CN113807808A - Basin centralized control management and control integrated platform - Google Patents

Basin centralized control management and control integrated platform Download PDF

Info

Publication number
CN113807808A
CN113807808A CN202110942154.2A CN202110942154A CN113807808A CN 113807808 A CN113807808 A CN 113807808A CN 202110942154 A CN202110942154 A CN 202110942154A CN 113807808 A CN113807808 A CN 113807808A
Authority
CN
China
Prior art keywords
data
platform
management
centralized control
basin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110942154.2A
Other languages
Chinese (zh)
Inventor
尹述红
王子伟
崔海涛
刘永珺
马月姣
胡丰
阳灿
唐睿高
王斌
胡林
陈伟
李红刚
何伟
崔庆峰
万建强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaneng Lancang River Hydropower Co Ltd
Original Assignee
Huaneng Lancang River Hydropower Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaneng Lancang River Hydropower Co Ltd filed Critical Huaneng Lancang River Hydropower Co Ltd
Priority to CN202110942154.2A priority Critical patent/CN113807808A/en
Publication of CN113807808A publication Critical patent/CN113807808A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/10File systems; File servers
    • G06F16/16File or folder operations, e.g. details of user interfaces specifically adapted to file systems
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/25Integrating or interfacing systems involving database management systems
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Abstract

The invention provides a drainage basin centralized control and management integrated platform, which comprises a data acquisition platform, a data storage platform, a data processing platform, a data access platform, a support tool, a platform management platform and an application development platform, wherein the data acquisition platform adopts a data collection engine, the data storage platform comprises a real-time database and a relational database, the storage of data such as real-time/historical data, alarm, documents and the like is realized, the support tool comprises tools such as configuration, report forms, Web services and the like, the support platform is developed for the second time, the application of the management and control integrated platform reduces system equipment and software configuration, and the system investment cost is saved; the large data comprehensive analysis is realized, the fault handling capacity is improved, the accident faults are reduced, the stable operation time of the system is greatly improved, the power generation benefit is brought, and the overhaul and maintenance cost is reduced; the labor intensity of personnel is reduced, and the personnel allocation is reduced.

Description

Basin centralized control management and control integrated platform
Technical Field
The invention discloses a basin centralized control and management integrated platform, and belongs to the technical field of intelligent management.
Background
In the prior art, with the continuous increase of centralized control power plants and centralized control units, the existing systems of centralized control centers, such as computer monitoring, electric energy metering, water regime and water regulation, face higher data and communication pressure, the demand of comprehensive data information increases with the development of the service requirements of the centralized control centers, the existing production systems of the centralized control centers are relatively independent from the service systems and the production systems, the data standards, interface standards and communication protocols among the systems are various, so that the data interaction quantity among the systems is small, the deep mining of the data is relatively deficient, the current application is only limited to basic data display and simple calculation and analysis, certain information barriers exist among the systems, the data linkage development among the systems is relatively difficult, and partial systems have gradually appeared phenomena affecting normal production operation management, such as data partial loss and the like due to overweight data pressure. Meanwhile, with the gradual increase of the centralized control power stations, operators can face more complex original data, and how to make more professional, timely and effective use of the data helps the operators to accurately finish remote operation duty work, so that the working pressure and the working intensity of the operators are reduced; how to improve the deep mining level of the data and the intelligent level of the operation decision support of the centralized control center; how to realize economic operation optimization, resource utilization maximization and the like becomes an important problem which needs to be solved urgently and is faced by the future development of centralized control.
Disclosure of Invention
Aiming at the defects in the prior art, the invention aims to provide a basin centralized control and management integrated platform to solve the problems in the background art.
In order to achieve the purpose, the invention is realized by the following technical scheme: the utility model provides a basin centralized control management and control integration platform, basin centralized control management and control integration platform includes data acquisition, data storage, data processing, data access, supporting tool, platform management and application development platform, and wherein data acquisition adopts the data collection engine, data storage includes real-time database and relational database, realizes the storage of data such as real-time/historical data, warning, document, the supporting tool includes tools such as configuration, report form and Web service, supporting platform secondary development.
Further, the application platform development comprises application development, application deployment and application access.
Further, the platform management is a basic function of the management and control integrated platform, and the platform management comprises: configuration management, authority management, resource monitoring, log management, backup and recovery and the like.
Furthermore, the data acquisition comprises a monitoring system, a water regime system, an electric energy system and a guarantee system, wherein the monitoring system calculates all data by a central control center basin, and the guarantee system undertakes to transmit three types of data including fault brief report, wave recording file and substation on-off state to a server of the data platform and the security area in a FTP (file transfer protocol) file transmission mode. The data platform establishes three sub-folders under an appointed folder, the three sub-folders are fault, wave and comm, a fault report file is stored under the fault folder, a wave recording file is stored under the wave folder, and a substation on-off state file is stored under the comm folder.
Further, the electric energy system is including inserting the power plant, inserting data, unit, power plant and the electric quantity that adds up, it includes electric quantity and end code to insert data, the unit includes station power consumption, generated energy and net electric quantity, the power plant includes generated energy, net electric quantity, direct station power consumption, synthesizes station power consumption, reactive power quantity (burden), reactive power quantity (positive), two-way reactive power quantity, 500kv side net electric quantity and 500kv side net electric quantity.
The invention has the beneficial effects that: the management and control integrated platform reduces the configuration of system equipment and software and saves the investment cost of the system; the large data comprehensive analysis is realized, the fault handling capacity is improved, the accident faults are reduced, the stable operation time of the system is greatly improved, the power generation efficiency is improved, and the overhaul and maintenance cost is reduced; the labor intensity of personnel is reduced, and the personnel allocation is reduced;
the technical support condition of steady propulsion is provided for unattended operation, the key effects of reducing and improving efficiency and managing the power plant are achieved, and the labor cost is saved by nearly hundred million yuan.
The platform provides external interfaces and display data in a specified range, and provides technical support for external business and enterprise culture propaganda of companies; the construction and application of the management and control integrated platform are originated in the centralized control center of the drainage basin of the domestic hydropower plant, and the management and control integrated platform provides wide experience for system integration and data analysis and application in the same industry, and has great social benefit influence.
The application of the integrated platform for centralized control and management brings considerable economic benefits and huge social benefits for companies, in addition, the achievement is implemented and applied in the business fields of operation, water regime, automation, information protection and the like of the centralized control center, the platform application business covers the power stations of the company's Langchan river basin, information barriers among business systems are broken, data islands are solved, a uniform data model is provided for the business systems, the aggregation of production data of all power stations of the company is realized for the first time, and a big data prototype of the centralized control center is constructed.
Detailed Description
In order to make the technical means, the creation characteristics, the achievement purposes and the effects of the invention easily understood, the invention is further explained by combining the specific embodiments.
The invention provides a technical scheme that: the basin centralized control and management control integrated platform comprises a data acquisition, a data storage, data processing, data access, a support tool, a platform management and an application development platform, wherein the data acquisition adopts a data collection engine, the data storage comprises a real-time database and a relational database, the storage of data such as real-time/historical data, alarm and document is realized, the support tool comprises tools such as configuration, report forms and Web services, and the support platform is used for secondary development.
The application platform development comprises application development, application deployment and application access.
The platform management is the basic function of management and control integration platform, the platform management includes: configuration management, rights management, resource monitoring, log management, backup and restore, etc.
The data acquisition system comprises a monitoring system, a water regime system, an electric energy system and a letter protection system, wherein the monitoring system calculates all data by a central control center drainage basin, and the letter protection system is responsible for sending three types of data, namely a fault brief report, a wave recording file and a substation on-off state to a server of a data platform and a safety area in an FTP (file transfer protocol) file transmission mode. The data platform establishes three sub-folders under the appointed folder, the three sub-folders are fault, wave and comm, the fault folder stores the fault report file, and the file name is as follows: xml (time format: yyyyMMdd _ hhmmss _ zzz), the main signal-protecting station transmits the file when the system has a power grid accident, the wave recording file is stored under the wave folder, and the file name is as follows: the station name, the device name, the original file name, the extension name, hdr, cfg, dat, and the file content are standard comtrade files. The communication protection main station sends the recording file when receiving the recording file sent by the substation, the comm folder stores the on-off state file of the substation, and the file name is as follows: comm _ time. csv (time format: yyyyMMdd _ hhmmss _ zzz), the file content is: station name, on/off. The trusted master uploads the file every 5 minutes.
The file security master station is responsible for storage, the data platform is responsible for deletion, and full redundancy deployment is adopted integrally, so that data loss caused by system failure is reduced to the greatest extent; the monitoring system calls the Hisoon real-time data interface to send data to the Hisoon real-time database, the Hisoon real-time database interface provides a caching function at the monitoring system side, and when system power failure, network interruption and the like occur, data loss can be prevented through the caching function of the interface, and data safety is guaranteed.
The electric energy system is including inserting the power plant, inserting data, unit, power plant and accumulation electric quantity, it includes electric quantity and end code to insert data, the unit includes station power consumption, generated energy and the electric quantity of going to the net, the power plant includes generated energy, the electric quantity of going to the net, direct station power consumption, synthesizes station power consumption, reactive power quantity (negative), reactive power quantity (positive), two-way reactive power quantity, 500kv side net electric quantity of going to the net and 500kv side net electric quantity of going to the net, through distributed data collection, will monitor, the production operation data of system such as regimen, electric energy, guarantor's letter summarization for scattered data can effectively manage and utilize in each system in the enterprise. All the systems can comprehensively and uniformly utilize the service data of all the systems through the uniform data access interface, the data utilization rate is improved, and the data and service fusion of a plurality of subsystems of the centralized control center is realized. On the basis of multi-system data fusion, various advanced technical means such as customized application and report development, video monitoring, equipment state detection, centralized control center intellectualization and the like are provided, a scientific basis is provided for comprehensive management and decision making of the centralized control center, the operation and maintenance cost of the system is reduced, and the production efficiency is improved.
While there have been shown and described what are at present considered the fundamental principles of the invention and its essential features and advantages, it will be apparent to those skilled in the art that the invention is not limited to the details of the foregoing exemplary embodiments, but is capable of other specific forms of practicing the invention without departing from the spirit or essential characteristics thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. The claims should not be construed to limit the claims to which they pertain.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single technical solution, and such description of the embodiments is only for the sake of clarity, and those skilled in the art should take the description as a whole, and the technical solutions in the embodiments may be combined appropriately to form other embodiments that those skilled in the art can understand.

Claims (5)

1. The utility model provides a basin centralized control management and control integration platform which characterized in that: the basin centralized control and management integrated platform comprises data acquisition, data storage, data processing, data access, a supporting tool, platform management and an application development platform, wherein the data acquisition adopts a data collection engine, the data storage comprises a real-time database and a relational database, the storage of data such as real-time/historical data, alarm, documents and the like is realized, the supporting tool comprises tools such as configuration, reports, Web services and the like, and the supporting platform is used for secondary development.
2. The basin centralized control and management integrated platform according to claim 1, characterized in that: the application platform development comprises application development, application deployment and application access.
3. The basin centralized control and management integrated platform according to claim 1, characterized in that: the platform management is the basic function of management and control integration platform, the platform management includes: configuration management, authority management, resource monitoring, log management, backup and recovery and the like.
4. The basin centralized control and management integrated platform according to claim 1, characterized in that: the data acquisition system comprises a monitoring system, a water regime system, an electric energy system and a letter protection system, wherein the monitoring system calculates all data by a central control center drainage basin, and the letter protection system is responsible for sending three types of data, namely a fault brief report, a wave recording file and a substation on-off state to a server of a data platform and a safety area in an FTP (file transfer protocol) file transmission mode. The data platform establishes three sub-folders under an appointed folder, the three sub-folders are fault, wave and comm, a fault report file is stored under the fault folder, a wave recording file is stored under the wave folder, and a substation on-off state file is stored under the comm folder.
5. The basin centralized control and management integrated platform according to claim 1, characterized in that: the electric energy system is including inserting the power plant, inserting data, unit, power plant and accumulating the electric quantity, it includes electric quantity and end code to insert the data, the unit includes station power consumption, generated energy and net surfing electric quantity, the power plant includes generated energy, net surfing electric quantity, direct station power consumption, synthesizes station power consumption, reactive power quantity (burden), reactive power quantity (positive), two-way reactive power quantity, 500kv side net surfing electric quantity and 500kv side net electric quantity.
CN202110942154.2A 2021-08-17 2021-08-17 Basin centralized control management and control integrated platform Pending CN113807808A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110942154.2A CN113807808A (en) 2021-08-17 2021-08-17 Basin centralized control management and control integrated platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110942154.2A CN113807808A (en) 2021-08-17 2021-08-17 Basin centralized control management and control integrated platform

Publications (1)

Publication Number Publication Date
CN113807808A true CN113807808A (en) 2021-12-17

Family

ID=78893709

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110942154.2A Pending CN113807808A (en) 2021-08-17 2021-08-17 Basin centralized control management and control integrated platform

Country Status (1)

Country Link
CN (1) CN113807808A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109670982A (en) * 2018-12-04 2019-04-23 上海欣能信息科技发展有限公司 A kind of electric service plateform system of fusion fortune inspection intelligence control system
CN110033102A (en) * 2019-03-21 2019-07-19 华能澜沧江水电股份有限公司 A kind of huge hydroelectric power plant has the intelligent diagnosing method and expert system of learning functionality
CN112014689A (en) * 2020-10-19 2020-12-01 国网江西省电力有限公司电力科学研究院 Method and device for diagnosing abnormity of current sampling loop
CN112488502A (en) * 2020-11-30 2021-03-12 南水北调东线江苏水源有限责任公司 Standard water resource management integrated management and control platform

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109670982A (en) * 2018-12-04 2019-04-23 上海欣能信息科技发展有限公司 A kind of electric service plateform system of fusion fortune inspection intelligence control system
CN110033102A (en) * 2019-03-21 2019-07-19 华能澜沧江水电股份有限公司 A kind of huge hydroelectric power plant has the intelligent diagnosing method and expert system of learning functionality
CN112014689A (en) * 2020-10-19 2020-12-01 国网江西省电力有限公司电力科学研究院 Method and device for diagnosing abnormity of current sampling loop
CN112488502A (en) * 2020-11-30 2021-03-12 南水北调东线江苏水源有限责任公司 Standard water resource management integrated management and control platform

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
王昱倩: "澜沧江流域梯级水电系统水库调度智能化概述", 水利技术监督, no. 5, pages 59 - 61 *
许良柱;张涛;陈荣;朱勇;吕志来;雷宪章;张野飚;康新民;: "集控中心全景状态监测系统研究与设计", 电力信息化, no. 06, pages 51 - 56 *
黄威: "多河流流域水电集控中心综合自动化系统平台设计与实现研究", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》, no. 07, pages 037 - 64 *

Similar Documents

Publication Publication Date Title
CN109638964B (en) Multi-element power grid information interaction system and method based on edge computing architecture
CN102518553B (en) Remote real-time monitoring system used for wind power station group
CN102842914B (en) Energy storage power station monitoring system
CN205901441U (en) Management and control system is concentrated in new forms of energy power station
CN104808615A (en) Method of automatically generating power device monitoring information table
CN108173261B (en) New energy grid-connected active high-reliability automatic control system
CN210422883U (en) Multi-wind-field fan electric centralized control system based on c/s framework
CN105226726A (en) A kind of photovoltaic plant centralized monitoring system
CN115483701A (en) Regional autonomous hierarchical regulation and control method for active power distribution network based on power distribution automation master station system
CN211790786U (en) Client side energy storage energy management system
CN113807808A (en) Basin centralized control management and control integrated platform
CN116846920A (en) Intelligent supervision real-time monitoring system
CN210469386U (en) High-performance wave recording main station architecture
CN113659704A (en) Remote monitoring system for new energy power station
Wang et al. RETRACTED: Research and Implementation of The Fault Information System FOR Relay Protection Based on Cloud Computing Technology
Baodi et al. Design and Application of Regional Multi-energy Complementary Distributed Energy Management and Control Platform Based on Big Data
CN105305623A (en) Distributed generation information management and control system
Zheng et al. Design and Application of Distribution Network Operation Control System Based on Synchronous Phasor Measurement Information
Qi et al. Construction and implementation of power grid dispatching interactive system based on Internet
CN213521409U (en) Power grid monitoring and early warning system
CN212321764U (en) Novel high-voltage overhead line fault early warning and positioning system
CN112217279B (en) Local unified management method of power distribution equipment based on edge computing technology
CN219372094U (en) New energy station panoramic monitoring system
CN220358880U (en) Substation automation system capable of being partitioned
Ji et al. Intelligent anti misoperation system for power grid dispatching of regions and counties

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination