CN109184259A - The sliding construction technology of building - Google Patents

The sliding construction technology of building Download PDF

Info

Publication number
CN109184259A
CN109184259A CN201811322904.0A CN201811322904A CN109184259A CN 109184259 A CN109184259 A CN 109184259A CN 201811322904 A CN201811322904 A CN 201811322904A CN 109184259 A CN109184259 A CN 109184259A
Authority
CN
China
Prior art keywords
sliding beam
sliding
counter
frame column
steel ball
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811322904.0A
Other languages
Chinese (zh)
Other versions
CN109184259B (en
Inventor
朱奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811322904.0A priority Critical patent/CN109184259B/en
Publication of CN109184259A publication Critical patent/CN109184259A/en
Application granted granted Critical
Publication of CN109184259B publication Critical patent/CN109184259B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/06Separating, lifting, removing of buildings; Making a new sub-structure

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The invention discloses a kind of gliding construction methods of building, it is characterized in that construction procedure includes: that (1) cuts 1/5 section of frame column as the coupling part with sliding beam;(2) brick wall at sliding beam position is cut, supporting module;(3) sliding beam steel is installed;(4) sliding beam concrete is poured;(5) concrete that couples reinforcing bar and abolish coupling part of the frame column with raft plate is cut off with wind cutting mill;(6) by the pre-buried screw attachment of the wooden straining beam and sliding beam;(7) the new basis at sliding beam position in place is poured;(8) in raft plate towards the embedded traction steel hanging ring of direction of draw, counter-force facility and jack are installed in counter-force stake of constructing;(9) it is laid with sliding rail in glide direction, new basis is also laid with sliding rail above;(10) it is drawn using traction facility;(11) sliding beam is coupled with new basis, frame column couples with new basis.

