CN109147541A CN201811253348.6A CN201811253348A CN109147541A CN 109147541 A CN109147541 A CN 109147541A CN 201811253348 A CN201811253348 A CN 201811253348A CN 109147541 A CN109147541 A CN 109147541A
Authority
CN
China
Prior art keywords
soil body
soil
water
water pipe
container
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811253348.6A
Other languages
Chinese (zh)
Inventor
刘兴禄
王宇虓
时刚
田孝伟
李超越
王维蒙
武天仪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dezhou Shandong Traffic Engineering Supervision Co
Zhengzhou University
Original Assignee
Dezhou Shandong Traffic Engineering Supervision Co
Zhengzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dezhou Shandong Traffic Engineering Supervision Co, Zhengzhou University filed Critical Dezhou Shandong Traffic Engineering Supervision Co
Priority to CN201811253348.6A priority Critical patent/CN109147541A/en
Publication of CN109147541A publication Critical patent/CN109147541A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B25/00Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/24Earth materials

Abstract

A kind of soil body penetration crash simulation device, to solve the technical issues of existing seepage failure simulator can not be analyzed applied to the soil body penetration breaking test under the influence of dynamic load.It includes the soil body, load loading device and simulation of infiltration device;The simulation of infiltration device makes the soil body that water infiltration phenomenon occur;The top of the soil body is arranged in the load loading device.A kind of application method of soil body penetration crash simulation device, the soil body penetration crash simulation device include soil body container, simulation of infiltration device, load loading device and measuring device;The simulation of infiltration device includes the water pipe with valve;The soil body container is equipped with soil erosion mouth, water pipe impenetrating mouth and observation area for containing the soil body, the soil body container;The load loading device shakes the soil body or soil body container;The measuring device includes displacement meter, soil pressure cell and controller;The soil body penetration under the influence of dynamic load, which can be observed, by it destroys situation.

Description

Soil body penetration crash simulation device and application method
Technical field
The present invention relates to Subgrade Subsidence experimental provisions, and in particular to a kind of soil body penetration crash simulation device and use Method.
Background technique
With City Buried Pipeline aging, pipe network water leakage situation is multiple, and the soil body near pipeline by water infiltration also due to being destroyed Road surface occurs to collapse.The road surface that such situation causes, which collapses, has the characteristics that concealment, is usually difficult to observe, this be unfavorable for improving and It is theoretical to verify surface collapse.
The mechanism, law of development that cavity is formed under urban pavement can be disclosed by not currently existing complete theoretical system, Existing research method is only from the angle analysis soil body penetration failure law of damage of soil body.
The Chinese patent literature CN105572319B for being disclosed on November 24th, 2017 describes a kind of waterpower induction covering Type karst collapse simulation test device, including water level control unit, rainfall simulation unit, test unit and intellectual monitoring list Member, in which: the water level control unit is used for the pressure water head and phreatic table of test unit during Control experiment;The people Work rainfall simulation unit is connect with the water level control unit, is provided by the water level control unit for simulating rain making It supplies water;The test unit includes water table aquifer simulation box and the bearing course water tank that is set to below the water table aquifer simulation box, is used Test is collapsed in covered karst, stainless (steel) wire, each stainless steel are respectively arranged at left and right sides of the water table aquifer simulation box Respectively constituted at left and right sides of net and water table aquifer simulation box left and right water tank for for dive under water layer soil body uniformly supply water;The intelligence prison Surveying unit includes water pressure sensor, soil pressure sensor, optical sensor, laser displacement sensor, soil moisture sensor And digital camera, the water pressure sensor are connected with the gaging hole on the rear panel for being set to water table aquifer simulation box, the gaging hole Take middle lower portion intensive, the dispersion of remaining position, and the dislocation arrangement at left and right sides of center line;The soil pressure sensor setting In the backplate surface of the water table aquifer simulation box;The optical sensor arrangement is in bearing course water tank upper end front and rear sides center Place is influenced to start the amount for flowing into bearing course water tank by hydraulic factors, be collapsed for covered karst for monitoring fine grained in coating It falls into soil cave forming process and foundation is provided;The laser displacement sensor is set to the top of the test unit, for monitoring ground Table sedimentation;The soil moisture sensor is arranged in the water table aquifer unsaturation band of soil model to be measured, for monitoring soil water-containing Amount collapses final soil arch unstability for covered karst and provides foundation;The test unit is being arranged in just in the digital camera Front, for shooting test process and result;Wherein, the water table aquifer simulation box and bearing course water tank are by organic transparent glass Be made, the top of the bearing course water tank is equipped with bearing course water tank top plate, connect with the bottom plate of water table aquifer simulation box, two parts it Between sealing padded by watertight rubber;Be respectively arranged at left and right sides of the water table aquifer simulation box stainless (steel) wire and respectively with it is described Stainless (steel) wire constitutes left and right water tank and is used to uniformly supply water for diving layer soil body;Organic glass is respectively arranged in the bottom of stainless (steel) wire Glass plate is used to prevent water inlet water flow from directly contacting with the soil body for the head energy dissipating entered;In the bottom plate of water table aquifer simulation box Between position be provided with a cavity, and with there are four sliding groove, the sliding groove is for being arranged Karst Fissures analog board, by being set to The gap of the left and right crack width control sheet adjustment Karst Fissures of crack karst analog board side is wide.
Chinese patent literature CN105572319B is described while also being described a kind of simulation waterpower induction covered karst The method collapsed includes the following steps: that (1) tiles soil pressure sensor on water table aquifer simulation box inner bottom plating, wants according to test Adjustment crack width control sheet is sought, and crack karst analog board is fixed;(2) by bearing course water tank and water table aquifer simulation box pair It connects, and is screwed, water table aquifer simulation box bottom plate position will be filled with water in bearing course water tank, while in bearing course water tank upper Fixed optical sensor;(3) soil sample is prepared, and spraying with sprayer, so that soil property contains certain moisture;(4) it is covered with walk The cavity that bottom plate middle position opens up, walk can not block intermediate crack, in order to avoid increase waterpower osmosis patch test effect, it will The soil sample of preparation is laid in water table aquifer simulation box, compacting, and colored thin by the setting of front side organic glass edge on soil layer Sand, the mark line as digital imaging system;(5) repetition step (4) is up to forming soil layer construction, in soil layer compacting process, It places into the soil moisture transducer;(6) pressure water head control cabinet is opened, and is adjusted by valve, so that the sluggish flow in water pipe Bearing course water tank is flowed into be saturated using " hot water saturation ", i.e., in water feeding tank to prevent from occurring gas explosion phenomenon in soil layer Hot water is stored, so that water level in pressure water head control cabinet is slightly above sample basal surface position, then slowly promote water tank, promotes 1 every time ~2cm, equal with water level in sample to Water in Water Tanks position, a few minutes of waiting promote water tank again, as water tank rises, examination Sample is slowly saturated, and excludes the air in sample, at the same time, when water pressure gaging hole has elutriation to go out, connects connection water pressure The hose of sensor, it is desirable that inner filling water excludes bubble before hose is connected, and hose both ends are slightly above conduit mouth, reduces a termination Admittance pipe, it is ensured that bubble-free between conduit and hose is filled the water in the other end with syringe, excludes air, connects water pressure sensor, Pay attention to excluding the air of water pressure sensor part;(7) it stands, adjusts left water table aquifer water level control box, right water table aquifer water level control Case processed and pressure water head control cabinet are to initial position, to the numerical stability in all the sensors, formation original state seepage field; (8) laser displacement sensor instrument is placed in above test model unit, opens all monitoring devices, change water according to test requirements document Power condition is tested.
Summary of the invention
Waterpower induction covered karst above-mentioned collapses simulation test device and application method is only used for simulation karst collapse, It being found after inventor's research, urban pipeline is generally laid in below the edge, pavement or greenbelt of urban road two sides, this Sample, traffic dynamic load also belong to soil body penetration and destroy important one of influence factor.
One of goal of the invention of the invention is to provide a kind of soil body penetration crash simulation device, collapses for simulated roadway water infiltration It falls into, it can not be applied to the soil body penetration breaking test analysis under the influence of dynamic load to solve existing seepage failure simulator The technical issues of.
In order to solve the above technical problems, the present invention adopts the following technical scheme:
Design a kind of soil body penetration crash simulation device, including the soil body, load loading device and simulation of infiltration device;The infiltration Simulator into the soil body for supplying water, so that the soil body occurs water and seeps phenomenon;The load loading device is mounted on It is arranged on the pressure dissipation body of the top of the soil body, the lower surface of the pressure dissipation body is plate face, pressure dissipation body Lower surface >=soil body upper surface.
Preferably, the load loading device is at least one in vibration excitor, cam vibration device and supersonic generator Kind;When the load loading device is vibration excitor or cam vibration device, the load loading device is arranged in the soil body Top.
Design a kind of soil body penetration crash simulation device, including soil body container, load loading device and simulation of infiltration device; The soil body container is equipped with soil erosion mouth for containing the soil body, in the side of the soil body container or bottom surface;The infiltration mould Quasi- device into the soil body for supplying water, so that the soil body occurs water and seeps phenomenon;The load loading device, which is mounted on, to be set It sets on the pressure dissipation body of the top of the soil body, the lower surface of pressure dissipation body is slightly less than the upper table of the soil body container Face, so that the stress concentration effect of the edge of the pressure dissipation body is weak, and again can be movable in the soil body container, Alternatively, the load loading device is for shaking the soil body container.
Preferably, the load loading device is at least one in vibration excitor, cam vibration device and supersonic generator Kind.
It further, further include measuring device, the measuring device is used to measure the sedimentation deformation of the soil body upper surface And/or the pressure of the inside soil body.
Preferably, the simulation of infiltration device includes the water pipe with valve, and the water pipe protrudes into the soil body or the soil In body container, the valve is arranged in the soil body or soil body container foreign side, for accessing water source with pressure.
Further, the different height of the soil body container side be equipped with multiple water pipe impenetrating mouths, the water pipe to A few water pipe impenetrating mouth protrudes into the soil body container, and the water pipe impenetrating mouth for being not provided with the water pipe, which is equipped with, to be used for Block the plug of corresponding water pipe impenetrating mouth.
Further, the side of the water pipe is additionally provided with permeable hole, and the permeable hole setting is corresponding in the soil body Or on the water pipe in the soil body container.
Further, the simulation of infiltration device further includes constant pressure water tank, and the constant pressure water tank is equipped with water inlet, upper water-out Mouth, lower outlet, upper water-out mouth, lower outlet are below water inlet setting, and lower outlet is connected to the valve pipe.
Compared with prior art, a kind of beneficial effect of soil body penetration crash simulation device of the present invention is: being added using load Carrying to set vibrates the soil body, situation is destroyed to simulate soil body penetration of soil body under the influence of dynamic loading, in this way, experimenter The sedimentation phenomenon of soil body surface can be observed, the heavy of soil body surface can also be measured by measuring tool or other measuring devices Demotion move, it can be applied to road surface water infiltration collapse simulated experiment.
The two of goal of the invention of the invention are to provide a kind of application method of soil body penetration crash simulation device, for simulating Water infiltration in road surface collapses, can not be broken applied to the soil body penetration under the influence of dynamic load to solve existing seepage failure simulator The technical issues of bad experimental analysis.
A kind of application method of soil body penetration crash simulation device, the soil body penetration crash simulation device include that the soil body holds Device, simulation of infiltration device, load loading device and measuring device;The simulation of infiltration device includes the water pipe with valve, in institute The side for stating water pipe is equipped with permeable hole, and permeable hole, which is arranged in, to be corresponded on the water pipe in the soil body container, is corresponding to The end point of the water pipe in the soil body container is equipped with plug;The soil body container is for containing the soil body, in the soil body The side or bottom surface of container are equipped with soil erosion mouth, are equipped with the observation area that transparent material is formed in the side of the soil body container, Multiple water pipe impenetrating mouths are equidistantly equipped on the different height of the observation area;The load loading device, which is mounted on, to be arranged in institute It states on the pressure dissipation body of the top of the soil body, the lower surface of pressure dissipation body is slightly less than the upper surface of the soil body container, so that The stress concentration effect of the edge of the pressure dissipation body is weak, and again can be movable in the soil body container, alternatively, described Load loading device is for shaking the soil body container;Displacement measurement hole is equipped on the pressure dissipation body, it is described Displacement measurement hole upright projection is on the water pipe with valve;The measuring device includes displacement meter, soil pressure cell and control Device, the measurement end of the measuring staff of the displacement meter are fixedly connected with pressure dissipation ball, for measuring the sedimentation of the soil body upper surface Displacement, the soil pressure cell are used to measure the pressure of the inside soil body;It is further comprising the steps of:
Production contains water and soil, take soil and be successively dried, processing is mixed and stirred in powder processed, water mixing;
Water and soil layering will be contained to be placed into soil body container, separated between two layers adjacent of aquifer by powder mark layer, To aqueous native compaction treatment when placing every layer of aquifer, the compacted thickness of every layer of aquifer is made to correspond to two adjacent water Then the difference in height of pipe impenetrating mouth places a soil pressure cell, will not need the water pipe that the water pipe with valve is arranged using plug Impenetrating mouth blocks, when the height containing water and soil in soil body container reaches the position for corresponding to and needing that the water pipe with valve is arranged, also The water pipe is inserted into soil body container through water pipe through hole, and the permeable hole of water pipe side is made to be entirely located in soil body container It is interior;At this moment the aquifer in soil body container and mark layer just form the soil body;
The pressure dissipation body for being equipped with load loading device is then placed on to the upper surface of the soil body, displacement meter is fixed on On soil body container, the measuring staff of displacement meter is vertically set in institute's displacement measurement hole, and the pressure dissipation ball and the soil body Upper surface connect, pressure dissipation body and the signal that the signal output end of displacement meter, soil pressure cell is accessed to corresponding controller Input interface;
Valve is closed, the other end of valve is accessed into constant pressure water source;
Carry out after observing and recording preparation, open valve, open load loading device, from observation area the soil body change and record because The process in the loss channel that Water pipe leaking is formed, and by the stress data and the soil body around controller record soil pressure cell The displacement data that surface occurs.
Compared with prior art, a kind of beneficial effect of soil body penetration crash simulation device of the present invention is: being added using load Carrying to set vibrates the soil body, situation is destroyed to simulate soil body penetration of soil body under the influence of dynamic loading, in this way, experimenter The sedimentation phenomenon of soil body surface can be observed, the heavy of soil body surface can also be measured by measuring tool or other measuring devices Demotion move, it can be applied to road surface water infiltration collapse simulated experiment.
Compared with prior art, a kind of beneficial effect of the application method of soil body penetration crash simulation device of the present invention is: The soil body is vibrated using load loading device, destroys situation to simulate soil body penetration of soil body under the influence of dynamic loading, this Sample, experimenter can observe the sedimentation phenomenon of soil body surface, can also measure by measuring tool or other measuring devices The sedimentation deformation of soil body surface, it can be applied to road surface water infiltration collapse simulated experiment.
Detailed description of the invention
Fig. 1 is a kind of main view of soil body penetration crash simulation device of the present invention.
Fig. 2 is a kind of sectional view of soil body penetration crash simulation device of the present invention.
In figure, 1- soil body container, 11- plug, 12- soil erosion mouth, 13- stirrup, the observation area 14-, the 2- soil body, 21- contains Water and soil layer, 22- powder mark layer, 31- water pipe, 311- permeable hole, 32- valve, 4- load loading device, 41- pressure dissipation body, 411- displacement measurement hole, 51- soil pressure cell, 52- displacement meter, 521- measuring staff, 53- controller, 6- constant pressure water tank, 61- water inlet, 62- upper water-out mouth, 63- lower outlet.
Specific embodiment
Illustrate a specific embodiment of the invention with reference to the accompanying drawings and examples, but following embodiment is used only in detail It describes the bright present invention in detail, does not limit the scope of the invention in any way.
Embodiment 1: a kind of soil body penetration crash simulation device, including soil body container 1, the soil body 2,4 and of load loading device Simulation of infiltration device.In soil body penetration breaking test, the soil body 2 is necessary, and soil body container 1 is only used for containing the soil body 2, That is soil body container 1 not be it is necessary, leakage point foreign side the soil body also can to leakage point formed surround, at this point, under The lower surface for the pressure dissipation body 41 stated is best >=upper surface of the soil body 2, the pressure dissipation effect of such pressure dissipation body 41 is most Good, stress concentration effect is also just not present in edge.In order to facilitate the operation and illustrate, using in the present embodiment has soil body container 1。
Soil body penetration crash simulation device can also include measuring device, and the measuring device is for measuring the soil body The sedimentation deformation of 2 upper surfaces and/or the pressure inside the soil body 2, as needed, measuring device can have one or two kinds of function Energy.
Load loading device 4 is at least one of vibration excitor, cam vibration device and supersonic generator;When load plus It carries and sets 4 when being vibration excitor or cam vibration device, load loading device 4 may be mounted on pressure dissipation body 41, pressure point Granular media 41 is selected as steel plate, and pressure dissipation body 41 is arranged on the upper surface of the soil body 2, what vibration excitor or cam vibration device issued Vibration is conducted by pressure dissipation body 41 to the soil body 2, so that the soil body 2 shakes.The size of pressure dissipation body 41 should be slightly less than The size of soil body container 2, in this way, load loading device 4 work when, because between pressure dissipation body 4 and soil body container 2 gap compared with It is small, dynamic pressure can be substantially dispersed to the upper surface of the soil body 2, acted on the soil body 2 in the edge of pressure dissipation body 4 Stress concentration effect is weak, and again can be movable in soil body container 1, can be ignored on the influence of the error of measurement;According to need It wants, displacement measurement hole 411 is equipped on pressure dissipation body 41,411 upright projection of displacement measurement hole is in the water pipe 31 with valve 32 On;Load loading device 4 also may be mounted on soil body container 1, and the vibration that vibration excitor or cam vibration device issue passes through soil Body container 1 is conducted to the soil body 2 in soil body container 1, so that the soil body 2 shakes;When load loading device 4 is ultrasonic wave When device, what it is due to supersonic generator sending is ultrasonic wave, can be conducted in air, as long as ultrasonic wave occurs in this way Device issue ultrasound can conduct to the soil body 2 and act on the soil body 2 can, load loading device 4 can be according to need at this time It fixes at the desired position.In the present embodiment, load loading device 4 selects vibration excitor.
Simulation of infiltration device into the soil body 2 for supplying water, so that the soil body 2 occurs water and seeps phenomenon.Simulation of infiltration device includes Water pipe 31 with valve 32, water pipe 31 protrude into the soil body 2 or soil body container 1, since the end point of water pipe 31 can make water flow Out, so in this way water outlet can be formed in the soil body 2 or soil body container 1;Valve 32 is arranged outside the soil body 2 or soil body container 1 Side, for accessing water source with pressure.As needed, plug can be used 31 end point of water pipe in the soil body 2 or in soil body container 1 Blocking, the side of water pipe 31 be equipped with permeable hole 311, permeable hole 311 setting correspond to the soil body 2 in or the soil body hold On the water pipe 31 in device 1, biggish infiltration region can be set in this way.Valve 32 includes shut-off valve or flow control valve, For opening water pipe or ending.Valve 32 can also include pressure-regulating valve, and pressure-regulating valve is arranged in shut-off valve or stream It, can be with for keeping the pressure of the water flow at the soil body 2 or soil body container 1 constant between adjustable valve and the soil body 2 or soil body container 1 Instead of the constant pressure water tank 6 used in the present embodiment.
Simulation of infiltration device can also include constant pressure water tank 6, and constant pressure water tank 6 can choose the water tank with upper opening, this Sample is capable of forming air open-work, and constant pressure water tank 6 includes water inlet 61, upper water-out mouth 62 and lower outlet 63, lower outlet 63 with Valve 32 is connected to by pipeline, when load loading device 4 makes the soil body 2 or soil body container 1 occurs laterally to shake, lower outlet 63 Pipeline between the soil body 2 or soil body container 1 is preferably provided with flexible tube section, can reduce in this way the soil body 2 or 1 side of soil body container to shake It is dynamic to be transmitted at constant pressure water tank 6.In use, the water inlet of constant pressure water tank 6 can be connected to water supply with pipeline, water can also be connected to The water outlet of pump, in use, the water inlet of water pump is arranged in water body.When fixed constant pressure water tank 6, it is desirable to adjust constant pressure water The height of case, that is to say, that be preferably selected on different height with multiple fixed bits fixed frame, at this moment lower outlet 63 with Pipeline between the soil body 2 or soil body container 1 should be equipped with flexible tube section, and this makes it possible to adjust lower outlet 63 and the soil body 2 or the soil body The pressure difference between water pipe 31 in container 1.
Soil body container 1 is selected as the cabinet with upper opening, is also convenient in this way with forming the soil body 2 by load convenient for filling soil The top of the soil body 2 is arranged in loading device 4, pressure dissipation body 41.Soil erosion mouth is equipped in the side of soil body container 1 or bottom surface 12.As needed, multiple water pipe impenetrating mouths can be equidistantly equipped on the different height of 1 side of soil body container, in the present embodiment, The difference in height of two adjacent water pipe impenetrating mouths is selected as 150mm, and water pipe 31, which protrudes into the soil body from least one water pipe impenetrating mouth, to be held In device 1, the water pipe impenetrating mouth of water pipe 31 is not provided with equipped with the plug 11 for blocking corresponding water pipe impenetrating mouth, plug 11 is best Using resilient plug, such as rubber stopper, stopper.The side of soil body container 1 is preferably provided with the observation area 14 of transparent material formation, in this way The situation inside soil body container 1 can be observed by observation area 14.Transparent material has acrylic, glass, wherein tempered glass Safety it is good.When transparent material selects glass, elastic shock attenuation material is preferably provided in the junction of glass and soil body container Material, vibration-absorptive material have rubber, glass cement.To prevent observation area 14 because pressure is toppled, set in the upper, middle and lower position of soil body container 1 3 stirrups 13 are set.
Measuring device may include displacement meter 52, soil pressure cell 51, controller 53, and controller 53 should be equipped with and displacement meter 52, the corresponding analog input interface of soil pressure cell 51 or digital signal input interface, controller 53 can be used and be equipped with The electronic computer of RS232 analog input card and RS232 Control card, RS232 Control card should be able to be converted to RS232 signal The square wave of different frequency, the signal output end of RS232 Control card are electrically connected with the control terminal of vibration excitor, to drive vibration excitor defeated The vibrations load of different frequency out.Displacement meter 52 is installed on soil body container 1, and the measuring staff of displacement meter 52 is vertically arranged, displacement meter 52 The measurement end of measuring staff 521 can be equipped with pressure dissipation ball, the diameter of pressure dissipation ball be more preferably less than the diameter in displacement measurement hole, Measuring staff 521 is vertically set in displacement measurement hole, and the bottom surface of pressure dissipation ball connects with the upper surface of the pressure dissipation body soil body 2, Since collapsing of inducing of the infiltration of water pipe 31 focuses primarily upon the top of water pipe 31, pressure dissipation ball can disperse 521 bottom end of measuring staff The measurement accuracy of pressure, such displacement meter 52 is calibrated.The electrical connection corresponding with the signal input interface of controller 53 of displacement meter 52, this Sample can measure the sedimentation deformation when soil body 2 collapses by displacement meter 52, the signal of soil pressure cell 51 and controller 53 inputs The corresponding electrical connection of interface, this makes it possible to the pressure measured inside the soil body 2 by soil pressure cell 51.Soil pressure cell 51 can be set One, it is two or more, a soil pressure cell 51 should be provided on the top of the soil body 2, can according to need in the soil body 2 not With the other soil pressure cells 51 of setting in height.
Embodiment 2: a kind of application method of soil body penetration crash simulation device, soil body penetration crash simulation device include soil Body container 1, simulation of infiltration device, load loading device 4 and measuring device;Simulation of infiltration device includes the water pipe with valve 32 31, it is equipped with permeable hole 311 in the side of water pipe 31, the water pipe 31 corresponded in soil body container 1 is arranged in permeable hole 311 On, plug is equipped in the end point of the water pipe 31 corresponded in soil body container 1;Soil body container 1 is for containing the soil body 2, in the soil body The side or bottom surface of container 1 are equipped with soil erosion mouth 12, are equipped with the observation area that transparent material is formed in the side of soil body container 1 14, it is equidistantly equipped with multiple water pipe impenetrating mouths on the different height of observation area 14, can be observed directly from observation area 14 in this way Sky around water pipe 31 falls into the collapse process formed with the soil body 2;Load loading device 4 is used to provide dynamic pressure to the soil body 2, Specifically, load loading device 4 is mounted on pressure dissipation body 41, pressure dissipation body 41 is placed on the upper of the soil body 2, pressure dissipation The lower surface of body 41 is slightly less than the upper surface of soil body container 1, so that the stress concentration effect of the edge of the pressure dissipation body It is weak, and again can be movable in the soil body container, alternatively, load loading device 4 is for shaking soil body container 1;? Pressure dissipation body 41 is equipped with displacement measurement hole 411, and 411 upright projection of displacement measurement hole is on the water pipe 31 with valve 32;It surveys Measuring device includes displacement meter 52, soil pressure cell 51 and controller 53, and the measurement end of the measuring staff 521 of displacement meter 52 can be fixedly connected There is pressure dissipation ball, for measuring the sedimentation deformation of 2 upper surface of the soil body, soil pressure cell 51 is for measuring inside the soil body 2 Pressure;The following steps are included:
Production contains water and soil, take soil and be successively dried, processing is mixed and stirred in powder processed, water mixing;
It is coated with isolated chromatography layer in the inner wall of soil body container 1 as needed, isolation layer material can be ointment, packing paper, and ointment can select Vaseline is selected, when isolated chromatography layer material selection packing paper, should leave a blank at observation area 14, block observation area 14 to avoid packing paper;Root According to needing to place packing paper in soil erosion mouth 12, when containing water and soil is placed to avoid this backward soil body container 1, contains water and soil from water and soil stream A slip of tongue 12 is largely fallen;
Then it will contain water and soil layering to be placed into soil body container 1, and pass through powder mark layer between adjacent two layers of aquifer 21 22 separate, and powder mark layer 22 can select albarium, if partial size can satisfy do not influence water body infiltration and the soil body 2 collapse , in this way can from observation area 14, intuitively the observation soil body 2 settles degree, to containing water and soil after placing every layer of aquifer 21 Compaction treatment, the compacted thickness of every layer of aquifer 21 correspond to the difference in height of two adjacent water pipe impenetrating mouths, correspond to Then 150mm places a soil pressure cell 31, the conducting wire of soil pressure cell 31 is made to be exposed to soil body container 1, will not using plug 11 The water pipe impenetrating mouth for needing to be arranged 31 water pipes with valve 32 blocks, and needs when the soil layer height in soil body container 1 reaches to correspond to When the position of water pipe 31 with valve 32 is set, also water pipe 31 is inserted into soil body container 1 through water pipe through hole, and make water The permeable hole 311 of 31 side of pipe is entirely located in soil body container 1;At this moment the aquifer 21 and mark layer 22 in soil body container 1 With regard to forming the corresponding soil body 2;
Then the upper surface of the soil body 2 will be placed on the pressure dissipation body 41 for being equipped with load loading device 4;Displacement meter 52 is consolidated It is scheduled on soil body container 2, the measuring staff 521 of displacement meter 52 is vertically set on the upper of in displacement measurement hole 411 and its end and the soil body 2 Surface connects, and the signal output end of displacement meter 52, soil pressure cell 51 is accessed to the signal input interface of corresponding controller;Ginseng See Fig. 1, displacement meter 52, soil pressure cell 51 conducting wire there are square bending formed it is more than needed, will not in this way when the soil body 2 is got deeply stuck in Cause causes soil pressure cell 51 or displacement meter 52 to measure because conductor length is limited is not allowed;
Constant pressure water tank 6 is arranged in the height of needs, valve 32 is closed, lower outlet 63 is connected to valve 32 by pipeline, Upper water-out mouth 62 is oriented to drainpipe by pipeline;
It carries out after observing and recording preparation, is filled the water into constant pressure water tank 6, open valve 32, open load loading device 4, pass through sight It examines area 14 and observes the process that the soil body 2 changes and records the loss channel formed by the leakage of water pipe 31, and recorded by controller 53 Stress data around soil pressure cell 51, the displacement data with the generation of 2 upper surface of the soil body.
In experiment, the water pipe 31 with valve 32 can be inserted into as needed in the water pipe through hole of corresponding position.
Compared with prior art, the beneficial effects of the present invention are: vibrating the soil body using load loading device, with mould Soil body penetration of quasi- soil body under the influence of dynamic loading destroys situation, in this way, experimenter can observe the sedimentation of soil body surface Phenomenon, can also by measuring tool or other measuring devices measurement soil body surface sedimentation deformation, it can be applied to road surface Water infiltration collapse simulated experiment.
The present invention is described in detail above in conjunction with drawings and examples, still, those of skill in the art Member is it is understood that without departing from the purpose of the present invention, can also carry out each design parameter in above-described embodiment Change, forms multiple specific embodiments, is common variation range of the invention, is no longer described in detail one by one herein.

Claims (10)

1. a kind of soil body penetration crash simulation device, including the soil body and simulation of infiltration device, which is characterized in that further include that load adds It carries and sets;The simulation of infiltration device into the soil body for supplying water, so that the soil body occurs water and seeps phenomenon;The load Loading device is mounted on the pressure dissipation body that the top of the soil body is arranged in, and the lower surface of the pressure dissipation body is plate Face, lower surface >=soil body upper surface of pressure dissipation body.
2. soil body penetration crash simulation device as described in claim 1, which is characterized in that the load loading device is exciting At least one of device, cam vibration device and supersonic generator;When the load loading device is vibration excitor or cam vibration When dynamic device, the top of the soil body is arranged in the load loading device.
3. a kind of soil body penetration crash simulation device, including soil body container and simulation of infiltration device, which is characterized in that further include lotus Carry loading device;The soil body container is equipped with soil erosion mouth for containing the soil body, in the side of the soil body container or bottom surface; The simulation of infiltration device into the soil body for supplying water, so that the soil body occurs water and seeps phenomenon;The load load dress It sets on the pressure dissipation body for being mounted on the top that the soil body is set, the lower surface of pressure dissipation body is slightly less than the soil body and holds The upper surface of device, so that the stress concentration effect of the edge of the pressure dissipation body is weak, and again can be in the soil body container Interior activity, alternatively, the load loading device is for shaking the soil body container.
4. soil body penetration crash simulation device as claimed in claim 3, which is characterized in that the load loading device is exciting At least one of device, cam vibration device and supersonic generator.
5. such as soil body penetration crash simulation device of any of claims 1-4, which is characterized in that further include measurement dress It sets, the measuring device is used to measure the sedimentation deformation of the soil body upper surface and/or the pressure of the inside soil body.
6. soil body penetration crash simulation device as described in claim 3 or 4, which is characterized in that the simulation of infiltration device packet Include the water pipe with valve, the water pipe protrudes into the soil body or the soil body container, valve setting in the soil body or Soil body container foreign side, for accessing water source with pressure.
7. soil body penetration crash simulation device as claimed in claim 6, which is characterized in that the difference of the soil body container side Height is equipped with multiple water pipe impenetrating mouths, and the water pipe protrudes into the soil body container from water pipe impenetrating mouth described at least one, The water pipe impenetrating mouth of the water pipe is not provided with equipped with the plug for blocking corresponding water pipe impenetrating mouth.
8. soil body penetration crash simulation device as claimed in claim 6, which is characterized in that the side of the water pipe is additionally provided with Water hole, the permeable hole are arranged on the water pipe corresponded in the soil body or in the soil body container.
9. soil body penetration crash simulation device as claimed in claim 6, which is characterized in that the simulation of infiltration device further includes Constant pressure water tank, the constant pressure water tank are equipped with water inlet, upper water-out mouth, lower outlet, and upper water-out mouth, lower outlet are below into water Mouth setting, lower outlet are connected to the valve pipe.
10. a kind of application method of soil body penetration crash simulation device, the soil body penetration crash simulation device includes that the soil body holds Device, simulation of infiltration device, which is characterized in that the soil body penetration crash simulation device further includes load loading device and measurement dress It sets;
The simulation of infiltration device includes the water pipe with valve, is equipped with permeable hole in the side of the water pipe, permeable hole setting exists Corresponding on the water pipe in the soil body container, it is equipped in the end point of the water pipe corresponded in the soil body container Plug;
The soil body container is equipped with soil erosion mouth for containing the soil body, in the side of the soil body container or bottom surface, described The side of soil body container is equipped with the observation area that transparent material is formed, and multiple water pipes are equidistantly equipped on the different height of observation area and are passed through Wear mouth;
The load loading device is mounted on the pressure dissipation body that the top of the soil body is arranged in, the following table of pressure dissipation body Face is slightly less than the upper surface of the soil body container, so that the stress concentration effect of the edge of the pressure dissipation body is weak, and again Can be movable in the soil body container, alternatively, the load loading device is for shaking the soil body container;Institute Pressure dissipation body is stated equipped with displacement measurement hole, institute's displacement measurement hole upright projection is on the water pipe with valve;
The measuring device includes displacement meter, soil pressure cell and controller, and the measurement end of the measuring staff of the displacement meter is fixedly connected There is pressure dissipation ball, for measuring the sedimentation deformation of the soil body upper surface, the soil pressure cell is for measuring in the soil body The pressure in portion;
It is further comprising the steps of:
Production contains water and soil, take soil and be successively dried, processing is mixed and stirred in powder processed, water mixing;
Water and soil layering will be contained to be placed into soil body container, separated between two layers adjacent of aquifer by powder mark layer, To aqueous native compaction treatment when placing every layer of aquifer, the compacted thickness of every layer of aquifer is made to correspond to two adjacent water Then the difference in height of pipe impenetrating mouth places a soil pressure cell, will not need the water pipe that the water pipe with valve is arranged using plug Impenetrating mouth blocks, when the height containing water and soil in soil body container reaches the position for corresponding to and needing that the water pipe with valve is arranged, also The water pipe is inserted into soil body container through water pipe through hole, and the permeable hole of water pipe side is made to be entirely located in soil body container It is interior;At this moment the aquifer in soil body container and mark layer just form the soil body;
The pressure dissipation body for being equipped with load loading device is then placed on to the upper surface of the soil body, displacement meter is fixed on On soil body container, the measuring staff of displacement meter is vertically set in institute's displacement measurement hole, and the pressure dissipation ball and the soil body Upper surface connect, pressure dissipation body and the signal that the signal output end of displacement meter, soil pressure cell is accessed to corresponding controller Input interface;
Valve is closed, the other end of valve is accessed into constant pressure water source;
Carry out after observing and recording preparation, open valve, open load loading device, from observation area the soil body change and record because The process in the loss channel that Water pipe leaking is formed, and by the stress data and the soil body around controller record soil pressure cell The displacement data that surface occurs.
CN201811253348.6A 2018-10-25 2018-10-25 Soil body penetration crash simulation device and application method Pending CN109147541A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811253348.6A CN109147541A (en) 2018-10-25 2018-10-25 Soil body penetration crash simulation device and application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811253348.6A CN109147541A (en) 2018-10-25 2018-10-25 Soil body penetration crash simulation device and application method

Publications (1)

Publication Number Publication Date
CN109147541A true CN109147541A (en) 2019-01-04

Family

ID=64810056

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811253348.6A Pending CN109147541A (en) 2018-10-25 2018-10-25 Soil body penetration crash simulation device and application method

Country Status (1)

Country Link
CN (1) CN109147541A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109920318A (en) * 2019-04-22 2019-06-21 华侨大学 A kind of simulator of roadbed Void Model
CN110133222A (en) * 2019-05-15 2019-08-16 贵州师范大学 A kind of Karst region water and soil leakage water-salt migration monitoring method
CN110455703A (en) * 2019-09-02 2019-11-15 中南大学 A kind of test device and its test method of compacted soil vaporous water and lyotropic salt migration
CN110887954A (en) * 2019-12-04 2020-03-17 中国地质科学院岩溶地质研究所 Physical simulation experiment device and method capable of controlling soil cave forming process
CN111829933A (en) * 2020-07-21 2020-10-27 中国矿业大学 Fracture network shear seepage test device and test method thereof
CN113237813A (en) * 2021-05-10 2021-08-10 天津市政工程设计研究总院有限公司 Device and method for testing sponge city effects of different permeable road structures
CN115266725A (en) * 2022-06-23 2022-11-01 北京科技大学 Test device and test method for leakage collapse of buried pipeline
CN116930459A (en) * 2023-07-25 2023-10-24 江苏龙环环境科技有限公司 Soil in-situ detection device and detection method thereof
CN117330733A (en) * 2023-09-28 2024-01-02 中国矿业大学 Model test system for karst collapse in deep part of large city
US20240077403A1 (en) * 2022-06-14 2024-03-07 Zhejiang University Centrifugal testing device and method for simulating ground subsidence induced by buried pipeline leakage and infiltration

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101514978A (en) * 2009-04-02 2009-08-26 河海大学 Test method for studying phenomenon of permeable damage on soil body and test device thereof
CN103808643A (en) * 2014-03-03 2014-05-21 中国科学院地质与地球物理研究所 Vertical seepage test method under one-dimensional consolidation condition of solid body
CN105527404A (en) * 2016-01-22 2016-04-27 西南交通大学 Test system and method for simulating ground loss extension in shield tunnel vertical section
CN107328522A (en) * 2017-08-09 2017-11-07 武汉科技大学 A kind of soil pressure cell caliberating device and its application method
CN108169427A (en) * 2017-12-27 2018-06-15 中国科学院武汉岩土力学研究所 The tunnel gushing water physical simulation experiment system and test method of a kind of Plane stress model
CN108693326A (en) * 2018-03-30 2018-10-23 南京科兴新材料科技有限公司 Soil displacement field and the visual experimental rig of seepage field and test method under a kind of simulation dyke building preloading
CN209708465U (en) * 2018-10-25 2019-11-29 郑州大学 Soil body penetration crash simulation device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101514978A (en) * 2009-04-02 2009-08-26 河海大学 Test method for studying phenomenon of permeable damage on soil body and test device thereof
CN103808643A (en) * 2014-03-03 2014-05-21 中国科学院地质与地球物理研究所 Vertical seepage test method under one-dimensional consolidation condition of solid body
CN105527404A (en) * 2016-01-22 2016-04-27 西南交通大学 Test system and method for simulating ground loss extension in shield tunnel vertical section
CN107328522A (en) * 2017-08-09 2017-11-07 武汉科技大学 A kind of soil pressure cell caliberating device and its application method
CN108169427A (en) * 2017-12-27 2018-06-15 中国科学院武汉岩土力学研究所 The tunnel gushing water physical simulation experiment system and test method of a kind of Plane stress model
CN108693326A (en) * 2018-03-30 2018-10-23 南京科兴新材料科技有限公司 Soil displacement field and the visual experimental rig of seepage field and test method under a kind of simulation dyke building preloading
CN209708465U (en) * 2018-10-25 2019-11-29 郑州大学 Soil body penetration crash simulation device

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109920318B (en) * 2019-04-22 2024-02-02 华侨大学 Simulator of roadbed cavity model
CN109920318A (en) * 2019-04-22 2019-06-21 华侨大学 A kind of simulator of roadbed Void Model
CN110133222A (en) * 2019-05-15 2019-08-16 贵州师范大学 A kind of Karst region water and soil leakage water-salt migration monitoring method
CN110455703A (en) * 2019-09-02 2019-11-15 中南大学 A kind of test device and its test method of compacted soil vaporous water and lyotropic salt migration
CN110887954A (en) * 2019-12-04 2020-03-17 中国地质科学院岩溶地质研究所 Physical simulation experiment device and method capable of controlling soil cave forming process
CN111829933A (en) * 2020-07-21 2020-10-27 中国矿业大学 Fracture network shear seepage test device and test method thereof
CN111829933B (en) * 2020-07-21 2021-03-05 中国矿业大学 Fracture network shear seepage test device and test method thereof
CN113237813A (en) * 2021-05-10 2021-08-10 天津市政工程设计研究总院有限公司 Device and method for testing sponge city effects of different permeable road structures
US20240077403A1 (en) * 2022-06-14 2024-03-07 Zhejiang University Centrifugal testing device and method for simulating ground subsidence induced by buried pipeline leakage and infiltration
US11940366B1 (en) * 2022-06-14 2024-03-26 Zhejiang University Centrifugal testing device and method for simulating ground subsidence induced by buried pipeline leakage and infiltration
CN115266725B (en) * 2022-06-23 2023-08-25 北京科技大学 Test device and test method for collapse caused by leakage of buried pipeline
CN115266725A (en) * 2022-06-23 2022-11-01 北京科技大学 Test device and test method for leakage collapse of buried pipeline
CN116930459A (en) * 2023-07-25 2023-10-24 江苏龙环环境科技有限公司 Soil in-situ detection device and detection method thereof
CN116930459B (en) * 2023-07-25 2024-03-12 江苏龙环环境科技有限公司 Soil in-situ detection device and detection method thereof
CN117330733A (en) * 2023-09-28 2024-01-02 中国矿业大学 Model test system for karst collapse in deep part of large city

Similar Documents

Publication Publication Date Title
CN109147541A (en) Soil body penetration crash simulation device and application method
CN106885758A (en) One kind visualization fracture grouting diffusion process simulation test device and application method
CN107843713B (en) Artificial rainfall simulation method for debris flow starting test
CN105044306A (en) Pile-supported embankment transparent soil model testing device and method
CN108035301B (en) The experimental rig and test method that suspended cut-off wall anti-seepage effect is simulated under a kind of seepage liquefaction
CN108222082A (en) Foundation pit dynamic precipitation indoor model test method and device under the conditions of multi-aquifer
CN107505448A (en) Seepage inflow erosion model equipment, system and test method caused by underground utilities breakage
CN207760898U (en) Foundation pit dynamic precipitation indoor model test device under the conditions of multi-aquifer
CN104020047A (en) Solidification and permeation combined testing device and method
CN107240346A (en) The experiment simulator and method of a kind of quantitative study karst collapse
CN209708465U (en) Soil body penetration crash simulation device
CN204832180U (en) Karst reservoir oil gas becomes to hide physical simulation device
CN109187285A (en) Seepage through soil mass experimental rig
CN105672379A (en) Foundation pit excavation model test device under dynamic artesian water action
CN105716958A (en) Foundation model test device for simulating lifting and dropping of confined water head
CN103898930B (en) Prestressed concrete pipe pile horizontal bearing attribute testing model and modeling method
CN113514232B (en) Segment floating model test device and method for simulating shield tunnel construction process
US11835508B2 (en) Model test device for ground collapse caused by pipeline leakage
CN209780859U (en) Low-permeability conglomerate oil reservoir fracturing horizontal well productivity simulation model
CN112942292A (en) Small-volume calibration tank for seabed soil static sounding test
CN108489870A (en) A kind of homogeneous aeration zone simulation test device and method
CN205720219U (en) Phreatic table and artesian head work in coordination with the excavation of foundation pit model test apparatus of lifting
CN108387710A (en) A kind of experimental rig and method for simulating the rectangle head boundary effect soil body
CN107101871A (en) The ess-strain control formula geotechnical centrifuge model system of complete off-load
CN205898837U (en) Thin sight flow field observation device during liquefaction in granule hole

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination