CN109162698A - Novel James's Boucherie process logging equipment and test method - Google Patents
Novel James's Boucherie process logging equipment and test method Download PDFInfo
- Publication number
- CN109162698A CN109162698A CN201811226407.0A CN201811226407A CN109162698A CN 109162698 A CN109162698 A CN 109162698A CN 201811226407 A CN201811226407 A CN 201811226407A CN 109162698 A CN109162698 A CN 109162698A
- Authority
- CN
- China
- Prior art keywords
- james
- pressure
- well
- logging
- test
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 56
- 238000010998 test method Methods 0.000 title abstract description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 79
- 238000012360 testing method Methods 0.000 claims abstract description 72
- 239000007921 spray Substances 0.000 claims description 15
- 238000004519 manufacturing process Methods 0.000 claims description 13
- 230000003068 static effect Effects 0.000 claims description 10
- 210000000481 breast Anatomy 0.000 claims description 9
- 239000012530 fluid Substances 0.000 claims description 9
- 238000004458 analytical method Methods 0.000 claims description 6
- 239000007788 liquid Substances 0.000 claims description 6
- LFQSCWFLJHTTHZ-UHFFFAOYSA-N Ethanol Chemical compound CCO LFQSCWFLJHTTHZ-UHFFFAOYSA-N 0.000 claims description 3
- 238000003556 assay Methods 0.000 claims description 3
- 238000007405 data analysis Methods 0.000 claims description 3
- 238000009826 distribution Methods 0.000 claims description 3
- 238000005338 heat storage Methods 0.000 claims description 3
- 238000000926 separation method Methods 0.000 abstract description 9
- 235000014171 carbonated beverage Nutrition 0.000 abstract description 6
- 239000003795 chemical substances by application Substances 0.000 abstract description 4
- 239000004615 ingredient Substances 0.000 abstract description 4
- 238000007701 flash-distillation Methods 0.000 abstract description 2
- 230000000694 effects Effects 0.000 description 6
- 238000013461 design Methods 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 238000004364 calculation method Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000005070 sampling Methods 0.000 description 2
- 229920006395 saturated elastomer Polymers 0.000 description 2
- 238000003860 storage Methods 0.000 description 2
- 206010053615 Thermal burn Diseases 0.000 description 1
- XLYOFNOQVPJJNP-PWCQTSIFSA-N Tritiated water Chemical compound [3H]O[3H] XLYOFNOQVPJJNP-PWCQTSIFSA-N 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000001816 cooling Methods 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000003912 environmental pollution Methods 0.000 description 1
- 238000011156 evaluation Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 230000000977 initiatory effect Effects 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000010248 power generation Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000003584 silencer Effects 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 238000012800 visualization Methods 0.000 description 1
- 238000004457 water analysis Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
Landscapes
- Physics & Mathematics (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Geophysics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)
Abstract
The present invention relates to a kind of novel James's Boucherie process logging equipment and test methods.It is characterized in that main valve upper end connects three-way connection, valve is tested by flanged joint in the upper end of three-way connection, the upper end for testing valve passes through the fixed device of flanged joint logging, the side of three-way connection is straight pipe, straight pipe right end tests pipeline by flanged joint James by flanged joint throttle valve, throttle valve right end, and James tests the water inlet pipe of rear end of pipeline joint noise reduction device, the drainpipe of muffler connects weir notch water tank, and the drainpipe of weir notch water tank connects drainage ditch.The present invention calculates carbonated drink total amount by Boucherie process and assesses the hot potentiality of individual well, vapour, water separation are carried out by muffler, measure vapour, water flow and temperature under atmospheric pressure, on-condensible gas content in steam is measured by pressure difference, enthalpy is determined using underground dynamic temperature, the flash distillation face of determination determines antisludging agent ingredient in turn and adds position, draws well head pressure, yield and temperature, flow and the relation curve of time.
Description
Technical field
The invention belongs to geothermal well the field of test technology, and in particular to a kind of novel James's Boucherie process logging equipment and survey
Method for testing.
Background technique
There is also some problems in existing geothermal well test process, and 1. James's pipe of test equipment puts idle discharge, to well
Serious thermal pollution and noise pollution are caused in periphery, and side pressure table needs people's situ visualization, by, carbonated drink fouling, synoptic climate etc.