Description

The sliding construction technology of building
Technical field
The present invention relates to a kind of sliding construction, in particular to a kind of gliding construction method of building.
Background technique
Urban construction is just being carried out like a raging fire, since urban planning and town road construction need to remove building, If directly carrying out demolition of buildings will cause a large amount of building wastes, and generate pollution.Especially historical protective is normal The building used, being removed will be very big loss.Building that is intact for some structures and still having use value, is adopted Secondary design iterations and construction are then avoided with building sliding technology, can be come into operation immediately after sliding in place, it is clear that Can have apparent economic benefit and social benefit.But how to ensure building safety in slipping, how to carry out and builds It builds object to couple with new basic, and how to reduce cost in the case where ensuring secured premise.
Summary of the invention
The present invention is to provide a kind of gliding construction method of building, solve building sliding construction is dangerous and cost High problem.
Sliding beam is arranged in the present invention on raft plate, and adjacent sliding beam distance is 3~3.6m, sliding beam bottom and raft plate top Portion's distance is 60~80mm, slides depth of beam depending on upper load, and when the building number of plies is 5 layers, sliding depth of beam is 800mm;When the building number of plies is 4 layers, sliding depth of beam is 750mm;When the building number of plies is 3 layers, sliding depth of beam is 700mm;When the building number of plies is 2 layers, sliding depth of beam is 650mm;When the building number of plies is 1 layer, sliding depth of beam is 600mm。
Sliding beam width is 300mm.Sliding beam following settings steel ball, steel ball diameter are 60~80mm.
In order to avoid local failure occurs in sliding beam in slipping, the wooden straining beam is set to increase between adjacent sliding beam Overall stiffness, the wooden straining beam diameter are 150~180mm, and the wooden straining beam and sliding beam angle are 45~60 degree.
Counter-force stake is set as counter-force facility on the right side of traction building on-station position, counter-force stake is from building position in place It sets distance and has 0.6~0.8m to there is an operation working space, counter-force stake uses prefabricated tubular pile, and prefabricated tubular pile diameter is 500~ 600mm.Frictional force is much larger when initial frictional is than pulling motion when counter-force stake is due to traction building, according to a large amount of detection knots Fruit, initial friction force coefficient is 0.15~0.2 when this technique being used to draw building, and dynamic friction coefficient is when pulling motion 0.017~0.025, for save the cost, reaction support is initially used as using counter-force stake and engineering pile joint when traction, draws fortune Only with counter-force stake as reaction support when dynamic.
Building has certain vibration in the process of walking, can be by taking if surrounding enviroment are high to damping requirements Technical measures achieve the purpose that vibration damping.Vibration damping bloom is set every 2~3m in sliding rail lower part, bullet is installed in vibration damping bloom Spring makes to slide rail as spring body, makes the steel ball being located within the scope of sliding rail body when encountering advance resistance, energy Alleviate impact force by the effect of vibration damping bloom inner spring, vibrational energy is directly attracted by vibration damping bloom inner spring, makes to encounter resistance The steel ball of power avoids bearing excessive pressure and impact force.
Construction procedure includes:
(1) in order to make sliding beam and frame column form entirety, 1/5 section of frame column is cut as the interconnecting piece with sliding beam Point;Temporary support is set near frame column.
(2) brick wall at sliding beam position is cut, supporting module, lateral template top is arranged fill orifice and shocks hole, fills Orifice diameter is 40~50mm, and it is 1.2~1.5m that spacing, which is arranged, in fill orifice;Shocking bore dia is 20~30mm, shocks hole setting Spacing is 0.7~0.9m;Steel ball is placed in template bottom in supporting module, steel ball is embedded in lower template, steel ball top It is identical as lower template elevation of top, there is bearing among steel ball, bearing protrudes into template, and bearing built-in length is 120~150mm.
(3) sliding beam steel is installed, the part of chiseling that sliding beam main tendon protrudes into frame column is bent upward or downward to increase Anchorage length, anchorage length are 500~700mm.
(4) sliding beam concrete is poured, then pouring frame column cuts position concrete, and concrete is carried out using high-pressure pump Perfusion.
(5) couple reinforcing bar with what wind cutting mill cut off frame column and raft plate after sliding beam concrete strength reaches design strength And the concrete of coupling part is abolished, keep frame column elevation of bottom identical as sliding beam elevation of bottom.
(6) by the pre-buried screw attachment of the wooden straining beam and sliding beam.
(7) the new basis at sliding beam position in place is poured.
(8) in raft plate towards the embedded traction steel hanging ring of direction of draw, counter-force facility and jack are installed in counter-force stake of constructing.
(9) it is laid with sliding rail in glide direction, new basis is also laid with sliding rail above.
(10) it is drawn using traction facility.
Facility is drawn using hydraulic synchronous system is automatically controlled, automatically controls hydraulic synchronous system by hydraulic system, detection Sensor and computer control system composition, wherein hydraulic system includes oil pump, hydraulic jack.Hydraulic system is by computer control System is automatically finished synchronous shift, realizes power and Bit andits control, operation locking, process display function.Hydraulic system working pressure 30~32MPa, spike pressure are 35MPa.Pushing tow cylinder thrust stroke is 1200mm, and it is 0~60mm/min, group that pushing tow, which controls speed, Interior each pushing tow cylinder pressure communication, position synchronization control between group and group, synchronization accuracy are ± lmm.
(11) sliding beam is coupled with new basis, frame column couples with new basis.
Can be there are two types of processing mode after sliding in place, one is wind after jacking sliding beam to cut steel ball, and removes sliding Then rail transfers sliding beam and couples sliding beam with new basis.This technique is a risk that in jacking sliding beam mistake It is easy partial structurtes destruction occur because accepting unevenly in journey.
If fabric structure performance is bad, sliding rail and new reinforcement foundation are welded, slid in place afterwards by steel ball It is welded with sliding rail, makes that rolling translation can not be carried out under the action of external load after steel ball.It will sliding rail and steel Ball gap is poured closely knit with high strength micro expansion pea gravel concreten, and steel ball is poured in high strength micro expansion pea gravel concreten. It not only ensure that superstructure is reliably connected with new basic using above-mentioned measure, and in the effect for meeting with violent earthquake load When, sliding the mutual friction and Extrusion deformation poured between filling pea gravel concreten and steel ball after rail can be absorbed part seismic energy Amount reduces effect of the earthquake to superstructure, can play certain function of shock insulation.
Frame column is connect with new basis connection using pea gravel concreten shove, after shove technique ensure that pillar Linking with foundation Its vertical displacement is zero.Shove is using dry pea gravel concreten, and stiff degree is agglomerating to be pinched with hand, and landing scatters to close Lattice.By two sides mould card clamping that frame column is opposite when shove, squeezed into from other two sides by dry concrete.
The present invention has a safety feature, and project cost is low.
Detailed description of the invention
Fig. 1, Sliding Structures schematic diagram, Fig. 2, formwork erection schematic diagram, Fig. 3, glide mirror (plane) schematic diagram, Fig. 4, vibration damping bloom Schematic diagram.
In each attached drawing: 1, sliding beam, 2, frame column, 3, raft plate, 4, steel ball, 5, sliding beam main tendon, 6, template, 7, wood drawing Beam, 8, vibration damping bloom, 9, spring.
Specific embodiment
Embodiment one
Sliding beam 1 is set on raft plate 3 in embodiment, and adjacent sliding beam 1 is apart from for 3.2m, 1 bottom of sliding beam and raft 3 distance from top of plate is 70mm, and 1 height of sliding beam is 750mm.1 width of sliding beam is 300mm.1 following settings steel ball of sliding beam 4,4 diameter of steel ball is 70mm.
The wooden straining beam 7 is set between adjacent sliding beam 1, and wooden 7 diameter of straining beam is 160mm, and the wooden straining beam 7 is with 1 angle of sliding beam 60 degree.
Counter-force stake is set as counter-force facility on the right side of traction building on-station position, counter-force stake is from building position in place Setting distance has 0.7m, and counter-force stake uses prefabricated tubular pile, and prefabricated tubular pile diameter is 500mm.Counter-force stake and work are used when initial traction Journey stake joint is used as reaction support, only with counter-force stake as reaction support when pulling motion.
Vibration damping bloom 8 is set every 2~3m in sliding rail lower part, spring 9 is installed in vibration damping bloom 8, makes to slide rail As spring body, make the steel ball 4 being located within the scope of sliding rail body when encountering advance resistance, it can be by vibration damping bloom Impact force is alleviated in the effect of 8 inner springs 9.
Construction procedure includes:
(1) 1/5 section of frame column is cut as the coupling part with sliding beam 1;Interim branch is set near frame column 2 Support.
(2) brick wall at 1 position of sliding beam being cut, supporting module 6, lateral 6 top of template is arranged fill orifice and shocks hole, Perfusion bore dia is 40mm, and it is 1.3m that spacing, which is arranged, in fill orifice;Shocking bore dia is 25mm, and shocking hole setting spacing is 0.8m; Steel ball 4 is placed in 6 bottom of template in supporting module 6, steel ball 4 is embedded in lower template 6, and 4 top of steel ball is pushed up with lower template 6 Portion's absolute altitude is identical, there is bearing among steel ball 4, and bearing protrudes into template 6, and bearing built-in length is 130mm.
(3) 1 reinforcing bar of sliding beam is installed, the part of chiseling that sliding beam main tendon 5 protrudes into frame column 2 is bent upward or downward to increase Add anchorage length, anchorage length 600mm.
(4) pour 1 concrete of sliding beam, then pouring frame column 2 cuts position concrete, concrete using high-pressure pump into Row perfusion.
(5) coupling for frame column 2 and raft plate 3 is cut off with wind cutting mill after 1 concrete strength of sliding beam reaches design strength Reinforcing bar and the concrete for abolishing coupling part keep 2 elevation of bottom of frame column identical as 1 elevation of bottom of sliding beam.
(6) by the pre-buried screw attachment of wooden straining beam 7 and sliding beam 1.
(7) the new basis at the position in place of sliding beam 1 is poured.
(8) in raft plate 3 towards the embedded traction steel hanging ring of direction of draw, counter-force facility and jack are installed in counter-force stake of constructing.
(9) it is laid with sliding rail in glide direction, new basis is also laid with sliding rail above.
(10) it is drawn using traction facility.
Facility is drawn using hydraulic synchronous system is automatically controlled, automatically controls hydraulic synchronous system by hydraulic system, detection Sensor and computer control system composition, wherein hydraulic system includes oil pump, hydraulic jack.Hydraulic system is by computer control System is automatically finished synchronous shift, realizes power and Bit andits control, operation locking, process display function.Hydraulic system working pressure 30~32MPa, spike pressure are 35MPa.Pushing tow cylinder thrust stroke is 1200mm, and it is 0~60mm/min, group that pushing tow, which controls speed, Interior each pushing tow cylinder pressure communication, position synchronization control between group and group, synchronization accuracy are ± lmm.
(11) sliding beam 1 is coupled with new basis, frame column 2 couples with new basis.
Sliding jacks sliding beam 1 afterwards in place, and wind cuts steel ball 4 after jacking sliding beam 1, and removes sliding rail, then under It puts sliding beam 1 and couples sliding beam 1 with new basis.
Frame column 2 is connect with new basis connection using pea gravel concreten shove, and shove technique ensure that pillar Linking with foundation Its vertical displacement is zero afterwards.Shove is using dry pea gravel concreten, and stiff degree is agglomerating to be pinched with hand, and landing scatters to close Lattice.By two sides mould card clamping that frame column 2 is opposite when shove, squeezed into from other two sides by dry concrete.
Embodiment two
Sliding beam 1 is set on raft plate 3 in embodiment, and adjacent sliding beam 1 is apart from for 3.2m, 1 bottom of sliding beam and raft 3 distance from top of plate is 70mm, and 1 height of sliding beam is 700mm;1 width of sliding beam is 300mm.1 following settings steel ball of sliding beam 4,4 diameter of steel ball is 70mm.
The wooden straining beam 7 is set between adjacent sliding beam 1, and wooden 7 diameter of straining beam is 150~180mm, and the wooden straining beam 7 is pressed from both sides with sliding beam 1 Angle is 50 degree.
Counter-force stake is set as counter-force facility on the right side of traction building on-station position, counter-force stake is from building position in place Setting distance has 0.7m, and counter-force stake uses prefabricated tubular pile, and prefabricated tubular pile diameter is 500~600mm.Counter-force stake is used when initial traction It is used as reaction support with engineering pile joint, only with counter-force stake as reaction support when pulling motion.
Vibration damping bloom 8 is set every 2~3m in sliding rail lower part, spring 9 is installed in vibration damping bloom 8, makes to slide rail As spring body, make the steel ball 4 being located within the scope of sliding rail body when encountering advance resistance, it can be by vibration damping bloom Impact force is alleviated in the effect of 8 inner springs 9.
Construction procedure includes:
(1) 1/5 section of frame column is cut as the coupling part with sliding beam 1;Interim branch is set near frame column 2 Support.
(2) brick wall at 1 position of sliding beam being cut, supporting module 6, lateral 6 top of template is arranged fill orifice and shocks hole, Perfusion bore dia is 45mm, and it is 1.3m that spacing, which is arranged, in fill orifice;Shocking bore dia is 25mm, and shocking hole setting spacing is 0.8m; Steel ball 4 is placed in 6 bottom of template in supporting module 6, steel ball 4 is embedded in lower template 6, and 4 top of steel ball is pushed up with lower template 6 Portion's absolute altitude is identical, there is bearing among steel ball 4, and bearing protrudes into template 6, and bearing built-in length is 130mm.
(3) 1 reinforcing bar of sliding beam is installed, the part of chiseling that sliding beam main tendon 5 protrudes into frame column 2 is bent upward or downward to increase Add anchorage length, anchorage length 500mm.
(4) pour 1 concrete of sliding beam, then pouring frame column 2 cuts position concrete, concrete using high-pressure pump into Row perfusion.
(5) coupling for frame column 2 and raft plate 3 is cut off with wind cutting mill after 1 concrete strength of sliding beam reaches design strength Reinforcing bar and the concrete for abolishing coupling part keep 2 elevation of bottom of frame column identical as 1 elevation of bottom of sliding beam.
(6) by the pre-buried screw attachment of wooden straining beam 7 and sliding beam 1.
(7) the new basis at the position in place of sliding beam 1 is poured.
(8) in raft plate 3 towards the embedded traction steel hanging ring of direction of draw, counter-force facility and jack are installed in counter-force stake of constructing.
(9) it is laid with sliding rail in glide direction, new basis is also laid with sliding rail above.
(10) it is drawn using traction facility.
Facility is drawn using hydraulic synchronous system is automatically controlled, automatically controls hydraulic synchronous system by hydraulic system, detection Sensor and computer control system composition, wherein hydraulic system includes oil pump, hydraulic jack.Hydraulic system is by computer control System is automatically finished synchronous shift, realizes power and Bit andits control, operation locking, process display function.Hydraulic system working pressure 30~32MPa, spike pressure are 35MPa.Pushing tow cylinder thrust stroke is 1200mm, and it is 0~60mm/min, group that pushing tow, which controls speed, Interior each pushing tow cylinder pressure communication, position synchronization control between group and group, synchronization accuracy are ± lmm.
(11) sliding beam 1 is coupled with new basis, frame column 2 couples with new basis.
Sliding rail is welded with new reinforcement foundation, sliding in place afterwards welds steel ball 4 and sliding rail, makes steel ball Rolling translation can not be carried out under the action of external load after 4.Rail will be slid and 4 gap of steel ball is thin with high strength micro expansion Stone concrete pours closely knit, and steel ball 4 is poured in high strength micro expansion pea gravel concreten.
Frame column 2 is connect with new basis connection using pea gravel concreten shove, and shove technique ensure that pillar Linking with foundation Its vertical displacement is zero afterwards.Shove is using dry pea gravel concreten, and stiff degree is agglomerating to be pinched with hand, and landing scatters to close Lattice.By two sides mould card clamping that frame column 2 is opposite when shove, squeezed into from other two sides by dry concrete.

Claims (1)

1. a kind of gliding construction method of building, it is characterized in that sliding beam is arranged on raft plate, adjacent sliding beam distance is 3 ~3.6m, sliding beam bottom and raft plate distance from top are 60~80mm, and sliding beam width is 300mm;Sliding beam following settings steel Ball, steel ball diameter are 60~80mm;
The wooden straining beam is set between adjacent sliding beam, the wooden straining beam diameter is 150~180mm, the wooden straining beam and sliding beam angle be 45~ 60 degree;
Construction procedure includes:
(1) 1/5 section of frame column is cut as the coupling part with sliding beam;Temporary support is set near frame column;
(2) brick wall at sliding beam position is cut, supporting module, lateral template top is arranged fill orifice and shocks hole, fill orifice Diameter is 40~50mm, and it is 1.2~1.5m that spacing, which is arranged, in fill orifice;Shocking bore dia is 20~30mm, shocks hole setting spacing For 0.7~0.9m;Steel ball is placed in template bottom in supporting module, steel ball is embedded in lower template, and steel ball top is under Die head absolute altitude is identical, there is bearing among steel ball, and bearing protrudes into template, and bearing built-in length is 120~150mm;
(3) sliding beam steel is installed, the part of chiseling that sliding beam main tendon protrudes into frame column is bent upward or downward to increase anchoring Length, anchorage length are 500~700mm;
(4) sliding beam concrete is poured, then pouring frame column cuts position concrete, and concrete is filled using high-pressure pump Note;
(5) couple reinforcing bar and broken with what wind cutting mill cut off frame column and raft plate after sliding beam concrete strength reaches design strength Except the concrete of coupling part, keep frame column elevation of bottom identical as sliding beam elevation of bottom;
(6) by the pre-buried screw attachment of the wooden straining beam and sliding beam;
(7) the new basis at sliding beam position in place is poured;
(8) in raft plate towards the embedded traction steel hanging ring of direction of draw, counter-force facility and jack are installed in counter-force stake of constructing;
(9) it is laid with sliding rail in glide direction, new basis is also laid with sliding rail above;
(10) it is drawn using traction facility;
Facility is drawn using hydraulic synchronous system is automatically controlled, hydraulic synchronous system is automatically controlled and is sensed by hydraulic system, detection Device and computer control system composition, wherein hydraulic system includes oil pump, hydraulic jack;Hydraulic system is controlled by computer, It is automatically finished synchronous shift, realizes power and Bit andits control, operation locking, process display function;Hydraulic system working pressure 30 ~32MPa, spike pressure are 35MPa;Pushing tow cylinder thrust stroke is 1200mm, and pushing tow controls speed for 0~60mm/min, in group Each pushing tow cylinder pressure communication, position synchronization control between group and group, synchronization accuracy are ± lmm;
(11) sliding beam is coupled with new basis, frame column couples with new basis;
Traction building on-station position right side setting counter-force stake as counter-force facility, counter-force stake from building on-station position away from From there is 0.6~0.8m, counter-force stake uses prefabricated tubular pile, and prefabricated tubular pile diameter is 500~600mm;Counter-force is used when initial traction Stake and engineering pile joint are used as reaction support, only with counter-force stake as reaction support when pulling motion.
CN201811322904.0A 2017-07-12 2017-07-12 Sliding construction technology for building Active CN109184259B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811322904.0A CN109184259B (en) 2017-07-12 2017-07-12 Sliding construction technology for building

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201811322904.0A CN109184259B (en) 2017-07-12 2017-07-12 Sliding construction technology for building
CN201710563525.XA CN107227862B (en) 2017-07-12 2017-07-12 The gliding construction method of building

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201710563525.XA Division CN107227862B (en) 2017-07-12 2017-07-12 The gliding construction method of building

Publications (2)

Publication Number Publication Date
CN109184259A true CN109184259A (en) 2019-01-11
CN109184259B CN109184259B (en) 2021-06-29

Family

ID=59956289

Family Applications (7)

Application Number Title Priority Date Filing Date
CN201710563525.XA Active CN107227862B (en) 2017-07-12 2017-07-12 The gliding construction method of building
CN201811322818.XA Pending CN109184257A (en) 2017-07-12 2017-07-12 The displacement construction technology of building
CN201811322858.4A Withdrawn CN109184258A (en) 2017-07-12 2017-07-12 Displacement construction method with raft plate building
CN201811322904.0A Active CN109184259B (en) 2017-07-12 2017-07-12 Sliding construction technology for building
CN201811322768.5A Active CN109184256B (en) 2017-07-12 2017-07-12 Displacement construction method for building
CN201811337134.7A Active CN109184261B (en) 2017-07-12 2017-07-12 Slippage construction method for building with raft
CN201811328587.3A Active CN109184260B (en) 2017-07-12 2017-07-12 Slippage construction technology for building with raft

Family Applications Before (3)

Application Number Title Priority Date Filing Date
CN201710563525.XA Active CN107227862B (en) 2017-07-12 2017-07-12 The gliding construction method of building
CN201811322818.XA Pending CN109184257A (en) 2017-07-12 2017-07-12 The displacement construction technology of building
CN201811322858.4A Withdrawn CN109184258A (en) 2017-07-12 2017-07-12 Displacement construction method with raft plate building

Family Applications After (3)

Application Number Title Priority Date Filing Date
CN201811322768.5A Active CN109184256B (en) 2017-07-12 2017-07-12 Displacement construction method for building
CN201811337134.7A Active CN109184261B (en) 2017-07-12 2017-07-12 Slippage construction method for building with raft
CN201811328587.3A Active CN109184260B (en) 2017-07-12 2017-07-12 Slippage construction technology for building with raft

Country Status (1)

Country Link
CN (7) CN107227862B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107816125B (en) * 2017-10-26 2024-06-07 临沂锋立建筑劳务有限公司 Structure for synchronous construction of basement and superstructure
CN109083442B (en) * 2018-10-15 2020-10-23 北京建工四建工程建设有限公司 Construction method of dynamic load bearing structure during butt joint of existing building and newly-built foundation
CN109281255B (en) * 2018-10-26 2023-10-20 中交路桥华南工程有限公司 Steel beam sliding support and system
CN114969889B (en) * 2022-04-18 2024-06-04 朱胜祥 Pile-raft foundation overhanging raft stress calculation method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1077512A (en) * 1992-09-25 1993-10-20 高继良 The method and apparatus of building translation
CN2440893Y (en) * 2000-08-16 2001-08-01 广州市鲁班建筑防水补强专业公司 Apparatus for unitary horizontal movement of construction
JP2003056186A (en) * 2001-08-17 2003-02-26 Hikiya Kenchikubutsu Furiku Chosei Shuei Tonosaki H-shape steel frame construction method in sill lifting and hauling work of wooden building using h-shape steel, specially-made anchor fitting and specially-made fine adjustment fitting in conformity with structural characteristic of wooden building
CN204738556U (en) * 2015-05-29 2015-11-04 中国建筑第六工程局有限公司 A device for landmark is whole to shift
CN106285040A (en) * 2016-08-19 2017-01-04 山东建筑大学 The track discrepancy in elevation is utilized to realize the method that building moving turns to
CN106760619A (en) * 2016-12-23 2017-05-31 河北省建筑科学研究院 A kind of building translation apparatus and its construction method

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1562430A (en) * 1925-01-08 1925-11-24 Alexander Orion Means for and method of moving buildings
CN1034881C (en) * 1993-10-09 1997-05-14 阮蔚文 Method for moving house
CN1132302A (en) * 1995-09-29 1996-10-02 哈尔滨市道里区房屋土地开发公司 Structure displacement method of building
JP2002013299A (en) * 2000-06-30 2002-01-18 Yutaka Kouen Structure transferring device
JP5415243B2 (en) * 2009-12-07 2014-02-12 大成建設株式会社 Structure transfer method
JP5320499B1 (en) * 2012-10-04 2013-10-23 株式会社北日本重量 Heavy goods transfer device and heavy goods transfer device
CN103233588B (en) * 2013-04-18 2015-07-29 叶长青 With the shift method of raft foundation building
JP6341705B2 (en) * 2014-03-14 2018-06-13 大成建設株式会社 Moving method
CN105089292A (en) * 2015-08-21 2015-11-25 顾雍舟 Monolithic movement construction method for house with soil foundation

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1077512A (en) * 1992-09-25 1993-10-20 高继良 The method and apparatus of building translation
CN2440893Y (en) * 2000-08-16 2001-08-01 广州市鲁班建筑防水补强专业公司 Apparatus for unitary horizontal movement of construction
JP2003056186A (en) * 2001-08-17 2003-02-26 Hikiya Kenchikubutsu Furiku Chosei Shuei Tonosaki H-shape steel frame construction method in sill lifting and hauling work of wooden building using h-shape steel, specially-made anchor fitting and specially-made fine adjustment fitting in conformity with structural characteristic of wooden building
CN204738556U (en) * 2015-05-29 2015-11-04 中国建筑第六工程局有限公司 A device for landmark is whole to shift
CN106285040A (en) * 2016-08-19 2017-01-04 山东建筑大学 The track discrepancy in elevation is utilized to realize the method that building moving turns to
CN106760619A (en) * 2016-12-23 2017-05-31 河北省建筑科学研究院 A kind of building translation apparatus and its construction method

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
国家知识产权局专利复审委员会编著: "《专利复审委员会案例诠释-现有技术与新颖性》", 30 November 2004, 知识产权出版社 *
庄延清: "建筑物整体平移施工技术", 《福建建筑》 *
袁广林等编著: "《建筑结构检测鉴定与加固技术》", 31 January 2016, 武汉大学出版社 *
韩继云等: "某文物建筑的平移改造工程", 《特种结构》 *

Also Published As

Publication number Publication date
CN109184258A (en) 2019-01-11
CN109184260A (en) 2019-01-11
CN109184257A (en) 2019-01-11
CN109184259B (en) 2021-06-29
CN109184261B (en) 2021-06-29
CN109184261A (en) 2019-01-11
CN107227862B (en) 2019-04-02
CN109184260B (en) 2021-06-29
CN109184256A (en) 2019-01-11
CN109184256B (en) 2021-06-29
CN107227862A (en) 2017-10-03

Similar Documents

Publication Publication Date Title
CN107227862B (en) The gliding construction method of building
CN101666081B (en) Abrupt slope bare rock drilling platform and technology in huge reservoir
CN104389419B (en) Encorbelment and prop up mould structure for mounting platform and a constructional method
ITBO20060414A1 (en) METHOD FOR LIFTING A BUILDING AFT.
CN107190762B (en) Pile foundation structure for reducing side friction resistance
CN105863362A (en) Deviation rectifying device for inclined transmission tower
CN105972313B (en) One kind is across base pit engineering conduit wiring suspension method and overhung construction
CN102864788A (en) Method for underpinning reinforced bridge pile foundation by bear-type static pressure cluster pile
CN106522112A (en) Cable-stayed bridge side span beam section erecting system and method thereof
CN107938666B (en) Pile end inner hammering pile sinking with pile shoe and synchronous end grouting structure and process
CN103498574B (en) After in masonry panel, increase stem stem Shockproof reinforcing method
CN104018490A (en) Z-shaped rectangular-section anti-skidding pile and construction method thereof
CN108265618A (en) A kind of reverse increasing layer construction method in overpass pier base underground
CN206956527U (en) A kind of damping anti-fall girder apparatus for preventing that prefabricated beam bridge from longitudinally coming off
CN103790176B (en) Construction method for embedded short limb column structure
CN103556820A (en) Suspension mold for enlarging and reinforcing concrete beam and construction method of suspension mold
CN204151798U (en) A kind of steel reinforced concrete anti-slide pile structure
CN103741690B (en) A kind of soil plug compensates pile tube and extracts construction method and soil plug used compensation pile tube pile pulling device thereof
CN108517795A (en) Railroad bridge protecting canopy frame structure and its construction method
CN208415124U (en) A kind of railroad bridge protecting canopy frame structure
CN102134861A (en) Method for testing precast pile in soil body
CN103883336B (en) A kind of adjustable gob side entry retaining body of wall of first initiatively relief pressure supporting and construction method thereof
CN205296177U (en) Dado bearing structure suitable for hole friction pile stake hole is dug in manual work
CN204715196U (en) A kind of cantilever casting beam abutment pier prestressed reinforcement device
CN201649355U (en) Restrained porous coal gangue brick masonry

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 325000 No. 48 Xinghai Road, Jingshan Street, Ouhai District, Wenzhou City, Zhejiang Province

Applicant after: Ye Changqing

Address before: 325000 Jinchuan Road, Tianhe street, Wenzhou economic and Technological Development Zone, Zhejiang, 4

Applicant before: Ye Changqing

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 325000 Jinchuan Road, Tianhe street, Wenzhou economic and Technological Development Zone, Zhejiang, 4

Patentee after: Ye Changqing

Address before: 325000 No. 48 Xinghai Road, Jingshan Street, Ouhai District, Wenzhou City, Zhejiang Province

Patentee before: Ye Changqing

CP02 Change in the address of a patent holder