CN109188526A - 一种改进型地表一致性剩余静校正方法 - Google Patents

一种改进型地表一致性剩余静校正方法 Download PDF

Info

Publication number
CN109188526A
CN109188526A CN201811303414.6A CN201811303414A CN109188526A CN 109188526 A CN109188526 A CN 109188526A CN 201811303414 A CN201811303414 A CN 201811303414A CN 109188526 A CN109188526 A CN 109188526A
Authority
CN
China
Prior art keywords
residual static
flakes
static correction
piece
muti
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811303414.6A
Other languages
English (en)
Other versions
CN109188526B (zh
Inventor
金凤鸣
赵贤正
李洪革
贺照权
曹孟起
李玉海
姜文亚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Dagang Oilfield Co
Original Assignee
Petrochina Dagang Oilfield Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Dagang Oilfield Co filed Critical Petrochina Dagang Oilfield Co
Priority to CN201811303414.6A priority Critical patent/CN109188526B/zh
Publication of CN109188526A publication Critical patent/CN109188526A/zh
Application granted granted Critical
Publication of CN109188526B publication Critical patent/CN109188526B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V1/00Seismology; Seismic or acoustic prospecting or detecting
    • G01V1/28Processing seismic data, e.g. analysis, for interpretation, for correction
    • G01V1/36Effecting static or dynamic corrections on records, e.g. correcting spread; Correlating seismic signals; Eliminating effects of unwanted energy
    • G01V1/362Effecting static or dynamic corrections; Stacking
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V2210/00Details of seismic processing or analysis
    • G01V2210/50Corrections or adjustments related to wave propagation
    • G01V2210/53Statics correction, e.g. weathering layer or transformation to a datum

Landscapes

  • Engineering & Computer Science (AREA)
  • Remote Sensing (AREA)
  • Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Acoustics & Sound (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Geophysics (AREA)
  • Geophysics And Detection Of Objects (AREA)

Abstract

本发明公开了一种改进型地表一致性剩余静校正方法,包括以下步骤:将连片融合多块资料分别进行标号,先分别按照各自的采集网格进行单块资料的剩余静校正处理工作;用两个空闲道头分别记下各块用于计算剩余静校正量的炮点和检波点道头字;将多块资料按照统一的网格进行网格;把用于计算剩余静校正量的炮点和检波点道头字用之前重新编辑的顺序号覆盖;进行连片融合剩余静校正处理,实现连片融合剩余静校正处理。本发明通过对多块连片融合地震数据计算检波点剩余静校正的道头字进行修改,消除多块连片融合资料对检波点的捆绑。使得统一网格后落在同一面元内的多块连片融合地震资料的检波点之间的融合时差得到消除。

Description

一种改进型地表一致性剩余静校正方法
技术领域
本发明涉及一种校正方法,具体为一种改进型地表一致性剩余静校正方法,属于地震勘探处理应用技术领域。
背景技术
在地震资料处理过程中,地表一致性剩余静校正起着非常重要的作用。能够提高地震资料的信噪比和分辨率。是地震资料处理过程中非常重要的一个环节。尤其在多块资料连片融合处理过程中,会起到非常重要的作用。
常规的地表一致性剩余静校正处理是把多块融合资料按照新的统一网格进行简单的划分,从而把不同区块的炮点和检波点按照统一网格划分到同一面元,造成不同区块的检波点被人为捆绑在一起。造成不同区块检波点之间的时差得不到校正,影响地表一致性剩余静校正连片融合处理效果,因此,针对上述问题提出一种改进型地表一致性剩余静校正方法。
发明内容
本发明的目的就在于为了解决上述问题而提供一种改进型地表一致性剩余静校正方法,在地震资料连片融合处理过程中,改善地表一致性剩余静校正处理效果。
本发明通过以下技术方案来实现上述目的,一种改进型地表一致性剩余静校正方法,该校正方法包括以下步骤:
步骤A、将连片融合多块资料分别进行标号,先分别按照各自的采集网格进行单块资料的剩余静校正处理工作;
步骤B、用两个空闲道头分别记下各块用于计算剩余静校正量的炮点和检波点道头字,把各块的炮点道头字和检波点道头字重新编辑顺序;
步骤C、将多块资料按照统一的网格进行网格;
步骤D、把用于计算剩余静校正量的炮点和检波点道头字用之前重新编辑的顺序号覆盖;
步骤E、进行连片融合剩余静校正处理,实现连片融合剩余静校正处理。
优选的,本发明的校正方法通过计算机编程实现。
本发明的有益效果是:本发明的方法能够提高地表一致性剩余静校正处理的效果,地震资料同相轴的连续性得到很好的调整,将连片融合多块资料分别进行标号,先分别按照各自的采集网格进行单块资料的剩余静校正处理工作;用两个空闲道头分别记下各块用于计算剩余静校正量的炮点和检波点道头字。把各块的炮点道头字和检波点道头字重新编辑顺序,使得多块融合之后炮点序号不重合,检波点序号也不重合;将多块资料按照统一的网格进行网格;把用于计算剩余静校正量的炮点和检波点道头字用之前重新编辑的顺序号覆盖;进行连片融合剩余静校正处理,实现连片融合剩余静校正处理效果明显,消除了常规地表一致性剩余静校正会把多块连片融合检波点捆绑在一起、不同区块检波点之间的时差得不到校正、影响多块连片融合剩余静校正处理效果的现象,极大的改善了多块连片融合地表一致性剩余静校正的效果。
附图说明
图1为常规地表一致性剩余静校正叠加剖面;
图2为本发明的方法处理后的地表一致性剩余静校正叠加剖面。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
请参阅图2所示,一种改进型地表一致性剩余静校正方法,该校正方法包括以下步骤:
步骤A、将连片融合多块资料分别进行标号,先分别按照各自的采集网格进行单块资料的剩余静校正处理工作;
步骤B、用两个空闲道头分别记下各块用于计算剩余静校正量的炮点和检波点道头字,把各块的炮点道头字和检波点道头字重新编辑顺序,使得多块融合之后炮点序号不重合,检波点序号也不重合;
步骤C、将多块资料按照统一的网格进行网格;
步骤D、把用于计算剩余静校正量的炮点和检波点道头字用之前重新编辑的顺序号覆盖;
步骤E、进行连片融合剩余静校正处理,实现连片融合剩余静校正处理。
具体的,本发明的校正方法通过计算机编程实现,可以实现改进型地表一致性振幅补偿处理功能。
由图2与常规的常规地表一致性剩余静校正叠加对比可见常规地表一致性剩余静校正会把多块连片融合检波点捆绑在一起,不同区块检波点之间的时差得不到校正,影响多块连片融合剩余静校正处理效果。使用本方法对输入数据进行修改之后,这种现象被消除,极大的改善了多块连片融合地表一致性剩余静校正的效果。
对于本领域技术人员而言,显然本发明不限于上述示范性实施例的细节,而且在不背离本发明的精神或基本特征的情况下,能够以其他的具体形式实现本发明。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本发明的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本发明内。不应将权利要求中的任何附图标记视为限制所涉及的权利要求。
此外,应当理解,虽然本说明书按照实施方式加以描述,但并非每个实施方式仅包含一个独立的技术方案,说明书的这种叙述方式仅仅是为清楚起见,本领域技术人员应当将说明书作为一个整体,各实施例中的技术方案也可以经适当组合,形成本领域技术人员可以理解的其他实施方式。

Claims (2)

1.一种改进型地表一致性剩余静校正方法,其特征在于:该校正方法包括以下步骤:
步骤A、将连片融合多块资料分别进行标号,先分别按照各自的采集网格进行单块资料的剩余静校正处理工作;
步骤B、用两个空闲道头分别记下各块用于计算剩余静校正量的炮点和检波点道头字,把各块的炮点道头字和检波点道头字重新编辑顺序;
步骤C、将多块资料按照统一的网格进行网格;
步骤D、把用于计算剩余静校正量的炮点和检波点道头字用之前重新编辑的顺序号覆盖;
步骤E、进行连片融合剩余静校正处理,实现连片融合剩余静校正处理。
2.根据权利要求1所述的一种改进型地表一致性剩余静校正方法,其特征在于:本发明的校正方法通过计算机编程实现。
CN201811303414.6A 2018-11-02 2018-11-02 一种改进型地表一致性剩余静校正方法 Expired - Fee Related CN109188526B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811303414.6A CN109188526B (zh) 2018-11-02 2018-11-02 一种改进型地表一致性剩余静校正方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811303414.6A CN109188526B (zh) 2018-11-02 2018-11-02 一种改进型地表一致性剩余静校正方法

Publications (2)

Publication Number Publication Date
CN109188526A true CN109188526A (zh) 2019-01-11
CN109188526B CN109188526B (zh) 2020-08-04

Family

ID=64941526

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811303414.6A Expired - Fee Related CN109188526B (zh) 2018-11-02 2018-11-02 一种改进型地表一致性剩余静校正方法

Country Status (1)

Country Link
CN (1) CN109188526B (zh)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101813786A (zh) * 2010-04-02 2010-08-25 中国石油集团西北地质研究所 子波处理二步法反褶积方法
GB2470241A (en) * 2009-09-21 2010-11-17 Statoilhydro Asa Forming a grid model of a geological structure having discontinuities
CN102323617A (zh) * 2011-06-13 2012-01-18 中国石油化工股份有限公司 一种复杂地表的二维地震资料连片处理方法
CN102998704A (zh) * 2012-12-13 2013-03-27 石颖 一种地球物理勘探地震资料处理方法
US8468206B2 (en) * 2009-02-10 2013-06-18 Certusview Technologies, Llc Methods, apparatus and systems for notifying excavators and other entities of the status of in-progress underground facility locate and marking operations
CN105093326A (zh) * 2014-05-23 2015-11-25 中国石油化工股份有限公司 一种地震勘探资料中波长剩余静校正处理方法
CN105093319A (zh) * 2014-05-14 2015-11-25 中国石油化工股份有限公司 基于三维地震数据的地面微地震静校正方法
CN105388521A (zh) * 2015-10-28 2016-03-09 中国石油天然气集团公司 一种叠后地震数据的拼接方法及装置

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8468206B2 (en) * 2009-02-10 2013-06-18 Certusview Technologies, Llc Methods, apparatus and systems for notifying excavators and other entities of the status of in-progress underground facility locate and marking operations
GB2470241A (en) * 2009-09-21 2010-11-17 Statoilhydro Asa Forming a grid model of a geological structure having discontinuities
CN101813786A (zh) * 2010-04-02 2010-08-25 中国石油集团西北地质研究所 子波处理二步法反褶积方法
CN102323617A (zh) * 2011-06-13 2012-01-18 中国石油化工股份有限公司 一种复杂地表的二维地震资料连片处理方法
CN102998704A (zh) * 2012-12-13 2013-03-27 石颖 一种地球物理勘探地震资料处理方法
CN105093319A (zh) * 2014-05-14 2015-11-25 中国石油化工股份有限公司 基于三维地震数据的地面微地震静校正方法
CN105093326A (zh) * 2014-05-23 2015-11-25 中国石油化工股份有限公司 一种地震勘探资料中波长剩余静校正处理方法
CN105388521A (zh) * 2015-10-28 2016-03-09 中国石油天然气集团公司 一种叠后地震数据的拼接方法及装置

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘成斋: "胜利油田三维地震数据连片处理", 《石油地球物理勘探》 *
张秀丽等: "低频可控震源与多区块三维地震资料现场拼接处理方法探讨", 《内蒙古石油化工》 *

Also Published As

Publication number Publication date
CN109188526B (zh) 2020-08-04

Similar Documents

Publication Publication Date Title
Lou et al. AIMBAT: A python/matplotlib tool for measuring teleseismic arrival times
Van den Bos Parameter estimation for scientists and engineers
Naidu et al. Singular perturbation analysis of discrete control systems
WO2007046107A3 (en) System and method for displaying seismic horizons with attributes
WO2004027682A3 (en) Simultaneous resolution enhancement and dip correction of resistivity logs through nonlinear iterative deconvolution
Simon et al. Cosmogenic 10Be production records reveal dynamics of geomagnetic dipole moment (GDM) over the Laschamp excursion (20–60 ka)
CN107817525B (zh) 一种近地表常速填充方法及装置
US7447114B2 (en) Non-linear seismic trace matching to well logs
EP1367524A3 (en) Method and system for stress testing simulations of the behavior of financial instruments
CN109738946B (zh) 两步法剔除异常地震初至的方法及系统
GB2465120A (en) Remote processing of well tool sensor data and correction of sensor data on data acquisition systems
MX2021012006A (es) Alineacion de nucleo de caracteristicas cuanticas.
CN104422963A (zh) 一种变偏移距vsp资料时差校正方法
CN104636717B (zh) 图表识别的方法及装置
CN104865597A (zh) 一种深度域层速度初始模型的建模方法
Sung et al. Analysis of art and humanity major learners' features in programming class
CN105388521A (zh) 一种叠后地震数据的拼接方法及装置
WO2014193619A3 (en) Automated interetaton error correction
CN103916702A (zh) 一种拦截广告的方法和终端
CN105629296B (zh) 三维地震叠后数据体拼接方法及装置
CN109188526A (zh) 一种改进型地表一致性剩余静校正方法
CN102968404B (zh) 地震资料的初至信息处理方法及装置
CN106950601A (zh) 静校正方法和装置
Hinkley et al. Prestack gather flattening for AVO
CN106556870B (zh) 一种基于保持边缘的测井建模方法和系统

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200804

Termination date: 20211102