CN109175695A - The method for laser welding of optical cable feed-through - Google Patents

The method for laser welding of optical cable feed-through Download PDF

Info

Publication number
CN109175695A
CN109175695A CN201811237703.0A CN201811237703A CN109175695A CN 109175695 A CN109175695 A CN 109175695A CN 201811237703 A CN201811237703 A CN 201811237703A CN 109175695 A CN109175695 A CN 109175695A
Authority
CN
China
Prior art keywords
feed
conduction band
laser welding
welding
optical cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811237703.0A
Other languages
Chinese (zh)
Inventor
刘圆
张超
徐林
范明海
孟庆洋
蔡旦君
聂玉全
李涛
但一
卢光远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Hengtong Marine Optical Network System Co Ltd
Original Assignee
Jiangsu Hengtong Marine Optical Network System Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Hengtong Marine Optical Network System Co Ltd filed Critical Jiangsu Hengtong Marine Optical Network System Co Ltd
Priority to CN201811237703.0A priority Critical patent/CN109175695A/en
Publication of CN109175695A publication Critical patent/CN109175695A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K26/00Working by laser beam, e.g. welding, cutting or boring
    • B23K26/20Bonding
    • B23K26/21Bonding by welding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K26/00Working by laser beam, e.g. welding, cutting or boring
    • B23K26/70Auxiliary operations or equipment
    • B23K26/702Auxiliary equipment

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Plasma & Fusion (AREA)
  • Mechanical Engineering (AREA)
  • Laser Beam Processing (AREA)

Abstract

The invention discloses a kind of method for laser welding of optical cable feed-through, comprising the following steps: (1) obtains feed conduction band of same size;(2) to feed conduction band bottom surface welding edge grinder buffing;(3) feed conduction band is bent into pipe;(4) laser welding is carried out to joint close, welding is passed through inert gas to weld simultaneously, prevents copper pipe from aoxidizing for completely cutting off air.The method for laser welding of optical cable feed-through of the invention, existing argon-are welding technology is replaced by way of a kind of laser welding, conduction band bending will be fed by, which first passing through, becomes the copper pipe of cladding cable core, then it is welded in corresponding position by laser, extend the equipment continuous available machine time, increase production capacity, while reducing the loss and waste of material;And relationship can also be contacted by adjust output power and copper pipe forward speed, weld seam welding effect can be controlled, easily meet production requirement, improve the quality of production.

Description

The method for laser welding of optical cable feed-through
Technical field
The present invention relates to the laser weldings of the method for laser welding of feed-through more particularly to submarine optical fiber cable feed-through Method.
Background technique
Submarine optical fiber cable, which communicates, has more than 100 years history, and anglo Shandong-Telegraph Of France starts between Great Britain and France within 1850 It has been laid with the first in the world submarine cable, Morse telegraphy password can only be sent.Into the nineties, submarine optical fiber cable is and satellite Communication becomes the main means of contemporary transcontinental communication.Start within 1989 to the end of the year 1998, it is Chinese successively to have taken part in 18 states The construction and investment of border submarine optical fiber cable.The open-minded of station is logged in Asia-Europe submarine optical fiber cable Shanghai within 2000, by group of China Telecom The Asia-Europe Fiber Optical Submarine Cable System that company participates in construction, connects Asia-Europe 33, seabed countries and regions, just by the construction more than 3 years Formula is open-minded.Building up for it indicates that China's international communication is horizontal and upgrades to a new height.Submarine optical fiber cable is international logical as the present age The important means of letter assumes responsibility for 90% international telecommunication service, is the main carriers of global information communication.It is also China's optical fiber enterprise The new high profit growth point of industry.
Fiber Optical Submarine Cable System is mainly used for connecting optical cable and Internet, it is divided into shore facilities and the big portion of underwater equipment two Point.The communication services such as voice, image, data are packaged and transmit by shore facilities.Underwater equipment is responsible for the processing of signal of communication, is sent And reception.Underwater equipment is divided into submarine optical fiber cable, repeater and " branch units " three parts: submarine optical fiber cable is most important one It is the part of most fragile.
Submarine optical fiber cable works in sufficiently complex and severe marine environment, and there are many factor for influencing submarine optical fiber cable safety, The safety of the most important safety for having transmission line and transmission information can by feeding conduction band periodic monitoring submarine optical fiber cable state Carry out the security monitoring to the link.Submarine optical fiber cable use environment is special, and the digital repeater function of submarine optical fiber cable is more, than sea The electricity consumption of the analog repeater of bottom cable is several times big, and power reguirements have very high reliability, cannot interrupt.Therefore having The area that shark haunts, will also be plus steel band around double-baging and again plus layer of polyethylene oversheath in the outside of submarine optical fiber cable.I.e. Make to be such strict protection, still found that the polyethylene insulator of deep-sea cable was stung by shark at the end of the eighties and badly cause to supply The example of electric fault, the maintenance cost that such as breaks down is very high, and carrying out fault location by feed conduction band can reduce the fault point The time is searched, maintenance cost is greatly reduced.
Copper pipe in submarine optical fiber cable is important feed conduction band, plays as the attachment transmission energy that connect with submarine optical fiber cable Effect, and in ocean, it in order to ensure normal work of the optical fiber in submarine optical fiber cable, needs to be protected well, such one Come, copper pipe then needs as closed copper pipe.Currently used production technology are as follows: closed using flat copper strips by molding die longitudinal wrap cable core It is welded after seam, using Tig Welding mode.
Copper strips longitudinal wrap argon gas tungsten-arc welding connects, such welding manner comparative maturity, but there are own shortcomings:
(1), in order to avoid the appearance of quality problems, burning of tungsten needle to a certain extent when, need according to actual use situation It is replaced, increases the time that equipment downtime waits;
(2), feed conduction band is directly bent into pipe with aircraft mould or limit mould in the prior art, after being unfavorable for control bending The joint close position of conduction band is fed, and directly bends and easily feed conduction band or mold is damaged;
(3), influence of the argon tungsten-arc welding vulnerable to copper strip surface clean-up performance need to carry out necessary cleaning by bit copper band, increase Add a procedure, new pollution may be introduced, increases the welding process factors of instability;
(4), it needs to be passed through argon gas always in welding process, will increase corresponding production cost;
Summary of the invention
The technical problem to be solved by the present invention is to overcome feed conduction band existing in background technique argon gas to protect tungsten electrode arc Welding there are disadvantages, a kind of method with laser welding optical cable feed-through is provided.
In order to solve the above-mentioned technical problems, the present invention provides a kind of method for laser welding of optical cable feed-through, packets It includes following steps: (1) obtaining feed conduction band of same size;(2) to feed conduction band bottom surface welding edge grinder buffing;(3) Feed conduction band is bent into pipe: making to feed conduction band from axial centre position into multiple idler wheel molding dies, along feed conduction band operation The forming width in direction, multiple idler wheel molding dies gradually becomes smaller, and feed conduction band is bent into the feed with both sides joint close and is led Pipe;(4) laser welding directly is carried out to commissure, welding is passed through inert gas to welding region simultaneously, anti-for completely cutting off air Only copper pipe aoxidizes.
It further comprise being obtained using cutter of same size in step (1) in a preferred embodiment of the present invention Conduction band is fed, feedforward conductance band is cut and passes through prelocalization device, the fixed feed conduction band positions of prelocalization device make to feed conduction band water It is flat to enter cutter.
In a preferred embodiment of the present invention, further comprise in step (2), with grinding wheel sander to feed conduction band into Row polishing, the grinding wheel sander includes fast pulley group and grinding wheel group, and the feed conduction band is from fast pulley group and grinding wheel group Between pass through, fast pulley group is pressed in conduction band is fed in grinding wheel group, and the grinding wheel group includes that feed two of conduction band two sides is arranged in Grinding wheel.
It further comprise that step (2) carries out in the first closed case in a preferred embodiment of the present invention, described first Closed case includes the first air inlet and the first gas outlet, is inserted into compressed air hose in air inlet, to grinder buffing at be passed through sky Gas, the copper powder that cleaning polishing generates install strainer and the first air extractor in gas outlet.
It further comprise in step (3), before idler wheel molding die, to feed in a preferred embodiment of the present invention Conduction band is positioned, and feed conduction band passes through post-positioning device, and feed conduction band is made to pass through the multiple of axial symmetry setting from the central position Idler wheel molding die, the idler wheel molding die forming width gradually become smaller, and the slope of the feed conduction band of bending just becomes larger, Feed conduction band is gradually bent into pipe, after being bent into feed conduction band pipe, by identical or be greater than as feed conduction band pipe diameter size The sizing die of 0.1mm further compresses feed conduction band pipe.
It further comprise feed conduction band edge docking after being bent into pipe in step (3) in a preferred embodiment of the present invention The gap spacing for locating to be formed is between 0~0.2mm.
It further comprise that step (4) carries out in the second closed case in a preferred embodiment of the present invention, described second Two layers of protective cover of closed case outer cladding, the gold with Thermal conductivity that the protective cover is coated by surface black material Category is made;The second air inlet and the second gas outlet is arranged in second closed case, leads in second air inlet to weld Enter inert gas, the inert gas is nitrogen;Second gas outlet is connected to the second air extractor, for taking laser welding away The exhaust gas and residue that copper pipe generates.
It further comprise using the seam welding of laser beam emitting head pairing, institute in step (4) in a preferred embodiment of the present invention It states laser beam emitting head to be fixed on the bracket that one can be adjusted to three vertical dimensions directions, for adjusting laser relative to copper The focal position of pipe weld seam;The laser beam emitting head bonding power 8400 ± 100W, 1.8~2.2mm of defocusing amount.
It further comprise being also equipped on the laser beam emitting head with filter glass in a preferred embodiment of the present invention Camera.
In a preferred embodiment of the present invention, further comprise the feed conduction band be copper strips or aluminium strip.
The method for laser welding of optical cable feed-through of the invention, has the advantages that
(1) existing argon-are welding technology is replaced by way of a kind of laser welding, when extension equipment is continuously switched on Between, increase production capacity, while reducing the loss and waste of material.
(2) feed conduction band becomes the feed of cladding cable core with the gradually smaller idler wheel molding die bending of multiple forming widths Conduit avoids the damage directly using molding die to feed conduction band, the joint close position of the feed conduit after ensure that bending.
(3) relationship is contacted by adjust output power and copper pipe forward speed, weld seam welding effect, Yi Man can be controlled Sufficient production requirement, improves the quality of production.
Detailed description of the invention
Fig. 1 is the method for laser welding block diagram of optical cable feed-through of the invention.
Fig. 2 is the method for laser welding equipment flowsheet of optical cable feed-through of the invention.
Fig. 3 is the grinding wheel sander structural schematic diagram of the method for laser welding of optical cable feed-through of the invention.
Fig. 4 is the top view of the idler wheel molding die of the method for laser welding of optical cable feed-through of the invention.
Wherein: 1- prelocalization device, 2- cutter, the closed closed case of 3- first, the first air inlet of 31-, 32- first Gas outlet, 4- fast pulley group, 5- grinding wheel group, 6- positioning device, the second closed case of 7-, 71 second air inlets, the second outlet of 72- Mouthful, 8- idler wheel molding die, 9- sizing die, 10 laser beam emitting heads, 11- camera, 12- copper strips, 13- cable core, 14- copper pipe.
Specific embodiment
The present invention will be further explained below with reference to the attached drawings and specific examples, so that those skilled in the art can be with It more fully understands the present invention and can be practiced, but illustrated embodiment is not as a limitation of the invention.
Embodiment
As shown in Figs. 1-2, present embodiment discloses a kind of method for laser welding of optical cable feed-through, the present embodiment masters It is used in submarine optical fiber cable, preferably feed conduction band is copper strips 12, aluminium band is unable to, because electrochemistry to occur anti-for aluminium and seawater It answers and generates hydrogen, hydrogen molecule can be diffused into the glass material of optical fiber, so that the loss of optical fiber is become larger, the copper strips in the present embodiment For the copper belt after 0.65mm, comprising the following steps: (1) obtain feed conduction band of same size;(2) to the weldering of feed conduction band bottom surface Edge fit edge grinder buffing;(3) feed conduction band is bent into pipe: forming feed conduction band from axial centre position into multiple idler wheels Mold, along feed conduction band traffic direction, the forming width of multiple idler wheel molding dies gradually becomes smaller, and feed conduction band is bent into tool There is the feed conduit of both sides joint close;(4) laser welding is carried out to both sides commissure, welding is passed through indifferent gas to weld simultaneously Body prevents copper pipe from aoxidizing for completely cutting off air.
In step (1), copper strips 12 of same size is obtained using cutter 2, copper strips 12 is filled by prelocalization before cutting 1 is set, the position of 1 fixed copper band 12 of prelocalization device makes copper strips 12 horizontally enter into cutter 2.
The choosing method of copper strips width in step (1): the width of copper strips 12 determines by the diameter of sizing die 9, copper strips 12 After being bent into copper pipe 14, it can be coated on 13 outside of cable core, the smallest width of copper strips 12 should are as follows: L:(cable core diameter-copper strips is thick Degree) * π, in order to make the 14 edge close apposition of copper pipe after bending, the width for cutting copper strips 12 should be greater than L width about 0.3- 0.5mm。
Smooth 12 surface of copper strips is unfavorable for being welded for laser, so needing to polish to 12 edge of copper strips before welding To increase the roughness of 12 exterior slots of copper pipe, reduces the energy of laser welding reflection, improve the utilization rate of laser energy, step (2) it in, is polished with grinding wheel sander copper strips 12, as shown in Figure 3: the grinding wheel sander includes fast pulley group 4 With grinding wheel group 5, the copper strips 12 passes through among fast pulley group 4 and grinding wheel group 5, and copper strips 12 is pressed on by the fast pulley group 4 In grinding wheel group 5, the grinding wheel group 5 include be arranged in feed conduction band two sides two grinding wheels, to 12 bottom surface both side edge of copper strips into Row polishing;In polishing, in order to guarantee that grinding effect is identical, setting 12 forward speed of copper strips is V0, the linear velocity at grinding wheel edge For V1, should make the sum of two velocity magnitudes (absolute value) of V0 and V1 in production is definite value, can ensure in this way copper strips 12 with When friction speed is advanced, the effect of polishing is identical.
The copper powder that polishing copper strips generates in order to prevent expands match in air, and to air pollution, step (2) is in the first closed box It is carried out in body 3, first closed case includes the first air inlet 31 and the first gas outlet 32, is inserted into pressure in the first air inlet 31 Contracting air hose, to grinder buffing at be passed through air, the copper powder that cleaning polishing generates installs strainer and first in the first gas outlet 32 Air extractor.
As shown in Figure 4: copper strips and cable core enter through positioning device 6,6 fixed copper band of positioning device together after edge polishing 12 enter idler wheel molding die 8 from middle position, are consistent the profile angle of 12 two sides of copper strips and stress, Duo Gekuan The axisymmetric setting of idler wheel molding die 8 of gradual change is spent in 12 two sides of copper pipe, 8 width of idler wheel molding die gradually becomes smaller, The slope of the copper pipe 12 of bending just becomes larger, and copper strips 12 is gradually bent into copper pipe 14, after bending copper pipe 14, process and copper pipe The identical or sizing die 9 greater than 0.1mm of diameter further compresses copper pipe 14, after compression at 12 edge docking of copper strips The gap spacing of formation is between 0~0.2mm.
Since the radiation of laser has very big harmfulness, step (4) carries out in the second closed case 7, and described second is close Closed box body 7 outer cladding, two layers of protective cover, the gold with Thermal conductivity that the protective cover is coated by surface black material Category is made;The second air inlet 71 and the second gas outlet 72 is arranged in second closed case 7, and second air inlet 71 is interior to weldering The place of connecing is passed through inert gas, and the inert gas is nitrogen, and nitrogen flow is set as 8L/min, and second gas outlet 72 is connected to Second air extractor, for taking the exhaust gas and residue of the generation of laser welding copper pipe away.
Being welded with laser beam emitting head 10 to both sides commissure in step (4), the laser beam emitting head 10 is fixed on On one bracket that can be adjusted to three vertical dimensions directions, for adjusting focal position of the laser relative to copper pipe weld seam; The startup power 3550W of the laser emitting head 10, nominally 10 8400 ± 100W of bonding power of laser beam emitting head, from Coke 1.8~2.2mm of amount can be adapted to the copper pipe welding of friction speed by adjusting bonding power and defocusing amount, can also mention The quality of height welding, improves the final product quality of product.
Preferably, it is also equipped with the camera 11 with filter glass on laser beam emitting head used, can implement to see The welding situation of copper pipe is examined, and so that the welding effect of copper pipe is reached requirement by adjusting bonding power and defocus rate.
Embodiment described above is only to absolutely prove preferred embodiment that is of the invention and being lifted, protection model of the invention It encloses without being limited thereto.Those skilled in the art's made equivalent substitute or transformation on the basis of the present invention, in the present invention Protection scope within.Protection scope of the present invention is subject to claims.

Claims (10)

1. a kind of method for laser welding of optical cable feed-through, which comprises the following steps: (1) obtain width phase Same feed conduction band;(2) to feed conduction band bottom surface welding edge grinder buffing;(3) feed conduction band is bent into pipe: leading feed Band from axial centre position enter multiple idler wheel molding dies, along feed conduction band traffic direction, multiple idler wheel molding dies at Type width gradually becomes smaller, and feed conduction band is bent into the feed conduit with both sides joint close;(4) laser is carried out to both sides commissure Welding, welding are passed through inert gas to weld simultaneously, prevent copper pipe from aoxidizing for completely cutting off air.
2. the method for laser welding of optical cable feed-through as described in claim 1, which is characterized in that in step (1), use Cutter obtains feed conduction band of same size, cuts feedforward conductance band and passes through prelocalization device, the fixed feedback of prelocalization device Electric conduction band positions make feed conduction band level enter cutter.
3. the method for laser welding of optical cable feed-through as described in claim 1, which is characterized in that in step (2), use sand Wheel grinding device polishes to feed conduction band, and the grinding wheel sander includes fast pulley group and grinding wheel group, and the feed is led Band passes through among fast pulley group and grinding wheel group, and fast pulley group is pressed in conduction band is fed in grinding wheel group, and the grinding wheel group includes setting Set two grinding wheels in feed conduction band two sides.
4. the method for laser welding of optical cable feed-through as claimed in claim 3, which is characterized in that step (2) is first It is carried out in closed case, first closed case includes the first air inlet and the first gas outlet, and insertion compression is empty in air inlet Tracheae, to grinder buffing at be passed through air, the copper powder that cleaning polishing generates installs strainer and the first air extractor in gas outlet.
5. the method for laser welding of optical cable feed-through as described in claim 1, which is characterized in that in step (3), pass through Before idler wheel molding die, feed conduction band is positioned, feed conduction band passes through post-positioning device, makes to feed conduction band from the central position Across multiple idler wheel molding dies of axial symmetry setting, the idler wheel molding die forming width is gradually become smaller, the feed of bending The slope of conduction band just becomes larger, gradually will feed conduction band be bent into pipe, be bent into feed conduction band pipe after, by with feed conduction band Pipe diameter size is identical or sizing die greater than 0.1mm, further compresses to feed conduction band pipe.
6. the method for laser welding of optical cable feed-through as described in claim 1, which is characterized in that bending in step (3) Cheng Guanhou, feed conduction band edge synthesize the gap of 0~0.2mm wide, and end face is concordant.
7. the method for laser welding of optical cable feed-through as described in claim 1, which is characterized in that step (4) is second It is carried out in closed case, two layers of protective cover of the second closed case outer cladding, the protective cover is applied by surface with black material The metal with Thermal conductivity covered is made;The second air inlet and the second gas outlet, institute is arranged in second closed case It states in the second air inlet and is passed through inert gas to weld, the inert gas is nitrogen;The second gas outlet connection second Air extractor, for taking the exhaust gas and residue of the generation of laser welding copper pipe away.
8. the method for laser welding of optical cable feed-through as described in claim 1, which is characterized in that in step (4), use Laser beam emitting head welds both sides commissure, and the laser beam emitting head is fixed on one can be to three vertical dimensions directions On the bracket of adjusting, for adjusting focal position of the laser relative to copper pipe weld seam;The laser beam emitting head bonding power 8400 ± 100W, 1.8~2.2mm of defocusing amount.
9. the method for laser welding of optical cable feed-through as claimed in claim 8, which is characterized in that the laser beam emitting head On be also equipped with the camera with filter glass.
10. the method for laser welding of optical cable feed-through as described in claim 1, which is characterized in that the feed conduction band For copper strips or aluminium strip.
CN201811237703.0A 2018-10-23 2018-10-23 The method for laser welding of optical cable feed-through Pending CN109175695A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811237703.0A CN109175695A (en) 2018-10-23 2018-10-23 The method for laser welding of optical cable feed-through

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811237703.0A CN109175695A (en) 2018-10-23 2018-10-23 The method for laser welding of optical cable feed-through

Publications (1)

Publication Number Publication Date
CN109175695A true CN109175695A (en) 2019-01-11

Family

ID=64942907

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811237703.0A Pending CN109175695A (en) 2018-10-23 2018-10-23 The method for laser welding of optical cable feed-through

Country Status (1)

Country Link
CN (1) CN109175695A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1159235A (en) * 1997-08-26 1999-03-02 Fujikura Ltd Manufacture of eccentric type copper coated steel trolley line
DE19859452C1 (en) * 1998-12-22 2000-02-10 Siemens Ag Stripform high critical temperature (Tc) superconductor manufacturing method
DE19828954C2 (en) * 1998-06-29 2001-11-15 Siemens Ag Process for producing a band-shaped multicore superconductor with high-T¶c¶ superconductor material and device for carrying out the process
US20020040890A1 (en) * 2000-08-31 2002-04-11 Nexans Process for producing a metal tube of copper
CN102412029A (en) * 2011-12-28 2012-04-11 浙江天杰实业有限公司 Processing process of semi-steel cable outer conductor
CN103021556A (en) * 2011-09-27 2013-04-03 吴江市中信科技有限公司 Coating machine
CN204087932U (en) * 2014-06-27 2015-01-07 成都联士电工有限公司 A kind of Through ground wire copper alloy sheath production equipment
CN104464979A (en) * 2014-09-10 2015-03-25 南通昱品通信科技有限公司 Copper clad aluminum extending and pulling production line and production process
CN206339721U (en) * 2016-12-26 2017-07-18 四川江虹线缆制造有限公司 A kind of aluminium strip wraps up production line with optical cable

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1159235A (en) * 1997-08-26 1999-03-02 Fujikura Ltd Manufacture of eccentric type copper coated steel trolley line
DE19828954C2 (en) * 1998-06-29 2001-11-15 Siemens Ag Process for producing a band-shaped multicore superconductor with high-T¶c¶ superconductor material and device for carrying out the process
DE19859452C1 (en) * 1998-12-22 2000-02-10 Siemens Ag Stripform high critical temperature (Tc) superconductor manufacturing method
US20020040890A1 (en) * 2000-08-31 2002-04-11 Nexans Process for producing a metal tube of copper
CN103021556A (en) * 2011-09-27 2013-04-03 吴江市中信科技有限公司 Coating machine
CN102412029A (en) * 2011-12-28 2012-04-11 浙江天杰实业有限公司 Processing process of semi-steel cable outer conductor
CN204087932U (en) * 2014-06-27 2015-01-07 成都联士电工有限公司 A kind of Through ground wire copper alloy sheath production equipment
CN104464979A (en) * 2014-09-10 2015-03-25 南通昱品通信科技有限公司 Copper clad aluminum extending and pulling production line and production process
CN206339721U (en) * 2016-12-26 2017-07-18 四川江虹线缆制造有限公司 A kind of aluminium strip wraps up production line with optical cable

Similar Documents

Publication Publication Date Title
CN107838550B (en) Underwater composite heat source additive manufacturing device and using method
CN107931842B (en) Underwater laser additive manufacturing device and using method thereof
CN104400226B (en) A kind of double-sided laser-TIG arc hybrid welding method
CN109604829A (en) Diesel engine of locomotive booster nozzle ring laser repair welding device and its repair welding method
CN110539081A (en) deepwater pipeline composite milling material increase and decrease in-situ repair equipment and method
CN110238491B (en) Method for welding inconel by CMT submerged arc welding
CN111299828B (en) Thick plate ultra-narrow gap laser wire-filling thermal conduction welding method
CN109175695A (en) The method for laser welding of optical cable feed-through
CN102133686B (en) Wire soldering method and device for dual interface cards
CN211102162U (en) Double-mechanical-arm laser-plasma composite milling material increase and decrease manufacturing equipment
CN211102164U (en) Deepwater pipeline composite milling material increase and decrease in-situ repair equipment
CN110539062A (en) deep sea pipeline plasma additive manufacturing in-situ repair equipment and method
CN100408252C (en) Welding electrode and device for its manufacture
CN112935549A (en) Narrow-gap laser wire filling welding equipment and method thereof
CN210683941U (en) High-speed laser cladding head
CN104148786A (en) Method for automatic argon arc welding of titanium-molybdenum-nickel alloy thick filament with diameter of 2.0 mm
CN116851870A (en) Underwater wet-process arc welding or additive manufacturing device and application method
CN2938339Y (en) Longitudinal packing lapping forming knife mould for cable sheathing
CN201584224U (en) Copper-clad aluminum wire production equipment
CN109332992B (en) A kind of patch type repair technology of submarine optical fiber cable copper strips feed layer
CN213803986U (en) Laser cladding nozzle
CN112518062A (en) Laser alternate wire filling welding method for regulating and controlling dissimilar joint elements
CN114248000A (en) Welding method and system
CN208358048U (en) A kind of laser cutting machine
CN112372141A (en) High-speed laser center wire feeding equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190111

RJ01 Rejection of invention patent application after publication