CN109162737A CN201811281626.9A CN201811281626A CN109162737A CN 109162737 A CN109162737 A CN 109162737A CN 201811281626 A CN201811281626 A CN 201811281626A CN 109162737 A CN109162737 A CN 109162737A
Authority
CN
China
Prior art keywords
hanging beam
binding
reinforcing bar
platform
styled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811281626.9A
Other languages
Chinese (zh)
Inventor
狄鹏
洪彩葵
费晓春
孙小猛
胡晓东
雷沙沙
马杰
蔡跃龙
刘宠
何杰红
阮俊生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Second Engineering Co Ltd of CTCE Group
Original Assignee
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Second Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tiesiju Civil Engineering Group Co Ltd CTCE Group, Second Engineering Co Ltd of CTCE Group filed Critical China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority to CN201811281626.9A priority Critical patent/CN109162737A/en
Publication of CN109162737A publication Critical patent/CN109162737A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/102Removable shuttering; Bearing or supporting devices therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/107Reinforcing elements therefor; Holders for the reinforcing elements

Abstract

The present invention relates to a kind of self-styled reinforcing steel bar-binding bench vehicles of depth, comprising: hanging beam and reinforcing bar binding platform vehicle;Hanging beam length is more than or equal to twice of reinforcing bar binding platform vehicle;Front end, middle part and the end of hanging beam are equipped with support construction;Support construction bottom has first walking mechanism;The top of reinforcing bar binding platform vehicle has job platform, and bottom has the second walking mechanism;Reinforcing bar binding platform vehicle can move freely under hanging beam along hanging beam length direction;The latter half of hanging beam has suspender.Self-styled reinforcing steel bar-binding bench vehicle provided by the invention, by pouring trolley in conjunction with the effective technology of reinforcing bar binding platform vehicle, it is bound in advance using reinforcing bar and the uninterrupted continuous construction of concrete casting, in same template number, multiple spot construction not only may be implemented, and effectively shorten the construction period of each segment, while reducing investment, working efficiency greatly improved, provide strong guarantee to total construction period, have a extensive future.

Description

A kind of self-styled reinforcing steel bar-binding bench vehicle
Technical field
The present invention relates to a kind of self-styled reinforcing steel bar-binding bench vehicles, belong to technical field of tunnel construction.
Background technique
To reduce influence of the engineering construction to natural environment, realizes green engineering, take Tunnel Passing lake, river, weir Method construction is built, solves the limitation of shield construction width.The method that the weir tunnel Zhu Fa takes trolley to construct, existing trolley side Case substantially there are two types of, a kind of scheme is that reinforcing bar binding and concreting trolley share, it may be assumed that after trolley is moved to designated position, It is to be supported on top assembling reinforcement with trolley, pouring for concrete is carried out after the completion of reinforcing bar, it is strong to regulation to concrete curing After degree, trolley moves to next segmental construction, and the disadvantages of this solution is to increase the operation cycle of trolley, reduces the use of trolley Efficiency, and reinforcing bar process of binding is to the more difficult cleaning of the pollution of template;Another scheme is needed big using independent reinforcing steel bar-binding bench vehicle Type equipment is suspended in midair to molding reinforcing bar has been bound, and concreting trolley could carry out lower step process in place, the program The disadvantage is that the large scale equipments such as gantry crane need to be put into, it is costly, and since method construction cofferdam structure type difference, gantry crane are built in weir Equal large scale equipments are not available.
Summary of the invention
The invention solves technical problems to be: the shortcomings that overcoming above-mentioned technology, provides a kind of easy to operate, concrete curing Time is not take up the self-styled reinforcing steel bar-binding bench vehicle in trolley period.
In order to solve the above-mentioned technical problem, technical solution proposed by the present invention is: a kind of self-styled reinforcing steel bar-binding bench vehicle, packet It includes: hanging beam and reinforcing bar binding platform vehicle;The hanging beam length is more than or equal to twice of the reinforcing bar binding platform vehicle;The hanging beam Front end, middle part and end be equipped with support construction;The support construction bottom has first walking mechanism;The reinforcing bar binding The top of platform truck has job platform, and bottom has the second walking mechanism;The reinforcing bar binding platform vehicle can be hung described It is moved freely under beam along the hanging beam length direction;The latter half of the hanging beam has suspender.
Above scheme is further improvement is that the support construction of the hanging beam front end includes propping up before front-end bracket, first Leg and the second front leg strut;Support construction in the middle part of the hanging beam includes supporting leg in supporting leg and second in first;The hanging beam end Support construction include rear support leg.
Above scheme is further improvement is that the hanging beam is made of a box-type section girder steel.
Above scheme further improvement is that first front leg strut, the second front leg strut, supporting leg in first, in second Supporting leg and rear support leg are made of column and corbel;First front leg strut, the second front leg strut, supporting leg in first prop up in second Leg and rear support leg are symmetrical arranged in the hanging beam two sides;The column of supporting leg is equipped with crossbeam in described second, on the crossbeam The jack connecting with the hanging beam is installed;The front-end bracket is made of truss structure, and bottom end is equipped with front end column.
Above scheme is further improvement is that the reinforcing bar binding platform vehicle includes the big chamber platform truck for runway With the small chamber platform truck for piping lane;The big chamber platform truck includes big chamber column and the operation horizontal by the big chamber upright supports Platform;The job platform is arranged side by side by several steel truss and is formed, and chord member is welded between the steel truss and is fixed;The job platform Top surface be made of channel steel and checkered steel plate, formed work surface;Also have by track girder truss support on the big chamber platform truck Track, the first walking mechanism can move on the track.
Above scheme is further improvement is that the side of the big chamber platform truck has oblique job platform;It is described big Ladder is also equipped on chamber platform truck.
Above scheme is further improvement is that the first walking mechanism and the second walking mechanism are the wheel of strap brake Rail walking mechanism.
Self-styled reinforcing steel bar-binding bench vehicle provided by the invention, for ultra-wide sections of tunnel construction in, narrow space, workload Greatly, large scale equipment dispatches feature living of being in a financial strait, and is bound in advance using reinforcing bar and is poured uninterrupted continuous arrangement and method for construction with concrete, Reinforcing bar binding can be carried out on reinforcing bar binding platform vehicle, is formed while concreting trolley carries out concreting 1 set of concreting trolley of each working face configures the arrangement and method for construction of 1 set reinforcing bar binding platform vehicle, and two procedures construction is mutual not It influences.Template investment is not only reduced, but also improves construction efficiency.
Scaffold is replaced using moveable reinforcing bar binding platform vehicle, the landing stage of scaffold reduced when assembling reinforcement is assembled With potential security risk when removing institute's increased additional duration, while eliminating scaffold construction.
By pouring trolley in conjunction with the effective technology of reinforcing bar binding platform vehicle, is bound using reinforcing bar and be poured with concrete in advance In same template number multiple spot construction not only may be implemented, and effectively shorten applying for each segment in uninterrupted continuous construction The work period greatly improved working efficiency, provide strong guarantee to total construction period, have a extensive future while reducing investment.
Detailed description of the invention
The present invention will be further explained below with reference to the attached drawings.
Fig. 1 is the present invention one preferred implementation side view example structural schematic diagram.
Fig. 2 is the overlooking structure diagram of Fig. 1.
Fig. 3 is hanging beam and support construction side structure schematic view in Fig. 1.
Fig. 4 is the overlooking structure diagram of Fig. 3.
Fig. 5 is the big chamber platform truck schematic view of the front view in Fig. 1.
Fig. 6 is the side structure schematic view of Fig. 5.
Fig. 7 is the small chamber platform truck schematic view of the front view in Fig. 1.
Fig. 8 is the side structure schematic view of Fig. 7.
Fig. 9 is supporting leg schematic view of the front view in second in Fig. 1.
Specific embodiment
Embodiment
The self-styled reinforcing steel bar-binding bench vehicle of the present embodiment, as depicted in figs. 1 and 2, comprising: hanging beam 1 and reinforcing bar binding platform Vehicle 18;1 length of hanging beam is more than or equal to twice of reinforcing bar binding platform vehicle 18;Front end, middle part and the end of hanging beam 1 are equipped with support Structure;Support construction bottom has first walking mechanism 16;The top of reinforcing bar binding platform vehicle 18 has job platform, bottom tool There is the second walking mechanism 13;Reinforcing bar binding platform vehicle 18 can move freely under hanging beam 1 along 1 length direction of hanging beam;Hanging beam 1 Latter half have suspender 2.First walking mechanism 16 and the second walking mechanism 13 are the wheel-track type walking mechanism of strap brake. Suspender 2 is symmetrical arranged in 1 two sides of hanging beam, is made of triangle wing plate with suspension hook.
As shown in Figure 3 and Figure 4, hanging beam 1 is made of a box-type section girder steel.Before the support construction of 1 front end of hanging beam includes Hold bracket 3, the first front leg strut 4 and the second front leg strut 5;The support construction at 1 middle part of hanging beam includes propping up in supporting leg 6 and second in first Leg 7;The support construction of 1 end of hanging beam includes rear support leg 8.
In first front leg strut 4, the second front leg strut 5, first in supporting leg 6, second supporting leg 7 and rear support leg 8 by column and beam Support composition;In first front leg strut 4, the second front leg strut 5, first in supporting leg 6, second supporting leg 7 and rear support leg 8 in 1 two sides of hanging beam It is symmetrical arranged.
Such as Fig. 9, the column 15 of supporting leg 7 is equipped with crossbeam in second, is equipped with the jack connecting with hanging beam 1 on crossbeam 17.In this way, the relative altitude of hanging beam 1 can be adjusted by jack 17.
Front-end bracket 3 is made of truss structure, and bottom end is equipped with front end column.First front leg strut 4, the second front leg strut 5, Track in one in supporting leg 6, second in the column bottom installation first walking mechanism 16 of supporting leg 7, rear support leg 8 and front-end bracket 3 Wheel.
Reinforcing bar binding platform vehicle 18 includes for the big chamber platform truck of the runway in tunnel and for the piping lane in tunnel Small chamber platform truck.The arrangement of big chamber platform truck and small chamber platform truck can be arranged concretely according to the actual needs of the site.
As shown in Figure 5 and Figure 6, big chamber platform truck includes big chamber column 12 and the job platform 9 that is supported by big chamber column 12; Big 12 bottom of chamber column is equipped with rail wheel 13.Job platform 9 is arranged side by side by several steel truss and is formed, and string is welded between steel truss Bar is fixed;The top surface of job platform 9 is made of channel steel and checkered steel plate, forms work surface;Also have by rail on big chamber platform truck The track that road beam truss 11 supports, first walking mechanism 16 can move in orbit.The side of big chamber platform truck has oblique Job platform 10;Ladder 14 is also equipped on big chamber platform truck.
As shown in Figure 7 and Figure 8, small chamber platform truck includes small chamber column and the job platform by small chamber upright supports;Small chamber Column bottom is equipped with rail wheel.There is workbench between small chamber column, and be disposed with ladder.
When construction, the installation of Section 1 fragment position pours trolley, installs self-carry provided in this embodiment in the front of Section 1 section Formula reinforcing steel bar-binding bench vehicle;Reinforcing bar binding platform vehicle 18 is located at Section 2 section at this time, and hanging beam then covers the 2nd and Section 3 section.Pour platform After vehicle is installed, using pour trolley as platform bind Section 1 section roof steel bar and casting concrete, with reinforcing bar binding platform Vehicle 18 is the roof steel bar that support platform binds Section 2 section;After the completion of the binding of Section 2 section reinforcing bar, 2 lifting top plate steel of suspender is utilized Muscle, reinforcing bar binding platform vehicle 18 move forward to Section 3 section, and the roof steel bar for carrying out Section 3 section binds work.To Section 1 section After the completion of concrete curing, pours trolley and demould and run at Section 2 section, roof steel bar is fallen within and is poured on trolley, is poured Section 2 section concrete.Meanwhile hanging beam 1 then slings the roof steel bar of Section 3 section to one segment of Forward, then reinforcing bar binding is flat Trolley 18 continues to move along a segment, carries out the reinforcing bar binding work of Section 4 section, so repeats to closure segment.
It is as follows to close up section constructing method: to closing up at preceding 2 segment, roof steel bar, which is fallen within, at this time is poured on trolley for construction, is closed Hold together at preceding 1 segment to have begun carry out reinforcing bar binding work.Close up progress concreting at preceding 2 segment, hanging beam 1 moves forward To having poured segment, and front-end bracket 3 is removed, front is supported on by the first front leg strut 4 of hanging beam 1 and has been poured on the top plate of segment. Hanging beam 1 continues to move along, until the second front leg strut 5 is supported on front and has poured on the top plate of segment, props up before then packing up first Leg 4.Supporting leg 6 in first is stretched out, falls within it on reinforcing bar binding platform vehicle 18, the top plate of preceding 1 segment is closed up in then 1 lifting of hanging beam Reinforcing bar.Reinforcing bar binding platform vehicle 18, which moves forward to, closes up segment, and starts the reinforcing bar binding work for carrying out closing up segment.Close up After the completion of the concrete curing of preceding 2 segment, pours to run to after trolley demoulds and close up preceding 1 segment, hanging beam 1 falls within roof steel bar It pours on trolley, is poured.Closing up the roof steel bar of segment using 1 lifting of hanging beam, reinforcing bar binding platform vehicle 18 moves forward, Close up after the completion of the concrete curing of preceding 1 segment, pours trolley demoulding and run to and close up segment position, its roof steel bar is fallen within and is poured Trolley is built, hanging beam 19 moves forward, pours and close up segment, complete to close up.
It is worked that the self-styled reinforcing steel bar-binding bench vehicle of the present embodiment carries out reinforced slab binding at new working face starting segment Journey is as follows: hanging beam 1 is walked in place, and hanging beam front-end bracket 3 is installed, and after being installed, hanging beam 19 moves forward a segment, is stretched out Supporting leg 6 in hanging beam first, is supported on it on reinforcing steel bar-binding bench vehicle 18, and using the 2 lifting reinforcing bar of suspender on hanging beam 19, reinforcing bar is tied up It pricks trolley and moves forward a segment, and start the reinforcing bar binding work of next segment.
The specific technical solution that the present invention is not limited to the above embodiment, in addition to the implementation, the present invention can also have Other embodiments.It is all using equivalent replacement formed technical solution, be the present invention claims protection scope.

Claims (7)

1. a kind of self-styled reinforcing steel bar-binding bench vehicle characterized by comprising hanging beam and reinforcing bar binding platform vehicle;The hanging beam is long Degree is more than or equal to twice of the reinforcing bar binding platform vehicle;Front end, middle part and the end of the hanging beam are equipped with support construction;Institute Support construction bottom is stated with first walking mechanism;The top of the reinforcing bar binding platform vehicle has job platform, and bottom has Second walking mechanism;The reinforcing bar binding platform vehicle can move freely under the hanging beam along the hanging beam length direction; The latter half of the hanging beam has suspender.
2. self-styled reinforcing steel bar-binding bench vehicle according to claim 1, it is characterised in that: the support construction of the hanging beam front end Including front-end bracket, the first front leg strut and the second front leg strut;Support construction in the middle part of the hanging beam includes supporting leg and the in first Supporting leg in two;The support construction of the hanging beam end includes rear support leg.
3. self-styled reinforcing steel bar-binding bench vehicle according to claim 1, it is characterised in that: the hanging beam is by a box-type section Girder steel is constituted.
4. self-styled reinforcing steel bar-binding bench vehicle according to claim 1, it is characterised in that: before first front leg strut, second Supporting leg, supporting leg in first, supporting leg and rear support leg are made of column and corbel in second;It is propped up before first front leg strut, second Leg, supporting leg in first, supporting leg and rear support leg are symmetrical arranged in the hanging beam two sides in second;The column of supporting leg in described second It is equipped with crossbeam, the jack connecting with the hanging beam is installed on the crossbeam;The front-end bracket is made of truss structure, Its bottom end is equipped with front end column.
5. self-styled reinforcing steel bar-binding bench vehicle according to claim 1, it is characterised in that: the reinforcing bar binding platform vehicle includes Big chamber platform truck for runway and the small chamber platform truck for piping lane;The big chamber platform truck includes big chamber column and by institute State the job platform of big chamber upright supports;The job platform is arranged side by side by several steel truss and is formed, and is welded between the steel truss Chord member is connect to fix;The top surface of the job platform is made of channel steel and checkered steel plate, forms work surface;On the big chamber platform truck Also there is the track by track girder truss support, the first walking mechanism can move on the track.
6. self-styled reinforcing steel bar-binding bench vehicle according to claim 5, it is characterised in that: the side of the big chamber platform truck has There is oblique job platform;Ladder is also equipped on the big chamber platform truck.
7. self-styled reinforcing steel bar-binding bench vehicle according to claim 1, it is characterised in that: the first walking mechanism and second Walking mechanism is the wheel-track type walking mechanism of strap brake.
CN201811281626.9A 2018-10-23 2018-10-23 A kind of self-styled reinforcing steel bar-binding bench vehicle Pending CN109162737A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811281626.9A CN109162737A (en) 2018-10-23 2018-10-23 A kind of self-styled reinforcing steel bar-binding bench vehicle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811281626.9A CN109162737A (en) 2018-10-23 2018-10-23 A kind of self-styled reinforcing steel bar-binding bench vehicle

Publications (1)

Publication Number Publication Date
CN109162737A true CN109162737A (en) 2019-01-08

Family

ID=64876244

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811281626.9A Pending CN109162737A (en) 2018-10-23 2018-10-23 A kind of self-styled reinforcing steel bar-binding bench vehicle

Country Status (1)

Country Link
CN (1) CN109162737A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111827351A (en) * 2020-07-24 2020-10-27 天津联东兴达科技有限公司 Concrete reinforcement cage ligature and conversion equipment
CN112627539A (en) * 2020-12-09 2021-04-09 中国葛洲坝集团第一工程有限公司 Four-hole inverted siphon top plate double-layer steel bar lifting, positioning and fixing device and construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202658529U (en) * 2012-06-27 2013-01-09 中铁四局集团机电设备安装有限公司 Device for integrally hoisting and molding prefabricated reinforced bars for fabricating girders of high-speed rails in situ
CN104695335A (en) * 2015-01-15 2015-06-10 中铁四局集团第二工程有限公司 Overall reinforcement binding and hoisting construction method and construction device adopting upstroke movable scaffolding
CN207552933U (en) * 2017-06-20 2018-06-29 山东恒堃机械有限公司 Reinforced mesh entirety mould-entering device
CN209369829U (en) * 2018-10-23 2019-09-10 中铁四局集团第二工程有限公司 A kind of self-styled reinforcing steel bar-binding bench vehicle

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202658529U (en) * 2012-06-27 2013-01-09 中铁四局集团机电设备安装有限公司 Device for integrally hoisting and molding prefabricated reinforced bars for fabricating girders of high-speed rails in situ
CN104695335A (en) * 2015-01-15 2015-06-10 中铁四局集团第二工程有限公司 Overall reinforcement binding and hoisting construction method and construction device adopting upstroke movable scaffolding
CN207552933U (en) * 2017-06-20 2018-06-29 山东恒堃机械有限公司 Reinforced mesh entirety mould-entering device
CN209369829U (en) * 2018-10-23 2019-09-10 中铁四局集团第二工程有限公司 A kind of self-styled reinforcing steel bar-binding bench vehicle

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111827351A (en) * 2020-07-24 2020-10-27 天津联东兴达科技有限公司 Concrete reinforcement cage ligature and conversion equipment
CN112627539A (en) * 2020-12-09 2021-04-09 中国葛洲坝集团第一工程有限公司 Four-hole inverted siphon top plate double-layer steel bar lifting, positioning and fixing device and construction method
CN112627539B (en) * 2020-12-09 2022-09-20 中国葛洲坝集团第一工程有限公司 Four-hole inverted siphon top plate double-layer steel bar lifting, positioning and fixing device and construction method

Similar Documents

Publication Publication Date Title
CN105386778B (en) Tunnel excavation lining construction chassis and tunnel excavation lining construction method
CN106702910B (en) A kind of main girder construction technique of the double rope face low-pylon cable-stayed bridges of double tower
CN109944170A (en) Continuous beam with high-pier end bay Cast-in-Situ Segment and closure section integrated construction system and construction method
CN105952482B (en) Self-propelled tunnel inverted arch lining trolley
CN106089253B (en) A kind of all-hydraulic template system poured for culvert
CN104695337B (en) Self-lifting sliding and turnover construction system and construction method
CN101781878B (en) Integral lifting template of main pylon of single-pylon cable-stayed bridge without dorsal cables and lifting construction method thereof
CN107905114B (en) A kind of construction method of large span Successive interference cancellation
CN102704949A (en) No-pull rod side wall construction method for underground tunnel and formwork trolley for construction
CN103967050A (en) Construction system of subway station
CN105350454B (en) Steel arch rib outer wrapped concrete construction method for steel trussed arch bridge
CN108086170B (en) The hole construction method excessively of mobile formwork and mobile formwork
CN102493362A (en) Construction method for midspan closure segment of longspan continuous rigid frame bridge
CN202596743U (en) Formwork trolley for underground tunnel pull-rod-free side wall construction
KR20140084107A (en) Self-Launching Movable Scaffolding System
CN110184950A (en) The construction method of bridge former address reorganization and expansion new bridge under a kind of guarantor's gating condition
CN107630709B (en) A kind of construction method of the mobile trolley of bored tunnel construction
CN203049470U (en) Hanging basket walking system
CN102094392A (en) Lower supported hanging basket in bridge construction and application thereof
CN110528402A (en) A kind of construction method of the more purlin piece combination Hanging Baskets of ultra-wide box beam
CN109267491B (en) Movable formwork and construction method thereof
CN103352710A (en) Suspension overturn type tunnel inverted arch formwork trolley and construction method thereof
CN104594204B (en) Urban light rail viaduct mountain type U beam Construction Supporting System and construction method
CN202544854U (en) Lining trolley for subway station
CN109519197A (en) A kind of sliding formwork just dual-purpose trolley of lining excavation supporting and its application

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination