CN109189691A - A kind of test case used time recording method, device and equipment - Google Patents

A kind of test case used time recording method, device and equipment Download PDF

Info

Publication number
CN109189691A
CN109189691A CN201811093925.XA CN201811093925A CN109189691A CN 109189691 A CN109189691 A CN 109189691A CN 201811093925 A CN201811093925 A CN 201811093925A CN 109189691 A CN109189691 A CN 109189691A
Authority
CN
China
Prior art keywords
test
test case
case
report
timing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811093925.XA
Other languages
Chinese (zh)
Inventor
王杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Yunhai Information Technology Co Ltd
Original Assignee
Zhengzhou Yunhai Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Yunhai Information Technology Co Ltd filed Critical Zhengzhou Yunhai Information Technology Co Ltd
Priority to CN201811093925.XA priority Critical patent/CN109189691A/en
Publication of CN109189691A publication Critical patent/CN109189691A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/36Preventing errors by testing or debugging software
    • G06F11/3668Software testing
    • G06F11/3672Test management
    • G06F11/3684Test management for test design, e.g. generating new test cases
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/36Preventing errors by testing or debugging software
    • G06F11/3668Software testing
    • G06F11/3672Test management
    • G06F11/3688Test management for test execution, e.g. scheduling of test suites
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/36Preventing errors by testing or debugging software
    • G06F11/3668Software testing
    • G06F11/3672Test management
    • G06F11/3692Test management for test results analysis

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Debugging And Monitoring (AREA)

Abstract

The invention discloses a kind of test case used time recording methods, comprising: saves preset test frame, is packaged with timing tool in test frame;Test case is generated based on test frame;When test case is run, by the call instruction in test case, the runing time of timing tool record test case is called;After the completion of test case operation, generates test report and the runing time of test case is added in test report.The present invention is capable of the runing time of statistical test use-case and is added it in test report so that staff is subsequent can to carry out runing time relevant analysis processing according to test report, test report it is analytical preferably, application range is wider.The present invention also provides a kind of device and equipment based on the above method.

Description

A kind of test case used time recording method, device and equipment
Technical field
The present invention relates to automatization testing technique fields, more particularly to a kind of test case used time recording method, device And equipment.
Background technique
With the development of computer, the demand of test program is also increasing, a kind of currently used automatic test side Formula is to carry it into the test frame built in advance, after the test case information for receiving staff's input in test block Test case is generated on the basis of frame, test case automatically generates test report later after the completion of executing.
But currently, the data item for providing analysis test process in test report usually only includes the test knot of various pieces Fruit, such as whether each part of detecting is successfully tested and the practical movement etc. used of test object, and do not include the test and use The runing time of example, so that test result is not enough to clearly reflect a test process, staff can not be according to test Report is intuitive to carry out the relevant analysis processing of runing time, test report it is analytical poor, application range is relatively narrow.
Therefore, how to provide the analytical stronger test case used time recording method of one kind, device and equipment is this field The current problem to be solved of technical staff.
Summary of the invention
The object of the present invention is to provide a kind of test case used time recording method, device and equipment, being capable of statistical test use The runing time of example simultaneously adds it in test report, so that staff is subsequent when can run according to test report Between relevant analysis processing, test report it is analytical preferably, application range is wider.
In order to solve the above technical problems, the present invention provides a kind of test case used time recording methods, comprising:
Preset test frame is saved, is packaged with timing tool in the test frame;
Test case is generated based on the test frame;
When the test case is run, by the call instruction in the test case, the timing tool is called to record The runing time of the test case;
After the completion of the test case operation, generates test report and the runing time of the test case is added to institute It states in test report.
Preferably, the call instruction by the test case, calls the timing tool to record the test The process of the runing time of use-case specifically includes:
When the test case brings into operation, by the starting call instruction in the test case, the timing is called Tool starts timing;
After the completion of the test case operation, by the termination call instruction in the test case, the timing is called Tool stops timing, and obtains runing time of the record time of the timing tool as the test case, described in control Timing tool is reset.
Preferably, when comprising multiple test cases, the generation test report and when by the operation of the test case Between be added to the process in the test report specifically:
The runing time of the test case after the completion of caching operation;
After the completion of whole test cases are run, the test report is generated;
The runing time of each test case of caching is added in the test report.
Preferably, the process that test case is generated based on the test frame specifically:
Receive the test case information of input;The test case information includes: test case title and test statement;
The test is generated according to the trip information being arranged in the test frame and the test case information to use Example.
Preferably, the trip information of setting includes: in the test frame
The total used time threshold value of test case naming rule, test case, test statement redaction rule, the day for saving test result The create-rule of parameter type, the timing tool save location and the call instruction that will catalogue, test result include.
Preferably, the test case information includes: test case title and test statement.
Preferably, before the test case brings into operation, further includes:
Receive the operating instruction of input;
Corresponding test case is searched according to the test case title carried in the operating instruction;
Later, the test case found is run.
It preferably, include multiple timing tools in the test structure;
When the test case is run, called by the call instruction in the test case according to calling rule is preset Idle timing tool in the test structure records the runing time of the test case.
Preferably, the test report is html file.
In order to solve the above technical problems, the present invention also provides a kind of test case used time recording devices, comprising:
Test frame database is packaged with timing tool in the test frame for saving preset test frame;
Test cases technology module, for generating test case based on the test frame;
Timing module, for by the call instruction in the test case, calling institute in test case operation State the runing time that timing tool records the test case;
Report generation module, for after the completion of test case operation, generating test report and using the test The runing time of example is added in the test report.
In order to solve the above technical problems, the present invention also provides a kind of test case used time recording equipments, comprising:
Memory, for storing computer program;
Processor realizes the test case used time record as described in any of the above item when for executing the computer program The step of method.
The present invention provides a kind of test case used time recording methods, and timing tool is encapsulated in test frame, works as operation When the test case of generation, the timing tool that the call instruction in the test case encapsulates before calling enables timing tool The runing time of the test case is enough recorded, when generating test report later, the runing time of test case is added to test In report.As it can be seen that the present invention is capable of the runing time of statistical test use-case and is added it in test report, so that work people When the subsequent foundation test report of member is analyzed, the relevant analysis processing of runing time can be intuitively carried out, test report Analytical preferable, application range is wider.The present invention also provides a kind of device and equipment based on the above method, it is no longer superfluous herein It states.
Detailed description of the invention
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to institute in the prior art and embodiment Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the invention Example, for those of ordinary skill in the art, without creative efforts, can also obtain according to these attached drawings Obtain other attached drawings.
Fig. 1 is a kind of flow chart of the process of test case used time recording method provided by the invention;
Fig. 2 is a kind of structural schematic diagram of test case used time recording device provided by the invention.
Specific embodiment
