- CN109140459A CN109140459A CN201810954341.0A CN201810954341A CN109140459A CN 109140459 A CN109140459 A CN 109140459A CN 201810954341 A CN201810954341 A CN 201810954341A CN 109140459 A CN109140459 A CN 109140459A
- Authority
- CN
- China
- Prior art keywords
- pipe
- fixedly connected
- drawer
- waste incinerator
- treatment box
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23G—CREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
- F23G5/00—Incineration of waste; Incinerator constructions; Details, accessories or control therefor
- F23G5/44—Details; Accessories
- F23G5/46—Recuperation of heat
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23J—REMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES
- F23J15/00—Arrangements of devices for treating smoke or fumes
- F23J15/02—Arrangements of devices for treating smoke or fumes of purifiers, e.g. for removing noxious material
- F23J15/04—Arrangements of devices for treating smoke or fumes of purifiers, e.g. for removing noxious material using washing fluids
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23J—REMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES
- F23J15/00—Arrangements of devices for treating smoke or fumes
- F23J15/06—Arrangements of devices for treating smoke or fumes of coolers
Abstract
The invention discloses a kind of environment protection garbage incineration processing unit, including pedestal, base top, which is fixed by the bracket, is provided with waste incinerator;Bottom is provided with the first drawer in the waste incinerator;The first drawer bottom opening, opening are fixedly connected with ventilated net;The waste incinerator left wall is fixedly connected with feed pipe, and feed pipe is located above the first drawer and feed pipe tilts to the right, and feed pipe left end is fixedly connected with feed hopper;The waste incinerator inner top is fixedly connected with rack, is provided with heating water tank above rack, the heating water tank lower right corner is connected with water inlet pipe, and the heating water tank upper left corner is connected with hot-water line, and hot-water line and water inlet pipe all extend to outside waste incinerator.The present invention carries out resource reutilization, energy conservation and environmental protection by heating to waste incineration to water;The flue gas generated when waste incineration preheats cold water, so that hot water heating speed is faster, further increases energy utilization rate.
Description
Technical field
The present invention relates to environment protection treating technical field, specifically a kind of environment protection garbage incineration processing unit.
Background technique
Rubbish is the solid waste generated in mankind's daily life and production, since discharge rate is big, complicated component multiplicity,
And there is pollution, resource and social, innoxious, recycling, minimizing and socialization processing are needed, such as cannot properly be located
Reason, just pollutes the environment, and influences environmental sanitation, and waste of resource destroys production and living safety, destroys social harmony.Garbage disposal
It seeks to rubbish to remove rapidly, and carries out harmless treatment, be finally subject to reasonable utilization.At current widely applied rubbish
Reason method is sanitary landfills, During High-Temperature Composting and burning.The purpose of garbage disposal is innoxious, recycling and minimizing.
Existing waste incineration is during the burning process not enough the utilization of heat, or even is directly discharged by heat, leads
Cause the waste on resource and the energy;A large amount of flue gas can be generated in Refuse Incineration Process, flue gas direct emission will cause air dirt
Dye, therefore need to carry out purified treatment before flue gas emission, existing gas cleaning processing mode is relatively simple, the purification to flue gas
Effect is general, and the purification higher cost of flue gas, is unfavorable for realizing energy-saving and environment-friendly purpose.
Summary of the invention
The purpose of the present invention is to provide a kind of environment protection garbage incineration processing units, to solve to mention in above-mentioned background technique
Out the problem of.
To achieve the above object, the invention provides the following technical scheme:
A kind of environment protection garbage incineration processing unit, including pedestal, the base top, which is fixed by the bracket, to be provided with rubbish and burns
Furnace is burnt, be square funnel-form at the top and bottom of the waste incinerator;Bottom is provided with the first pumping in the waste incinerator
Drawer, the interior front and back of the waste incinerator and right wall offer the sliding slot with the cooperation of the first drawer, the waste incinerator left wall
The opening passed through for the first drawer is offered, the first drawer left wall is fixedly connected with pull ring;First drawer bottom is opened
Mouthful, opening is fixedly connected with ventilated net;The waste incinerator bottom center is fixedly connected with scum pipe, the pedestal top
Portion is placed with picking-up container, and picking-up container is located at below scum pipe;The waste incinerator left wall is fixedly connected with feed pipe, feed pipe
Above the first drawer and feed pipe tilts to the right, and the feed pipe left end is fixedly connected with feed hopper;The rubbish
Incinerator left wall is additionally provided with lighting-up tuyere, and lighting-up tuyere is hinged with switching door between the first drawer and feed pipe at lighting-up tuyere;
The waste incinerator inner top is fixedly connected with rack, and heating water tank is provided with above rack, and the heating water tank is right
Inferior horn is connected with water inlet pipe, and the heating water tank upper left corner is connected with hot-water line, and hot-water line and water inlet pipe all extend to rubbish and burn
It burns outside furnace;Pipe is fixedly connected at the waste incinerator top center.
As a further solution of the present invention: the waste incinerator lower left corner is fixedly connected with blast pipe, on blast pipe
It is connected with blower.
As further scheme of the invention: the feed pipe comes out and is hinged with cover board at the top of mouth.
As further scheme of the invention: the waste incinerator is made of thermal insulation material.
As further scheme of the invention: the waste incinerator right side wall, which is fixed by the bracket, is connected with preheating water
Case, the preheating water tank lower right corner are connected with cold water pipe, and the preheating water tank upper left corner is fixedly connected with water inlet pipe, the preheating
Bend pipe is provided in water tank, bend pipe top passes through preheating water tank's roof and is fixedly connected with pipe bottom end, and bend pipe bottom end passes through pre-
Boiler bottom wall is fixedly connected with connecting tube.
As further scheme of the invention: the bend pipe uses copper pipe.
As further scheme of the invention: the base top is further fixedly arranged on treatment box, and the treatment box is right
Wall is fixedly connected with water pipe, and the connecting tube passes through treatment box side wall and extends to bottom in treatment box, and connecting tube bottom end is fixed
It is connected with petticoat pipe, petticoat pipe cover mouth down, the treatment box is fixedly connected with sewage pipe by inferior horn, is provided with valve on sewage pipe;
The treatment box inner top is provided with the second drawer, and front and back and left wall offer and the cooperation of the second drawer in the treatment box
Sliding slot, the processing right wall of box offer the opening passed through for the second drawer, and the second drawer right wall is fixedly connected with pull ring,
The second drawer bottom opening, the second drawer inner top are fixedly connected with filter core;Be square leakage at the top of the treatment box
It is bucket-shaped, smoke exhaust pipe is fixedly connected at treatment box top center.
As further scheme of the invention: the petticoat pipe bottom is fixedly connected with baffle, is uniformly provided on baffle
Several unidirectional air outlets.
As further scheme of the invention: being provided with water injection pipe in the treatment box, water injection pipe right end passes through processing
It right wall of box and is fixedly connected with treatment box, if the pipeline section bottom that the water injection pipe is located in treatment box is uniformly fixedly connected with dry fog
Change spray head.
Compared with prior art, the beneficial effects of the present invention are:
The present invention carries out resource reutilization, energy conservation and environmental protection by heating to waste incineration to water, to rubbish;Rubbish is burnt
The flue gas generated when burning enters in bend pipe from pipe to be entered back into connecting tube, into preheating water tank by cold from cold water pipe
The heat of water, flue gas is conducted by bend pipe into cold water, is absorbed by cold water, to preheat to cold water, the warm water after preheating
It enters back into heating water tank and is heated at high temperature, so that hot water heating speed is faster, further increase energy utilization rate;It is cold simultaneously
Water can cool down to flue gas, and the convenient subsequent purification to flue gas is handled;Make flue gas shape by the unidirectional air outlet on baffle
At bubble, bubble crosses water to carry out primary purification, water mist is sprayed by atomizer, so that the tiny particles content in smog is melted
Enter in water mist and settle, to carry out double purification to flue gas, flue gas is filtered by filter core, to be carried out three times to flue gas
Purification, is purified by multi-filtering, is guaranteed that the flue gas of discharge will not pollute atmosphere, is protected environment;Multi-filtering purification improves net
Change effect, while reducing the use degree to filter core, improve filter core service life, reduces replacement cost.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of environment protection garbage incineration processing unit.
Fig. 2 is the overlooking structure diagram of the first drawer in environment protection garbage incineration processing unit.
Fig. 3 is the partial structural diagram of feed pipe discharge outlet in environment protection garbage incineration processing unit.
Fig. 4 is the present invention looks up structural representation of baffle in environment protection garbage incineration processing unit.
In figure: 1- pedestal, 2- blower, 3- blast pipe, 4- scum pipe, 5- picking-up container, 6- waste incinerator, 7- first take out
Drawer, 8- ventilated net, 9- switching door, 10- feed pipe, 11- cover board, 12- feed hopper, 13- rack, 14- heating water tank, 15- heat
Water pipe, 16- water inlet pipe, 17- pipe, 18- preheating water tank, 19- bend pipe, 20- cold water pipe, 21- connecting tube, 22- treatment box,
23- petticoat pipe, 24- baffle, the unidirectional air outlet of 25-, 26- sewage pipe, 27- water pipe, 28- water injection pipe, 29- atomizer, 30-
Two drawers, 31- filter core, 32- smoke exhaust pipe.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Please refer to Fig. 1~4, in the embodiment of the present invention, a kind of environment protection garbage incineration processing unit, including pedestal 1, it is described
It is fixed by the bracket at the top of pedestal 1 and is provided with waste incinerator 6, be square funnel-form at the top and bottom of waste incinerator 6;Institute
It states bottom in waste incinerator 6 and is provided with the first drawer 7, front and back and right wall offer and first in the waste incinerator 6
The sliding slot that drawer 7 cooperates, 6 left wall of waste incinerator offer the opening passed through for the first drawer 7, first drawer 7
Left wall is fixedly connected with pull ring, pulls the first drawer 7 that can extract the first drawer 7 out to the left, and 7 bottom of the first drawer is opened
Mouthful, opening is fixedly connected with ventilated net 8, burned in use, rubbish is placed on ventilated net 8, ventilated net 8 facilitate air from
Under up flow, while remaining waste residue is passed downwardly through from the mesh on ventilated net 8 after burning;May be used also after the extraction of first drawer 7
To clear up ventilated net 8,8 mesh of ventilated net is avoided to block;6 bottom center of waste incinerator is fixedly connected with row
Slag pipe 4 is placed with picking-up container 5 at the top of the pedestal 1, and picking-up container 5 is located at 4 lower section of scum pipe, after catching waste incineration
Waste residue;6 lower left corner of waste incinerator is fixedly connected with blast pipe 3, and blower 2 is connected on blast pipe 3, can by blower 2
With into waste incinerator 6 air blast supply oxygen, accelerate waste incineration speed;6 left wall of waste incinerator is fixedly connected with charging
Pipe 10, feed pipe 10 is located at 7 top of the first drawer and feed pipe 10 tilts to the right, and 10 left end of feed pipe is fixedly connected
There is feed hopper 12, by adding rubbish into feed hopper 12, rubbish is entered in waste incinerator 6 by feed pipe 10 to be burned, institute
It states feed pipe 10 and comes out and be hinged with cover board 11 at the top of mouth, the state in a vertical shape under the effect of gravity of cover board 11, cover board when waste incineration
11 close feed pipe 10, and heat and flue gas is avoided to be discharged by feed pipe 10, and when adding rubbish, rubbish slides to the right will lid
Plate 11 opens, easy to use;6 left wall of waste incinerator is additionally provided with lighting-up tuyere, and lighting-up tuyere is located at the first drawer 7 and charging
Switching door 9 is hinged between pipe 10, at lighting-up tuyere, rubbish can be lighted by opening switching door 9;Top in the waste incinerator 6
Portion is fixedly connected with rack 13, and heating water tank 14 is provided with above rack 13, and 14 lower right corner of heating water tank is connected with
Water inlet pipe 16,14 upper left corner of heating water tank are connected with hot-water line 15, and hot-water line 15 and water inlet pipe 16 all extend to rubbish and burn
It burns outside furnace 6, when waste incineration heats the water in heating water tank 14, to carry out resource reutilization, energy-saving ring to rubbish
It protects;The waste incinerator 6 is made of thermal insulation material, heat losses when preventing from burning, and energy utilization rate is higher;The rubbish
It is fixedly connected with pipe 17 at 6 top center of incinerator, the flue gas that when waste incineration generates is discharged from pipe 17;
6 right side wall of waste incinerator, which is fixed by the bracket, is connected with preheating water tank 18, and 18 lower right corner of preheating water tank connects
It is connected to cold water pipe 20,18 upper left corner of preheating water tank is fixedly connected with water inlet pipe 16, is provided in the preheating water tank 18 curved
Pipe 19,19 top of bend pipe pass through 18 roof of preheating water tank and are fixedly connected with 17 bottom end of pipe, and 19 bottom end of bend pipe passes through preheating water
18 bottom wall of case is fixedly connected with connecting tube 21;The bend pipe 19 uses copper pipe, convenient for thermally conductive, flue gas that when waste incineration generates from
Pipe 17, which enters in bend pipe 19, to be entered back into connecting tube 21, passes through cold water, flue gas into preheating water tank 18 from cold water pipe 20
Heat by bend pipe 19 conduct into cold water, absorbed by cold water, to preheat to cold water, the warm water after preheating is entered back into
It is heated at high temperature in heating water tank 14, so that hot water heating speed is faster, further increases energy utilization rate;Cold water can simultaneously
To cool down to flue gas, the convenient subsequent purification to flue gas is handled;
Treatment box 22 is further fixedly arranged at the top of the pedestal 1,22 right wall for the treatment of box is fixedly connected with water pipe 27, passes through
Water pipe 27 injected clear water, the connecting tube 21 can pass through 22 side wall for the treatment of box and extend in treatment box 22 into treatment box 22
Bottom, 21 bottom end of connecting tube are fixedly connected with petticoat pipe 23,23 cover mouth down of petticoat pipe, and 23 bottom of petticoat pipe is fixedly connected with baffle
24, several unidirectional air outlets 25 are uniformly provided on baffle 24, flue gas is discharged by unidirectional air outlet 25, several bubbles are formed,
Bubble passes through from the water in treatment box 22, the water filtering in part dust case 22 processed, so that preliminary purification is carried out, it is described
Treatment box 22 is fixedly connected with sewage pipe 26 by inferior horn, and valve is provided on sewage pipe 26, and opening valve, sewage can be discharged;
Water injection pipe 28 is provided in the treatment box 22,28 right end of water injection pipe, which passes through 22 right wall for the treatment of box and fixes with treatment box 22, to be connected
It connects, the pipeline section bottom that the water injection pipe 28 is located in treatment box 22 is uniformly fixedly connected with several atomizers 29, passes through atomization
Spray head 29 sprays water mist, so that the tiny particles content in smog incorporates in water mist, settles therewith, to carry out two to flue gas
Secondary purification;22 inner top for the treatment of box is provided with the second drawer 30, in the treatment box 22 front and back and left wall offer with
The sliding slot of second drawer 30 cooperation, 22 right wall for the treatment of box offer the opening passed through for the second drawer 30, and described second takes out
30 right wall of drawer is fixedly connected with pull ring, pulls the second drawer 30 that can extract the second drawer 30 out to the right, second drawer 30
Bottom opening, 30 inner top of the second drawer are fixedly connected with filter core 31, are filtered by filter core 31 to flue gas;Second takes out
Drawer 30 can also be cleared up or be replaced to filter core 31 after extracting out, using more convenient;Be square funnel at the top of the treatment box 22
Shape is fixedly connected with smoke exhaust pipe 32 at 22 top center for the treatment of box, and purified flue gas is discharged from smoke exhaust pipe 32;By making cigarette
Gas forms bubble by unidirectional air outlet 25, so that bubble, which crosses water, carries out primary purification, sprays water by atomizer 29
Mist, so that the tiny particles content in smog is incorporated in water mist and settled, so that double purification is carried out to flue gas, by filter core 31 to cigarette
Gas is filtered, to be purified three times to flue gas, is purified by multi-filtering, guarantees that the flue gas of discharge will not pollute greatly
Gas protects environment;Multi-filtering purification improves clean-up effect, while reducing the use degree to filter core 31, improves filter core 31 and uses
Service life reduces replacement cost.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie
In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter
From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power
Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims
Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped
Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should
It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art
The other embodiments being understood that.
Claims (9)
1. a kind of environment protection garbage incineration processing unit, including pedestal (1), pedestal (1) top is fixed by the bracket setting
There are waste incinerator (6), which is characterized in that be square funnel-form at the top and bottom of the waste incinerator (6);The rubbish
Incinerator (6) interior bottom is provided with the first drawer (7), and front and back and right wall offer and first in the waste incinerator (6)
The sliding slot of drawer (7) cooperation, waste incinerator (6) left wall offer the opening passed through for the first drawer (7), and described first
Drawer (7) left wall is fixedly connected with pull ring;First drawer (7) bottom opening, opening are fixedly connected with ventilated net (8);
Waste incinerator (6) bottom center is fixedly connected with scum pipe (4), is placed with picking-up container at the top of the pedestal (1)
(5), picking-up container (5) is located at below scum pipe (4);Waste incinerator (6) left wall is fixedly connected with feed pipe (10), charging
Pipe (10) is located above the first drawer (7) and feed pipe (10) tilts to the right, and feed pipe (10) left end is fixedly connected
There are feed hopper (12);Waste incinerator (6) left wall is additionally provided with lighting-up tuyere, and lighting-up tuyere is located at the first drawer (7) and charging
It manages between (10), switching door (9) is hinged at lighting-up tuyere;Waste incinerator (6) inner top is fixedly connected with rack
(13), it being provided with heating water tank (14) above rack (13), heating water tank (14) lower right corner is connected with water inlet pipe (16),
Heating water tank (14) upper left corner is connected with hot-water line (15), and hot-water line (15) and water inlet pipe (16) all extend to waste incineration
Furnace (6) is outside;Pipe (17) are fixedly connected at waste incinerator (6) top center.
2. environment protection garbage incineration processing unit according to claim 1, which is characterized in that the waste incinerator (6)
The lower left corner is fixedly connected with blast pipe (3), and blower (2) are connected on blast pipe (3).
3. environment protection garbage incineration processing unit according to claim 1, which is characterized in that the feed pipe (10) comes out
Cover board (11) are hinged at the top of mouthful.
4. environment protection garbage incineration processing unit according to claim 1, which is characterized in that the waste incinerator (6)
It is made of thermal insulation material.
5. environment protection garbage incineration processing unit according to claim 1 to 4, which is characterized in that the waste incineration
Furnace (6) right side wall, which is fixed by the bracket, to be connected with preheating water tank (18), and preheating water tank (18) lower right corner is connected with cold water pipe
(20), preheating water tank (18) upper left corner is fixedly connected with water inlet pipe (16), is provided with bend pipe in the preheating water tank (18)
(19), bend pipe (19) top passes through preheating water tank's (18) roof and is fixedly connected with pipe (17) bottom end, and bend pipe (19) bottom end is worn
It crosses preheating water tank (18) bottom wall and is fixedly connected with connecting tube (21).
6. environment protection garbage incineration processing unit according to claim 5, which is characterized in that the bend pipe (19) uses copper
Pipe.
7. environment protection garbage incineration processing unit according to claim 5, which is characterized in that at the top of the pedestal (6) also
It is fixedly installed treatment box (22), treatment box (22) right wall is fixedly connected with water pipe (27), and the connecting tube (21) is worn
It crosses treatment box (22) side wall and extends to treatment box (22) interior bottom, connecting tube (21) bottom end is fixedly connected with petticoat pipe (23), petticoat pipe
(23) cover mouth down, the treatment box (22) are fixedly connected with sewage pipe (26) by inferior horn, and sewage pipe is provided with valve on (26);
Treatment box (22) inner top is provided with the second drawer (30), and front and back and left wall offer and the in the treatment box (22)
The sliding slot of two drawers (30) cooperation, treatment box (22) right wall offer the opening passed through for the second drawer (30), and described the
Two drawers (30) right wall is fixedly connected with pull ring, the second drawer (30) bottom opening, the second drawer (30) inner top
It is fixedly connected with filter core (31);Be square funnel-form at the top of the treatment box (22), fixed at treatment box (22) top center to connect
It is connected to smoke exhaust pipe (32).
8. environment protection garbage incineration processing unit according to claim 7, which is characterized in that petticoat pipe (23) bottom is solid
Surely it is connected with baffle (24), several unidirectional air outlets (25) is uniformly provided on baffle (24).
9. environment protection garbage incineration processing unit according to claim 7, which is characterized in that set in the treatment box (22)
It is equipped with water injection pipe (28), water injection pipe (28) right end passes through treatment box (22) right wall and is fixedly connected with treatment box (22), the note
The pipeline section bottom that water pipe (28) is located in treatment box (22) is uniformly fixedly connected with several atomizers (29).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810954341.0A CN109140459A (en) | 2018-08-21 | 2018-08-21 | A kind of environment protection garbage incineration processing unit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810954341.0A CN109140459A (en) | 2018-08-21 | 2018-08-21 | A kind of environment protection garbage incineration processing unit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109140459A true CN109140459A (en) | 2019-01-04 |
Family
ID=64790552
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810954341.0A Pending CN109140459A (en) | 2018-08-21 | 2018-08-21 | A kind of environment protection garbage incineration processing unit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109140459A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113790450A (en) * | 2021-08-10 | 2021-12-14 | 江苏梵坤环保科技发展股份有限公司 | Environment-friendly waste incineration treatment method and device |
TWI816068B (en) * | 2020-11-24 | 2023-09-21 | 李季砡 | combustion device |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2795677Y (en) * | 2005-02-21 | 2006-07-12 | 袁培策 | Boiler water spray dust remover |
CN101718468A (en) * | 2009-11-27 | 2010-06-02 | 董立丰 | No smoke environmental protection and energy conservation boiler |
CN202109508U (en) * | 2011-06-27 | 2012-01-11 | 张福秀 | Energy-saving environmental-protection flue |
CN108187482A (en) * | 2018-01-22 | 2018-06-22 | 储成立 | A kind of waste gas generated by burning garbage multiple treatment device |
-
2018
- 2018-08-21 CN CN201810954341.0A patent/CN109140459A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2795677Y (en) * | 2005-02-21 | 2006-07-12 | 袁培策 | Boiler water spray dust remover |
CN101718468A (en) * | 2009-11-27 | 2010-06-02 | 董立丰 | No smoke environmental protection and energy conservation boiler |
CN202109508U (en) * | 2011-06-27 | 2012-01-11 | 张福秀 | Energy-saving environmental-protection flue |
CN108187482A (en) * | 2018-01-22 | 2018-06-22 | 储成立 | A kind of waste gas generated by burning garbage multiple treatment device |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWI816068B (en) * | 2020-11-24 | 2023-09-21 | 李季砡 | combustion device |
CN113790450A (en) * | 2021-08-10 | 2021-12-14 | 江苏梵坤环保科技发展股份有限公司 | Environment-friendly waste incineration treatment method and device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109140459A (en) | A kind of environment protection garbage incineration processing unit | |
CN202166062U (en) | Environment-friendly energy-saving combustion furnace | |
CN104373942B (en) | Incinerator | |
CN106617198A (en) | Coffee bean baking machine | |
CN204240362U (en) | Incinerator | |
CN108679618A (en) | A kind of vertical waste incinerator | |
CN107694265A (en) | A kind of old metal smelting smoke dust processing system | |
CN204310834U (en) | Percolate high temperature treating device | |
CN106082571A (en) | Low heat value mud three change processes technique and device | |
CN201724384U (en) | Energy-saving environment-friendly high temperature jet type hot blast stove | |
CN106439834B (en) | A kind of refuse treatment plant that air is preheated using self-loopa pyrolysis gas | |
CN107726337A (en) | A kind of smoke processing system of garbage disposal furnace | |
CN108413413A (en) | A kind of acrylic acid and esters waste oil processing system and method | |
CN208108115U (en) | A kind of refuse disposal installation for environment-friendly engineering | |
CN110345484A (en) | A kind of system for garbage flying ash and percolate cooperative disposal | |
CN205893035U (en) | Low heat value mud " three change " processing apparatus | |
CN205939165U (en) | Medical garbage burning furnace | |
CN108266732A (en) | A kind of small-sized consumer waste incineration device | |
CN204153782U (en) | Integration garbage classification equipment | |
CN204404188U (en) | House refuse direct gasification melting incinerating device | |
CN106152147A (en) | One way of life garbage combustion device | |
CN208457974U (en) | A kind of vertical waste incinerator | |
CN202660560U (en) | Incinerator | |
CN206918998U (en) | It is a kind of can off-gas recovery water heater | |
CN207661861U (en) | A kind of energy conservation and environmental protection heating system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190104 |
|
RJ01 | Rejection of invention patent application after publication |