CN109139041A CN201810995231.9A CN201810995231A CN109139041A CN 109139041 A CN109139041 A CN 109139041A CN 201810995231 A CN201810995231 A CN 201810995231A CN 109139041 A CN109139041 A CN 109139041A
Authority
CN
China
Prior art keywords
pipe joints
jacking pipe
tunnel
prestressing force
jacking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810995231.9A
Other languages
Chinese (zh)
Inventor
竺维彬
黄辉
肖瑞传
温晓虎
仇培云
黄威然
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU MESS TRANSIT ENGINEERING CONSULTANT Co Ltd
Guangzhou Metro Group Co Ltd
Original Assignee
GUANGZHOU MESS TRANSIT ENGINEERING CONSULTANT Co Ltd
Guangzhou Metro Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU MESS TRANSIT ENGINEERING CONSULTANT Co Ltd, Guangzhou Metro Group Co Ltd filed Critical GUANGZHOU MESS TRANSIT ENGINEERING CONSULTANT Co Ltd
Priority to CN201810995231.9A priority Critical patent/CN109139041A/en
Publication of CN109139041A publication Critical patent/CN109139041A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/003Machines for drilling anchor holes and setting anchor bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • E21D20/021Grouting with inorganic components, e.g. cement

Abstract

The invention discloses a kind of methods for improving jacking pipe joints globality, include the following steps: S1, in the manufacturing process of jacking pipe joints, the prestressing force hole at several perforation jacking pipe joints both ends is reserved on the tube wall of each jacking pipe joints, and the position of the prestressing force hole of each jacking pipe joints corresponds;S2, using prepared jacking pipe joints, the construction in tunnel is completed by the way of jacking construction;S3, respectively with prestress anchorage cable pass through each jacking pipe joints in the corresponding prestressing force hole in position, the both ends in the tunnel first constructed are exposed at the both ends of each prestress anchorage cable respectively;S4, the both ends simultaneous tension prestress anchorage cable in tunnel;S5, using prestressing force pretensioning method, finally by prestress anchorage cable tensioning to pre-stress design controlling value;S6, the last casting concrete in prestressing force hole.The present invention can effectively improve the globality of tunnel structure, with the lateral force that construction tunnel work progress after resistance generates, be particularly suitable for the pipe-jacking project of left and right tunnel spacing very little.

Description

A method of improving jacking pipe joints globality
Technical field
The present invention relates to technical field of tunnel construction, and in particular to a method of improve jacking pipe joints globality.
Background technique
In some pipe-jacking projects, left and right tunnel spacing very little (such as 10cm), after the completion of a tunnel, an other tunnel Road can generate extruding to the soil body on periphery during jacking construction, to generate one to the structure in the tunnel that side is first completed A lateral force, this is likely to result in the tunnel first completed being generated uneven offset by the tube coupling of lateral force and other tube couplings, The accident integrally destroyed in tunnel even occurs, it is therefore necessary to take method to improve the globality of the structure in the tunnel first constructed, with The lateral force that construction tunnel work progress generates after resistance.
Summary of the invention
In view of the deficiencies of the prior art, the present invention is intended to provide a kind of method for improving jacking pipe joints globality, Ke Yiyou Effect improves the globality of tunnel structure, with the lateral force that construction tunnel work progress after resistance generates, is particularly suitable for left and right tunnel The pipe-jacking project of road spacing very little.
To achieve the goals above, the present invention adopts the following technical scheme:
A method of jacking pipe joints globality is improved, is included the following steps:
S1, in the manufacturing process of jacking pipe joints, several perforations push pipes are reserved on the tube wall of each jacking pipe joints The prestressing force hole at tube coupling both ends, and the position of the prestressing force hole of each jacking pipe joints corresponds;
S2, using the prepared jacking pipe joints of step S1, the construction in tunnel is completed by the way of jacking construction;
S3, respectively with prestress anchorage cable pass through each jacking pipe joints in the corresponding prestressing force hole in position, each prestressing force Expose the both ends in the tunnel first constructed respectively in the both ends of anchor cable;
S4, the both ends simultaneous tension prestress anchorage cable in tunnel;
S5, using prestressing force pretensioning method, finally by prestress anchorage cable tensioning to pre-stress design controlling value;
The structure of S6, the casting concrete in prestressing force hole, tunnel substantially increase under the action of prestress anchorage cable Globality.
Further, in step S1, several perforation jacking pipe joints two specifically are reserved around the even tube wall of jacking pipe joints The prestressing force hole at end.
Further, in step S3, tapered reamer is installed on the anchor cable head of prestress anchorage cable, utilizes tapered reamer Prestress anchorage cable is passed through to the prestressing force hole reserved in jacking pipe joints.
The beneficial effects of the present invention are: it can effectively improve the globality of tunnel structure through the invention, after resisting The lateral force that construction tunnel work progress generates, is particularly suitable for the pipe-jacking project of left and right tunnel spacing very little.
Detailed description of the invention
Fig. 1 is the prefabricated jacking pipe joints front schematic view obtained of step S1 in the embodiment of the present invention;
Fig. 2 is the tunnel schematic top plan view in the embodiment of the present invention after the completion of step S3;
Fig. 3 is the scheme of installation that prestress anchorage cable loads onto tapered reamer in the embodiment of the present invention.
Specific embodiment
Below with reference to attached drawing, the invention will be further described, it should be noted that following embodiment is with this technology Premised on scheme, the detailed implementation method and specific operation process are given, but protection scope of the present invention is not limited to this Embodiment.
A method of jacking pipe joints globality is improved, is included the following steps:
S1, as shown in Figure 1, in the manufacturing process of jacking pipe joints 100, reserved on the tube wall of each jacking pipe joints 100 The prestressing force hole 101 at several perforation 100 both ends of jacking pipe joints, and the position of the prestressing force hole 101 of each jacking pipe joints Set one-to-one correspondence;
In practical applications, as shown in Fig. 2, tunnel is usually made of multiple jacking pipe joints 100, need to guarantee each push pipe The position of the prestressing force hole of tube coupling corresponds, and can pass through each jacking pipe joints convenient for prestress anchorage cable to pass through Entire tunnel;
S2, using the prepared jacking pipe joints 100 of step S1, the tunnel first constructed is completed by the way of jacking construction 200 construction;
S3, prestress anchorage cable 102 is used to pass through the corresponding prestressing force hole 101 in position in each jacking pipe joints 100 respectively, respectively Expose the both ends in the tunnel 200 first constructed respectively in the both ends 1021 of root prestress anchorage cable 102;
S4, the tunnel 200 formerly constructed both ends simultaneous tension prestress anchorage cable 102 both ends 1021;
S5, using prestressing force pretensioning method, finally by 102 tensioning of prestress anchorage cable to pre-stress design controlling value;
S6, the casting concrete in prestressing force hole 101, the structure in the tunnel 200 first constructed is in prestress anchorage cable 102 Globality is substantially increased under effect, the lateral force that the tunnel so as to construct after being effective against is generated in work progress, especially It is suitable for the pipe-jacking projects of left and right tunnel spacing very little.
Further, in step S1, several perforation jacking pipe joints specifically are reserved around the even tube wall of jacking pipe joints 100 The prestressing force hole 101 at both ends, as shown in Figure 1.
Further, in step S3, tapered reamer 103 is installed on the anchor cable head of prestress anchorage cable 102, utilizes taper Prestress anchorage cable 102 is passed through the prestressing force hole 101 reserved in jacking pipe joints 100 by reamer 103, as shown in Figure 3.
For those skilled in the art, it can be provided various corresponding according to above technical solution and design Change and modification, and all these change and modification, should be construed as being included within the scope of protection of the claims of the present invention.

Claims (3)

1. a kind of method for improving jacking pipe joints globality, which comprises the steps of:
S1, in the manufacturing process of jacking pipe joints, several perforations jacking pipe joints are reserved on the tube wall of each jacking pipe joints The prestressing force hole at both ends, and the position of the prestressing force hole of each jacking pipe joints corresponds;
S2, using the prepared jacking pipe joints of step S1, the construction in tunnel is completed by the way of jacking construction;
S3, respectively with prestress anchorage cable pass through each jacking pipe joints in the corresponding prestressing force hole in position, each prestress anchorage cable Both ends expose the both ends in the tunnel first constructed respectively;
S4, the both ends simultaneous tension prestress anchorage cable in tunnel;
S5, using prestressing force pretensioning method, finally by prestress anchorage cable tensioning to pre-stress design controlling value;
S6, the last casting concrete in prestressing force hole.
2. the method according to claim 1 for improving jacking pipe joints globality, which is characterized in that in step S1, specifically The prestressing force hole at several perforation jacking pipe joints both ends is reserved around the even tube wall of jacking pipe joints.
3. the method according to claim 1 for improving jacking pipe joints globality, which is characterized in that in step S3, answering in advance Tapered reamer is installed on the anchor cable head of power anchor cable, is reserved prestress anchorage cable in jacking pipe joints using tapered reamer Prestressing force hole.
CN201810995231.9A 2018-08-29 2018-08-29 A method of improving jacking pipe joints globality Pending CN109139041A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810995231.9A CN109139041A (en) 2018-08-29 2018-08-29 A method of improving jacking pipe joints globality

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810995231.9A CN109139041A (en) 2018-08-29 2018-08-29 A method of improving jacking pipe joints globality

Publications (1)

Publication Number Publication Date
CN109139041A true CN109139041A (en) 2019-01-04

Family

ID=64829014

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810995231.9A Pending CN109139041A (en) 2018-08-29 2018-08-29 A method of improving jacking pipe joints globality

Country Status (1)

Country Link
CN (1) CN109139041A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111520539A (en) * 2020-05-09 2020-08-11 无锡市锡山三建实业有限公司 Device for jacking construction of pipeline
CN112253166A (en) * 2020-10-23 2021-01-22 中铁工程装备集团有限公司 Prefabricated coupling device between pipe joints and construction method applying prefabricated coupling device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101392654A (en) * 2008-10-30 2009-03-25 上海大学 Shield tunnel segment lining-anchor rod structure system
CN204476444U (en) * 2015-01-30 2015-07-15 安徽理工大学 A kind of self-drilling hollow grouting cable anchor
CN104976424A (en) * 2015-05-15 2015-10-14 中铁二局股份有限公司 Anchor cable construction method for rectangular top pipe joint connecting and strengthening
CN106948343A (en) * 2017-04-20 2017-07-14 大连理工大学 The tonnage anchor cable and peace method processed of a kind of tension and compression combination bearing mode

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101392654A (en) * 2008-10-30 2009-03-25 上海大学 Shield tunnel segment lining-anchor rod structure system
CN204476444U (en) * 2015-01-30 2015-07-15 安徽理工大学 A kind of self-drilling hollow grouting cable anchor
CN104976424A (en) * 2015-05-15 2015-10-14 中铁二局股份有限公司 Anchor cable construction method for rectangular top pipe joint connecting and strengthening
CN106948343A (en) * 2017-04-20 2017-07-14 大连理工大学 The tonnage anchor cable and peace method processed of a kind of tension and compression combination bearing mode

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111520539A (en) * 2020-05-09 2020-08-11 无锡市锡山三建实业有限公司 Device for jacking construction of pipeline
CN112253166A (en) * 2020-10-23 2021-01-22 中铁工程装备集团有限公司 Prefabricated coupling device between pipe joints and construction method applying prefabricated coupling device
CN112253166B (en) * 2020-10-23 2022-03-04 中铁工程装备集团有限公司 Prefabricated coupling device between pipe joints and construction method applying prefabricated coupling device

Similar Documents

Publication Publication Date Title
CN109139041A (en) A method of improving jacking pipe joints globality
CN201025038Y (en) Adjustable pre-stress steel arch frame
CN104895072A (en) A pre-stressed anchor cable and a pre-stressed anchor cable one-time forming construction method
CN104294771A (en) Square prefabricated reinforced concrete culvert
JP2017186801A (en) Lock bolt
CN205529907U (en) P -type anchorage device at fixed end
CN204097891U (en) Reinforced concrete prefabricated square culvert
CN204609300U (en) A kind of fixed sleeving for construction drainage pipeline preformed hole hole
CN103510521A (en) Connecting component
CN204001665U (en) A kind of scaffold assembling wall-connecting piece
CN206052644U (en) A kind of deep hole grouting rock bolt circular arc type centering supporting structure
CN206111215U (en) Be used for big section weak surrounding rock tunnel construction supporting construction
CN103835731A (en) Supporting device and method for primary supporting of expansible soil layer tunnel
CN210421162U (en) Underground outdoor side shear wall and outside beam slab connection structure
CN210003293U (en) A protection device that encorbelments for protecting open hole stability on curved wall
CN103498573B (en) Set up the existing frame strengthening method of band frame bracing members
CN207362674U (en) A kind of arch bridge steel strand wires sunpender that single can change rope
CN206052643U (en) A kind of deep hole grouting rock bolt hook type centering supporting structure
CN105133664B (en) Combined frame type isolation protection system and construction method thereof
CN206539351U (en) A kind of grid type tunnel arch
KR101730877B1 (en) Establishing method for attached wall in slope using the module for fixing in slope
CN206368367U (en) A kind of pattern foundation pit supporting structure soil nailing
CN204857985U (en) Bury formula stray current ground terminal
CN212176093U (en) Vertical seam connection structure of assembled shear force wall
CN205777810U (en) A kind of steel tower being applicable to high slope

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190104