Core of the invention is to provide a kind of test case used time recording method, device and equipment, can statistical test use The runing time of example simultaneously adds it in test report, so that staff is subsequent when can run according to test report Between relevant analysis processing, test report it is analytical preferably, application range is wider.
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art Every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
Shown in Figure 1 the present invention provides a kind of test case used time recording method, Fig. 1 is provided by the invention one The flow chart of the process of kind test case used time recording method;This method comprises:
Step s1: preset test frame is saved, is packaged with timing tool in test frame;
It is understood that test frame is that test development is formed extraction specific area test method general character part in the process Architecture, specifically for limiting redaction rule and the parameter informations such as operation rule of test case, actual test process In, after bringing the test statement based on actual test object that staff inputs into test frame, it can access complete Test case.This mode can reduce the workload of staff, keep staff equal when need not write test case every time It needs to be configured the part (such as test report output position, test case naming rule) of certain general character, improves test The formation efficiency of use-case.
In the present invention, timing tool is encapsulated to test frame, be because in the present invention timing tool belong to it is each The tool that test case can be called belongs to the general character part of different test cases, be encapsulated in timing tool after, can So that staff does not need to input the program in relation to timing tool every time, thus simple when generating specific test case The generating process for changing test case, reduces the workload of staff.Also, since test case is generated based on test frame , timing tool is packaged in test frame, is packaged in other positions compared to by timing tool, can be facilitated in test case In operational process, by the command adapted thereto in test case to the calling of timing tool.
Step s2: test case is generated based on test frame;
It is understood that due to being packaged with timing tool in test frame, when in order to run follow-up test use-case, energy It enough calls timing tool to record the runing time of test case, therefore the generation comprising call instruction is needed to advise in test frame It then, and based on test frame include the call instruction for calling timing tool in the test case generated.Such case Under, when each test case is run, timing tool just will receive calling to record the runing time of each test case, to mention The analyticity of high test result.
Step s3: when test case is run, by the call instruction in test case, timing tool record test is called to use The runing time of example;
Step s4: it after the completion of test case operation, generates test report and the runing time of test case is added to survey In examination report.
The present invention encapsulates timing tool in test frame, when the test case that operation generates, in the test case The timing tool that call instruction encapsulates before calling, makes timing tool be able to record the runing time of the test case, later When generating test report, the runing time of test case is added in test report.As it can be seen that the present invention being capable of statistical test use The runing time of example simultaneously adds it in test report, when so that the subsequent foundation test report of staff being analyzed, energy It is enough intuitive to carry out the relevant analysis processing of runing time, test report it is analytical preferably, application range is wider.
In an advantageous embodiment, the process in step s3 specifically includes:
When test case brings into operation, by the starting call instruction in test case, timing tool is called to start timing;
After the completion of test case operation, by the termination call instruction in test case, timing tool is called to stop timing, And runing time of the record time of timing tool as test case is obtained, control timing tool is reset.
It is understood that the present invention calls the purpose of timing tool, it is to make timing tool be able to record that test is used The runing time of example, therefore in order to realize the purpose, need to make timing tool be able to know that test case when bring into operation with And when terminate to run, to guarantee that the time of timing tool record is equal to the runing time of test case.Therefore in the present embodiment, Call instruction and termination call instruction are originated by adding in test case, is come respectively when test case originates and terminates, Corresponding triggering timing tool starts timing and terminates timing, and when ensure that timing tool stops working, the result of record is straight The runing time equal to test case is connect, this timing mode accuracy is higher.Also, since generally there are multiple tests use Therefore, but after the result reading that timing tool is recorded example needs to control timing tool clearing, to facilitate follow-up test Use-case carries out timing.
In other embodiments, the runing time that other modes obtain test case also can be used, for example, can be not provided with Call instruction is terminated, but setting terminates reading instruction in test case, i.e., when test case operation is completed, passes through test use Instruction is read in termination in example, reads the current record data of timing tool, and controls timing tool clearing.Certainly, it can also adopt Above-mentioned purpose is realized in other ways, and this is not limited by the present invention.
In addition, a timing tool is only arranged in the present invention preferably in test structure, this is to reduce test structure Data volume, but under the very more scene of test case, if each test case must if an only timing tool It must serially run, successively to call timing tool, will affect the overall operation efficiency of test case in this way.Therefore, in order to avoid Multiple testing tools can be arranged in above situation in test structure.In this case, when each test case is run, pass through Call instruction in the test case calls the idle timing tool in test structure to record the survey according to calling rule is preset The runing time of example on probation.Here default calling rule can be random or poll etc., and this is not limited by the present invention.When So, the present invention also unlimited setting number for determining timing tool.
In different application scenarios, the test case can be generated after every operation for completing a test case Corresponding test report, or can also be after completing multiple test cases, then unified generation includes the survey of these test cases The test report of test result is specific to be not construed as limiting using which kind of above mode present invention.
In a specific embodiment, it when comprising multiple test cases, in step s4, generates test report and will test The runing time of use-case is added to the process in test report specifically:
The runing time of test case after the completion of caching operation;
After the completion of whole test cases are run, test report is generated;
The runing time of each test case of caching is added in test report.
It is understood that staff may may require that a collection of test case of operation, if often under certain application scenarios If a test case generates test report, staff may be inconvenient when checking test result, be also not easy into The result of each test case of row compares, it is therefore desirable to which the result of this collection of test case is input to the same test report In.If only including a timing tool in test structure, each test case needs successively to be tested, in this case, Since timing tool can be reset, therefore need temporarily to delay the test result for the test case that operation finishes and runing time It deposits, after waiting other test cases to run, then is uniformly input in test report.If in test structure including multiple timing Tool, since the runing time of different test cases is likely to different, the time that test case operation finishes is also different, Therefore the test case in order to wait not running to finish, it is also desirable to when by the test result and operation that first run the test case finished Between cached.In addition, a data area can be separately provided in the runing time and test result of cache test use-case It as buffer zone, or can also be cached to test report, generate the rough draft of test report, when whole test cases are equal After the completion of operation, test report is just generated and is finished.Which kind of cache way is specifically used, the present invention is not construed as limiting.
Specifically, the process of step s2 specifically:
Receive the test case information of input;Test case information includes: test case title and test statement;
Test case is generated according to the trip information and test case information being arranged in test frame.
It is understood that if test case information is only comprising if test statement, rear end generates according to test frame and surveys When example on probation, the test case title that the title of test case then can be generated at random, and be generated at random would generally be more irregular, When follow-up work personnel check test result, it is not easy to differentiate the corresponding pass of test case title with the test statement inputted before System, it has not been convenient to understanding of the staff to test result.Therefore, include test case title in test case information, make to survey The naming rule of example title on probation can meet the habit of staff, check and analyze test knot convenient for staff is subsequent Fruit.
Further, before test case brings into operation, further includes:
Receive the operating instruction of input;
Corresponding test case is searched according to the test case title carried in operating instruction;
Later, the test case found is run.
It is understood that when there are multiple test cases, if these test cases are saved in advance, When subsequent desired some test case of control is run, then the test case title by carrying in received operating instruction is needed It is searched, and then controls operation.Certainly, it if the whole test case operations of subsequent desired control, is not required in operating instruction Test case title is carried, but is directly successively run according to the preservation sequence of each test case.
Specifically, the trip information being arranged in test frame includes:
The total used time threshold value of test case naming rule, test case, test statement redaction rule, the day for saving test result The create-rule of parameter type, timing tool save location and call instruction that will catalogue, test result include.In addition, also It may include the file type of test report, statement law of test report etc..Such as test report can be HTML (HyperText Markup Language, hypertext markup language) file.Certainly, the present invention is not limited in test frame and is set The particular content for the trip information set, staff can set according to actual needs.
Shown in Figure 2 the present invention also provides a kind of test case used time recording device, Fig. 2 is provided by the invention A kind of structural schematic diagram of test case used time recording device.The device includes:
Test frame database 1 is packaged with timing tool in test frame for saving preset test frame;
Test cases technology module 2, for generating test case based on test frame;
Timing module 3, for by the call instruction in test case, calling timing tool in test case operation Record the runing time of test case;
Report generation module 4, for generating test report and the operation by test case after the completion of test case operation Time is added in test report.
In a preferred embodiment, timing module 3 specifically includes:
Start trigger unit, for by the starting call instruction in test case, adjusting when test case brings into operation Start timing with timing tool;
Trigger unit is terminated, for by the termination call instruction in test case, adjusting after the completion of test case operation Stop timing with timing tool, and obtain runing time of the record time of timing tool as test case, controls timeworker Tool is reset.
In a preferred embodiment, when comprising multiple test cases, report generation module 4 is specifically included:
Cache unit, for caching the runing time of the test case after the completion of running;
Report generation unit, for generating test report after the completion of whole test cases are run;
Time adding unit, for the runing time of each test case of caching to be added in test report.
Preferably, Test cases technology module 2 specifically includes:
Receiving unit, test case information for receiving input;
Use-case generation unit is surveyed for generating according to the trip information and test case information that are arranged in test frame Example on probation.
Preferably, further includes:
Searching module, operating instruction for receiving input;It is searched according to the test case title carried in operating instruction Corresponding test case;Run the test case found, triggering timing module 3.
The present invention also provides a kind of test case used time recording equipments, comprising:
Memory, for storing computer program;
Processor realizes the step of the test case used time recording method such as any of the above item when for executing computer program Suddenly.
Above several specific embodiments are only the preferred embodiment of the present invention, and above several specific embodiments can be with Any combination, the embodiment obtained after combination is also within protection scope of the present invention.It should be pointed out that for the art For those of ordinary skill, relevant speciality technical staff deduced out in the case where not departing from spirit of that invention and concept thereof other change Into and variation, should all be included in the protection scope of the present invention.
It should also be noted that, in the present specification, the terms "include", "comprise" or its any other variant are intended to contain Lid non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that There is also other identical elements in process, method, article or equipment including the element.

