CN110033102A - A kind of huge hydroelectric power plant has the intelligent diagnosing method and expert system of learning functionality - Google Patents

A kind of huge hydroelectric power plant has the intelligent diagnosing method and expert system of learning functionality Download PDF

Info

Publication number
CN110033102A
CN110033102A CN201910219497.9A CN201910219497A CN110033102A CN 110033102 A CN110033102 A CN 110033102A CN 201910219497 A CN201910219497 A CN 201910219497A CN 110033102 A CN110033102 A CN 110033102A
Authority
CN
China
Prior art keywords
data
power plant
intelligent
experts database
strategy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910219497.9A
Other languages
Chinese (zh)
Inventor
鲁俊兵
南冠群
乔进国
李春露
齐巨涛
胡丰
杨定祥
王远洪
张鹤鸣
徐德新
龚登位
胡金飞
辉金荣
贺飞
曾阳麟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaneng Lancang River Hydropower Co Ltd
Original Assignee
Huaneng Lancang River Hydropower Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaneng Lancang River Hydropower Co Ltd filed Critical Huaneng Lancang River Hydropower Co Ltd
Priority to CN201910219497.9A priority Critical patent/CN110033102A/en
Publication of CN110033102A publication Critical patent/CN110033102A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D10/00Energy efficient computing, e.g. low power processors, power management or thermal management

Abstract

The invention discloses intelligent diagnosing methods and expert system that a kind of huge hydroelectric power plant has learning functionality, integrate automated system data first, obtain whole factory automation system data and re-start integration, form power plant and produce large database concept;Then experts database model is established, the Stakeout & Homicide Preservation Strategy of experts database is set;Last experts database diagnosis carries out processing output Diagnostic Strategy, O&M in-situ processing to the data in large database concept by experts database model, and operation maintenance personnel is disposed scene according to the experts database Diagnostic Strategy of acquisition.Method and system provided by the invention forms intelligent diagnostics experts database by carrying out processing to data, to form overall strategy output, operation maintenance personnel carries out site disposal according to the experts database tutorial message of acquisition, promote the inline diagnosis of hydroelectric power plant's running equipment operating condition and the repair based on condition of component ability of maintenance, it is horizontal to the operation management for promoting power station, it is simultaneously power plant safety, economical operation, the intelligent uses such as master status maintenance decision support provide platform.

Description

A kind of huge hydroelectric power plant has the intelligent diagnosing method and expert system of learning functionality
Technical field
The present invention relates to hydroelectric power plant Intelligent Diagnosis Technology field, especially a kind of huge hydroelectric power plant has the intelligence of learning functionality It can diagnostic expert system.
Background technique
Existing rank traditional approach by rule of thumb, sense organ or single alarm, signal measured value judge equipment operation condition, work as generation Personnel are needed when a certain failure, and rule of thumb judgement is handled, this is more demanding to personnel's technical ability, experience level, and exists because of personnel Level of skill difference cause equipment operation maintenance, troubleshooting not in time, incorrect lead to failure or fault spread.
As in recent years information-based reaches its maturity, the generation information technologies such as cloud computing, big data, artificial intelligence it is extensive With and smart grid all-round construction and intellectual technology high speed development, traditional hydroelectric power plant is complete to intelligent hydroelectric power plant direction Face development has been inexorable trend.
Domestic major Hydropower Enterprise ' is all exploring intellectual analysis, repair based on condition of component maintenance strategy based on device diagnostic, purpose It is exactly in order to further enhance the control ability to equipment.
Summary of the invention
An object of the present invention is to propose that a kind of huge hydroelectric power plant has the intelligent diagnosing method of learning functionality;The present invention The second purpose be to propose that a kind of huge hydroelectric power plant has the Intelligent Diagnosis Expert System of learning functionality.
An object of the present invention is achieved through the following technical solutions:
A kind of huge hydroelectric power plant provided by the invention has the intelligent diagnosing method of learning functionality, comprising the following steps:
Automated system data are integrated, whole factory automation system data is obtained and re-starts integration, it is big to form power plant's production Database;
Experts database model is established, the Stakeout & Homicide Preservation Strategy of experts database is set;
Experts database diagnosis carries out processing output Diagnostic Strategy to the data in large database concept by experts database model.
O&M in-situ processing, operation maintenance personnel are disposed scene according to the experts database Diagnostic Strategy of acquisition.
Further, the automated system data of integrating are for being acquired the data of sub- automated system, the son Automated system includes computer supervisory control system, water regime monitoring system, electric energy monitoring system, environmental monitoring system, state prison Examining system, reactor monitoring system, main transformer on-line monitoring system, fault wave recording device monitoring system, prudential sub-station monitor system, And collected data are input to visual intelligent cruising inspection system, SAP inspection standard, intelligent warehouse management system, teams and groups In standardization management platform, power plant safety management information system, it is shared to be suitable for being formed data of information system.
Further, the Stakeout & Homicide Preservation Strategy of the experts database model is to utilize iterative learning control method according to the following steps Come what is realized:
The control information amendment definite value input that preceding primary or preceding n times are measured, so that alarm setting value gradually approaches rationally;Root Successive ignition is carried out according to strategy, and has self study and artificial modified function, repeatedly with this, intelligence is formed by multisystem strategy It can operational system basic scheme library.
The second object of the present invention is to what is be achieved through the following technical solutions:
The present invention also provides the Intelligent Diagnosis Expert Systems that a kind of huge hydroelectric power plant has learning functionality, including
Automated system Data Integration unit obtains whole factory automation system data and re-starts integration, it is raw to form power plant Produce large database concept;
Experts database model is established, the Stakeout & Homicide Preservation Strategy of experts database is set;
Experts database diagnosis unit carries out processing output Diagnostic Strategy to the data in large database concept by experts database model.
O&M in-situ processing center, operation maintenance personnel are disposed scene according to the experts database Diagnostic Strategy of acquisition.
Further, the automated system Data Integration unit is acquired the data of sub- automated system, the son Automated system includes computer supervisory control system, water regime monitoring system, electric energy monitoring system, environmental monitoring system, state prison Examining system, reactor monitoring system, main transformer on-line monitoring system, fault wave recording device monitoring system, prudential sub-station monitor system, And collected data are input to visual intelligent cruising inspection system, SAP inspection standard, intelligent warehouse management system, teams and groups In standardization management platform, power plant safety management information system, it is shared to be suitable for being formed data of information system.
Further, the Stakeout & Homicide Preservation Strategy of the experts database model is to utilize iterative learning control method according to the following steps Come what is realized:
The control information amendment definite value input that preceding primary or preceding n times are measured, so that alarm setting value gradually approaches rationally;Root Successive ignition is carried out according to strategy, and has self study and artificial modified function, repeatedly with this, intelligence is formed by multisystem strategy It can operational system basic scheme library.
By adopting the above-described technical solution, the present invention has the advantage that:
Huge hydroelectric power plant provided by the invention has the intelligent diagnosing method and expert system of learning functionality, carries out to data The means such as screening, conversion, association analysis, data statistics, model management, machine learning, deep learning, early warning alarm, form intelligence Energy diagnostician library carries out process configuration, combination to experts database, to form overall strategy output, operation maintenance personnel is according to acquisition Experts database tutorial message carry out site disposal, promote the inline diagnosis of hydroelectric power plant's running equipment operating condition and repair based on condition of component and safeguard energy Power, it is horizontal to the operation management for promoting power station, it realizes " unattended " comprehensively, is further improved and is promoted hydroelectric power plant's production management Mode is of great significance.It is simultaneously power plant safety, economical operation, the intelligent uses such as master status maintenance decision support provide Platform.
Other advantages, target and feature of the invention will be illustrated in the following description to a certain extent, and And to a certain extent, based on will be apparent to those skilled in the art to investigating hereafter, Huo Zheke To be instructed from the practice of the present invention.Target of the invention and other advantages can be realized by following specification and It obtains.
Detailed description of the invention
Detailed description of the invention of the invention is as follows.
Fig. 1 is the Intelligent Diagnosis Expert System model that huge hydroelectric power plant has learning functionality.
Fig. 2 is building Data Analysis Services platform.
Fig. 3 is intelligent diagnostics expert's tying composition that huge hydroelectric power plant has learning functionality.
Specific embodiment
Present invention will be further explained below with reference to the attached drawings and examples.
Huge hydroelectric power plant provided in this embodiment has the Intelligent Diagnosis Expert System of learning functionality, by carrying out to data The means such as screening, conversion, association analysis, data statistics, model management, machine learning, deep learning, early warning alarm, form intelligence Energy diagnostician library carries out process configuration, combination to experts database, to form overall strategy output, operation maintenance personnel is according to acquisition Experts database tutorial message carry out site disposal, Intelligent Diagnosis Expert System provided in this embodiment includes automated system data Integral unit establishes experts database model, experts database diagnosis unit and O&M in-situ processing center;
The automated system Data Integration unit obtains whole factory automation system data and re-starts integration, forms electricity Factory produces large database concept;It is described to establish experts database model, the Stakeout & Homicide Preservation Strategy of experts database is set;The experts database diagnosis is single Member carries out processing output Diagnostic Strategy to the data in large database concept by experts database model;O&M in-situ processing center, Operation maintenance personnel is disposed scene according to the experts database Diagnostic Strategy of acquisition.
The automated system Data Integration unit is acquired the data of sub- automated system, the sub- Department of Automation System includes computer supervisory control system, water regime monitoring system, electric energy monitoring system, environmental monitoring system, condition monitoring system, electricity Anti- device monitoring system, main transformer on-line monitoring system, fault wave recording device monitoring system, prudential sub-station monitor system, and will acquisition To data be input to visual intelligent cruising inspection system, SAP inspection standard, intelligent warehouse management system, teams and groups standardization pipe In platform, power plant safety management information system, it is shared to be suitable for being formed data of information system.
Automated system Data Integration unit provided in this embodiment, acquisition whole factory automation system data re-start whole It closes, forms power plant's production big data analysis center and historical data is analyzed and is located using big data analysis software and strategy Reason forms the creation data analysis center of level of factory (river basin level).System uses large database platform, using the number of the universal standard According to interface mode, each subsystem real time data is extracted, transmitted, stored, processed, is counted, using data modeling, using at Ripe perfect data statistics model stores creation data, is counted and early warning, thus for production managements at different levels and data point Analysis provides data basis.Database using standard, uniformly, common database form, have expansible portability.Database The polynary isomeric data of acquisition is merged and has phase mutual verifying function and data quality management function, for abnormal data It can carry out automatically " screening ".
Diagnostician library provided in this embodiment use structuring software design approach, with voe power plant operating standard, Maintenance procedure, upkeep operation guiding book are data basis, are instructed using emergency disposal card, accident prediction, defect dictionary as expert Opinion carries out measuring point with a variety of data analysing methods such as association analysis, trend analysis, variance analysis, numerical characteristic analyses Laterally, longitudinal comparative analysis, gos deep into mining data potential value, establishes device diagnostic experts database.
Data after iterative learning provided in this embodiment collects for big data and experts database carry out strategy setting, utilize Iterative learning control method, by the preceding primary or preceding control information amendment definite value input measured several times, so that intelligent diagnostics approach Rationally.Successive ignition is carried out according to strategy, and has self study and artificial modified function and repeatedly with this continues to optimize intelligence Diagnostic Strategy forms the intelligent diagnostics experts database with learning functionality by multisystem strategy.
The research for carrying out the storage of hydroelectric power plant's production big data and analysis and application system building etc., realizes great be directed to Property, practicability intelligent diagnostics experts database, point profession formulates intelligent early-warning plan to the operation data of key equipment and important equipment Slightly, fault alarm threshold value and countermeasure are studied.According to operating standard, upkeep operation guiding book, maintenance procedure, operation conditions, Defect processing experience etc. determines the chife failure models of every class equipment, and power plant's emergency disposal card, prediction scheme, defect dictionary case are put Enter in experts database, can quickly form far when occurring abnormal, operation maintenance personnel is instructed according to the experts database of acquisition Information carries out site disposal.The inline diagnosis of hydroelectric power plant's running equipment operating condition and the repair based on condition of component ability of maintenance are promoted, to promotion power station Operation management it is horizontal, realize " unattended " comprehensively, be further improved and promoted hydroelectric power plant's manufacturing management system have it is important Meaning, while being power plant safety, economical operation, the intelligent uses such as master status maintenance decision support provide platform.
Fig. 1 is the Intelligent Diagnosis Expert System model that huge hydroelectric power plant has learning functionality, and system is to full factory's production run Equipment and resource carry out unified Modeling, realize the object data Organization And Management based on unified model, data support it is distributed or Centralized management is included mainly two large divisions, is designed using the principle of modularization, componentialized framework and layer distributed.
Fig. 2 is that there is the Intelligent Diagnosis Expert System of learning functionality to construct Data Analysis Services platform for huge hydroelectric power plant, respectively Resource consolidation between automated system uses the data-interface mode of the universal standard, carry out to each subsystem real time data It extracts, transmission, processing, statistics, storage, " quasi real time " data center of level of factory (collection is regimental) is formed, to manage for productions at different levels Reason and data analysis provide data basis.
It further include data supporting system for analysis and decision making in diagnostician library provided in this embodiment, system platform (webpage/ Client) novel professional graphic technology enriched by picture, report, curve, list etc., shape is provided for enterprise users at different levels As intuitive data display interface, the function of assistant analysis and decision is realized in management easy to produce and data analysis.
Data acquisition and processing (DAP) therein is as follows: system acquisition computer supervisory control system, regimen, electric flux, environmental monitoring, The data such as condition monitoring system, reactor, main transformer on-line monitoring, fault wave recording device, prudential sub-station, pass through communication server string Mouthful or network carry out data acquisition, and with visual intelligent cruising inspection system, SAP inspection standard, intelligent warehouse management system, The data of information system such as teams and groups' standardization management platform, power plant safety management information system are shared.While it in data acquisition and adopting System has data quality management function after collection, can be screened automatically for abnormal data.
Fig. 3 is the Intelligent Diagnosis Expert System structure chart that huge hydroelectric power plant has learning functionality, and multiple data collectors are adopted Collect a data for word automated system and each maintenance work station is transferred to by interchanger, in conjunction with historical data backup server and deposits It stores up the related data in disk array and carries out Data Analysis Services, such as carry out multiple information iteration and self study, and be directed to and converge Data after collection are carried out strategy setting and are repaired the preceding primary or preceding control information measured several times using iterative learning control method Positive definite value input, so that alarm setting value gradually approaches rationally.Successive ignition is carried out according to strategy, and has self study and artificially repairs Positive function repeatedly with this forms intelligent operational system basic scheme library by multisystem strategy.
Implementation strategy management in user terminal and human-computer interaction server is uploaded to finally by Web server, according to electricity The strategy of factory's design studies carries out process configuration, combination to basic scheme library.Detailed process can pull, layout, reuse etc., letter Clean clear displaying algorithm flow provides flexible task schedule service strategy, transparent big data based on Time And Event, any Personnel can go up hand operation.Finally show that overall strategy is exported by workflow management.
Finally, it is stated that the above examples are only used to illustrate the technical scheme of the present invention and are not limiting, although referring to compared with Good embodiment describes the invention in detail, those skilled in the art should understand that, it can be to skill of the invention Art scheme is modified or replaced equivalently, and without departing from the objective and range of the technical program, should all be covered in the present invention Protection scope in.

Claims (6)

1. the intelligent diagnosing method that a kind of huge hydroelectric power plant has learning functionality, it is characterised in that: the following steps are included:
Automated system data are integrated, whole factory automation system data is obtained and re-starts integration, power plant is formed and produces big data Library;
Experts database model is established, the Stakeout & Homicide Preservation Strategy of experts database is set;
Experts database diagnosis carries out processing output Diagnostic Strategy to the data in large database concept by experts database model.
O&M in-situ processing, operation maintenance personnel are disposed scene according to the experts database Diagnostic Strategy of acquisition.
2. the intelligent diagnosing method that huge hydroelectric power plant as described in claim 1 has learning functionality, it is characterised in that: described whole Automated system data are closed for being acquired to the data of sub- automated system, the sub- automated system includes computer prison Control system, water regime monitoring system, electric energy monitoring system, environmental monitoring system, condition monitoring system, reactor monitoring system, Main transformer on-line monitoring system, fault wave recording device monitoring system, prudential sub-station monitor system, and collected data are input to Visual intelligent cruising inspection system, SAP inspection standard, intelligent warehouse management system, teams and groups' standardization management platform, power plant safety In management information system, it is shared to be suitable for being formed data of information system.
3. the intelligent diagnosing method that huge hydroelectric power plant as described in claim 1 has learning functionality, it is characterised in that: described special The Stakeout & Homicide Preservation Strategy of family's library model is realized according to the following steps using iterative learning control method:
The control information amendment definite value input that preceding primary or preceding n times are measured, so that alarm setting value gradually approaches rationally;According to plan Successive ignition is slightly carried out, and has self study and artificial modified function and intelligent fortune repeatedly with this is formed by multisystem strategy Maintain system basic scheme library.
4. the Intelligent Diagnosis Expert System that a kind of huge hydroelectric power plant has learning functionality, it is characterised in that: including
Automated system Data Integration unit obtains whole factory automation system data and re-starts integration, and it is big to form power plant's production Database;
Experts database model is established, the Stakeout & Homicide Preservation Strategy of experts database is set;
Experts database diagnosis unit carries out processing output Diagnostic Strategy to the data in large database concept by experts database model.
O&M in-situ processing center, operation maintenance personnel are disposed scene according to the experts database Diagnostic Strategy of acquisition.
5. the Intelligent Diagnosis Expert System that huge hydroelectric power plant as claimed in claim 4 has learning functionality, it is characterised in that: institute It states automated system Data Integration unit to be acquired the data of sub- automated system, the sub- automated system includes calculating Machine monitoring system, water regime monitoring system, electric energy monitoring system, environmental monitoring system, condition monitoring system, reactor monitoring system System, main transformer on-line monitoring system, fault wave recording device monitoring system, prudential sub-station monitor system, and collected data are defeated Enter to visual intelligent cruising inspection system, SAP inspection standard, intelligent warehouse management system, teams and groups' standardization management platform, power plant In Safeguard Management Information System, it is shared to be suitable for being formed data of information system.
6. the Intelligent Diagnosis Expert System that huge hydroelectric power plant as claimed in claim 4 has learning functionality, it is characterised in that: institute It states the Stakeout & Homicide Preservation Strategy of experts database model and is realized according to the following steps using iterative learning control method:
The control information amendment definite value input that preceding primary or preceding n times are measured, so that alarm setting value gradually approaches rationally;According to plan Successive ignition is slightly carried out, and has self study and artificial modified function and intelligent fortune repeatedly with this is formed by multisystem strategy Maintain system basic scheme library.
CN201910219497.9A 2019-03-21 2019-03-21 A kind of huge hydroelectric power plant has the intelligent diagnosing method and expert system of learning functionality Pending CN110033102A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910219497.9A CN110033102A (en) 2019-03-21 2019-03-21 A kind of huge hydroelectric power plant has the intelligent diagnosing method and expert system of learning functionality

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910219497.9A CN110033102A (en) 2019-03-21 2019-03-21 A kind of huge hydroelectric power plant has the intelligent diagnosing method and expert system of learning functionality

Publications (1)

Publication Number Publication Date
CN110033102A true CN110033102A (en) 2019-07-19

Family

ID=67236396

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910219497.9A Pending CN110033102A (en) 2019-03-21 2019-03-21 A kind of huge hydroelectric power plant has the intelligent diagnosing method and expert system of learning functionality

Country Status (1)

Country Link
CN (1) CN110033102A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111077857A (en) * 2019-11-29 2020-04-28 华电电力科学研究院有限公司 Power plant equipment management platform system and equipment management method
CN111931561A (en) * 2020-06-24 2020-11-13 深圳市法本信息技术股份有限公司 Management method, system and agent equipment of heterogeneous RPA robot
CN113807808A (en) * 2021-08-17 2021-12-17 华能澜沧江水电股份有限公司 Basin centralized control management and control integrated platform

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105509728A (en) * 2015-11-02 2016-04-20 湖南红太阳新能源科技有限公司 Photovoltaic power station failure equipment navigation method and system
CN108663980A (en) * 2018-06-11 2018-10-16 哈尔滨锅炉厂有限责任公司 Station boiler remote online diagnostic system and its inline diagnosis method
CN108681747A (en) * 2018-05-11 2018-10-19 武汉理工大学 Rotary machinery fault diagnosis based on deep learning and condition monitoring system and method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105509728A (en) * 2015-11-02 2016-04-20 湖南红太阳新能源科技有限公司 Photovoltaic power station failure equipment navigation method and system
CN108681747A (en) * 2018-05-11 2018-10-19 武汉理工大学 Rotary machinery fault diagnosis based on deep learning and condition monitoring system and method
CN108663980A (en) * 2018-06-11 2018-10-16 哈尔滨锅炉厂有限责任公司 Station boiler remote online diagnostic system and its inline diagnosis method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
潘伟峰等: "水电厂主设备状态检修决策支持系统的设计与开发", 《水电与抽水蓄能》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111077857A (en) * 2019-11-29 2020-04-28 华电电力科学研究院有限公司 Power plant equipment management platform system and equipment management method
CN111931561A (en) * 2020-06-24 2020-11-13 深圳市法本信息技术股份有限公司 Management method, system and agent equipment of heterogeneous RPA robot
CN113807808A (en) * 2021-08-17 2021-12-17 华能澜沧江水电股份有限公司 Basin centralized control management and control integrated platform

Similar Documents

Publication Publication Date Title
CN113450065B (en) Production operation management system and method for wind power plant
CN102882969B (en) A kind of safety production cloud service platform of industrial and mining enterprises
CN102932419B (en) A kind of data-storage system for the safety production cloud service platform towards industrial and mining enterprises
CN102917032B (en) A kind of safety production cloud service platform of industrial and mining enterprises
CN111985561A (en) Fault diagnosis method and system for intelligent electric meter and electronic device
CN109857080B (en) Intelligent ship lock operation and maintenance system based on BIM
CN111178758A (en) Concrete dam monitoring data intelligent management and real-time evaluation system based on BIM
CN103559562A (en) Power grid intelligent operation system and achieving method thereof
CN110033102A (en) A kind of huge hydroelectric power plant has the intelligent diagnosing method and expert system of learning functionality
CN110175324B (en) Power grid operation instruction verification method and system based on data mining
CN112803592A (en) Intelligent fault early warning method and system suitable for distributed power station
CN102880802A (en) Fatal danger fountainhead analysis and evaluation method for safety production cloud service platform system facing industrial and mining enterprises
CN102903010A (en) Support vector machine-based abnormal judgment method for safety production cloud service platform orientating industrial and mining enterprises
CN102929827A (en) Wireless sensor data acquisition cluster for industrial-and-mining-enterprise-oriented safety production cloud service platform
CN102930372A (en) Data analysis method for association rule of cloud service platform system orienting to safe production of industrial and mining enterprises
CN102917031A (en) Data computing system of safety production cloud service platform for industrial and mining enterprises
CN112613066B (en) Internet information management system based on large-scale wind power plant
CN113689123A (en) Intelligent management platform is gathered to natural gas modularization
CN110728381A (en) Intelligent power plant inspection method and system based on RFID and data processing
CN102545381A (en) Data analysis center system for technical supervision of power grid equipment
CN102903009A (en) Malfunction diagnosis method based on generalized rule reasoning and used for safety production cloud service platform facing industrial and mining enterprises
CN110245163A (en) A kind of Operation of Electric Systems hidden troubles removing method
KR20220089853A (en) Method for Failure prediction and prognostics and health management of renewable energy generation facilities using machine learning technology
RU2549514C2 (en) System for predicting and evaluating safety of hazardous production facility using integrated safety model
CN115936663A (en) Maintenance method and device for power system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190719

RJ01 Rejection of invention patent application after publication