It is not high to influence accuracy;2. test equipment is not integrated, splice more, installation inconvenience, carrying inconvenience automates journey
It spends low;3. the assembly of test equipment needs the cooperation of winch inconvenient, test speed and effect are influenced;4. the flow of GEOTHERMAL WATER is surveyed
Examination can not carry out accurate vapour, water separation, the stream of steam under atmospheric pressure and hot water can only be substantially analyzed by theoretical calculation
Amount.
Summary of the invention
Aiming at the problems existing in the prior art, the purpose of the present invention is to provide a kind of novel James's Boucherie process to log well
The technical solution of equipment and test method.
Novel James's Boucherie process logging equipment, it is characterised in that including main valve, test valve, throttle valve, Zhan
Mu Si tests pipeline, muffler and weir notch water tank, and main valve lower end is arranged on well head, and main valve upper end connects three-way connection,
Valve is tested by flanged joint in the upper end of three-way connection, and the upper end for testing valve passes through the fixed device of flanged joint logging, threeway
The side of connector is straight pipe, and pressure gauge P2 and thermometer T1 is installed on straight pipe, and straight pipe right end is throttled by flanged joint
Valve, throttle valve right end test pipeline by flanged joint James, test in James and pressure gauge P1, James are arranged on pipeline
The water inlet pipe of rear end of pipeline joint noise reduction device is tested, the drainpipe of muffler connects weir notch water tank, and the drainpipe of weir notch water tank connects
Run in water channel.
Novel James's Boucherie process logging equipment, it is characterised in that air pipeline auxiliary is also set up on the well head
Pressure gauge P3 is arranged on pressure gauge auxiliary valve for valve and pressure gauge auxiliary valve.
Novel James's Boucherie process logging equipment, it is characterised in that setting PT is surveyed on the fixed device of the logging
Well instrument entrance.
Novel James's Boucherie process logging equipment, it is characterised in that the straight pipe of the three-way connection is additionally provided with
Lacing film sample tap.
Novel James's Boucherie process logging equipment, it is characterised in that be an empty barrel knot inside the muffler
Rubble muffler is arranged in the middle part of structure, empty barrel, and rubble muffler is composed of the grid and rubble of multiple small pore-likes, rubble
Muffler is connected to the water inlet pipe on muffler barrel.
Novel James's Boucherie process logging equipment, it is characterised in that the weir notch water tank is an open storage
Water tank is equipped with triangle weir flowmeter in the back segment of weir notch water tank.
Novel James's Boucherie process logging equipment, it is characterised in that the pressure gauge P1, pressure gauge P2 and pressure
It is provided with pressure sensor at table P3, is provided with temperature sensor at thermometer T1.
A kind of method carrying out underground heat well test using novel James's Boucherie process logging equipment, it is characterised in that
Include the following steps:
The first step judges whether to be applicable in novel James's Boucherie process logging equipment and well head according to the well well head pressure of closing of geothermal well
Connection type, the direct flanged joint of main valve of the three-way connection and well head of novel James's Boucherie process logging equipment, installs
Cheng Houying does not leak vapour or water;It does not need to draw spray if it is flowing well;
Second step carries out well-logging work according to testing process, all data all answer it is accurate, it is complete effectively, if closed
Well pressure is very low, and static test downhole temperature is very tall and big in 120 DEG C, then the well can be by drawing spirt row open flow test;
Third step, after finishing all test jobs, assay well yield, including well logging data analysis is handled, it surveys respectively
Determine steam flow amount, water flow and the temperature under different pressures, and measure the on-condensible gas content in separate vapour, determines the heat of individual well
Enthalpy and hot fluid yield draw well head pressure, yield and temperature, flow and the relation curve of time etc..
A kind of method carrying out underground heat well test using novel James's Boucherie process logging equipment, it is characterised in that
Testing process described in second step is as follows:
1) it installs logging equipment and fixes the fixed device of logging, it is most deep that the weighted rod of PT logging instrument is first placed into shaft bottom
Place, reintroduces, and starts static pressure-temperature test, until matching since well head after PT logging instrument and weighted rod are connected
PT logging instrument is proposed well head after the completion, downloads all data by more than the shaft bottom bosom that weight stick has just touched three meters of position;
2) throttle valve is opened, is released;Draw spray if necessary and pressurizeed by air pipeline auxiliary valve to well head using air compressor machine, is added
Well head main valve must shut off when pressure, wait several hours, then open throttle valve;
3) value and James's test of well head pressure gauge P3, straight pipe pressure gauge P2 and thermometer T1 were recorded every ten minutes
The value of pressure gauge P1 and weir notch water level h on pipeline;
4) after stability of flow, start dynamic flow-pressure test, to the shaft bottom that the weighted rod of PT logging instrument is touched since well head
More than bosom three meters of position, proposes well head after the completion, downloads all data, and PT logging instrument is relay down toward main production
The depth in region, fixed PT logging instrument simultaneously record pressure;
5) after eight hours of flow open flow, close throttle valve, close flow, latter two hour continue record down-hole pressure;
6) three meters of shaft bottom bosom or more is touched up from weighted rod, record static pressure, downloading data;
7) flow is calculated using weir notch liquid level and James's side pressure, examines heat storage capacity using underground dynamic temperature;
8) power output=flow/(production area dynamic pressure-static pressure);
9) production area depth is determined using pressure-temperature distribution results, carry out the forecast analysis of pressure buildup.
Beneficial effects of the present invention:
1. James's test pipeline is directly connected into muffler, can solve ground in atmospheric environment bottom silencer by the design of muffler
Hot fluid releasability noise reduction problem ensures that steam is discharged into atmosphere upwards simultaneously, and steam and hot water are shunted, and well logging generates
GEOTHERMAL WATER can be put into drainage ditch and carry out cooling discharge, noise can be effectively reduced in the rubble muffler being arranged in muffler;
It, can 2. the design of weir notch water tank is equipped with triangle weir flowmeter in weir notch water tank back segment, can accurately measure hot water flow
To verify the calculating data accuracy of James's Boucherie process;
3. be equipped with air pipeline auxiliary valve in well head, convenient for can not the producing well of self-spray draw spray processing;
4. being equipped with pressure sensor and temperature sensor in the position of pressure gauge and thermometer, sensing data can be introduced and be surveyed
Whether well controls computer, while can accurate with the reading of reduced pressure table and thermometer;
5. materialization in the water that also confirm geothermal fluid other than the thermal parameter of resource to be determined during geothermal power generation
It studies point, has great significance especially for the problems such as fouling and corrosion, such as determine antisludging agent ingredient, determination adds position
It sets, this equipment is equipped with lacing film sample tap, analyzes fouling convenient for water sample sampling analysis and lacing film, can analyze calculating by well logging
Carbonated drink flashes face out, determines antisludging agent ingredient and adds position.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the structural schematic diagram one of muffler;
Fig. 3 is the structural schematic diagram two of muffler;
Fig. 4 is schematic view of the mounting position of the triangle weir flowmeter in weir notch water tank;
Fig. 5 is the schematic diagram for measuring triangle weir flowmeter liquid level h;
In figure: 1- well head, 2- air pipeline auxiliary valve, 3- pressure gauge auxiliary valve, 4- main valve, 5- three-way connection, 6- are surveyed
Try valve, the fixed device of 7- logging, 8- lacing film sample tap, 9- throttle valve, 10- James test pipeline, 11- muffler, the weir 12-
Slot water tank, 13- drainage ditch, 14- water inlet pipe, 15- drainpipe, 16- rubble muffler, 17- triangle weir flowmeter.
Specific embodiment
The invention is further explained in the following combination with the attached drawings of the specification:
Novel James's Boucherie process logging equipment, including main valve 4, test valve 6, throttle valve 9, James test pipeline 10, disappear
Sound device 11 and weir notch water tank 12, main valve lower end are arranged on well head 1, and air pipeline auxiliary valve 2 is also equipped on well head 1
With pressure gauge auxiliary valve 3, pressure gauge P3 is set at pressure gauge auxiliary valve 3, can be read according to pressure gauge P3 and close well pressure,
Judge whether to need compressed air to draw spray according to closing well pressure and can analyze, draws spray connection air compressor machine and compressed air if necessary
Pipeline simultaneously opens air pipeline auxiliary valve and can draw spray, and the upper end flange connecting test valve 6 of three-way connection 5 tests valve
Device 7 is fixed with flanged joint logging in upper end, and PT logging instrument entrance, the side of three-way connection is arranged on the fixed device of logging
With flanged joint straight pipe, pressure gauge P2 and thermometer T1 is installed on straight pipe, also sets up lacing film sample tap 8 on straight pipe, directly
Pipeline section flanged joint throttle valve 9, throttle valve rear end flanged joint James test pipeline 10 and install pressure gauge P1;By Zhan
Mu Si test pipeline is directly connected to be passed through the water inlet pipe 14 of muffler, the main function of muffler 11 be one at atmosheric pressure
Steam-water separation is carried out, another is exactly to reduce noise;The drainpipe 15 of muffler connects weir notch water tank 12, in weir notch water tank
Back segment is equipped with triangle weir flowmeter, and the drainpipe of weir notch water tank connects drainage ditch 13, can be measured by triangle weir flowmeter 17
The flow of hot water after separation.
The main effect of three-way connection is to play the cooperation that flow rate test and PT logging instrument are gone into the well when dynamic is tested.
Testing valve is that PT logging instrument will be opened when going into the well, and PT logging instrument goes out the effect to be closed after well, is effectively isolated PT survey
Logging fixed device of the well instrument with well head.
The fixed device of logging is the blowout hookup of PT logging instrument, it is opened in test, and PT logging instrument passes through logging
When fixed device is gone into the well, geothermal fluid will not spray.
Well head pressure and temperature, lacing film sample tap when installation pressure gauge P2 and thermometer T1 can measure dynamic on straight pipe
It is the dedicated port for carrying out water analysis sampling and lacing film fouling test, which belongs to domestic initiation.
It is provided with pressure sensor at pressure gauge P1, pressure gauge P2 and pressure gauge P3, is provided with temperature at thermometer T1
Sensor.
The effect of throttle valve is flow when control dynamic is tested.
The pressure gauge P1 reading that James tests pipeline substitutes into formula and calculates carbonated drink total amount.
The effect of muffler be steam-water separation and reduce noise, such benefit be by James's pipe geothermal fluid into
Steam, which is discharged into atmosphere, after row steam-water separation will not scald the vegetation in well site, and GEOTHERMAL WATER is discharged into diversion channel after weir notch to be polluted
Periphery underground water can also be collected for Returning test.
Muffler is the equipment of a principle using vapour, water Gravity Separation principle and orifice plate noise reduction, is inside muffler
One empty barrel is the critical component rubble muffler 16 of muffler in the middle part of empty barrel, is by the grid of many small pore-likes and broken
Stone is composed, and is connected with the water inlet pipe of barrel, and James's side pressure pipe accesses water inlet pipe, and steam is discharged by muffler top
Atmosphere, hot water are discharged into weir notch water tank by muffler lower pipeline.
Muffler is connect by pipeline and flange with weir notch water tank, by 60 degree of triangular-notch weirs that weir notch water tank back segment is arranged in
Flowmeter, the liquid level h for measuring triangular-notch weir can calculate the flow of GEOTHERMAL WATER by formula;Pass through triangle weir flowmeter
It is free from environmental pollution that GEOTHERMAL WATER can be discharged into drainage ditch, or can collect for recharge.
Weir notch water tank is exactly an open water tank, is equipped with triangle weir flowmeter, triangle in the back segment of weir notch water tank
The effect of weir flowmeter is exactly the flow for measuring hot water.
The method for carrying out underground heat well test using the equipment, includes the following steps:
The first step judges whether to be applicable in novel James's Boucherie process logging equipment and well head according to the well well head pressure of closing of geothermal well
Connection type, the direct flanged joint of main valve of the three-way connection and well head of novel James's Boucherie process logging equipment, installs
Cheng Houying does not leak vapour or water;It does not need to draw spray if it is flowing well;
Second step carries out well-logging work according to testing process, all data all answer it is accurate, it is complete effectively, if closed
Well pressure is very low, and static test downhole temperature is very tall and big in 120 DEG C, then the well can be by drawing spirt row open flow test;
Third step, after finishing all test jobs, assay well yield, including well logging data analysis is handled, it surveys respectively
Determine steam flow amount, water flow and the temperature under different pressures, and measure the on-condensible gas content in separate vapour, determines the heat of individual well
Enthalpy and hot fluid yield draw well head pressure, yield and temperature, flow and the relation curve of time etc..
Testing process in second step is as follows:
1) it installs logging equipment and fixes the fixed device of logging, it is most deep that the weighted rod of PT logging instrument is first placed into shaft bottom
Place, reintroduces, and starts static pressure-temperature test, until matching since well head after PT logging instrument and weighted rod are connected
PT logging instrument is proposed well head after the completion, downloads all data by more than the shaft bottom bosom that weight stick has just touched three meters of position;
2) throttle valve is opened, is released;Draw spray if necessary and pressurizeed by air pipeline auxiliary valve to well head using air compressor machine, is added
Well head main valve must shut off when pressure, wait several hours, then open throttle valve;
3) value and James's test of well head pressure gauge P3, straight pipe pressure gauge P2 and thermometer T1 were recorded every ten minutes
The value of pressure gauge P1 and weir notch water level h on pipeline;
4) after stability of flow, start dynamic flow-pressure test, to the shaft bottom that the weighted rod of PT logging instrument is touched since well head
More than bosom three meters of position, proposes well head after the completion, downloads all data, and PT logging instrument is relay down toward main production
The depth in region, fixed PT logging instrument simultaneously record pressure;
5) after eight hours of flow open flow, close throttle valve, close flow, latter two hour continue record down-hole pressure;
6) three meters of shaft bottom bosom or more is touched up from weighted rod, record static pressure, downloading data;
7) flow is calculated using weir notch liquid level and James's side pressure, examines heat storage capacity using underground dynamic temperature;
8) power output=flow/(production area dynamic pressure-static pressure);
9) production area depth is determined using pressure-temperature distribution results, carry out the forecast analysis of pressure buildup.
In novel James's Boucherie process logging equipment, in the flowing well to Jing mouthfuls of Ya Li≤0.1MPa, (well not sprayed will draw
Spray) test evaluation when, comprising the following steps:
The first step judges whether to be applicable in this equipment and well head connection type according to the well head pressure of geothermal well, in principle this equipment
The direct flanged joint of the main valve of threeway and well head, should not leak vapour (water), specific requirement is as follows after being installed:
A. the upper flange of well head main valve should be exactly matched with the lower flange of logging equipment three-way connection, and gasket will meet well head
The requirement of temperature and pressure, bolt will be fastened diagonally;
B. the fixed device of the fixed logging in three-way connection upper end should assemble complete with PT logging instrument, and PT logging instrument installs weight
Shaft bottom following can be arrived by the fixed device of logging, three-way connection and main valve afterwards, go up and down and stablize effectively;
C. James's side pressure sensor stabilization is effective, and site pressure meter reading is consistent with pressure sensor, weir notch liquid level sensor
(triangle weir flowmeter) is stablized effectively, and readings are consistent for sensor and scene;
D. straight pipe temperature sensor and pressure sensor are stablized effectively, site pressure table, the reading of thermometer and sensor one
It causes;
E. draw gusher air compressor machine stable operation, valve switch is effective;
F. before official testing starts, counter weight is voluntarily stablized effective up and down.
Second step starts to test according to testing process, and capacitance sensor record data are inspected periodically during test
It is whether consistent with the data such as site pressure table, thermometer.
Third step downloads test data and inputs computer and start to analyze, wherein the test data calculation formula about flow
It is as follows:
Enthalpy is determined according to underground dynamic temperature, carbonated drink total amount is calculated according to James's Boucherie process formula, according to triangular-notch weir public affairs
Formula calculates the flow of GEOTHERMAL WATER, then can calculate the flow of steam.According to conservation of energy principle, so that it may calculate
The flow of steam flow and GEOTHERMAL WATER under different pressures.It can be found according to saturated vapor performance curve and be saturated temperature under different pressures
Degree.The content of on-condensible gas can be calculated according to the variation of steam pressure.
Requirement to individual well open flow test can be first with the hot potentiality of Boucherie process measuring and calculating individual well, and Accurate Determining then must be in well head
Vapour, water separation (muffler just plays the role of steam-water separation) are carried out, the triangle weir flowmeter of weir notch water tank just determines greatly
The flow of hot water under atmospheric pressure has just calculated the flow of steam under atmospheric pressure by Boucherie process and triangular-notch weir, according to energy
Law of conservation can calculate the flow of steam and hot water under different pressures, this is for the first time at home.
Compressed air of the present invention draw be sprayed on the country be it is pioneering, it is special for drawing the parameter in the method for spray about pressure and time
Not important (core for drawing spray is high pressure and long-time, it is necessary to cold water are pressed into storage fluid layer and be heated to vapourizing temperature again).
The present invention combines static and dynamic pressure, temperature data, we can analyze the production capacity of geothermal production not
Solidifying gas content etc..
Equipment of the invention is able to reflect out vapour, water flow and temperature under different pressures, and measures in separate vapour
On-condensible gas content determines the heat content and hot fluid yield of individual well, draws well head pressure, yield and temperature, flow and time
Relation curve.
The present invention calculates carbonated drink total amount by Boucherie process and assesses the hot potentiality of individual well, carries out vapour by muffler, water separates, survey
Determine vapour under atmospheric pressure, water flow and temperature, on-condensible gas content in steam is measured by pressure difference, it is true using underground dynamic temperature
Determine enthalpy, determine flash distillation face and then determine antisludging agent ingredient and add position, draw well head pressure, yield and temperature, flow and
The relation curve of time.
Equipment of the invention has carried out innovative design on the basis of original James's Boucherie process, passes through Boucherie process meter
It calculates formula (formula is known) and calculates underground heat well capacity;Meanwhile passing through triangular-notch weir mensuration (formula is known) energy
The result hot water flow and steam flow of enough repetition measurements at atmosheric pressure and verifying Boucherie process;It can be simulated in conjunction with PT logging instrument
Log in producing well;Meanwhile the speed for drawing curve and analysis is substantially increased, it can be logged well in advance by tracing analysis
Production history trend, for power station production design effective design considerations is provided.
Claims (9)
1. novel James's Boucherie process logging equipment, it is characterised in that including main valve, test valve, throttle valve, James's test
Pipeline, muffler and weir notch water tank, main valve lower end are arranged on well head, and main valve upper end connects three-way connection, three-way connection
Upper end valve is tested by flanged joint, test the upper end of valve and pass through the fixed device of flanged joint logging, the side of three-way connection
Side is straight pipe, and pressure gauge P2 and thermometer T1 is installed on straight pipe, and straight pipe right end passes through flanged joint throttle valve, throttle valve
Right end tests pipeline by flanged joint James, tests in James and pressure gauge P1 is arranged on pipeline, and James tests pipeline
The water inlet pipe of rear end joint noise reduction device, the drainpipe of muffler connect weir notch water tank, and the drainpipe of weir notch water tank connects drainage ditch.
2. novel James's Boucherie process logging equipment according to claim 1, it is characterised in that also set up on the well head
Pressure gauge P3 is arranged on pressure gauge auxiliary valve for air pipeline auxiliary valve and pressure gauge auxiliary valve.
3. novel James's Boucherie process logging equipment according to claim 1, it is characterised in that the fixed dress of the logging
Set setting PT logging instrument entrance.
4. novel James's Boucherie process logging equipment according to claim 1, it is characterised in that the three-way connection it is straight
Pipeline section is additionally provided with lacing film sample tap.
5. novel James's Boucherie process logging equipment according to claim 1, it is characterised in that be inside the muffler
Rubble muffler is arranged in the middle part of one empty barrel structure, empty barrel, and rubble muffler is the grid and rubble group by multiple small pore-likes
It closes, rubble muffler is connected to the water inlet pipe on muffler barrel.
6. novel James's Boucherie process logging equipment according to claim 1, it is characterised in that the weir notch water tank is one
A open water tank is equipped with triangle weir flowmeter in the back segment of weir notch water tank.
7. novel James's Boucherie process logging equipment according to claim 2, it is characterised in that the pressure gauge P1, pressure
It is provided with pressure sensor at table P2 and pressure gauge P3, is provided with temperature sensor at thermometer T1.
8. a kind of method for carrying out underground heat well test using novel James's Boucherie process logging equipment, it is characterised in that including as follows
Step:
The first step judges whether to be applicable in novel James's Boucherie process logging equipment and well head according to the well well head pressure of closing of geothermal well
Connection type, the direct flanged joint of main valve of the three-way connection and well head of novel James's Boucherie process logging equipment, installs
Cheng Houying does not leak vapour or water;It does not need to draw spray if it is flowing well;
Second step carries out well-logging work according to testing process, all data all answer it is accurate, it is complete effectively, if closed
Well pressure is very low, and static test downhole temperature is very tall and big in 120 DEG C, then the well can be by drawing spirt row open flow test;
Third step, after finishing all test jobs, assay well yield, including well logging data analysis is handled, it surveys respectively
Determine steam flow amount, water flow and the temperature under different pressures, and measure the on-condensible gas content in separate vapour, determines the heat of individual well
Enthalpy and hot fluid yield draw well head pressure, yield and temperature, flow and the relation curve of time etc..
9. a kind of side for carrying out underground heat well test using novel James's Boucherie process logging equipment according to claim 8
Method, it is characterised in that testing process described in second step is as follows:
1) it installs logging equipment and fixes the fixed device of logging, it is most deep that the weighted rod of PT logging instrument is first placed into shaft bottom
Place, reintroduces, and starts static pressure-temperature test, until matching since well head after PT logging instrument and weighted rod are connected
PT logging instrument is proposed well head after the completion, downloads all data by more than the shaft bottom bosom that weight stick has just touched three meters of position;
2) throttle valve is opened, is released;Draw spray if necessary and pressurizeed by air pipeline auxiliary valve to well head using air compressor machine, is added
Well head main valve must shut off when pressure, wait several hours, then open throttle valve;
3) value and James's test of well head pressure gauge P3, straight pipe pressure gauge P2 and thermometer T1 were recorded every ten minutes
The value of pressure gauge P1 and weir notch water level h on pipeline;
4) after stability of flow, start dynamic flow-pressure test, to the shaft bottom that the weighted rod of PT logging instrument is touched since well head
More than bosom three meters of position, proposes well head after the completion, downloads all data, and PT logging instrument is relay down toward main production
The depth in region, fixed PT logging instrument simultaneously record pressure;
5) after eight hours of flow open flow, close throttle valve, close flow, latter two hour continue record down-hole pressure;
6) three meters of shaft bottom bosom or more is touched up from weighted rod, record static pressure, downloading data;
7) flow is calculated using weir notch liquid level and James's side pressure, examines heat storage capacity using underground dynamic temperature;
8) power output=flow/(production area dynamic pressure-static pressure);
9) production area depth is determined using pressure-temperature distribution results, carry out the forecast analysis of pressure buildup.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811226407.0A CN109162698A (en) | 2018-10-22 | 2018-10-22 | Novel James's Boucherie process logging equipment and test method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811226407.0A CN109162698A (en) | 2018-10-22 | 2018-10-22 | Novel James's Boucherie process logging equipment and test method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109162698A true CN109162698A (en) | 2019-01-08 |
Family
ID=64878748
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811226407.0A Pending CN109162698A (en) | 2018-10-22 | 2018-10-22 | Novel James's Boucherie process logging equipment and test method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109162698A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111852462A (en) * | 2019-04-29 | 2020-10-30 | 中国石油天然气股份有限公司 | Method and device for acquiring dynamic reserves of oil well |
CN116591668A (en) * | 2023-07-19 | 2023-08-15 | 大庆鑫得丰石油技术有限公司 | Flow data acquisition device of gas production wellhead |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101718642A (en) * | 2009-11-06 | 2010-06-02 | 广东省生态环境与土壤研究所 | Method and device for monitoring rainfall runoff pollution of expressway pavements |
CN203231773U (en) * | 2013-04-22 | 2013-10-09 | 韩卫 | Special-shaped flow measurement weir flow measuring device |
CN203838034U (en) * | 2014-04-16 | 2014-09-17 | 东营市东达机械制造有限责任公司 | Hanging piece sampler |
CN208900093U (en) * | 2018-10-22 | 2019-05-24 | 当雄县羊易地热电站有限公司 | Novel James's Boucherie process logging equipment |
-
2018
- 2018-10-22 CN CN201811226407.0A patent/CN109162698A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101718642A (en) * | 2009-11-06 | 2010-06-02 | 广东省生态环境与土壤研究所 | Method and device for monitoring rainfall runoff pollution of expressway pavements |
CN203231773U (en) * | 2013-04-22 | 2013-10-09 | 韩卫 | Special-shaped flow measurement weir flow measuring device |
CN203838034U (en) * | 2014-04-16 | 2014-09-17 | 东营市东达机械制造有限责任公司 | Hanging piece sampler |
CN208900093U (en) * | 2018-10-22 | 2019-05-24 | 当雄县羊易地热电站有限公司 | Novel James's Boucherie process logging equipment |
Non-Patent Citations (2)
Title |
---|
吴岑宏: "地热井探测中的超高温测井技术研究", 中国煤炭地质, vol. 30, no. 4, pages 70 - 73 * |
浦静怡 等: "端压法测试羊易地热田 SC202井放喷实验", 中国煤炭学会钻探工程专业委员会2017年钻探工程学术研讨会论文集, pages 49 - 54 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111852462A (en) * | 2019-04-29 | 2020-10-30 | 中国石油天然气股份有限公司 | Method and device for acquiring dynamic reserves of oil well |
CN116591668A (en) * | 2023-07-19 | 2023-08-15 | 大庆鑫得丰石油技术有限公司 | Flow data acquisition device of gas production wellhead |
CN116591668B (en) * | 2023-07-19 | 2023-09-22 | 大庆鑫得丰石油技术有限公司 | Flow data acquisition device of gas production wellhead |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105588796B (en) | A kind of device of accurate quick measure soil permeability coefficient | |
WO2020258589A1 (en) | Method for inversion calculation of coal seam gas parameters by rapid measurement while drilling | |
CN109916799A (en) | Measure the experimental method of the spontaneous Imbibition Relative Permeability of unconventional tight gas reservoir | |
CN202419144U (en) | Virtual instrument-based underground steam pipeline leakage detection device | |
CN107024499A (en) | One-dimensional earth pillar frost-heaving deformation analyzer | |
CN205506640U (en) | Test device is measured to normal position soil osmotic coefficient | |
CN103968883B (en) | Mud detection method and mud survey meter | |
CN109883937A (en) | A kind of test device and method of the top part corrosion behavior of high temperature and pressure Wet gas line | |
CN104776971A (en) | Visualization experiment device for liquid and sand carrying of gas flow | |
CN109162698A (en) | Novel James's Boucherie process logging equipment and test method | |
CN105628549A (en) | Method for directly, quickly and full-automatically determining content of desorbing gas in coal seam | |
CN105865970A (en) | Direct fitting determination method of gas content of coal seam | |
CN110186522A (en) | Reading compensation and flow-measuring method are crossed in conjunction with the moisture of vortex street amplitude characteristic | |
CN201254989Y (en) | On-line detection device for water content of oil well | |
CN114001880B (en) | Water supply pipeline leakage amount assessment method based on in-pipe leakage acoustic wave analysis | |
CN208900093U (en) | Novel James's Boucherie process logging equipment | |
CN204327076U (en) | Drilling fluid leakage comprehensive discrimination system | |
CN107884432A (en) | Measure experimental provision and method that water-oil phase in collector and delivery pipe road glues wall temperature | |
CN105649603A (en) | Method for measuring accumulated liquid quantity of well bore of gas well in real time | |
Liping et al. | Experimental study on the amplitude characteristics and propagation velocity of dynamic pressure wave for the leakage of gas-liquid two-phase intermittent flow in pipelines | |
CN111535798B (en) | Metering method of steam metering system | |
CN205719870U (en) | Original position soil rainfall infiltration measurement apparatus | |
CN201100852Y (en) | A portable hydraulic failure diagnosis instrument | |
CN204666329U (en) | A kind of air-flow is taken liquid and is taken sand visual experimental apparatus | |
CN110487838A (en) | A kind of portable salt marsh soil scene original position frost heave and molten sunken detection device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |