CN206368367U - A kind of pattern foundation pit supporting structure soil nailing - Google Patents
A kind of pattern foundation pit supporting structure soil nailing Download PDFInfo
- Publication number
- CN206368367U CN206368367U CN201621264776.5U CN201621264776U CN206368367U CN 206368367 U CN206368367 U CN 206368367U CN 201621264776 U CN201621264776 U CN 201621264776U CN 206368367 U CN206368367 U CN 206368367U
- Authority
- CN
- China
- Prior art keywords
- rod
- soil nailing
- supporting structure
- foundation pit
- pit supporting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model discloses a kind of pattern foundation pit supporting structure soil nailing, its drip irrigation device is to include the body of rod, one end of the body of rod is welded with first brace rod and second brace rod parallel with the body of rod, the axis of first brace rod and the second brace rod is overlapped, the neck being adapted to horizontal beading is formed between first brace rod and the second brace rod, the firmness of soil nailing and horizontal beading welding position can be improved.
Description
Technical field
The utility model is related to architectural engineering pit supporting apparatus field, more particularly to a kind of pattern foundation pit supporting structure soil nailing.
Background technology
Pattern foundation pit supporting structure is to ensure the safety of Underground Construction and foundation ditch surrounding enviroment, to foundation pit side-wall and surrounding enviroment
Supporting and retaining system, reinforcing and the safeguard measure of use.
Application of the soil-nail wall support in pattern foundation pit supporting structure is very universal, and technology is also quite ripe.Soil nail wall is a kind of in situ
Soil body reinforcement technology.It is configured to be arranged on reinforcement rod member (i.e. soil nailing or anchor pole) and its surrounding soil secure bond in slopes
The complex of formation, and the supporting construction of similar Form Gravity Breast Wall that surface layer is constituted.
Soil-nail wall support construction procedure is as follows:1st, slope excavating;2nd, manual amendment side slope is domatic;3rd, line setting, really
The position of fixed each soil nailing and mark;4th, manual pore-forming;5th, soil nailing cage bar is made(The body of rod)And place in muscle hole, the outer end of cage bar
End sets reserved section to be used to weld with horizontal beading;6th, to aerial slip casting;7th, linked network;8th, jetting cement.
But in the prior art, as shown in figure 1, most using single " L " type construction, bending during the design of the end of the soil nailing body of rod 1
Welded with horizontal beading 2 in portion 12.This way is present with drawback:
Reinforcing bar has infringement when cold bend(ing) is into " L " type to reinforcing bar, and after " L " type crotch is welded with horizontal beading 2, soil nailing is in tension
Force part is the flex point weld 11 of " L " type crotch first during power, is extended back successively, and the position beyond overlapping part can not
Equably while stress, can cause " L " type crotch to be torn with the horizontal weld of beading 2, cause the accident.
Utility model content
The purpose of this utility model is to provide a kind of pattern foundation pit supporting structure soil nailing, can improve soil nailing and horizontal beading welding position
Firmness.
Above-mentioned technical purpose of the present utility model technical scheme is that:
A kind of pattern foundation pit supporting structure soil nailing, including the body of rod, one end of the body of rod be welded with first brace rod parallel with the body of rod and
The axis of second brace rod, the first brace rod and the second brace rod is overlapped, formed between the first brace rod and the second brace rod with
The neck of horizontal beading adaptation.
By using above-mentioned technical proposal, the first brace rod and the second brace rod is each parallel to the body of rod and is welded on the body of rod
On, it is to avoid it is direct to the body of rod to bend, can it reduce due to directly carrying out the infringement that bending is caused to the body of rod, but by horizontal stroke
Beading can improve the firmness of soil nailing and horizontal beading welding position directly through welding together after neck with the body of rod;It is existing
Have in technology, when carrying out single-sided welding, the hook length of general L-type is five times of shank diameter, causes the wave of reinforcing bar main material
Take, the utility model direct to the body of rod need not be bent, and reduce the waste of reinforcing bar main material.
Preferably, the length of first brace rod and the second brace rod is identical.
By using above-mentioned technical proposal, in the prior art, the body of rod is bent into l-shaped, not only waste of materials also wastes people
The length of power, first support bar and second support bar is identical, then can disposably make more first support bar and second
Strut, operation is easy, saves manpower.
Preferably, the length of the first brace rod is two to three times of shank diameter.
By using above-mentioned technical proposal, it is ensured that while the body of rod is with horizontal beading weld firmness, also reduce
The consumption of first brace rod and the second brace rod, has saved material.
Preferably, being welded with pernetti on the body of rod.
By using above-mentioned technical proposal, if the body of rod stretches into Kong Zhonghou, periphery and the hole of the body of rod fit, then rear
During continuous slip casting, the position that the body of rod fits with hole can be because the concrete injected be less and insecure, and the setting of pernetti can be with
The body of rod is supported so that gap is formed between the body of rod and hole.
Preferably, the pernetti includes multigroup support bar perpendicular to the body of rod, every group of support bar is included along body of rod axle
To arrangement and the first pole and the second pole of equal length.
By using above-mentioned technical proposal, after the body of rod is stretched into hole, end and the hole inwall of support bar fit, can be by
Separate, while being formed with gap between adjacent support bar, follow-up slip casting will not be caused between the body of rod and the inwall in hole
Influence;The equal length of first pole and the second pole, then can cause the body of rod to be located at the center in hole as far as possible.
Preferably, the pernetti includes the support that multigroup centering is welded.
By using above-mentioned technical proposal, the support that centering is set can be prevented in body of rod offset bore to a certain extent
The heart so that the body of rod is as equal as possible with the distance between hole wall, contributes to the progress of follow-up slip casting work.
Preferably, the section of the support is isosceles trapezoid.
By using above-mentioned technical proposal, the contact area of support and hole wall can be increased, body of rod axle is further increased
The Aligning degree at Xian Yukong centers.
Preferably, the distance between described adjacent pernetti is 1m.
By using above-mentioned technical proposal, while effectively can realizing pernetti, pernetti and the body of rod can be reduced again
Weld.
In summary, the utility model has the advantages that:It is formed between first brace rod and the second brace rod
Neck, improves the firmness of the body of rod and horizontal beading weld;Save material.
Brief description of the drawings
Fig. 1 is the sectional view that soil nailing welds together with horizontal beading in the prior art;
Fig. 2 is the overall structure diagram of embodiment 1;
Fig. 3 is to embody the partial sectional view that horizontal beading is placed into neck;
Fig. 4 is to embody the structural representation that soil nailing is stretched into hole;
Fig. 5 is the structural representation of embodiment 2.
In figure, 1, the body of rod;11st, flex point weld;12nd, kink;2nd, horizontal beading;3rd, the first brace rod;4th, the second support
Muscle;5th, neck;6th, pernetti;61st, support bar;611st, the first pole;612nd, the second pole;62nd, support;621st, left frame;622、
Right shelf 7, the soil body in situ;71st, hole.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.Wherein identical parts identical accompanying drawing
Mark is represented.It should be noted that the word "front", "rear", "left", "right", the "up" and "down" that are used below in description refer to
It is the direction in accompanying drawing, word " bottom surface " and " top surface ", " interior " and " outer " are referred respectively to towards or away from particular elements geometry
The direction at center.
Embodiment 1, a kind of pattern foundation pit supporting structure soil nailing, as shown in Fig. 2 including the body of rod 1, one end of the body of rod 1 is welded with parallel
In the first brace rod 3 and the second brace rod 4 of the body of rod 1, the first brace rod 3 and the axis of second support bar 4 coincide.
Neck 5 is formed between first brace rod 3 and the second brace rod 4, with reference to Fig. 2, neck 5 is adapted with horizontal beading 2.
The equal length of first brace rod 3 and the second brace rod 4, the length of first support bar 61 can be the diameter of the body of rod 1
Twice to three times.
Pernetti 6 is welded with the body of rod 1, pernetti 6 includes the support 62 that multigroup centering is welded, i.e.,:Support 62 includes a left side
Frame 621 and right shelf 622, left frame 621 are consistent with the size and shape of right shelf 622.
The section of left frame 621 is isosceles trapezoid, and the end of left 621 liang of waists of frame is together with the welding of the body of rod 1, left frame 621
Upper bottom in hole 71 when and the inwall in hole fit(As shown in Figure 4).
Distance is 1 meter between adjacent left frame 621.
When in use, manually the body of rod 1 is stretched into hole 71, then left frame 621 and right shelf 622 fit with hole wall, can be with
The body of rod 1 and hole wall are separated.
The end of the body of rod 1 is reserved in the outside in hole 71, and horizontal beading 2 is passed through into neck 5, can be tentatively by horizontal beading 2 and bar
Body 1 is fixed(The relation that horizontal beading 2 is fixed in neck 5 is as shown in Figure 3), then horizontal beading 2 and the body of rod 1 are consolidated using spot welding
It is fixed.
Embodiment 2, as shown in figure 5, as different from Example 1, pernetti 6 includes multigroup being radially arranged along the body of rod 1
Support bar 61, every group of support bar 61 includes the first pole 611 and the second pole 612 of equal length, the first pole 611 and
Two poles 612 can be provided with two, and be located at the axis of the both sides of the body of rod 1, the first pole 611 and the second pole 612 respectively
It is misaligned.
The distance between first adjacent pole 611 is 1 meter.
This specific embodiment is only to explain of the present utility model, and it is not to limitation of the present utility model, ability
Field technique personnel can make the modification without creative contribution to the present embodiment as needed after this specification is read, but
As long as all being protected in right of the present utility model by Patent Law.
Claims (8)
1. a kind of pattern foundation pit supporting structure soil nailing, including the body of rod (1), it is characterised in that:One end of the body of rod (1) is welded with and the body of rod (1)
The axis of parallel the first brace rod (3) and the second brace rod (4), the first brace rod (3) and the second brace rod (4) is overlapped, the
The neck (5) being adapted to horizontal beading (2) is formed between one brace rod (3) and the second brace rod (4).
2. pattern foundation pit supporting structure soil nailing according to claim 1, it is characterised in that:First brace rod (3) and second
The length for supportting muscle (4) is identical.
3. pattern foundation pit supporting structure soil nailing according to claim 2, it is characterised in that:The length of first brace rod (3) is the body of rod
(1) two to three times of diameter.
4. pattern foundation pit supporting structure soil nailing according to claim 1, it is characterised in that:Pernetti is welded with the body of rod (1)
(6)。
5. pattern foundation pit supporting structure soil nailing according to claim 4, it is characterised in that:The pernetti (6) includes multigroup vertical
Support bar (61) in the body of rod (1), every group of support bar (61) includes first along the arrangement of the body of rod (1) axial direction and equal length
Pole(611)With the second pole (612).
6. pattern foundation pit supporting structure soil nailing according to claim 4, it is characterised in that:The pernetti (6) includes multigroup centering
The support (62) of welding.
7. pattern foundation pit supporting structure soil nailing according to claim 6, it is characterised in that:The section of the support (62) is isosceles ladder
Shape.
8. pattern foundation pit supporting structure soil nailing according to claim 7, it is characterised in that:Between the adjacent pernetti (6) away from
From for 1m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621264776.5U CN206368367U (en) | 2016-11-22 | 2016-11-22 | A kind of pattern foundation pit supporting structure soil nailing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621264776.5U CN206368367U (en) | 2016-11-22 | 2016-11-22 | A kind of pattern foundation pit supporting structure soil nailing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206368367U true CN206368367U (en) | 2017-08-01 |
Family
ID=59389541
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621264776.5U Expired - Fee Related CN206368367U (en) | 2016-11-22 | 2016-11-22 | A kind of pattern foundation pit supporting structure soil nailing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206368367U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108222021A (en) * | 2018-02-28 | 2018-06-29 | 中国五冶集团有限公司 | It is a kind of for soil nailing device of deep foundation pit support and preparation method thereof |
-
2016
- 2016-11-22 CN CN201621264776.5U patent/CN206368367U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108222021A (en) * | 2018-02-28 | 2018-06-29 | 中国五冶集团有限公司 | It is a kind of for soil nailing device of deep foundation pit support and preparation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104806011B (en) | Raft board post poured band formwork for placing | |
CN104831818B (en) | The connecting node of precast reinforced concrete beam and superposed column | |
CN206189647U (en) | Novel infilled wall brickwork drawknot muscle structure | |
CN206467667U (en) | Suspended net shotcrete building enclosure between a kind of stake of use expansion type fixation reinforced mesh | |
CN104295112B (en) | A kind of reinforced concrete post connects steel core concrete column syndeton and construction method | |
CN103603494B (en) | A kind of ultra-thin steel truss sloping core construction method and formwork structure | |
CN107724540A (en) | Steel plate shear force wall and the attachment structure and its construction method of steel bar girder floor plates | |
CN106759858A (en) | The connecting node and preparation method of a kind of H profile steel beam and rectangular steel-tube concrete column | |
CN204753836U (en) | Connected node of precast reinforced concrete roof beam and coincide post | |
CN206368367U (en) | A kind of pattern foundation pit supporting structure soil nailing | |
CN208534081U (en) | A kind of reconstruction structure of old building constructional column | |
CN206319597U (en) | A kind of cantilever steel girder erecting device | |
CN103882808B (en) | Ramp bridge and main line bridge join the construction method across erecting beam support system | |
CN104295001A (en) | Variable cross-section pre-stress cant beam and construction process thereof | |
CN209397712U (en) | The connection structure of antidetonation steel pipe in a kind of shear wall | |
CN203684102U (en) | Supporting system for precast beam formed by connecting span erection of ramp bridge and main line bridge | |
CN204174955U (en) | Reinforced concrete post connects steel core concrete column syndeton | |
CN207314348U (en) | A kind of fixed structure of flare template | |
CN205476507U (en) | Inside pump line fixing device of jacking platform | |
CN203866972U (en) | Embedded component for filler wall tie bars | |
CN208072414U (en) | A kind of deep foundation pit support bar planting linked network fixing device | |
CN208267393U (en) | Electrical wire tube one-time reserved pre-buried finished product protection device | |
CN207700198U (en) | A kind of advanced support supporting construction | |
CN207277864U (en) | A kind of concrete temporary support moulding bed for large-scale steel structure assembly | |
CN206941961U (en) | A kind of reinforced concrete support post |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170801 Termination date: 20211122 |
|
CF01 | Termination of patent right due to non-payment of annual fee |