Claims (10)

1. a kind of test case used time recording method characterized by comprising
Preset test frame is saved, is packaged with timing tool in the test frame;
Test case is generated based on the test frame;
When the test case is run, by the call instruction in the test case, call described in the timing tool record The runing time of test case;
After the completion of the test case operation, generates test report and the runing time of the test case is added to the survey In examination report.
2. test case used time recording method according to claim 1, which is characterized in that described to pass through the test case Interior call instruction, the process for calling the timing tool to record the runing time of the test case specifically include:
When the test case brings into operation, by the starting call instruction in the test case, the timing tool is called Start timing;
After the completion of the test case operation, by the termination call instruction in the test case, the timing tool is called Stop timing, and obtain runing time of the record time of the timing tool as the test case, controls the timing Tool is reset.
3. test case used time recording method according to claim 1, which is characterized in that when including multiple test cases When, the process for generating test report and the runing time of the test case being added in the test report is specific Are as follows:
The runing time of the test case after the completion of caching operation;
After the completion of whole test cases are run, the test report is generated;
The runing time of each test case of caching is added in the test report.
4. test case used time recording method according to claim 1, which is characterized in that described to be based on the test frame Generate the process of test case specifically:
Receive the test case information of input;The test case information includes: test case title and test statement;
The test case is generated according to the trip information being arranged in the test frame and the test case information.
5. test case used time recording method according to claim 4, which is characterized in that be arranged in the test frame Trip information includes:
The total used time threshold value of test case naming rule, test case, test statement redaction rule, the log mesh for saving test result The create-rule of parameter type, the timing tool save location and the call instruction that record, test result include.
6. test case used time recording method according to claim 4, which is characterized in that the test case brings into operation Before, further includes:
Receive the operating instruction of input;
Corresponding test case is searched according to the test case title carried in the operating instruction;
Later, the test case found is run.
7. test case used time recording method according to claim 1, which is characterized in that comprising more in the test structure A timing tool;
When the test case is run, by the call instruction in the test case, according to presetting calling rule, described in calling Idle timing tool in test structure records the runing time of the test case.
8. test case used time recording method according to claim 1, which is characterized in that the test report is HTML text Part.
9. a kind of test case used time recording device characterized by comprising
Test frame database is packaged with timing tool in the test frame for saving preset test frame;
Test cases technology module, for generating test case based on the test frame;
Timing module, for by the call instruction in the test case, calling the meter in test case operation When tool records described in test case runing time;
Report generation module, for generating test report and by the test case after the completion of test case operation Runing time is added in the test report.
10. a kind of test case used time recording equipment characterized by comprising
Memory, for storing computer program;
Processor realizes the test case used time as claimed in any one of claims 1 to 8 when for executing the computer program The step of recording method.
CN201811093925.XA 2018-09-19 2018-09-19 A kind of test case used time recording method, device and equipment Pending CN109189691A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811093925.XA CN109189691A (en) 2018-09-19 2018-09-19 A kind of test case used time recording method, device and equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811093925.XA CN109189691A (en) 2018-09-19 2018-09-19 A kind of test case used time recording method, device and equipment

Publications (1)

Publication Number Publication Date
CN109189691A true CN109189691A (en) 2019-01-11

Family

ID=64908412

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811093925.XA Pending CN109189691A (en) 2018-09-19 2018-09-19 A kind of test case used time recording method, device and equipment

Country Status (1)

Country Link
CN (1) CN109189691A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113495546A (en) * 2020-03-20 2021-10-12 北京新能源汽车股份有限公司 Method, controller and test bench for realizing automatic test of test cases

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105824748A (en) * 2015-01-22 2016-08-03 国际商业机器公司 Determining test case efficiency
CN106844196A (en) * 2016-12-22 2017-06-13 福建瑞之付微电子有限公司 A kind of payment terminal embedded software test Workload Account system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105824748A (en) * 2015-01-22 2016-08-03 国际商业机器公司 Determining test case efficiency
CN106844196A (en) * 2016-12-22 2017-06-13 福建瑞之付微电子有限公司 A kind of payment terminal embedded software test Workload Account system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
HAGYAO520(KING): "性能测试工具 Performance 自动化解决方案 [开源项目] 基于 JMeter 的性能自动化测试框架完美版", 《HTTPS://TESTERHOME.COM/TOPICS/13610》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113495546A (en) * 2020-03-20 2021-10-12 北京新能源汽车股份有限公司 Method, controller and test bench for realizing automatic test of test cases
CN113495546B (en) * 2020-03-20 2022-11-15 北京新能源汽车股份有限公司 Method, controller and test bench for realizing automatic test of test cases

Similar Documents

Publication Publication Date Title
CN107273280B (en) Log processing method and device, electronic equipment and storage medium
CN107341098B (en) Software performance testing method, platform, equipment and storage medium
CN104699598B (en) Automated testing method, device, equipment and system
CN109871326A (en) A kind of method and apparatus that script is recorded
CN110457277A (en) Service process performance analysis method, device, equipment and storage medium
CN102841789A (en) Method and device for recording and playing back user operations in browser
CN103927255A (en) Software testing method based on cloud testing system, cloud testing system and client side of cloud testing system
CN110489319B (en) Interface performance test analysis method and storage medium
CN105630566A (en) Application page loading duration determining method and application page loading duration determining device
CN105677306A (en) Automation script compiling method and device
CN105279092A (en) Software testing method and apparatus
CN111259212B (en) Telemetering data interpretation method, device, equipment and storage medium
CN110597704A (en) Application program pressure testing method, device, server and medium
CN108984374B (en) Method and system for testing database performance
CN109189691A (en) A kind of test case used time recording method, device and equipment
CN110019077A (en) Log inquiring method, device, equipment and computer readable storage medium
WO2019051714A1 (en) Test method and test apparatus for application memory of smart device
CN111026657B (en) Method, computing device and medium for testing application in mobile terminal
CN112363915A (en) Method and device for page performance test, terminal equipment and storage medium
CN114095396A (en) Intelligent substation data communication detection method, system, equipment and storage medium
CN106775480A (en) A kind of real-time monitoring system data recording method based on LabVIEW
CN107885649A (en) The performance test methods and device of IOS application programs
CN113779117A (en) Data monitoring method and device, storage medium and electronic equipment
CN211352457U (en) Mobile application system based on micro-service
CN112612707B (en) Method and device for running test script, equipment and computer readable storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190111