CN106844196A - A kind of payment terminal embedded software test Workload Account system - Google Patents
A kind of payment terminal embedded software test Workload Account system Download PDFInfo
- Publication number
- CN106844196A CN106844196A CN201611198262.9A CN201611198262A CN106844196A CN 106844196 A CN106844196 A CN 106844196A CN 201611198262 A CN201611198262 A CN 201611198262A CN 106844196 A CN106844196 A CN 106844196A
- Authority
- CN
- China
- Prior art keywords
- test
- module
- case
- unit
- integration
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/36—Preventing errors by testing or debugging software
- G06F11/3668—Software testing
- G06F11/3672—Test management
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- Quality & Reliability (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Debugging And Monitoring (AREA)
Abstract
The present invention relates to a kind of payment terminal embedded software test Workload Account system, the payment terminal that the system is equipped with software to be tested with some respectively coordinates, including:One test assignment division module, a unit testing use-case control module, an integration test use-case control module, a unit testing module, an integration test module, a time statistical module, a task number of times statistical module, a data uploading unit and a total test job amount statistic unit.Payment terminal embedded software test Workload Account system provided by the present invention, there is provided it is a kind of it is easy-to-use it is feasible, become more meticulous, the method for the test job amount statistics suitable for embedded software system that there are enough data to support, can flexibly be extended according to newly-increased testing requirement.
Description
Technical field
The present invention relates to payment terminal embedded software test Workload Account, particularly a kind of payment terminal embedded software
Part test job volume statistic system.
Background technology
Existing payment terminal embedded software test needs to carry out all functional modules unit, pressure, intersection, property
Energy, compatibility, reliability, ease for use etc. are tested, and a set of are carried than more complete test case and testing standard even if having had
For test execution, but because the robustness of embedded system ground complexity, tester's operating efficiency difference, tested version is poor
The reason such as different never has a kind of comparing, and precisely efficient method counts the test required for completing submersible software test
Time.
The existing statistical test workload method of IT industries has:Ad-hoc methods, the percentage method of development time, analogy method
(Empirical value method or historical data method)、WBS(work breakdown structure)Estimation algorithm etc., but the presence of these methods:
Need dependence development amount, statistics difference is big, inefficient, error is larger, measurement is according to not enough (because no data is supported
And upper-level leader cannot be persuaded), flexibility ratio not enough etc. defect.It is easy-to-use feasible the invention provides one kind to solve the problems, such as appeal
, become more meticulous, the method for the test job amount statistics suitable for embedded software system that there are enough data to support;And should
Method can flexibly extend according to newly-increased testing requirement.
The content of the invention
It is existing to overcome it is an object of the invention to provide a kind of payment terminal embedded software test Workload Account system
There is defect present in technology.
To achieve the above object, the technical scheme is that:A kind of payment terminal embedded software test workload system
Meter systems, the payment terminal that the system is equipped with software to be tested with some respectively coordinates, including:One test assignment divides mould
Block, a unit testing use-case control module, an integration test use-case control module, a unit testing module, an integration test mould
Block, a time statistical module, a task number of times statistical module, a data uploading unit and a total test job amount statistics are single
Unit;The test assignment division module is controlled with the unit testing use-case control module and the integration test use-case respectively
Module is connected, and the unit testing use-case control module is connected with the unit testing module, the integration test use-case control
Module is connected with the integration test module, the time statistical module respectively with the unit testing module and the synthesis
Test module be connected, the task number of times statistical module respectively with the unit testing module and the integration test module phase
Even, the data uploading unit respectively with the time statistical module, the task number of times statistical module and total test
Workload Account unit is connected;Software to be tested is carried out function division by the test assignment division module, and by division result
It is transmitted separately to the unit testing use-case control module and the integration test use-case control module;The unit testing is used
Example control module and integration test use-case control module obtain corresponding test case according to division result respectively, and will correspondence
Test case transmit to the unit testing module and the integration test module;The unit testing module and described comprehensive
Close test module respectively to test the payment terminal for carrying the software to be tested by test case, the time counts mould
Block and the task number of times statistical module count execution time and test execution number of times respectively, and through leaflet in the data
Unit is uploaded to total test job amount statistic unit, and then obtains total test job amount.
In an embodiment of the present invention, the test assignment division module is according to the software function module group to be tested
Function division is carried out to the software to be tested into, the type of hardware carried of default test request and software to be tested, is obtained
Functional module in the tape test software;The functional module includes:Wireless module, wifi module, ethernet module, bluetooth mould
Block, contact-type IC card module, contactless card module and file system.
In an embodiment of the present invention, the unit testing use-case control module and the unit testing use-case data storehouse phase
Even, the integration test use-case control module is connected with the integration test use-case data storehouse, the unit testing use-case control
Module calls corresponding unit testing use-case according to the functional module for obtaining from the unit testing use-case data storehouse;The synthesis
Test case control module calls corresponding integration test according to the functional module for obtaining from the integration test use-case data storehouse
Use-case.
In an embodiment of the present invention, be stored with the following units test case in the unit testing use-case data storehouse:alg
Test case, app test cases, asyn test cases, eth test cases, fs test cases, icc test cases, kb test cases, mag test cases,
Port test cases, ppp test cases and prnt test cases;The integration test use-case data stock contains following integration test and uses
Example:Print performance/pressure test example, MDM performances/pressure test example, ETH performances/pressure test example, wireless performance/pressure are surveyed
Examination example, IC performances/pressure test example, magnetic card performance/pressure test example, security performance/pressure test example, fsys performances/pressure
Test case, serial ports performance/pressure test example and RTC integration tests.
In an embodiment of the present invention, the time statistical module counts unit testing use-case single performs time and comprehensive
Close test case single and perform the time;The task number of times statistical module counts unit testing use-case performs number of times and comprehensive survey
Example on probation performs number of times.
In an embodiment of the present invention, total test job amount statistic unit counts following workload respectively:Unit is surveyed
Examination workloadD, integration test workloadZ, software test number of times to be testedC, carry the payment terminal quantity of the software to be testedS, it is contemplated that workloadL1, it is contemplated that working dayT1, the quantity of BUGL2, the time that single BUG is positioned or reappearedT2, BUG positioning timesT3, total test job amountL2And total test job dayT4。
In an embodiment of the present invention, the unit testing workloadDAccording to the time statistical module counts each
The single of unit testing use-case performs the time and performs number of times and calculates;The integration test workload is counted according to the time
The single of each integration test use-case of module statistics performs the time and performs number of times and calculates;The software test to be tested time
NumberCDetermined according to default test request;The expected workloadL1Calculate in the following way:
;
Estimated working dayT1Calculate in the following way:
;
The quantity of the BUGL2Estimated according to Kilo Lines of Code ratio of defects or obtained according to actual test result;
The single BUG positioning or the time of reproductionT2It is a default average value;
The BUG positioning timesT3Calculate in the following way:
;
Total test job amountL2Calculate in the following way:
;
Total test job dayT4Calculate in the following way:
。
In an embodiment of the present invention, also including a test case perform recording unit, the unit respectively with the unit
Test case control module and the integration test use-case control module are connected, unit testing use-case and synthesis that acquisition is called
Test case, record participates in the unit testing use-case and integration test use-case of test.
In an embodiment of the present invention, also including one with total test job amount statistic unit and the test case
Perform the connected form generation unit of recording unit;The form generation unit is according to unit testing use-case, unit testing use-case
Implementation status, execution time and test execution number of times generate a unit testing table;The form generation unit is according to comprehensive survey
Example on probation, integration test use-case implementation status, execution time and test execution number of times generate an integration test table;The form
Generation unit generates a total test job amount statistical form according to the unit that total test job amount is counted.
Compared to prior art, the invention has the advantages that:
1. by test process use-case perform time quantization and considered test scope, retest, BUG treatment
Influence etc. factor to test job amount, objective and more accurately can estimate out more accurate test job amount.Can use
The workload to new task is assessed before the test begins, and Y or N is filled in by assessing the module of software support, by confirming
The quantity of module hardware configuration fills in individual module test execution number of times, and then calculating the wheel of execution one automatically by the form surveys
Theoretical time required for examination, for the arrangement of test job provides foundation.
2. the quantized result for providing can arrange test plan, item controlled progress etc. to provide important number for project manager
According to foundation:The individual feature module testing time in the form is exported to form after being calculated automatically by test program,
It represents the theoretical time of each functional module test, determines to participate in the module of test, module testing in conjunction with actual task
The information such as number just can more accurately calculate the theoretical time required for completing certain specific test assignment, in this case
The form for arriving can be as the data foundation for formulating test plan.
3. statistics can also be used to carry out the operating efficiency of tester entry evaluation, and for tester examines
According to etc.:After the completion of test job, tester can be according to the version number of actual test, the BUG quantity of discovery, positioning
The information such as the average time that BUG needs, supplement form, calculate a more accurately theoretical time, and test lead can
It is compared with according to the time of the theoretical time and tester's actual consumption, assesses operating efficiency of tester etc..
Brief description of the drawings
Fig. 1 is the systematic schematic diagram of payment terminal embedded software test Workload Account system in the present invention.
Fig. 2 is unit testing table in one embodiment of the invention.
Fig. 3 is integration test table in one embodiment of the invention.
Fig. 4 is total test job amount statistical form in one embodiment of the invention.
Specific embodiment
Below in conjunction with the accompanying drawings, technical scheme is specifically described.
With reference to the analysis to daily test job and testing process, embedded software test can first whole system according to
Function is divided into independent module, then carries out unit testing (referring to functional test) and integration test (except function according still further to module
Test beyond test, comprising:Pressure, intersection, compatibility, ease for use test etc.).Therefore will according to ready-portioned functional module
The test use cases of embedded software system are also carried out same division, and increase timing statisticses in code is tested, by fortune
Row test case counts the execution time of each modular unit test case and integration test test execution respectively.Then will test
Time on be sent in the Microsoft Excel on PC.According to actual task analyze individual module need test number of times (test
Number of times, the decision of hardware number of times that number of times is tested according to version), in conjunction with multiples such as the BUG quantity, the time of positioning BUG for finding
Factor calculates the Mathematical Modeling of total test job amount to set up.Carry out statistical test using excel forms finally according to Mathematical Modeling
Workload.
The invention provides a kind of payment terminal embedded software test Workload Account system, as shown in figure 1, the system
A PC ends are mounted in, and the payment terminal for being equipped with software to be tested with some respectively coordinates, including:One test assignment is divided
Module, a unit testing use-case control module, an integration test use-case control module, a unit testing module, an integration test
Module, a time statistical module, a task number of times statistical module, a data uploading unit and a total test job amount statistics are single
Unit;Test assignment division module is connected with unit testing use-case control module and integration test use-case control module respectively, single
First test case control module is connected with unit testing module, and integration test use-case control module is connected with integration test module,
Time statistical module is connected with unit testing module and integration test module respectively, task number of times statistical module respectively with unit
Test module and integration test module are connected, data uploading unit respectively with time statistical module, task number of times statistical module
And total test job amount statistic unit is connected;Software to be tested is carried out function division by test assignment division module, and will be drawn
Point result is transmitted separately to unit testing use-case control module and integration test use-case control module;Unit testing use-case is controlled
Module and integration test use-case control module obtain corresponding test case according to division result respectively, and by corresponding test
Use-case is transmitted to unit testing module and integration test module;Unit testing module and integration test module are respectively by test
Use-case is tested the payment terminal for carrying the software to be tested, and time statistical module and task number of times statistical module are distinguished
Statistics execution time and test execution number of times, and total test job amount statistic unit is uploaded to through data uploading unit, and then
Obtain total test job amount.
Further, in the present embodiment, test assignment division module is constituted according to software function module to be tested, preset
The type of hardware that test request and software to be tested are carried treats test software carries out function division, obtains the tape test software
In functional module;Functional module includes:Wireless module, wifi module, ethernet module, bluetooth module, Contact Type Ic Card mould
Block, contactless card module and file system etc..
Further, in the present embodiment, unit testing use-case control module is connected with unit testing use-case data storehouse, comprehensive
Close test case control module to be connected with integration test use-case data storehouse, unit testing use-case control module is according to the function of obtaining
Module calls corresponding unit testing use-case from unit testing use-case data storehouse;Integration test use-case control module is according to acquisition
Functional module calls corresponding integration test use-case from integration test use-case data storehouse.
Further, in the present embodiment, be stored with the following units test case in unit testing use-case data storehouse:alg
Test case, app test cases, asyn test cases, eth test cases, fs test cases, icc test cases, kb test cases, mag test cases,
Port test cases, ppp test cases and prnt test cases;Integration test use-case data stock contains following integration test use-case:
Print performance/pressure test example, MDM performances/pressure test example, ETH performances/pressure test example, wireless performance/pressure test
Example, IC performances/pressure test example, magnetic card performance/pressure test example, security performance/pressure test example, fsys performances/pressure are surveyed
Examination example, serial ports performance/pressure test example and RTC integration tests.
Further, in the present embodiment, time statistical module counts unit testing use-case single performs time and comprehensive
Close test case single and perform the time;Task number of times statistical module counts unit testing use-case performs number of times and integration test is used
Example example performs number of times.
Further, in the present embodiment, total test job amount statistic unit counts following workload respectively:Unit testing
WorkloadD, integration test workloadZ, software test number of times to be testedC, carry the payment terminal quantity of the software to be testedS,
Expected workloadL1, it is contemplated that working dayT1, the quantity of BUGL2, the time that single BUG is positioned or reappearedT2, BUG positioning timesT3, total test job amountL2And total test job dayT4。
Unit testing workloadDThe single of each the unit testing use-case according to time statistical module counts perform the time with
And perform number of times calculating;Integration test workloadZThe single of each the integration test use-case according to time statistical module counts is held
Row time and execution number of times are calculated;Total execution time is single time and the product for performing number of times, namely always performs time=mono-
Secondary execution time * performs number of times, and said units test job amount D and integration test workload Z always holds for each test case
Row time sum.
Software test number of times to be testedCDetermined according to default test request;Expected workloadL1Calculate in the following way:
;
Estimated working dayT1Calculate in the following way:
;
The quantity of BUGL2Estimated according to Kilo Lines of Code ratio of defects or obtained according to actual test result;
Single BUG positioning or the time of reproductionT2It is a default average value;
BUG positioning timesT3Calculate in the following way:
;
Total test job amountL2Calculate in the following way:
;
Total test job dayT4Calculate in the following way:
。
Further, in the present embodiment, recording unit also is performed including a test case, the unit is surveyed with unit respectively
Example control module on probation and integration test use-case control module are connected, and the unit testing use-case that acquisition is called is used with integration test
Example, record participates in the unit testing use-case and integration test use-case of test.
Further, in the present embodiment, also performed with total test job amount statistic unit and test case including one
The connected form generation unit of recording unit;Form generation unit according to unit testing use-case, unit testing use-case implementation status,
Execution time and test execution number of times generate a unit testing table;Form generation unit is according to integration test use-case, comprehensive survey
Example implementation status on probation, execution time and test execution number of times generate an integration test table;Form generation unit is according to total survey
The unit for trying Workload Account generates a total test job amount statistical form.
Unit testing table is as shown in Figure 2.First is classified as unit testing project;Whether the mark of secondary series " testing " arranges to control
Making the testing time of which module needs to be calculated in the net cycle time of certain actual test task, when " Y " is extended this as
Expression needs to participate in amount of work statistics;3rd is classified as needed for full unit test of each unit testing use-case execution
Time;4th is classified as each unit testing use-case performs number of times, and the same software module of payment terminal equipment may have multiple
Hardware configuration, One function unit can be run into test process to be needed by multiple test case, therefore provides " execution number of times "
Attribute is performed several times recording each module testing, for example:A software version may work during POS version regression tests
Make on various wireless modules, it is assumed that to test 3 kinds of wireless module hardware, then function ppp related to wireless module is accomplished by
It is performed 3 times, the corresponding number of times that performs just needs to extend this as 3;5th is classified as a class unit test use-case total execution time, namely
The time that one unit testing use-case is repeatedly tested, the train value=single performs time * execution number of times.As shown in figure 3, for comprehensively
Test table.
It is illustrated in figure 4 total test job amount statistical form." unit testing workload " and " integration test work in Fig. 4
Amount " is calculated using the testing time that the data " whether performing " in Fig. 2 and Fig. 3 forms arrange the project for extending this as Y." version
Testing time " is represented:One software may need tested many wheels, and number of times is filled according to test assignment actual conditions before test.
" test prototype number of times " uses how many test equipments simultaneously when representing test, need to be filled according to actual conditions." estimated work
Amount "=(unit testing workload+integration test workload) * versions testing time/(1+ (test prototype number -1)/2);It is " estimated
Working day "=" expected workload "/60/6.Record " quantity of BUG " and " single BUG positioning or multiple are also needed to when testing out BUG
Existing time ", " quantity of BUG " is estimated according to Kilo Lines of Code ratio of defects or filled according to actual test result, " single BUG
Positioning or the time of reproduction " rule of thumb averages, and both just obtain " BUG positioning times " in multiplication.Finally, work is always tested
Measure=be expected test job amount+BUG positioning times." total test job day "=" total test job amount "/60/6.
Above is presently preferred embodiments of the present invention, all changes made according to technical solution of the present invention, produced function work
During with scope without departing from technical solution of the present invention, protection scope of the present invention is belonged to.
Claims (9)
1. a kind of payment terminal embedded software test Workload Account system, the system is equipped with to be tested with some respectively
The payment terminal of software coordinates, it is characterised in that including:One test assignment division module, a unit testing use-case control module,
One integration test use-case control module, a unit testing module, an integration test module, a time statistical module, a task time
Number statistical module, a data uploading unit and a total test job amount statistic unit;The test assignment division module difference
It is connected with the unit testing use-case control module and the integration test use-case control module, the unit testing use-case control
Molding block is connected with the unit testing module, and the integration test use-case control module is connected with the integration test module,
The time statistical module is connected with the unit testing module and the integration test module respectively, the task number of times system
Meter module be connected with the unit testing module and the integration test module respectively, the data uploading unit respectively with institute
The time statistical module, the task number of times statistical module and total test job amount statistic unit is stated to be connected;It is described
Software to be tested is carried out function division by test assignment division module, and division result is transmitted separately into the unit testing use
Example control module and the integration test use-case control module;The unit testing use-case control module and integration test are used
Example control module obtains corresponding test case according to division result respectively, and corresponding test case is transmitted to the unit
Test module and the integration test module;The unit testing module and the integration test module are respectively by testing use
Example is tested the payment terminal for carrying the software to be tested, and the time statistical module and the task number of times count mould
Block counts execution time and test execution number of times respectively, and is uploaded to total test job amount through the data uploading unit
Statistic unit, and then obtain total test job amount.
2. a kind of payment terminal embedded software test Workload Account system according to claim 1, it is characterised in that
The test assignment division module is according to the software function module composition to be tested, default test request and software to be tested
The type of hardware of carrying carries out function division to the software to be tested, obtains the functional module in the tape test software;It is described
Functional module includes:Wireless module, wifi module, ethernet module, bluetooth module, contact-type IC card module, contactless card
Module and file system.
3. a kind of payment terminal embedded software test Workload Account system according to claim 1, it is characterised in that
The unit testing use-case control module is connected with the unit testing use-case data storehouse, the integration test use-case control module
It is connected with the integration test use-case data storehouse, the unit testing use-case control module is according to the functional module for obtaining from described
Call corresponding unit testing use-case in unit testing use-case data storehouse;The integration test use-case control module is according to the work(for obtaining
Energy module calls corresponding integration test use-case from the integration test use-case data storehouse.
4. a kind of payment terminal embedded software test Workload Account system according to claim 1,2 or 3, its feature
It is the following units test case that is stored with the unit testing use-case data storehouse:Alg test cases, app test cases, asyn
Test case, eth test cases, fs test cases, icc test cases, kb test cases, mag test cases, port test cases, ppp test cases with
And prnt test cases;The integration test use-case data stock contains following integration test use-case:Print performance/pressure test
Example, MDM performances/pressure test example, ETH performances/pressure test example, wireless performance/pressure test example, IC performances/pressure test
Example, magnetic card performance/pressure test example, security performance/pressure test example, fsys performances/pressure test example, serial ports performance/pressure
Test case and RTC integration tests.
5. a kind of payment terminal embedded software test Workload Account system according to claim 3, it is characterised in that
The time statistical module counts unit testing use-case single performs the time and integration test use-case single performs the time;It is described
Task number of times statistical module counts unit testing use-case performs number of times and integration test use-case performs number of times.
6. a kind of payment terminal embedded software test Workload Account system according to claim 5, it is characterised in that
Total test job amount statistic unit counts following workload respectively:Unit testing workloadD, integration test workloadZ, treat
Test software testing timeC, carry the payment terminal quantity of the software to be testedS, it is contemplated that workloadL1, it is contemplated that working dayT1,
The quantity of BUGL2, the time that single BUG is positioned or reappearedT2, BUG positioning timesT3, total test job amountL2And total test
Working dayT4。
7. a kind of payment terminal embedded software test Workload Account system according to claim 6, it is characterised in that
The unit testing workloadDThe single of each the unit testing use-case according to the time statistical module counts perform the time with
And perform number of times calculating;The integration test workloadZAccording to each integration test use-case of the time statistical module counts
Single perform the time and perform number of times calculate;The software test number of times to be testedCDetermined according to default test request;Institute
State expected workloadL1Calculate in the following way:
;
Estimated working dayT1Calculate in the following way:
;
The quantity of the BUGL2Estimated according to Kilo Lines of Code ratio of defects or obtained according to actual test result;
The single BUG positioning or the time of reproductionT2It is a default average value;
The BUG positioning timesT3Calculate in the following way:
;
Total test job amountL2Calculate in the following way:
;
Total test job dayT4Calculate in the following way:
。
8. a kind of payment terminal embedded software test Workload Account system according to claim 6, it is characterised in that
Also include a test case perform recording unit, the unit respectively with the unit testing use-case control module and the synthesis
Test case control module is connected, and unit testing use-case and integration test use-case that acquisition is called, record participate in the unit of test
Test case and integration test use-case.
9. a kind of payment terminal embedded software test Workload Account system according to claim 8, it is characterised in that
Also include that one performs the form generation that recording unit is connected with total test job amount statistic unit and the test case
Unit;The form generation unit is held according to unit testing use-case, unit testing use-case implementation status, execution time and test
Places number generates a unit testing table;The form generation unit according to integration test use-case, integration test use-case implementation status,
Execution time and test execution number of times generate an integration test table;The form generation unit is according to total test job amount
The unit of statistics generates a total test job amount statistical form.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611198262.9A CN106844196B (en) | 2016-12-22 | 2016-12-22 | Payment terminal embedded software testing workload statistical system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611198262.9A CN106844196B (en) | 2016-12-22 | 2016-12-22 | Payment terminal embedded software testing workload statistical system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106844196A true CN106844196A (en) | 2017-06-13 |
CN106844196B CN106844196B (en) | 2019-12-10 |
Family
ID=59136898
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611198262.9A Active CN106844196B (en) | 2016-12-22 | 2016-12-22 | Payment terminal embedded software testing workload statistical system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106844196B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108363666A (en) * | 2018-02-13 | 2018-08-03 | 中链科技有限公司 | A kind of Software function test time determines method, apparatus and terminal |
CN109189691A (en) * | 2018-09-19 | 2019-01-11 | 郑州云海信息技术有限公司 | A kind of test case used time recording method, device and equipment |
CN109240919A (en) * | 2018-08-20 | 2019-01-18 | 郑州云海信息技术有限公司 | A kind of test data volume statistic system and method |
CN109324978A (en) * | 2018-11-28 | 2019-02-12 | 北京精密机电控制设备研究所 | A kind of software testing management system of multi-person synergy |
CN109375924A (en) * | 2018-09-17 | 2019-02-22 | 四川长虹电器股份有限公司 | A kind of test quality management platform and method based on RTC |
CN115617702A (en) * | 2022-12-20 | 2023-01-17 | 中化现代农业有限公司 | Test working hour prediction method and prediction device |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101149780A (en) * | 2006-09-20 | 2008-03-26 | 中国科学院自动化研究所 | System and method for automatic measurement for radio frequency identification service system |
CN101847227A (en) * | 2009-03-24 | 2010-09-29 | 鸿富锦精密工业(深圳)有限公司 | Product test management system and method |
CN102693460A (en) * | 2011-03-25 | 2012-09-26 | 鸿富锦精密工业(深圳)有限公司 | Tester management system and method thereof |
US8375364B2 (en) * | 2006-10-11 | 2013-02-12 | Infosys Limited | Size and effort estimation in testing applications |
US8495576B2 (en) * | 2010-04-20 | 2013-07-23 | Siemens Aktiengesellschaft | Method for estimating testing efforts for software unit testing |
CN103279831A (en) * | 2013-06-27 | 2013-09-04 | 李岩 | Method for achieving management system for evaluating software test quality and development capacity |
CN103455415A (en) * | 2012-08-20 | 2013-12-18 | 深圳信息职业技术学院 | Software test method |
US20140280961A1 (en) * | 2013-03-15 | 2014-09-18 | Frank Martinez | System and method for a cloud computing abstraction with multi-tier deployment policy |
CN104978274A (en) * | 2015-07-11 | 2015-10-14 | 佛山市朗达信息科技有限公司 | Software testing workload estimation method |
US9201768B1 (en) * | 2014-02-06 | 2015-12-01 | Amdoes Software Systems Limited | System, method, and computer program for recommending a number of test cases and effort to allocate to one or more business processes associated with a software testing project |
CN105354141A (en) * | 2015-11-16 | 2016-02-24 | 北京用友政务软件有限公司 | EMT test case management system and method |
US9330365B2 (en) * | 2012-09-27 | 2016-05-03 | Tata Consultancy Services Limited | Method and system for estimating size and effort of software assurance projects |
CN105677549A (en) * | 2015-12-30 | 2016-06-15 | 合一网络技术(北京)有限公司 | Software testing management method and system |
-
2016
- 2016-12-22 CN CN201611198262.9A patent/CN106844196B/en active Active
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101149780A (en) * | 2006-09-20 | 2008-03-26 | 中国科学院自动化研究所 | System and method for automatic measurement for radio frequency identification service system |
US8375364B2 (en) * | 2006-10-11 | 2013-02-12 | Infosys Limited | Size and effort estimation in testing applications |
CN101847227A (en) * | 2009-03-24 | 2010-09-29 | 鸿富锦精密工业(深圳)有限公司 | Product test management system and method |
US8495576B2 (en) * | 2010-04-20 | 2013-07-23 | Siemens Aktiengesellschaft | Method for estimating testing efforts for software unit testing |
CN102693460A (en) * | 2011-03-25 | 2012-09-26 | 鸿富锦精密工业(深圳)有限公司 | Tester management system and method thereof |
CN103455415A (en) * | 2012-08-20 | 2013-12-18 | 深圳信息职业技术学院 | Software test method |
US9330365B2 (en) * | 2012-09-27 | 2016-05-03 | Tata Consultancy Services Limited | Method and system for estimating size and effort of software assurance projects |
US20140280961A1 (en) * | 2013-03-15 | 2014-09-18 | Frank Martinez | System and method for a cloud computing abstraction with multi-tier deployment policy |
CN103279831A (en) * | 2013-06-27 | 2013-09-04 | 李岩 | Method for achieving management system for evaluating software test quality and development capacity |
US9201768B1 (en) * | 2014-02-06 | 2015-12-01 | Amdoes Software Systems Limited | System, method, and computer program for recommending a number of test cases and effort to allocate to one or more business processes associated with a software testing project |
CN104978274A (en) * | 2015-07-11 | 2015-10-14 | 佛山市朗达信息科技有限公司 | Software testing workload estimation method |
CN105354141A (en) * | 2015-11-16 | 2016-02-24 | 北京用友政务软件有限公司 | EMT test case management system and method |
CN105677549A (en) * | 2015-12-30 | 2016-06-15 | 合一网络技术(北京)有限公司 | Software testing management method and system |
Non-Patent Citations (4)
Title |
---|
侯莉: "基于经验的软件测试执行工作量估算模型", 《中国优秀硕士学位论文全文数据库 信息科技辑》 * |
原普雨,霍嘉: "软件测试生产力WBS评估模型研究", 《中国金融电脑》 * |
祝晓春: "增强型软件项目中测试工作量度量研究", 《中国博士学位论文全文数据库 信息科技辑》 * |
陈璇,黄萍: "软件测试工作量估计方法与应用", 《计算机与数字工程》 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108363666A (en) * | 2018-02-13 | 2018-08-03 | 中链科技有限公司 | A kind of Software function test time determines method, apparatus and terminal |
CN109240919A (en) * | 2018-08-20 | 2019-01-18 | 郑州云海信息技术有限公司 | A kind of test data volume statistic system and method |
CN109375924A (en) * | 2018-09-17 | 2019-02-22 | 四川长虹电器股份有限公司 | A kind of test quality management platform and method based on RTC |
CN109189691A (en) * | 2018-09-19 | 2019-01-11 | 郑州云海信息技术有限公司 | A kind of test case used time recording method, device and equipment |
CN109324978A (en) * | 2018-11-28 | 2019-02-12 | 北京精密机电控制设备研究所 | A kind of software testing management system of multi-person synergy |
CN109324978B (en) * | 2018-11-28 | 2022-05-24 | 北京精密机电控制设备研究所 | Software test management system with multi-user cooperation |
CN115617702A (en) * | 2022-12-20 | 2023-01-17 | 中化现代农业有限公司 | Test working hour prediction method and prediction device |
Also Published As
Publication number | Publication date |
---|---|
CN106844196B (en) | 2019-12-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106844196A (en) | A kind of payment terminal embedded software test Workload Account system | |
CN107066382B (en) | Model-based spacecraft system automatic testing method | |
CN102169846B (en) | Method for writing multi-dimensional variable password in parallel in process of testing integrated circuit wafer | |
CN110045266A (en) | A kind of chip universal testing method and device | |
CN108459957A (en) | Test method, device, equipment and the storage medium of fund system test case | |
CN106095654A (en) | Performance verification device, the system with performance verification device and method | |
CN108414962A (en) | Intelligent electric energy meter whole-life cycle fee system based on cloud platform and RFID | |
CN109416639A (en) | For intending the method, system and computer-readable medium of true network traffic patterns on a virtual machine | |
CN103425577B (en) | A kind of test method and device | |
CN110275494A (en) | The system and method for use classes parameter group progress field device management | |
CN109086546A (en) | Signal link signal quality evaluating method, device, equipment and readable storage medium storing program for executing | |
CN103294599B (en) | A kind of embedded software cross-beta method based on cloud | |
CN108304286A (en) | A kind of system and method carrying out automatic test to transcoding server concurrency performance | |
CN103345442A (en) | Equipment automated testing service integration system | |
CN106407516B (en) | A kind of verification method of parallel proof | |
CN111176575A (en) | SSD (solid State disk) service life prediction method, system, terminal and storage medium based on Prophet model | |
CN109145390A (en) | The semi-matter simulating system of satellite information application terminal measures of effectiveness | |
CN113961473A (en) | Data testing method and device, electronic equipment and computer readable storage medium | |
CN107992914A (en) | A kind of machining period measuring method and system, terminal | |
CN107451058A (en) | A kind of software development methodology and device | |
CN113504935A (en) | Software development quality evaluation method and device, electronic equipment and readable storage medium | |
CN109918444A (en) | Training/verifying/management method/system, medium and equipment of model result | |
CN109656756A (en) | Multi-core CPU board adjustment method and device, mobile memory medium | |
CN106557419A (en) | The method of testing and device of program | |
CN110134598B (en) | Batch processing method, device and system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |