CN109138467A - One kind intercepts water component and its construction method - Google Patents

One kind intercepts water component and its construction method Download PDF

Info

Publication number
CN109138467A
CN109138467A CN201811108076.0A CN201811108076A CN109138467A CN 109138467 A CN109138467 A CN 109138467A CN 201811108076 A CN201811108076 A CN 201811108076A CN 109138467 A CN109138467 A CN 109138467A
Authority
CN
China
Prior art keywords
layer
shuting
construction
component
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811108076.0A
Other languages
Chinese (zh)
Other versions
CN109138467B (en
Inventor
严新建
初彦辰
于传东
寻文靓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Tianrun Construction Co Ltd
Original Assignee
Beijing Tianrun Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Tianrun Construction Co Ltd filed Critical Beijing Tianrun Construction Co Ltd
Priority to CN201811108076.0A priority Critical patent/CN109138467B/en
Publication of CN109138467A publication Critical patent/CN109138467A/en
Application granted granted Critical
Publication of CN109138467B publication Critical patent/CN109138467B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/24Safety or protective measures preventing damage to building parts or finishing work during construction
    • E04G21/30Safety or protective measures preventing damage to building parts or finishing work during construction against mechanical damage or dirt, e.g. guard covers of stairs

Abstract

It intercepts water component and its construction method the invention particularly discloses one kind, the component that intercepts water includes: shuting, its longitudinal section is in U-shape, the side of its width direction is fixed on concrete wall and is tightly connected with concrete wall, its length direction is obliquely installed, the both ends of shuting length direction, highly high one end is water receiving end, highly low one end is discharge ends, concrete wall is stretched out at the both ends of shuting length direction, remove the highest shuting of height and the minimum shuting of height, in any other two adjacent shutings, the water end (W.E.) that runs in of one shuting is located at the surface at the water receiving end of another shuting;Drainpipe is mounted on the minimum shuting of height.The sewage that construction building top concrete pouring layer flows down can be intercepted by shuting, it can guarantee that shaving sub- construction layer to construction of exterior insulation system layer or exterior wall while carrying out the construction of concrete pouring layer constructs, construction speed is greatly accelerated, integrated engineering time cost is saved.

Description

One kind intercepts water component and its construction method
Technical field
It intercepts water component and its construction method the present invention relates to the realm of building construction more particularly to one kind.
Background technique
At present on building sites, Structural Engineering completion carries out alien invasion decoration after binding based on common working procedure The construction of engineering.Part project under construction be improve construction speed, save construction time cost, external Facade design construction speed into It has gone optimization, has been carried out so that alien invasion engineering and main structural engineering are intersected, therefore there are following two in different construction fields Kind condition of construction:
1) the decoration of exterior wall engineering and main structural engineering that, there is external thermal insulation in the design intert operation.
2), the decoration of exterior wall engineering and main structural engineering of external thermal insulation do not intert operation in the design.
But when construction exterior facing cross-operation, sewage, cement slurry etc. that exterior wall top concrete structure construction generates Pollutant intersects the processes such as the external thermal insulation carried out or exterior wall putty to lower part and is bound to cause pollution or damage.Therefore cross-operation meeting Increase significantly the Polluted area disposal costs of alien invasion construction operation.
Therefore, it needs one kind and intercepts water component and its construction method to solve the above problems.
Summary of the invention
It is an object of the invention to: one kind is provided and is intercepted water component and its construction method, to solve on exterior wall in the prior art The pollutants such as sewage, the cement slurry that portion's concrete structure construction generates intersect the works such as the external thermal insulation carried out or exterior wall putty to lower part The problem of sequence is polluted or is damaged, and leads to the increase of Polluted area disposal costs.
On the one hand, the present invention provides one kind and intercepts water component, is arranged on the exterior wall of construction building, and the exterior wall is located at described It is described outer between the exterior wall putty construction layer of the construction of exterior insulation system layer or lower section of construction building top concrete pouring layer and lower section Wall includes multiple concrete walls, and multiple concrete walls are sequentially connected end to end in turn, comprising:
Shuting, longitudinal section are in U-shape, the side of width direction be fixed on the concrete wall and with it is described Concrete wall is tightly connected, and length direction is obliquely installed, the both ends of the shuting length direction, and the high one end of height is Water receiving end, the low one end of height is discharge ends, and the concrete wall is stretched out at the both ends of the shuting length direction, is removed The highly highest shuting and the minimum shuting of height in two adjacent shutings, are cut described in one The water end (W.E.) that runs in of sink is located at the surface at the water receiving end of another shuting;
Drainpipe is mounted on the minimum shuting of height.
Preferably, the shuting is set close to the side interval of concrete wall along the length direction of the shuting There are multiple fixation holes, each corresponding described fixation hole passes through the fixation hole by screw and fixes with concrete wall Connection.
Preferably, the material of the shuting is galvanized steel plain sheet.
Preferably, further including multiple pulling mouth lines along shuting length direction setting, the both ends of the pulling mouth line It is fixedly connected respectively with the two sidewalls of the slot width direction that intercepts water.
Preferably, the two sides of the slot width direction that intercepts water, neutralize the height of the side of the concrete wall fitting Height of the degree not less than the side far from the concrete wall.
Preferably, the upper end for the side that the shuting and the concrete wall are fixed is mixed by sealant with described Solidifying cob wall body is tightly connected.
On the other hand, the present invention provides a kind of construction method for the component that intercepts water described in any of the above-described scheme, comprising:
Setting first layer in interval intercepts water component along the vertical direction on the exterior wall of construction building and the second layer intercepts water component, institute It states the first layer component that intercepts water to be located at the second layer and intercept water above component, the first layer intercepts water component and the second layer intercepts water Component corresponds to N-1 layers of the construction building and is located at the inside of Climbing frame for outer-wall, and the n-th layer of the construction building is coagulation Native pouring layer, N-1 layers are conservation layer;
After the concrete pouring layer casting complete, the Climbing frame for outer-wall is climbed one layer upwards, and by described first The installation site of layer intercepts water component and the second layer intercepts water component is lifted up one layer.
Preferably, when carrying out outer heat insulation layer construction, the construction method of the component that intercepts water further include:
The setting overhanging hard protection structure above construction of exterior insulation system layer, the overhanging hard protection structure are fallen for accepting top Under object;
Third layer is arranged between the construction of exterior insulation system layer and the overhanging hard protection structure to intercept water component.
The spacing preferably, third layer intercepts water between component and the construction of exterior insulation system layer is 300~500mm.
Preferably, the first layer intercepts water component and the second layer intercept water the spacing between component be 300~ 800mm。
The invention has the benefit that
The sewage that construction building top concrete pouring layer flows down is intercepted by shuting, prevents sewage from continuing to flow downward And the external insulation construction layer or exterior wall putty construction layer of lower section are polluted, it is ensured that carrying out concrete pouring layer Sub- construction layer is shaved to construction of exterior insulation system layer or exterior wall while construction to construct, and is greatly accelerated construction speed, is not only saved About integrated engineering time cost, also saves the construction cost of exterior wall engineering.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of component of intercepting water in the embodiment of the present invention;
Fig. 2 is the partial structure diagram one when the component of the invention that intercepts water is arranged on the exterior wall of construction building;
Fig. 3 is the partial structure diagram two when the component of the invention that intercepts water is arranged on the exterior wall of construction building;
Fig. 4 is the partial structure diagram three when the component of the invention that intercepts water is arranged on the exterior wall of construction building;
Fig. 5 is the partial structure diagram four when the component of the invention that intercepts water is arranged on the exterior wall of construction building.
Fig. 6 is the schematic diagram when component of the invention that intercepts water is located at external corner;
Fig. 7 is the schematic diagram when component of the invention that intercepts water is located at inner corner trim;
Fig. 8 is the schematic diagram that the component of the invention that intercepts water is located at another visual angle when external corner;
Fig. 9 is the schematic diagram that the component of the invention that intercepts water is located at another visual angle when inner corner trim.
In figure:
1, concrete pouring layer;
2, construction of exterior insulation system layer;
3, concrete wall;
4, shuting;
5, drainpipe;
6, pulling mouth line;
7, overhang hard protection structure;
8, climbing frame.
Specific embodiment
To further illustrate the technical scheme of the present invention below with reference to the accompanying drawings and specific embodiments.
As shown in figure 1-9, it intercepts water component the present embodiment provides one kind, the outer of the construction building built is set On wall, the exterior wall refer to the external walls of construction building be located at top concrete pouring layer 1 and lower section construction of exterior insulation system layer 2 or Part between the exterior wall putty construction layer of lower section, in the present embodiment, exterior wall includes multiple concrete walls 3, and multiple mixed Solidifying cob wall body 3 is sequentially connected end to end in turn.
The component that intercepts water includes shuting 4 and drainpipe 5, and the longitudinal section of shuting 4 is in U-shape, and the shuting 4 is substantially along water Square to extension, and the extending direction of shuting 4 is its length direction, the line direction of shuting 4U-shaped structure opposite sides For its width direction.In the present embodiment, the side of 4 width direction of shuting is fixed on concrete wall 3 and and concrete Wall 3 is tightly connected, to can intercept the sewage that construction building top concrete pouring layer 1 flows down by shuting 4, is prevented Sewage continues to flow downward and pollute to the construction of exterior insulation system layer 2 or exterior wall putty construction layer of lower section, it is ensured that Construct while concrete pouring layer 1 is constructed to construction of exterior insulation system layer 2 or exterior wall putty construction layer, greatly speeds up Construction speed, has saved the construction cost of integrated engineering time cost and exterior wall engineering.The length direction of shuting 4 tilts Setting, the both ends of 4 length direction of shuting are stretched out outside concrete wall 3, and in the both ends of 4 length direction of shuting, height is high One end be water receiving end, the low one end of height is discharge ends.To corresponding on each concrete wall 3 of exterior wall to set There is a shuting 4, multiple shutings 4 are surrounded by a circle around the periphery of exterior wall.Two adjacent shutings 4 exist in the present embodiment The corner of corresponding two concrete walls 3 intersects, and (it is highest described to remove height in two adjacent shutings 4 Shuting 4 and the minimum shuting 4 of height), the discharge ends of a shuting 4 are located at the water receiving end of another shuting 4 Surface, thus, the height of multiple shutings 4 successively reduces, and the sewage being collected into shuting 4 can be highest from height The minimum shuting 4 of the flow direction height of shuting 4.Drainpipe 5 is mounted on the minimum shuting 4 of height, will be received by drainpipe 5 Collection is arranged at sewage collecting in sewage wherein.
In the present embodiment, the material of shuting 4 uses galvanized steel plain sheet, and thickness is not less than 0.6mm.4 width direction of shuting Two sides, neutralize concrete wall 3 be bonded side height be not less than far from concrete wall 3 side, the present embodiment In, the height for the side that shuting 4 and concrete wall 3 are bonded is 150mm~200mm, the side far from concrete wall 3 Height is 100mm~150mm.The width of one end of 4 bottom of shuting is 120mm~150mm, due to standing in Climbing frame for outer-wall 8 Spacing between bar and exterior wall is generally 150mm, thus by the width of one end of 4 bottom of shuting be set as 120mm~ 150mm, it is ensured that shuting 4 can be arranged in the inside of 8 upright bar of Climbing frame for outer-wall, to guarantee shuting 4 along concrete wall 3 The perforation of width direction.
Along the length direction of shuting 4, shuting 4 is equipped at intervals with multiple fixation holes close to the side of concrete wall 3, right Each fixation hole is answered, fixation hole is passed through by screw and is fixedly connected with concrete wall 3.It can be by impact drill mixed The position that each fixation hole is corresponded on solidifying cob wall body 3 is punched, and plastic expansion item is then embedded in punched hole, is passed through Screw passes through fixation hole, and is screwed into plastic expansion item, and shuting 4 is fixed on concrete wall 3.In the present embodiment, phase Spacing between adjacent two fixation holes is 300mm~400mm.
The component that intercepts water further includes along the spaced multiple pulling mouth lines 6 of 4 length direction of shuting, the both ends of pulling mouth line 6 It is fixedly connected respectively with the two sidewalls of 4 width direction of shuting.Make the two sidewalls shape of 4 width direction of shuting by pulling mouth line 6 It draws in pairs, prevents shuting 4 from deforming.Pulling mouth line 6 can use No. 8 or No. 10 iron wires.
In the present embodiment, the upper end for the side that shuting 4 and concrete wall 3 are fixed passes through sealant and concrete wall 3 are tightly connected, and so as to prevent gap of the sewage between shuting 4 and concrete wall 3 from flowing downward, guarantee that sewage is equal It can be flowed into shuting 4.
Using the water receiving end of the highest shuting 4 in position as starting point, until the discharge ends of the minimum shuting 4 in position are terminal, Multiple shutings 4 are obliquely installed according to 1%~3% gradient.(height highest is removed in the junction of two concrete walls 3 The shuting 4 and the minimum shuting 4 of height), in two adjacent shutings 4, the row of one of shuting 4 Water end (W.E.) is 80mm~100mm higher than the water receiving end of another shuting 4, can connect to avoid when two adjacent shutings 4 connect The place of connecing is difficult to seal the problem of being easy to cause leak.Concrete wall 310cm, and shuting 4 are stretched out in the both ends of shuting 4 Discharge ends do sealing treatment, be respectively provided with opening on two sidewalls of the shuting 4 close to discharge ends, sewage can be convenient from cutting The opening of sink 4 is flowed into the water receiving end of lower section shuting 4.Drainpipe 5 can be the pvc row that diameter is 80mm~100mm Water pipe.
The present embodiment also provides a kind of construction method of above-mentioned component that intercepts water, and includes the following steps:
Setting first layer in interval intercepts water component along the vertical direction on the exterior wall of construction building and the second layer intercepts water component, the The one layer of component that intercepts water is located at the second layer and intercepts water the surface of component, between first layer intercepts water component and the second layer intercepts water component between Away from for 300~800mm, first layer intercepts water component and the second layer intercepts water, and component corresponds to N-1 layers of construction building and is located at outer The inside of wall climbing frame 8, the n-th layer of construction building is concrete pouring layer 1 in this implementation, and N-1 layer are conservation layer.
After concrete 1 casting complete of pouring layer, Climbing frame for outer-wall 8 is made to climb one layer upwards, and first layer is intercepted water component One layer is lifted up with the intercept water installation site of component of the second layer.After the completion of the n-th layer construction of construction building, construction is built The N+1 layers of progress concrete casting built, Climbing frame for outer-wall 8 climb one layer upwards, and first layer is intercepted water component and the second layer intercepts water Component is removed from concrete wall 3, and the first layer under disassembly is intercepted water component and the second layer component that intercepts water is arranged at In n-th layer.And by current N+1 layers as new n-th layer, using current n-th layer as new N-1 layers, and so on.
This implementation is located at the construction of exterior insulation system of top concrete pouring layer 1 and lower section by the external walls in construction building The component that intercepts water is arranged in part between layer 2 or the exterior wall putty construction layer of lower section, guarantees carrying out the construction of concrete pouring layer 1 When, the sewage that is flowed down along exterior wall will not construction of exterior insulation system layer 2 to lower section or exterior wall putty construction layer pollute, guarantee exterior wall Engineering and concrete are poured while constructing, and greatly accelerate construction speed, also save while saving integrated engineering time cost The construction cost of exterior wall engineering.
Specifically, when constructing to construction of exterior insulation system layer 2, the construction method of the component that intercepts water further include:
The setting overhanging hard protection structure 7 above construction of exterior insulation system layer 2, overhanging hard protection structure 7 are fallen for accepting top Under object, play installation protective action.
Setting third layer intercepts water component between construction of exterior insulation system layer 2 and overhanging hard protection structure 7.
It can guarantee the sewage that is not flowed down by concrete pouring layer 1 of construction of exterior insulation system layers 2 by the way that the three layers of component that intercepts water are arranged It influences.
In the present embodiment, the spacing that third layer intercepts water between component and construction of exterior insulation system layer 2 is 300~500mm.It needs to infuse Meaning just starts to carry out construction of exterior insulation system when main structure completes about 60%-70%.
Obviously, the above embodiment of the present invention is just for the sake of clearly illustrating examples made by the present invention, and being not is pair The restriction of embodiments of the present invention.For those of ordinary skill in the art, may be used also on the basis of the above description To make other variations or changes in different ways.There is no necessity and possibility to exhaust all the enbodiments.It is all this Made any modifications, equivalent replacements, and improvements etc., should be included in the claims in the present invention within the spirit and principle of invention Protection scope within.

Claims (10)

  1. The component 1. one kind intercepts water, is arranged on the exterior wall of construction building, and the exterior wall is located at the construction building top concrete Between the exterior wall putty construction layer of the construction of exterior insulation system layer (2) or lower section of pouring layer (1) and lower section, the exterior wall includes multiple mixed Solidifying cob wall body (3), multiple concrete walls (3) are sequentially connected end to end in turn characterized by comprising
    Shuting (4), longitudinal section is in U-shape, the side of width direction be fixed on the concrete wall (3) and with institute Concrete wall (3) sealed connection is stated, length direction is obliquely installed, the both ends of shuting (4) length direction, and height is high One end be water receiving end, the low one end of height is discharge ends, and the coagulation is stretched out at the both ends of shuting (4) length direction Cob wall body (3) removes the highest shuting (4) of height and the minimum shuting (4) of height, any other adjacent In two shutings (4), the water end (W.E.) that runs in of a shuting (4) is located at the water receiving of another shuting (4) The surface at end;
    Drainpipe (5) is mounted on the minimum shuting (4) of height.
  2. 2. the component according to claim 1 that intercepts water, which is characterized in that the length direction along the shuting (4), described section Sink (4) is equipped at intervals with multiple fixation holes close to the side of concrete wall (3), each corresponding described fixation hole passes through Screw passes through the fixation hole and is fixedly connected with concrete wall (3).
  3. 3. the component according to claim 1 that intercepts water, which is characterized in that the material of the shuting (4) is galvanized steel plain sheet.
  4. 4. the component according to claim 1 that intercepts water, which is characterized in that further include being set along the shuting (4) length direction The multiple pulling mouth lines (6) set, two sidewalls of the both ends of the pulling mouth line (6) respectively with the shuting (4) width direction are fixed Connection.
  5. 5. the component according to claim 1 that intercepts water, which is characterized in that the two sides of shuting (4) width direction, wherein It is not less than the height of the side far from the concrete wall (3) with the height of the side of the concrete wall (3) fitting.
  6. 6. the component according to claim 1 that intercepts water, which is characterized in that the shuting (4) and the concrete wall (3) The upper end of fixed side is tightly connected by sealant and the concrete wall (3).
  7. 7. a kind of construction method of the component described in any one of claims 1-6 that intercepts water characterized by comprising
    Setting first layer in interval intercepts water component along the vertical direction on the exterior wall of construction building and the second layer intercepts water component, and described the The one layer of component that intercepts water is located at the second layer and intercepts water above component, the first layer intercepts water component and the second layer intercepts water component It corresponds to N-1 layers of the construction building and is located at the inside of Climbing frame for outer-wall (8), the n-th layer of the construction building is coagulation Native pouring layer (1), N-1 layers are conservation layer;
    After concrete pouring layer (1) casting complete, the Climbing frame for outer-wall (8) is climbed upwards after one layer, and by described the One layer is intercepted water component and the intercept water installation site of component of the second layer is lifted up one layer.
  8. 8. the construction method of the component according to claim 7 that intercepts water, which is characterized in that when carrying out outer heat insulation layer construction, The construction method of the component that intercepts water further include:
    Setting overhanging hard protection structure (7) above construction of exterior insulation system layer (2), the overhanging hard protection structure (7) is for accepting The object that top is fallen;
    Third layer is arranged between the construction of exterior insulation system layer (2) and the overhanging hard protection structure (7) to intercept water component.
  9. 9. the construction method of the component according to claim 8 that intercepts water, which is characterized in that the third layer intercepts water component and institute Stating the spacing between construction of exterior insulation system layer (2) is 300~500mm.
  10. 10. the construction method of the component according to claim 7 that intercepts water, which is characterized in that the first layer intercept water component and The second layer spacing between component that intercepts water is 300~800mm.
CN201811108076.0A 2018-09-21 2018-09-21 Water interception component and construction method thereof Active CN109138467B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811108076.0A CN109138467B (en) 2018-09-21 2018-09-21 Water interception component and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811108076.0A CN109138467B (en) 2018-09-21 2018-09-21 Water interception component and construction method thereof

Publications (2)

Publication Number Publication Date
CN109138467A true CN109138467A (en) 2019-01-04
CN109138467B CN109138467B (en) 2021-08-06

Family

ID=64823179

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811108076.0A Active CN109138467B (en) 2018-09-21 2018-09-21 Water interception component and construction method thereof

Country Status (1)

Country Link
CN (1) CN109138467B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110409830A (en) * 2019-05-30 2019-11-05 广西建工集团第五建筑工程有限责任公司 A kind of construction method that high layer main body subregion intercepts water and U-shaped shuting used

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102005039157A1 (en) * 2005-08-17 2007-03-01 Roman Zahner Connection profile bead e.g. embrasure connection profile bead, for e.g. door frame, has foil attached to profile body or to bar by adhesive joint under formation of pre-assembled profile bead, where foil can be folded/unrolled or viewable
CN204212443U (en) * 2014-11-05 2015-03-18 中建四局第一建筑工程有限公司 A kind of external wall stop water
CN107268553A (en) * 2017-08-01 2017-10-20 夏峰 A kind of pollution cutting device and its construction method for ecological construction
CN107829745A (en) * 2017-11-01 2018-03-23 中国恩菲工程技术有限公司 Vertical shaft intercepts water device
CN207499484U (en) * 2017-10-18 2018-06-15 增城市碧桂园物业发展有限公司 Exterior wall cuts dirty floor construction building

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102005039157A1 (en) * 2005-08-17 2007-03-01 Roman Zahner Connection profile bead e.g. embrasure connection profile bead, for e.g. door frame, has foil attached to profile body or to bar by adhesive joint under formation of pre-assembled profile bead, where foil can be folded/unrolled or viewable
CN204212443U (en) * 2014-11-05 2015-03-18 中建四局第一建筑工程有限公司 A kind of external wall stop water
CN107268553A (en) * 2017-08-01 2017-10-20 夏峰 A kind of pollution cutting device and its construction method for ecological construction
CN207499484U (en) * 2017-10-18 2018-06-15 增城市碧桂园物业发展有限公司 Exterior wall cuts dirty floor construction building
CN107829745A (en) * 2017-11-01 2018-03-23 中国恩菲工程技术有限公司 Vertical shaft intercepts water device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110409830A (en) * 2019-05-30 2019-11-05 广西建工集团第五建筑工程有限责任公司 A kind of construction method that high layer main body subregion intercepts water and U-shaped shuting used

Also Published As

Publication number Publication date
CN109138467B (en) 2021-08-06

Similar Documents

Publication Publication Date Title
CN101705697B (en) Diaphragm wall joint flexible water stop installing device and method
CN207073232U (en) A kind of roof drainage structure
CN109707117A (en) A kind of construction technology of siphon type rainwater discharging system
CN103628575A (en) Large-altitude-difference variable-section concrete structure construction joint and construction method thereof
CN109138467A (en) One kind intercepts water component and its construction method
CN203334285U (en) Underground concrete structure engineering seam waterproof preparation grouting system
CN204690801U (en) Formwork erecting structure is hung in basement roof ater-casting
CN209620278U (en) It is a kind of with the anti-bank formwork structure of concrete that can have enough to meet the need reinforcing bar liner
CN208717952U (en) A kind of reserved passage construction device of basement post-pouring zone
CN202990112U (en) Plate and beam reserved joint bar structure of hydropower house
CN104963364A (en) Disposing method for topdown structural slab lower side wall construction joint
CN106759526B (en) A kind of purlin before Brace in Deep Footing Groove beam demolition blasting protects preprocess method
CN206279417U (en) Surface drainage
CN201644490U (en) Concrete placing waste treatment and recovery system
CN203756235U (en) Lateral drainage device of tunnel
CN103821109B (en) Expansion joint of pool leaks restorative procedure
CN207685959U (en) A kind of floor when construction for Super High intercepts water drainage arrangement
CN210032696U (en) A outer wall drainage device that intercepts water for during high-rise construction
CN209874074U (en) Porous inclined plane slip casting embedded pipe
CN209509149U (en) One kind can have enough to meet the need automatic adjustable regularization staircase and cut off the water supply high-altitude spray system
CN207405469U (en) Assembled urban architecture bridge sound arrester pedestal
CN209129413U (en) A kind of roofing reserved opening concrete plugging device
CN208072929U (en) Scaffold wall connecting piece
CN207484499U (en) A kind of Novel free clears up sump glass shell
CN206034504U (en) Drainage channel for cleaning post -cast strip

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant