CN109185999A - The method for installing bearing plate of outdoor air conditioner and preparation method thereof and the bearing plate installation outdoor machine of air-conditioner using the outer machine of installation outdoor air conditioner - Google Patents

The method for installing bearing plate of outdoor air conditioner and preparation method thereof and the bearing plate installation outdoor machine of air-conditioner using the outer machine of installation outdoor air conditioner Download PDF

Info

Publication number
CN109185999A
CN109185999A CN201811225762.6A CN201811225762A CN109185999A CN 109185999 A CN109185999 A CN 109185999A CN 201811225762 A CN201811225762 A CN 201811225762A CN 109185999 A CN109185999 A CN 109185999A
Authority
CN
China
Prior art keywords
bearing plate
strand
installation
braiding
outdoor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811225762.6A
Other languages
Chinese (zh)
Inventor
高兴文
路平
郑建锋
赵俊领
闫文中
杨永现
程丽娜
尚培晓
倪良才
贾方旭
岳修泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Guoji Construction And Installation Co Ltd
HENAN GUOJI CONSTRUCTION GROUP CO Ltd
Original Assignee
Henan Guoji Construction And Installation Co Ltd
HENAN GUOJI CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Guoji Construction And Installation Co Ltd, HENAN GUOJI CONSTRUCTION GROUP CO Ltd filed Critical Henan Guoji Construction And Installation Co Ltd
Priority to CN201811225762.6A priority Critical patent/CN109185999A/en
Publication of CN109185999A publication Critical patent/CN109185999A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F1/00Room units for air-conditioning, e.g. separate or self-contained units or units receiving primary air from a central station
    • F24F1/06Separate outdoor units, e.g. outdoor unit to be linked to a separate room comprising a compressor and a heat exchanger
    • F24F1/60Arrangement or mounting of the outdoor unit

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Other Air-Conditioning Systems (AREA)

Abstract

The method that the present invention provides bearing plate of a kind of installation outdoor air conditioner and preparation method thereof and the bearing plate installation outdoor machine of air-conditioner using the outer machine of installation outdoor air conditioner, bearing plate can be with pressure-bearing, facilitate staff to stay in outdoor and outdoor machine of air-conditioner is installed on bearing plate, keep outdoor machine of air-conditioner installation speed fast, more can guarantee the safety of staff.Fiber rack can play the role of reinforcing casting bulk strength, braiding strand is formed by least 3 glass fiber windings, different braiding strands forms cross knot, cross knot includes the three-dimensional cross knot formed by least 1 transverse plane braiding strand, at least 1 vertical braiding strand and at least 1 oblique braiding strand, keep the connection between the braiding strand of fiber rack even closer, intensity is stronger, keeps the intensity for entirely pouring ingot bar stronger.Ingot bar side end face is poured equipped with connecting hole, convenient when building house, the bearing plate of the outer machine of installation outdoor air conditioner is connected with indoor reinforcing bar, convenient to connect with interior architecture plate or metope.

Description

Bearing plate of outdoor air conditioner and preparation method thereof is installed and is used outside installation outdoor air conditioner The method of the bearing plate installation outdoor machine of air-conditioner of machine
Technical field
The present invention relates to building field more particularly to a kind of bearing plate for installing outdoor air conditioner and preparation method thereof and use The method for installing the bearing plate installation outdoor machine of air-conditioner of the outer machine of outdoor air conditioner.
Background technique
A how overhanging platform outside existing building construction is equipped with outdoor machine of air-conditioner on platform, and platform not load-bearing is being pacified When filling outdoor machine of air-conditioner, people can not directly step down on platform and install, and have wall barrier between platform and interior, generally at most exist A wicket is opened up on wall, outdoor machine of air-conditioner can not be installed on platform by wicket, so the installation of air-conditioning mostly from It is suspended in midair above roof, then people will also install outdoor machine of air-conditioner, installation trouble by way of suspention on platform, and compare It is relatively hazardous.
Summary of the invention
To solve the above problems, the present invention provides bearing plate of a kind of installation outdoor air conditioner and preparation method thereof and using peace The method for filling the bearing plate installation outdoor machine of air-conditioner of the outer machine of outdoor air conditioner, the bearing plate of the outer machine of installation outdoor air conditioner provided by the invention With pressure-bearing staff can be facilitated to stay in outdoor, outdoor machine of air-conditioner is installed on bearing plate, keep outdoor machine of air-conditioner installation speed fast, and It more can guarantee the safety of staff.
The object of the present invention is achieved in the following manner: the bearing plate of the outer machine of installation outdoor air conditioner, including cement sand Ingot bar is poured made of casting, pours and fiber rack is distributed in ingot bar, and fiber rack includes braiding strand, and braiding strand includes laterally Where plane knitting strand, vertical braiding strand and oblique braiding strand, vertical braiding strand and transverse plane braiding strand Transverse plane is vertical, and the angle that oblique braiding strand weaves the transverse plane where strand with transverse plane is to be less than greater than 0 ° 90 °, the braiding strand of different directions forms cross knot, and cross knot includes by least 1 transverse plane braiding strand, at least 1 The three-dimensional cross knot that vertical braiding strand and at least 1 oblique braiding strand are formed;Braiding strand is twined by least 3 glass fibres Around forming;Fiber rack further includes equally distributed vertical basalt fibre, pours ingot bar upper surface and is equipped with nonwoven polypropylene fabric, Ingot bar side end face is poured equipped with connecting hole.
Braiding strand is entwined by least 3 glass fibres and at least one basalt fibre.
At cross knot, the glass fibre for being wound in a braiding strand interlocks across the glass for being wound in other braiding strands Between fiber.
The angle of adjacent 2 transverse planes braiding strand in transverse plane is identical, and oblique braiding strand is in transverse plane On projection line divide equally adjacent 2 transverse planes in transverse plane braiding strand angle.
A kind of preparation method of the bearing plate of the outer machine of installation outdoor air conditioner, first puts fiber rack well in mold, then past The cement sand mixed with water is poured in mold, is then put nonwoven polypropylene fabric in cement sand upper surface, is then allowed to stand and is frozen into Ingot bar is poured, the bearing plate of outdoor air conditioner is as installed.
Using the method for the bearing plate installation outdoor machine of air-conditioner of machine outside installation outdoor air conditioner, by way of suspention, installation Personnel are placed on the bearing plate of the outdoor outer machine of installation outdoor air conditioner, and then staff ties up safety belt, then by outstanding The mode hung puts outdoor machine of air-conditioner and other parts and installation tool, the staff on bearing plate can catch outdoor machine of air-conditioner and its Its part and installation tool, then staff installs outdoor machine of air-conditioner on the bearing plate of machine outside installation outdoor air conditioner.
Since bearing plate is bearing plate, so staff can stay on bearing plate, when installing outdoor machine of air-conditioner, do not have to Make staff that outdoor machine of air-conditioner to be installed by way of suspending in midair always, improves the installation speed of outdoor machine of air-conditioner, and reduce work Risk when person works.
Compared with the existing technology, the bearing plate of the outer machine of installation outdoor air conditioner provided by the invention can facilitate work with pressure-bearing Personnel stay in outdoor and install outdoor machine of air-conditioner on bearing plate, keep outdoor machine of air-conditioner installation speed fast, and more can guarantee staff Safety.Fiber rack can play the role of reinforcing casting bulk strength etc., and weave strand and twined by least 3 glass fibres Around forming, the intensity of every braiding strand can be reinforced;Different braiding strands forms cross knot, and cross knot includes by least 1 Root transverse plane weaves the three-dimensional cross knot that strand, at least 1 vertical braiding strand and at least 1 oblique braiding strand are formed, Keep the connection between the braiding strand of fiber rack even closer, intensity is stronger, keeps the intensity for entirely pouring ingot bar stronger.Pour ingot bar One side end face is equipped with connecting hole, convenient when building house, the bearing plate of the outer machine of installation outdoor air conditioner and indoor reinforcing bar phase Even, convenient to be connect with interior architecture plate or metope.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention.
Fig. 2 is the structural schematic diagram of fiber rack.
Fig. 3 is the mounting structure schematic diagram of outdoor machine of air-conditioner.
Specific embodiment
As depicted in figs. 1 and 2, a kind of bearing plate of the outer machine of installation outdoor air conditioner, including poured made of the casting of cement sand Ingot bar 1 pours and fiber rack 2 is distributed in ingot bar, and fiber rack 2 includes braiding strand 20, and braiding strand 20 includes transverse plane Strand 21, vertical braiding strand 22 and oblique braiding strand 23 are woven, vertical braiding strand 21 and transverse plane weave strand 21 The transverse plane at place is vertical, and the angle of oblique braiding strand 23 and the transverse plane where transverse plane braiding strand 21 is big In 0 ° less than 90 °, the braiding strand of different directions forms cross knot 24, and cross knot includes by least 1 transverse plane braiding stock The three-dimensional cross knot 25 that line 21, at least 1 vertical braiding strand 22 and at least 1 oblique braiding strand 23 are formed;Weave strand 20 are formed by least 3 glass fiber windings;Fiber rack 2 further includes equally distributed vertical basalt fibre 26, casting Block upper surface is equipped with nonwoven polypropylene fabric 3, pours ingot bar side end face equipped with connecting hole 4;Transverse plane weaves where strand 21 Transverse plane it is parallel with ingot bar upper surface is poured.
Fiber rack can play the role of reinforcing casting bulk strength etc., and weave strand by least 3 glass fibres It is entwined, the intensity of every braiding strand can be reinforced;Different braiding strand forms cross knot, cross knot include at least by The three-dimensional cross knot that 1 transverse plane braiding strand, at least 1 vertical braiding strand and at least 1 oblique braiding strand are formed, Keep the connection between the braiding strand of fiber rack even closer, intensity is stronger, keeps the intensity for entirely pouring ingot bar stronger.Pour ingot bar One side end face is equipped with connecting hole, convenient when building house, the bearing plate of the outer machine of installation outdoor air conditioner and indoor reinforcing bar phase Even, convenient to be connect with interior architecture plate or metope.
Braiding strand is entwined by least 3 glass fibres and at least one basalt fibre.
At cross knot, the glass fibre for being wound in a braiding strand interlocks across the glass for being wound in other braiding strands Between fiber.
The angle of adjacent 2 transverse planes braiding strand in transverse plane is identical, and oblique braiding strand is in transverse plane On projection line divide equally adjacent 2 transverse planes in transverse plane braiding strand angle.
A kind of preparation method of the bearing plate of the outer machine of installation outdoor air conditioner, first puts fiber rack 2 well in mold, then past The cement sand mixed with water is poured in mold, is then put nonwoven polypropylene fabric 3 in cement sand upper surface, is then allowed to stand and is frozen into Ingot bar 1 is poured, the bearing plate of outdoor air conditioner is as installed.
As shown in figure 3, the method for the bearing plate installation outdoor machine of air-conditioner using the outer machine of installation outdoor air conditioner, passes through the side of suspention Formula is placed on staff 5 outside outdoor installation outdoor air conditioner on the bearing plate 6 of machine, and then staff ties up safety belt 7, Then outdoor machine of air-conditioner 8 and other parts and installation tool are being put by way of suspention, the staff on bearing plate can connect Firmly outdoor machine of air-conditioner 8 and other parts and installation tool, then staff 5 pacifies on the bearing plate 6 of machine outside installation outdoor air conditioner Fill outdoor machine of air-conditioner 8.
Since bearing plate is bearing plate, so staff can stay on bearing plate, when installing outdoor machine of air-conditioner, do not have to Make staff that outdoor machine of air-conditioner to be installed by way of suspending in midair always, improves the installation speed of outdoor machine of air-conditioner, and reduce work Risk when person works.
What has been described above is only a preferred embodiment of the present invention, it is noted that for those skilled in the art, Without depart from that overall concept of the invention, several changes and improvements can also be made, these also should be considered as of the invention Protection scope.

Claims (6)

1. a kind of bearing plate of the outer machine of installation outdoor air conditioner, it is characterised in that: including pouring ingot bar made of the casting of cement sand, pour Fiber rack is distributed in ingot bar, fiber rack includes braiding strand, and braiding strand includes transverse plane braiding strand, vertically compiles Strand and oblique braiding strand are knitted, the vertical transverse plane woven where strand weaves strand with transverse plane is vertical, oblique volume The angle for knitting the transverse plane where strand and transverse plane braiding strand is the braiding stock of different directions greater than 0 ° less than 90 ° Line forms cross knot, and cross knot includes by least 1 transverse plane braiding strand, at least 1 vertical braiding strand and at least 1 The three-dimensional cross knot that oblique braiding strand is formed;Braiding strand is formed by least 3 glass fiber windings;Fiber rack further includes Equally distributed vertical basalt fibre pours ingot bar upper surface equipped with nonwoven polypropylene fabric, pours ingot bar side end face and be equipped with Connecting hole.
2. the bearing plate of the outer machine of installation outdoor air conditioner according to claim 1, it is characterised in that: braiding strand is by least 3 Root glass fibre and at least one basalt fibre are entwined.
3. the bearing plate of the outer machine of installation outdoor air conditioner according to claim 1, it is characterised in that: at cross knot, be wound in The glass fibre of one braiding strand interlocks across the glass fibre for being wound in other braiding strands.
4. the bearing plate of the outer machine of installation outdoor air conditioner according to claim 1, it is characterised in that: adjacent in transverse plane The angle of 2 transverse plane braiding strands is identical, and projection line of the oblique braiding strand on transverse plane is divided equally in transverse plane Adjacent 2 transverse planes braiding strand angle.
5. the preparation method of the bearing plate of the outer machine of installation outdoor air conditioner described in -4 any claims according to claim 1, It is characterized in that: first putting fiber rack well in mold, then toward the cement sand mixed with water is poured in mold, then in cement sand Nonwoven polypropylene fabric is put in sub- upper surface, is then allowed to stand to be frozen into and pours ingot bar, as installs the bearing plate of outdoor air conditioner.
6. according to claim 1 outside the bearing plate installation air-conditioning of the outer machine of the installation of use described in -5 any claims outdoor air conditioner The method of machine, it is characterised in that: by way of suspention, installation personnel is placed on the pressure-bearing of machine outside outdoor installation outdoor air conditioner On plate, then staff ties up safety belt, and outdoor machine of air-conditioner and other parts and erector are then being put by way of suspention Have, the staff on bearing plate can catch outdoor machine of air-conditioner and other parts and installation tool, and then staff is installing Outdoor machine of air-conditioner is installed on the bearing plate of the outer machine of outdoor air conditioner.
CN201811225762.6A 2018-10-21 2018-10-21 The method for installing bearing plate of outdoor air conditioner and preparation method thereof and the bearing plate installation outdoor machine of air-conditioner using the outer machine of installation outdoor air conditioner Pending CN109185999A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811225762.6A CN109185999A (en) 2018-10-21 2018-10-21 The method for installing bearing plate of outdoor air conditioner and preparation method thereof and the bearing plate installation outdoor machine of air-conditioner using the outer machine of installation outdoor air conditioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811225762.6A CN109185999A (en) 2018-10-21 2018-10-21 The method for installing bearing plate of outdoor air conditioner and preparation method thereof and the bearing plate installation outdoor machine of air-conditioner using the outer machine of installation outdoor air conditioner

Publications (1)

Publication Number Publication Date
CN109185999A true CN109185999A (en) 2019-01-11

Family

ID=64946389

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811225762.6A Pending CN109185999A (en) 2018-10-21 2018-10-21 The method for installing bearing plate of outdoor air conditioner and preparation method thereof and the bearing plate installation outdoor machine of air-conditioner using the outer machine of installation outdoor air conditioner

Country Status (1)

Country Link
CN (1) CN109185999A (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5930096Y2 (en) * 1980-04-25 1984-08-28 ナショナル住宅産業株式会社 flower box device
CN2698393Y (en) * 2004-04-20 2005-05-11 田亮 High building outdoors high-lift operation safe fixing device
CN2923877Y (en) * 2006-03-17 2007-07-18 江苏九鼎新材料股份有限公司 Novel composite wall material
CN201148690Y (en) * 2008-01-07 2008-11-12 河北北方绿野居住环境发展有限公司 Prefabricated type load bearing heat preserving decorative composite wall plate
CN102560830A (en) * 2012-02-18 2012-07-11 常州同维佳业新材料科技有限公司 Stereoscopic mesh reinforcing fabric
CN203258836U (en) * 2013-05-24 2013-10-30 四川燎源工程设备有限公司 Mounting bracket based on central air conditioner outer machine
CN103541487A (en) * 2012-07-17 2014-01-29 马义和 Reinforced cement board containing glass fiber in three-dimensional net-shaped structure
CN106168397A (en) * 2016-08-31 2016-11-30 河南省第二建设集团有限公司 A kind of air-conditioner outdoor unit concealed installation building structure
CN106765682A (en) * 2016-12-16 2017-05-31 珠海格力电器股份有限公司 A kind of air-conditioning installation auxiliary device and air-conditioning install accessory cart
CN108332310A (en) * 2018-02-01 2018-07-27 王根节 A kind of installation method of outdoor machine of air-conditioner
CN207774654U (en) * 2017-12-29 2018-08-28 熊亚军 A kind of outdoor machine of air-conditioner installation tool

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5930096Y2 (en) * 1980-04-25 1984-08-28 ナショナル住宅産業株式会社 flower box device
CN2698393Y (en) * 2004-04-20 2005-05-11 田亮 High building outdoors high-lift operation safe fixing device
CN2923877Y (en) * 2006-03-17 2007-07-18 江苏九鼎新材料股份有限公司 Novel composite wall material
CN201148690Y (en) * 2008-01-07 2008-11-12 河北北方绿野居住环境发展有限公司 Prefabricated type load bearing heat preserving decorative composite wall plate
CN102560830A (en) * 2012-02-18 2012-07-11 常州同维佳业新材料科技有限公司 Stereoscopic mesh reinforcing fabric
CN103541487A (en) * 2012-07-17 2014-01-29 马义和 Reinforced cement board containing glass fiber in three-dimensional net-shaped structure
CN203258836U (en) * 2013-05-24 2013-10-30 四川燎源工程设备有限公司 Mounting bracket based on central air conditioner outer machine
CN106168397A (en) * 2016-08-31 2016-11-30 河南省第二建设集团有限公司 A kind of air-conditioner outdoor unit concealed installation building structure
CN106765682A (en) * 2016-12-16 2017-05-31 珠海格力电器股份有限公司 A kind of air-conditioning installation auxiliary device and air-conditioning install accessory cart
CN207774654U (en) * 2017-12-29 2018-08-28 熊亚军 A kind of outdoor machine of air-conditioner installation tool
CN108332310A (en) * 2018-02-01 2018-07-27 王根节 A kind of installation method of outdoor machine of air-conditioner

Similar Documents

Publication Publication Date Title
CN106400691A (en) Integrated construction process for anti-collision wall formwork
CN102979297B (en) Hanging type stairwell operating platform mechanism and construction method thereof
CN114427258A (en) High-altitude large-span cantilever concrete member disassembly-free construction system and construction method
CN108547660B (en) The goaf filling method of suspension type reinforcement reinforcing obturation
CN205063056U (en) Anticorrosion structure of node is hung futilely to assembly type structure outer wall
CN109185999A (en) The method for installing bearing plate of outdoor air conditioner and preparation method thereof and the bearing plate installation outdoor machine of air-conditioner using the outer machine of installation outdoor air conditioner
CN109989350A (en) A kind of bridge Sarasota construction method
CN105347142A (en) Plate penetrating installing method for installing construction lifting machine on basement top plate
CN205316526U (en) Outer quick -witted support frame of fixed air conditioner suspends in midair
CN209194751U (en) Concrete heat-insulation wall and its connector
CN109555257B (en) Combined supporting and hanging rod type suspended ceiling and construction method
CN205442393U (en) Posture that falls suspension system
CN207376661U (en) A kind of plugging structure of poured band of outer wall of basement
CN205367457U (en) Cast member installs special hoist
CN216664766U (en) Assembled parapet that cornices
CN105178451B (en) The anticorrosion structure and its construction method of the cladding node of assembled architecture outer wall
CN206070598U (en) A kind of poured band of outer wall of basement outboard template and its fixed structure
CN205502574U (en) Mould mould is hung to swift formula
CN207727805U (en) A kind of reinforced perps unit of fabricated shear wall anchor pole
CN209554695U (en) A kind of anti-collision wall template hoisting device
CN219241277U (en) Hanging basket safety rope tying and hanging device on flat roof
CN218815120U (en) Hanging basket suspension system for cornice
CN104344075A (en) Rapid hoisting and mounting method for suspending temporary air/water pipeline on shaft wall in vertical shaft construction
CN218338330U (en) Adjustable cleaning steel frame
CN205316521U (en) Outer quick -witted suspension support structure of suspension type air conditioner

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190111