CN109184231A - The combined hanging method of roof purline - Google Patents

The combined hanging method of roof purline Download PDF

Info

Publication number
CN109184231A
CN109184231A CN201811449948.XA CN201811449948A CN109184231A CN 109184231 A CN109184231 A CN 109184231A CN 201811449948 A CN201811449948 A CN 201811449948A CN 109184231 A CN109184231 A CN 109184231A
Authority
CN
China
Prior art keywords
hoist cable
roof purline
roof
lifting
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811449948.XA
Other languages
Chinese (zh)
Inventor
高国庆
傅志军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201811449948.XA priority Critical patent/CN109184231A/en
Publication of CN109184231A publication Critical patent/CN109184231A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The combined hanging method of specifically a kind of roof purline of the present invention;It is characterized in that: including two step 1, preparation, production main hoist cables of isometric lifting, more hoist cables are inserted on every main hoist cable;Roof purline is well placed by step 2 according to the erection sequence and installation site of roof purline in planning on ground;Step 3, successively will roof purline binding on secondary hoist cable;All secondary hoist cables are lifted to high-altitude by main hoist cable by step 4 simultaneously;Step 5 keeps main hoist cable motionless, successively puts down the purlin in time hoist cable according to the erection sequence of roof purline in planning and carries out installation exercise;Step 6 repeats step 2,5 until all roof purlines are installed.This hanging method batch in such a way that main lifting rope cooperates time lifting rope lifts purlin, a possibility that lifting is repeated to reduce lifting appliance, and then the danger coefficient of high altitude operation is reduced, meanwhile, batch carries out purlin lifting and is also beneficial to accelerate the precision of roof purline operation.

Description

The combined hanging method of roof purline
Technical field
The present invention relates to houses to build field, the combined hanging method of specifically a kind of roof purline.
Background technique
Currently, in the lifting operation of roof purline, purlin is individually to carry out lifting one by one and carry out on roof high Sky builds operation;So the problem of operation, is that the quantity of purlin is often more, during repeating strip, very The activity duration of hanging device is wasted, and lifting is repeated and yet needs to be repeated binding confirmation, these movements also need It occupies a large amount of time and does not pay attention to that slightly safety accident may be caused.
Summary of the invention
It is an object of the invention to overcome drawbacks described above, a kind of combined hanging side of fast and efficiently roof purline is provided Method.
In order to achieve the above object, the present invention is implemented as follows:
A kind of combined hanging method of roof purline, including
Two step 1, preparation, production main hoist cables of isometric lifting, are inserted into more hoist cables on every main hoist cable;
Roof purline is well placed by step 2 according to the erection sequence and installation site of roof purline in planning on ground;
Step 3, successively will roof purline binding on secondary hoist cable;
All secondary hoist cables are lifted to high-altitude by main hoist cable by step 4 simultaneously;
Step 5 keeps main hoist cable motionless, successively puts down the purlin in time hoist cable simultaneously according to the erection sequence of roof purline in planning Carry out installation exercise;
Step 6 repeats step 2,5 until all roof purlines are installed.
The combined hanging method of the roof purline, the main hoist cable, the uniform steel cable of secondary hoist cable are made, wherein secondary Hoist cable is that set is pricked on main hoist cable;The secondary hoist cable is sennit, and the other end is equipped with hanging ring, to carry out when binding purlin It is fixed.
This hanging method batch in such a way that main lifting rope cooperates time lifting rope lifts purlin, sets to reduce lifting Standby a possibility that repeating lifting, and then the danger coefficient of high altitude operation is reduced, meanwhile, batch carries out purlin lifting and is also beneficial to add The precision of fast roof purline operation.
Detailed description of the invention
Fig. 1 is the schematic diagram one of this hanging method.
Fig. 2 is the schematic diagram two of this hanging method.
Specific embodiment
The present invention is further illustrated below by way of specific embodiment.
As shown in Figure 1 and Figure 2, a kind of combined hanging method of roof purline, including
Step 1, preparation, the production main hoist cable 1 of two isometric liftings, are inserted into more hoist cables 2 on every main hoist cable 1;
Roof purline 3 is well placed by step 2 according to the erection sequence of roof purline 3 in planning and installation site on ground;
Step 3, successively will the binding of roof purline 3 on secondary hoist cable 2;
All secondary hoist cables 2 are lifted to high-altitude by main hoist cable 1 by step 4 simultaneously;
Step 5 keeps main hoist cable 1 motionless, successively puts down the purlin in time hoist cable 2 according to the erection sequence of roof purline 3 in planning Item simultaneously carries out installation exercise;
Step 6 repeats step 2,5 until all roof purlines are installed.
The combined hanging method of the roof purline, the main hoist cable, the uniform steel cable of secondary hoist cable are made, wherein secondary Hoist cable is that set is pricked on main hoist cable;The secondary hoist cable is sennit, and the other end is equipped with hanging ring, to carry out when binding purlin It is fixed.
This hanging method batch in such a way that main lifting rope cooperates time lifting rope lifts purlin, sets to reduce lifting Standby a possibility that repeating lifting, and then the danger coefficient of high altitude operation is reduced, meanwhile, batch carries out purlin lifting and is also beneficial to add The precision of fast roof purline operation.

Claims (2)

1. a kind of combined hanging method of roof purline, it is characterized in that: including
Two step 1, preparation, production main hoist cables of isometric lifting, are inserted into more hoist cables on every main hoist cable;
Roof purline is well placed by step 2 according to the erection sequence and installation site of roof purline in planning on ground;
Step 3, successively will roof purline binding on secondary hoist cable;
All secondary hoist cables are lifted to high-altitude by main hoist cable by step 4 simultaneously;
Step 5 keeps main hoist cable motionless, successively puts down the purlin in time hoist cable simultaneously according to the erection sequence of roof purline in planning Carry out installation exercise;
Step 6 repeats step 2,5 until all roof purlines are installed.
2. the combined hanging method of roof purline according to claim 1, it is characterized in that: the main hoist cable, secondary hoist cable are equal Even steel cable is made, wherein secondary hoist cable is that set is pricked on main hoist cable;The secondary hoist cable is sennit, and the other end is equipped with hanging ring, To be fixed when binding purlin.
CN201811449948.XA 2018-11-30 2018-11-30 The combined hanging method of roof purline Pending CN109184231A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811449948.XA CN109184231A (en) 2018-11-30 2018-11-30 The combined hanging method of roof purline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811449948.XA CN109184231A (en) 2018-11-30 2018-11-30 The combined hanging method of roof purline

Publications (1)

Publication Number Publication Date
CN109184231A true CN109184231A (en) 2019-01-11

Family

ID=64938463

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811449948.XA Pending CN109184231A (en) 2018-11-30 2018-11-30 The combined hanging method of roof purline

Country Status (1)

Country Link
CN (1) CN109184231A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2965408A (en) * 1958-05-23 1960-12-20 John D Edwards Apparatus for mounting purlins on a roof under structure
CN201746220U (en) * 2010-07-27 2011-02-16 广东省第二建筑工程公司 Strip-type element hanging device
CN107352386A (en) * 2017-08-31 2017-11-17 上海二十冶建设有限公司 The simple lifting tool and its application method of steel structural roof combined hanging
CN108584670A (en) * 2018-05-15 2018-09-28 中国十七冶集团有限公司 A kind of device in place for more purlin fast hoistings

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2965408A (en) * 1958-05-23 1960-12-20 John D Edwards Apparatus for mounting purlins on a roof under structure
CN201746220U (en) * 2010-07-27 2011-02-16 广东省第二建筑工程公司 Strip-type element hanging device
CN107352386A (en) * 2017-08-31 2017-11-17 上海二十冶建设有限公司 The simple lifting tool and its application method of steel structural roof combined hanging
CN108584670A (en) * 2018-05-15 2018-09-28 中国十七冶集团有限公司 A kind of device in place for more purlin fast hoistings

Similar Documents

Publication Publication Date Title
CN207395691U (en) A kind of landslide ground displacement equipment
CN204615155U (en) A kind of lightning rod apparatus for automatically lifting
CN109184231A (en) The combined hanging method of roof purline
CN201591922U (en) Energy-storage type electric control cable drop escape device
CN210103219U (en) Elevator pit overhauls operation control system
CN103715632A (en) Transmission line operation hanging device and transmission line operation method
CN202444202U (en) Aerial cable locking device
CN101993002B (en) Automatic lift type shaft hanging stage
CN210899479U (en) Communication equipment installation device
CN203983838U (en) Multifunctional intellectual insulation line lifter
CN210103295U (en) Multi-claw manipulator
CN208561497U (en) A kind of Plug-in tower crane for following tower body to climb together is climbed frame apparatus
CN113067283A (en) Indirect operation and tool transmission method for power transmission and transformation equipment
CN206842993U (en) The lowering or hoisting gear of Raw material pail is transported in a kind of coating material production
CN204754194U (en) Perpendicular conveyer that uses in mould of bump top
CN203760921U (en) Insulation hoisting pulling plate for insulator replacing
CN214934920U (en) Auxiliary device for cable processing
CN201473159U (en) Self-controlled lifting type suspension sinking platform for vertical shaft
CN203826911U (en) Novel cable net cover connector
CN209124758U (en) Automatic discharging device is used in a kind of production of metal electrical appliance kit
CN202944960U (en) Floor calling system
CN210825095U (en) Titanium wire changes tray device
CN206815843U (en) A kind of construction roof beam structure for building
CN108675132A (en) A kind of steel construction purlin and Accessory Members method for rapidly mounting
CN202424002U (en) Spacer rod hoisting tool used safely

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190111