to model generation module by the three-dimensional data to input, three-dimensional data is scanned construction site by three-dimensional scanner and obtains;Parameter management module is used to receive the model of model generation module output, and by being digitized measuring technique to the data that are measured from out again of scene, verify with model and error analysis, and on the basis of output model administrative model parameter;The present invention has the advantages that systemic hierarchial and operation is simple and design is fine.

Description

A kind of architectural electricity operational system based on BIM model
Technical field
The invention belongs to building engineering fields, and in particular to a kind of architectural electricity operational system based on BIM model.
Background technique
BIM, i.e. BuildingInformationModelling Building Information Model, technology is in architectural design, construction The application in stage has graduallyd mature, and value obtains universal approval, but is still in infancy in terms of operation management;It closes It applying in BIM technology in operation management management aspect, different research institutions obtained the achievement being not quite similar under study for action in recent years, But research direction is almost the same: how one experienced the model conversion of stages of design and construction into a suitable O&M rank The model that section uses studies the method obtained and surrounds a thinking always: removal redundancy branches and leaves increase suitable shoot;It is so-called Redundancy branches and leaves be exactly data center's O&M is not served in model it is direct, but largely influence operational efficiency it is extra Data, such as the data of some buildings and structure discipline;Shoot is exactly to increase due facility, element of installation in BIM model, And the data model for needing to use during O&M or parameter are assigned, such as Unit account of plant information, health information, service information Deng the carrier transmitted as information in maintenance work;The operation management of existing building facility mostly uses greatly " BIM modeling software+existing Having facilities management software " mode of hierarchical structure realizes;BIM model information is passed to operation management software to use, two classes Software systems will set up effective communication mechanism, data interaction be carried out by interface using hierarchical structure, with BIM model and its Its basic data is bottom, provides to upper layer and is used for business logic processing and showing interface using data, and the data of lower layer need Above one layer interacts as channel;When upper layer especially top carries out business operation, need to extract from different data sources Data simultaneously successively trace, although framework is clearly easy management, the more more correspondingly operations of level are also more complicated;It therefore, is solution The above problem develops a kind of systemic hierarchial and operation is simple and design the is fine architectural electricity operational system based on BIM model It is necessary to.
Summary of the invention
The purpose of the invention is to overcome the deficiencies in the prior art, and provide a kind of systemic hierarchial and operation is simple and set The fine architectural electricity operational system based on BIM model of meter.
The object of the present invention is achieved like this: a kind of architectural electricity operational system based on BIM model, including model is raw At with module, database, application system and electric member, model generation module is used to be generated according to model request and mould Type requests corresponding model, and the database is used to store the parameter and operation/maintenance data of the electric member, the application system Including parameter management system, the parameter management system includes request generation module and parameter management module, and the request generates Module issues model request to model generation module by the three-dimensional data to input, and three-dimensional data passes through three-dimensional scanner Construction site is scanned and is obtained;The parameter management module is used to receive the mould of model generation module output Type, and the data for being digitized measuring technique and being measured from out again to scene by being inputted, are tested with model Card and error analysis, and on the basis of output model administrative model parameter.
The parameter management system is operation management system, and the request generation module is used to need to the electrical structure When the operation/maintenance data of part is managed, requested to model generation module transmission pattern, the parameter management module is for receiving The model that model generation is exported with module, and on the basis of model manage electric member operation/maintenance data.
It is provided with service management system in the application system, for receiving service request, and according to the service request, It is associated with model relevant to the service request.
The service management system forms service request record, the database is for storing according to the service request The service request record.
Remote monitoring system and fault identification alarm system are provided in the application system, the remote monitoring system is used In to electric member monitoring and parameter acquisition, fault identification alarm system is by remote monitoring system parameter collected and data The electric member parameter stored in library compares, and data exception occurs, then issues alarm signal.
The remote monitoring system is for being monitored the electric current, voltage and power of electric member.
The three-dimensional scanner uses three-dimensional laser scanner.
Beneficial effects of the present invention: the present invention is first passed through by the three-dimensional scanner and digital measuring technique of setting Three-dimensional scanner carries out the three-dimensional data that 3-D scanning obtains construction site to construction site, is then input to ginseng Management system is counted, the request generation module in parameter management system is issued to model generation with module by the three-dimensional data inputted Model request, model generation generates model corresponding with model request with module, finally, by digitizing to construction site Measurement, obtains data and is input to parameter management system, the mould exported with the received model generation of parameter management module with module Type, which carries out verifying and error analysis, realizes Fine design to reduce the error of measurement;Meanwhile the present invention passes through setting mould Type, which generates, uses module, database and application system, using the parameter management system in application system to model generation module institute The data of the model of output are managed, and due to needing not move through intermediate level, reduce intermediate calculation amount;Total, this hair It is bright to have the advantages that systemic hierarchial and operation simply and design fine.
Detailed description of the invention
Fig. 1 is structure flow chart of the invention.
Specific embodiment
Following further describes the present invention with reference to the drawings.
A kind of architectural electricity operational system based on BIM model as shown in Figure 1:, including model generation module, data Library, application system and electric member, model generation module are used to be generated according to model request corresponding with model request Model, the database are used to store the parameter and operation/maintenance data of the electric member, and the application system includes parameter management System, the parameter management system include that request generation module and parameter management module, the request generation module pass through to defeated The three-dimensional data entered issues model request to model generation module, and three-dimensional data is existing to construction by three-dimensional scanner Field is scanned and obtains;The parameter management module is used to receive the model of model generation module output, and defeated by institute The data for being digitized measuring technique and being measured from out again to scene entered, carry out verifying and error analysis with model, And on the basis of output model administrative model parameter.
The parameter management system is operation management system, and the request generation module is used to need to the electrical structure When the operation/maintenance data of part is managed, requested to model generation module transmission pattern, the parameter management module is for receiving The model that model generation is exported with module, and on the basis of model manage electric member operation/maintenance data.
It is provided with service management system in the application system, for receiving service request, and according to the service request, It is associated with model relevant to the service request.
The service management system forms service request record, the database is for storing according to the service request The service request record.
Remote monitoring system and fault identification alarm system are provided in the application system, the remote monitoring system is used In to electric member monitoring and parameter acquisition, fault identification alarm system is by remote monitoring system parameter collected and data The electric member parameter stored in library compares, and data exception occurs, then issues alarm signal;The remote monitoring system It is monitored for electric current, voltage and the power to electric member, by the way that remote monitoring system is arranged, utilizes long-range monitoring system System is monitored electric current, voltage and the power to electric member, and will monitor resulting data Real-time Feedback to failure and know Other alarm system, fault identification alarm system pass through the electricity that will be stored in remote monitoring system parameter collected and database Gas component parameter compares, if data comparison is abnormal, fault identification alarm system issues alarm signal, mentions to operator It wakes up, allows the operator to find in time and solve failure.
The three-dimensional scanner uses three-dimensional laser scanner.
The present invention first passes through three-dimensional scanner to building by the three-dimensional scanner and digital measuring technique of setting Construction site carries out the three-dimensional data that 3-D scanning obtains construction site, is then input to parameter management system, parametron Request generation module in reason system issues model request to model generation module by the three-dimensional data of input, and model generates Corresponding with model request model is generated with module, finally, by construction site progress digitized measurement, obtaining data and defeated Enter to parameter management system, carries out verifying and error point with the model that module exports with the received model generation of parameter management module Analysis, to reduce the error of measurement, realizes Fine design;Meanwhile the present invention is generated by setting model and uses module, database And application system, it is carried out using data of the parameter management system in application system to the model that model generation is exported with module Management reduces intermediate calculation amount, also, the present invention passes through the long-range monitoring system of setting due to needing not move through intermediate level System and fault identification alarm system, are monitored electric current, voltage and the power to electric member using remote monitoring system, The electric member stored in parameter collected and database is monitored to remote monitoring system using fault identification alarm system Parameter compares, and can find in time convenient for operator and solve failure;Total, the present invention has systemic hierarchial and operation Advantage simple and that design is fine.

Claims (7)

1. a kind of architectural electricity operational system based on BIM model, including model generation module, database, application system and Electric member, it is characterised in that: the model generation is used to generate mould corresponding with model request according to model request with module Type, the database are used to store the parameter and operation/maintenance data of the electric member, and the application system includes parameter management system System, the parameter management system include that request generation module and parameter management module, the request generation module pass through to input Three-dimensional data to model generation with module issue model request, three-dimensional data by three-dimensional scanner to construction site It is scanned and obtains;The parameter management module is used to receive the model of model generation module output, and by being inputted Be digitized measuring technique to the data that are measured from out again of scene, verify with model and error analysis, and The parameter of administrative model on the basis of output model.
2. a kind of architectural electricity operational system based on BIM model as described in claim 1, it is characterised in that: the parameter Management system is operation management system, and the request generation module is used to that the operation/maintenance data to the electric member to be needed to carry out When management, requested to model generation module transmission pattern, the parameter management module is defeated for receiving model generation module Model out, and on the basis of model manage electric member operation/maintenance data.
3. a kind of architectural electricity operational system based on BIM model as described in claim 1, it is characterised in that: the application Service management system is provided in system, for receiving service request, and according to the service request, association is asked with the service Seek relevant model.
4. a kind of architectural electricity operational system based on BIM model as claimed in claim 3, it is characterised in that: the service Management system forms service request record, the database is for storing the service request record according to the service request.
5. a kind of architectural electricity operational system based on BIM model as described in claim 1, it is characterised in that: the application Remote monitoring system and fault identification alarm system are provided in system, the remote monitoring system is used for the prison to electric member Control and parameter acquisition, fault identification alarm system will be stored electrical in remote monitoring system parameter collected and database Component parameter compares, and data exception occurs, then issues alarm signal.
6. a kind of architectural electricity operational system based on BIM model as claimed in claim 5, it is characterised in that: described long-range Monitoring system is for being monitored the electric current, voltage and power of electric member.
7. a kind of architectural electricity operational system based on BIM model as described in claim 1, it is characterised in that: the three-dimensional Scanning means uses three-dimensional laser scanner.
CN201810843670.8A 2018-07-27 2018-07-27 A kind of architectural electricity operational system based on BIM model Pending CN109191063A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810843670.8A CN109191063A (en) 2018-07-27 2018-07-27 A kind of architectural electricity operational system based on BIM model

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810843670.8A CN109191063A (en) 2018-07-27 2018-07-27 A kind of architectural electricity operational system based on BIM model

Publications (1)

Publication Number Publication Date
CN109191063A true CN109191063A (en) 2019-01-11

Family

ID=64937310

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810843670.8A Pending CN109191063A (en) 2018-07-27 2018-07-27 A kind of architectural electricity operational system based on BIM model

Country Status (1)

Country Link
CN (1) CN109191063A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109668521A (en) * 2019-01-30 2019-04-23 桂林电子科技大学 A kind of prefabricated components automation quick three-dimensional modeling system
CN109889526A (en) * 2019-02-28 2019-06-14 北京市燃气集团有限责任公司 A kind of burning line collecting method and acquisition device based on position coordinates

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105512730A (en) * 2015-12-02 2016-04-20 中国南方电网有限责任公司 BIM model-based data center operation and maintenance system

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105512730A (en) * 2015-12-02 2016-04-20 中国南方电网有限责任公司 BIM model-based data center operation and maintenance system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109668521A (en) * 2019-01-30 2019-04-23 桂林电子科技大学 A kind of prefabricated components automation quick three-dimensional modeling system
CN109668521B (en) * 2019-01-30 2024-09-06 桂林电子科技大学 Automatic rapid three-dimensional modeling system for prefabricated part
CN109889526A (en) * 2019-02-28 2019-06-14 北京市燃气集团有限责任公司 A kind of burning line collecting method and acquisition device based on position coordinates
CN109889526B (en) * 2019-02-28 2020-01-24 北京市燃气集团有限责任公司 Gas pipeline data acquisition method and gas pipeline data acquisition device based on position coordinates

Similar Documents

Publication Publication Date Title
CN207093267U (en) A kind of Hydroelectric Generating Set State Monitoring and fault diagnosis system
CN104283318B (en) Based on electric power apparatus integrated monitoring index system system and the analytical method thereof of large data
CN104460635B (en) A kind of integrated information platform system based on intelligent hydroelectric power plant
Terciyanlı et al. Enhanced nationwide wind-electric power monitoring and forecast system
CN101225532B (en) Power supply safety on-line monitoring system for electrolytic aluminum production
CN103487749A (en) On-line monitoring and diagnosing system and method for mechanical state of high-voltage circuit breaker
CN105187010A (en) Intelligent monitoring and operation maintenance system for photovoltaic power station
CN107146065A (en) Railway engineering management platform system
DE212016000186U1 (en) simulation system
CN110011864B (en) High-speed railway contact net safety state monitoring method
CN103177396A (en) Intelligentized whole-employee overall-process full-profession multidimensional risk management and control platform for site operations of power supply enterprises
CN109191063A (en) A kind of architectural electricity operational system based on BIM model
CN110033102A (en) A kind of huge hydroelectric power plant has the intelligent diagnosing method and expert system of learning functionality
CN109583467A (en) A kind of electric power meteorological data fusion method and system
CN109408492A (en) Railway power equipment record management system and its method based on fault location function
CN108876174A (en) A kind of supervisory systems and method of construction engineering quality detection
CN108052561A (en) Routine test analysis method and device based on timeliness norm controlling
CN106340963A (en) Electric power distribution room intelligent commission maintenance monitoring system
Koziel et al. Application of big data analytics to support power networks and their transition towards smart grids
CN113256272A (en) Fine evaluation system for power equipment
CN208431106U (en) Wind turbines yaw system monitors mechanism on-line
CN110261693A (en) A kind of online thermal test method and system based on stable state sampling technique
CN109934950A (en) APP and method are maked an inspection tour in a kind of standardization of transmission line of electricity
CN103984305A (en) Method for evaluating clock state of power grid automation equipment based on data statistic analysis
CN206074795U (en) The online checking system of electric power meter networking

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190111

RJ01 Rejection of invention patent application after publication