CN109116246B - Lead-acid storage battery abuse overdischarge performance evaluation method and capacity recovery method - Google Patents

Lead-acid storage battery abuse overdischarge performance evaluation method and capacity recovery method Download PDF

Info

Publication number
CN109116246B
CN109116246B CN201810795279.5A CN201810795279A CN109116246B CN 109116246 B CN109116246 B CN 109116246B CN 201810795279 A CN201810795279 A CN 201810795279A CN 109116246 B CN109116246 B CN 109116246B
Authority
CN
China
Prior art keywords
capacity
lead
storage battery
overdischarge
acid storage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810795279.5A
Other languages
Chinese (zh)
Other versions
CN109116246A (en
Inventor
薛奎网
吴宏亮
徐小亮
曾刘芳
刘巍
杨宝峰
楼志强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shuangdeng Group Co Ltd
Original Assignee
Shuangdeng Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shuangdeng Group Co Ltd filed Critical Shuangdeng Group Co Ltd
Priority to CN201810795279.5A priority Critical patent/CN109116246B/en
Priority to PCT/CN2018/112341 priority patent/WO2020015226A1/en
Priority to AU2018432963A priority patent/AU2018432963A1/en
Publication of CN109116246A publication Critical patent/CN109116246A/en
Application granted granted Critical
Publication of CN109116246B publication Critical patent/CN109116246B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/06Lead-acid accumulators
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries

Abstract

The invention discloses a method for evaluating abusive overdischarge performance of a lead-acid storage battery, which mainly obtains an abusive overdischarge capacity rate Caod through an abusive overdischarge performance test and obtains an overdischarge capacity decay rate Caoc through a circulating discharge test so as to pre-evaluate the quality and overdischarge capacity of a related design scheme. The invention also discloses a capacity recovery method after the lead-acid storage battery is abused and overdischarged, which activates the built-in active substances through deep discharge so as to promote the capacity recovery of the laggard battery. In general, the quantitative evaluation method is simple, convenient and accurate, has good timeliness, is beneficial to guidance and design, and can obviously reduce the research and development period and cost. The user can optimize and adjust the running efficiency of the matched battery pack in time by applying the invention.

Description

Lead-acid storage battery abuse overdischarge performance evaluation method and capacity recovery method
Technical Field
The invention belongs to the technical field of lead-acid storage batteries, and particularly relates to a method for evaluating the abuse and overdischarge performance of a lead-acid storage battery, and a method for recovering the capacity of a backward battery generated by abuse and overdischarge.
Background
The lead-acid storage battery has a bucket effect in the use process, namely, the lagging battery pulls down the performance indexes of other batteries. Because the industry is short of a means for evaluating the lagging battery in advance, particularly for evaluating the misuse and overdischarge of the lead-acid storage battery, a method for recovering the capacity of the lagging battery is not available. Therefore, the battery pack applied in the engineering can not meet the expected performance index, and the technical problems of poor solution and easy initiation of contradiction between supply and demand parties occur frequently. In reality, the cycle life, the over-discharge capacity and the product consistency of the lead-acid storage battery manufactured according to different design schemes have certain differences, and the differences cannot be quantitatively evaluated in the research, development and design stages, and only the manufactured sample can be used for physical detection to obtain relatively reliable data. In the prior art, the object detection is easy to realize, the method is simple and convenient, and the data is accurate, but the verification period is too long, the timeliness is poor, and the method is not beneficial to guiding production. In addition, the lead-acid storage battery can bring trace performance difference due to process errors in the manufacturing process, and the lead-acid storage battery is qualified as long as the performance indexes are not out of tolerance. However, users have over-discharge and under-charge situations during the use process, and such situations are easy to cause lagging batteries. In view of the two situations, it is necessary to research a method for evaluating the overdischarge performance of lead-acid storage batteries and a method for recovering the capacity of lead-acid storage batteries, which is beneficial for manufacturers to develop research and development schemes for comparison and fractionation and quantitative analysis in time. On the other hand, the battery capacity recovery is convenient for users to timely recover the battery capacity, and a good basic condition is created for improving the operation efficiency of the battery.
Disclosure of Invention
The invention mainly aims at the problem that the industry lacks a method for detecting the related performance of a lead-acid storage battery, and provides a method for evaluating the overdischarge performance of lead-acid storage battery abuse, which is simple and convenient, easy to implement and capable of carrying out quantitative analysis. The invention also includes a method for recovering capacity of a lagging battery caused by overdischarge abuse.
The invention achieves the technical aim through the following technical scheme.
The method for evaluating the abuse overdischarge performance of the lead-acid storage battery is improved in that the evaluation is carried out in an environment of 25 +/-2 ℃, and the method comprises the following specific steps:
1.1, according to the conventional configuration, selecting 6 lead-acid storage batteries with the same specification to be connected in series into a group, firstly carrying out I10A is discharged, then 2.35V and 2I current limiting are adopted10Charging for 16 hours;
1.2, from which 1 lead-acid battery can optionally be used alone I10Discharging for 4 hours by the current A, and connecting the overdischarged lag battery with other 5 fully charged lead-acid storage batteries in series to form a storage battery pack;
1.3, storage battery set I10Discharging by the current A until the voltage of 5 fully charged lead-acid storage batteries is reduced to 5 x 1.80V, stopping discharging, and standing for 2 hours;
1.4, 2.35V/battery pack with constant voltage and 2I current limiting10A, continuously charging for 144 hours;
1.5 when the battery set is I10A is putWhen the voltage is up to 6 × 1.80V, carrying out capacity detection, and converting into a capacity value in a reference state at 25 ℃;
1.6, calculating the real discharge capacity and rated capacity C of the storage battery pack10Obtaining the abuse overdischarge capacity rate Caod;
1.7 for storage battery set I10A, discharging, and stopping the voltage to be 6 x 1.4V;
1.8 at constant pressure 6 x 2.35V, current limiting 2I10Under the condition A, the storage battery pack is charged for 36 hours in a connecting way;
1.9, repeating the steps 1.7 and 1.8 for 5 times;
1.10, secondary battery with I10When A discharges to the end voltage of 6 x 1.80V, carrying out capacity detection;
1.11, calculating the ratio of the actual discharge capacity to the rated capacity of the storage battery pack to obtain the cyclic overdischarge capacity decay rate Caoc.
In a method for recovering capacity of a lead acid battery after abuse over-discharge, the improvement comprising the steps of:
2.1 overdischarged laggard cells will be abused with I10A, carrying out deep discharge, wherein the termination voltage is 1.25V;
2.2 at constant pressure 2.35V, current limit 2I10Under the condition of A, continuously charging for 36 hours;
2.3, repeating the steps 2.1 and 2.2 for 3 times;
2.4, with I10And discharging the A to the end voltage of 1.80V, carrying out capacity detection, and calculating the ratio of the actual discharge capacity to the rated capacity to obtain the repaired capacity recovery rate Caor.
Compared with the prior art, the invention has the following positive effects:
1. the method is reasonable, the steps are simple and convenient, and the operability is good;
2. the abuse overdischarge capacity rate and the cycle overdischarge capacity attenuation rate are accurately obtained through testing, and the quantitative pre-evaluation method is high in accuracy and beneficial to timely guidance of design, so that the aim of reducing the research and development period and the cost is fulfilled;
3. the method for rapidly evaluating the over-discharge performance of the lead-acid storage battery and the method for recovering the capacity of the lagging battery are provided for users, and the running efficiency of the matched storage battery can be optimized and adjusted in time.
Detailed Description
The invention is further illustrated by the method for evaluating the abuse and overdischarge performance of lead-acid storage batteries with different design schemes.
Before evaluation, a design scheme A and a design scheme B are selected to prepare samples respectively, the samples in the embodiment are 2V lead-acid storage batteries with the specification of 200AH, the number of the lead-acid storage batteries is 9 respectively, 6 lead-acid storage batteries in each scheme are used for the lead-acid storage battery abuse overdischarge performance evaluation method and the capacity recovery method, and the remaining 3 lead-acid storage batteries in each scheme are used for 100% DOD cycle life test.
The method for evaluating the abuse overdischarge performance of the lead-acid storage battery comprises the following steps of respectively preparing samples by using a design scheme A and a design scheme B, and evaluating the environment at 25 +/-2 ℃, wherein the method comprises the following steps:
1.1, according to the conventional configuration, selecting 6 lead-acid storage batteries with the same specification to be connected in series into a group, firstly carrying out I10A is discharged, then 2.35V and 2I current limiting are adopted10Charging for 16 hours;
1.2, from which 1 lead-acid battery can optionally be used alone I10Discharging for 4 hours by the current A, and connecting the current A with other 5 fully charged lead-acid storage batteries in series to form a storage battery pack;
1.3, storage battery set I10Discharging by the current A until the voltage of 5 fully charged lead-acid storage batteries is reduced to 5 x 1.80V, stopping discharging, and standing for 2 hours;
1.4, 2.35V/battery pack with constant voltage and 2I current limiting10A, continuously charging for 144 hours;
1.5 when the battery set is I10When the A is discharged to the total voltage of 6 x 1.80V, carrying out capacity detection and converting the capacity value into a capacity value in a reference state at 25 ℃;
1.6, calculating the real discharge capacity and rated capacity C of the storage battery pack10Obtaining the abuse overdischarge capacity rate Caod;
1.7 for storage battery set I10A, discharging, and stopping the voltage to be 6 x 1.4V;
1.8 at constant pressure 6 x 2.35V, current limiting 2I10Under the condition A, the storage battery pack is charged for 36 hours in a connecting way;
1.9, repeating the steps 1.7 and 1.8 for 5 times;
1.10, secondary battery with I10When A discharges to the end voltage of 6 x 1.80V, carrying out capacity detection;
1.11, calculating the ratio of the actual discharge capacity to the rated capacity of the storage battery pack to obtain the cyclic overdischarge capacity decay rate Caoc.
The method for recovering the capacity of the lead-acid storage battery after abuse and overdischarge needs to be carried out after the evaluation, and comprises the following specific steps:
2.1 overdischarged laggard cells will be abused with I10A, carrying out deep discharge, wherein the termination voltage is 1.25V;
2.2 at constant pressure 2.35V, current limit 2I10Under the condition of A, continuously charging for 36 hours;
2.3, repeating the steps 2.1 and 2.2 for 3 times;
2.4, with I10And discharging the A to the end voltage of 1.80V, carrying out capacity detection, and calculating the ratio of the actual discharge capacity to the rated capacity to obtain the repaired capacity recovery rate Caor.
After the sample of the design scheme A and the sample of the design scheme B are subjected to the steps, an abuse overdischarge capacity rate Caod, a cycle overdischarge capacity decay rate Caoc and a repaired capacity recovery rate are respectively obtained, and specific data are shown in the following table:
A. sample abuse overdischarge performance evaluation and capacity recovery data comparison table of B design scheme
Figure 175305DEST_PATH_IMAGE001
In order to further verify the similarity of the test result of the invention and the actual situation, 3 samples reserved in the design scheme A and the design scheme B are taken to respectively carry out 100 percent DOD cycle life test, and the specific test conditions and steps are as follows:
firstly, discharging a lead-acid storage battery sample at 20A until the termination voltage is 1.80V;
then, charging was continued for 16 hours under the conditions of constant voltage of 7.05V and current limiting of 40A;
the two steps are repeated until the capacity is less than 80% of the rated capacity.
And (3) testing results:
the sample discharge depth 100% DOD cycle life of the design scheme A is 507 times, the sample discharge depth 100% DOD cycle life of the design scheme B is 302 times, and the sample of the design scheme A is obviously better than the sample of the design scheme B through comparison.
The quantitative evaluation method is simple, convenient and accurate, has good timeliness, and is beneficial to further guiding design, so that the aim of reducing the research and development period and the cost is fulfilled. The invention can recover the capacity of the backward battery generated by abuse and overdischarge, and is beneficial to optimizing and adjusting the running efficiency of the matched battery pack in time.

Claims (2)

1. The method for evaluating the abuse and overdischarge performance of the lead-acid storage battery is characterized in that the evaluation is carried out in an environment of 25 +/-2 ℃, and the method comprises the following specific steps:
1.1, according to the conventional configuration, selecting 6 lead-acid storage batteries with the same specification to be connected in series into a group, firstly carrying out I10A is discharged, then 2.35V and 2I current limiting are adopted10Charging for 16 hours;
1.2, from which 1 lead-acid battery can optionally be used alone I10Discharging for 4 hours by the current A, and connecting the overdischarged lag battery with other 5 fully charged lead-acid storage batteries in series to form a storage battery pack;
1.3, storage battery set I10Discharging by the current A until the voltage of 5 fully charged lead-acid storage batteries is reduced to 5 x 1.80V, stopping discharging, and standing for 2 hours;
1.4, 2.35V/battery pack with constant voltage and 2I current limiting10A, continuously charging for 144 hours;
1.5 when the battery set is I10When the A is discharged to the total voltage of 6 x 1.80V, carrying out capacity detection and converting the capacity value into a capacity value in a reference state at 25 ℃;
1.6, calculating the real discharge capacity of the storage battery packTo rated capacity C10Obtaining the abuse overdischarge capacity rate Caod;
1.7 for storage battery set I10A, discharging, and stopping the voltage to be 6 x 1.4V;
1.8 at constant pressure 6 x 2.35V, current limiting 2I10Under the condition A, the storage battery pack is charged for 36 hours in a connecting way;
1.9, repeating the steps 1.7 and 1.8 for 5 times;
1.10, secondary battery with I10When A discharges to the end voltage of 6 x 1.80V, carrying out capacity detection;
1.11, calculating the ratio of the actual discharge capacity to the rated capacity of the storage battery pack to obtain the cyclic overdischarge capacity decay rate Caoc.
2. A method for recovering the capacity of a lead-acid battery after abuse overdischarge according to claim 1, characterized in that the method comprises the following steps:
2.1 overdischarged laggard cells will be abused with I10A, carrying out deep discharge, wherein the termination voltage is 1.25V;
2.2 at constant pressure 2.35V, current limit 2I10Under the condition of A, continuously charging for 36 hours;
2.3, repeating the steps 2.1 and 2.2 for 3 times;
2.4, with I10And discharging the A to the end voltage of 1.80V, carrying out capacity detection, and calculating the ratio of the actual discharge capacity to the rated capacity to obtain the repaired capacity recovery rate Caor.
CN201810795279.5A 2018-07-19 2018-07-19 Lead-acid storage battery abuse overdischarge performance evaluation method and capacity recovery method Active CN109116246B (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201810795279.5A CN109116246B (en) 2018-07-19 2018-07-19 Lead-acid storage battery abuse overdischarge performance evaluation method and capacity recovery method
PCT/CN2018/112341 WO2020015226A1 (en) 2018-07-19 2018-10-29 Abuse and over-discharge performance evaluation and capacity recovery method for lead-acid battery
AU2018432963A AU2018432963A1 (en) 2018-07-19 2018-10-29 Abuse and over-discharge performance evaluation and capacity recovery method for lead-acid battery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810795279.5A CN109116246B (en) 2018-07-19 2018-07-19 Lead-acid storage battery abuse overdischarge performance evaluation method and capacity recovery method

Publications (2)

Publication Number Publication Date
CN109116246A CN109116246A (en) 2019-01-01
CN109116246B true CN109116246B (en) 2020-04-28

Family

ID=64862997

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810795279.5A Active CN109116246B (en) 2018-07-19 2018-07-19 Lead-acid storage battery abuse overdischarge performance evaluation method and capacity recovery method

Country Status (3)

Country Link
CN (1) CN109116246B (en)
AU (1) AU2018432963A1 (en)
WO (1) WO2020015226A1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112098862B (en) * 2020-08-04 2023-03-28 中汽研汽车检验中心(天津)有限公司 Method for testing and evaluating overdischarge tolerance of lithium ion battery monomer
CN111999671B (en) * 2020-08-04 2023-01-10 中汽研汽车检验中心(天津)有限公司 Lithium ion battery overdischarge excess capacity value calculation method
CN113113684B (en) * 2021-03-30 2022-06-10 天能电池集团股份有限公司 Lead storage battery treatment method for improving wet pressure and discharge performance of unit cell

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011127973A (en) * 2009-12-16 2011-06-30 Kawasaki Heavy Ind Ltd State of charge estimation method and device for secondary battery
CN105790376B (en) * 2016-04-28 2019-03-05 王托 The Activiation method of overdischarge plumbic acid valve control battery group
CN106093787A (en) * 2016-07-01 2016-11-09 天能电池集团有限公司 A kind of battery of electric bicycle deeper cavity life detecting method

Also Published As

Publication number Publication date
CN109116246A (en) 2019-01-01
AU2018432963A1 (en) 2020-04-16
WO2020015226A1 (en) 2020-01-23

Similar Documents

Publication Publication Date Title
CN106291372B (en) A kind of new lithium-ion-power cell method for predicting residual useful life
CN110165319B (en) Sorting method for self-discharge performance of high-capacity lithium battery
WO2018209784A1 (en) Lithium precipitation detection method for battery, battery management system, and battery system
CN110988086B (en) Method for detecting structural stability of electrode material in battery cycle process
CN109116246B (en) Lead-acid storage battery abuse overdischarge performance evaluation method and capacity recovery method
CN103579700B (en) A kind of lithium ion battery sorting method for group matching
CN110548702B (en) Consistency screening method for power type lithium battery
CN109201521B (en) Self-discharge screening process for nickel-cobalt lithium manganate lithium ion battery
CN103269096A (en) Battery pack equilibrium method based on clustering analysis
CN110726940B (en) Method for rapidly evaluating cycle performance of high-nickel cathode material of lithium ion battery
CN102074757A (en) Method for estimating charge states of lithium ion battery
CN103008261A (en) Method for sorting degrees of self-discharging of lithium ion batteries
CN107607874A (en) The bikini screening technique of quick charge/discharge lithium ion battery
CN110749832B (en) Method for quickly estimating actual capacity of retired lithium ion battery of electric vehicle
CN108732499B (en) Method and system for detecting cycle life of lithium ion battery
CN110031771A (en) A method of description battery consistency
CN112186278B (en) Lithium ion battery matching method
CN111064253A (en) Battery health degree rapid evaluation method based on average discrete Frechet distance
CN110850323A (en) Method and device for evaluating accelerated attenuation of retired ternary lithium battery
CN111366864A (en) Battery SOH on-line estimation method based on fixed voltage rise interval
CN101388562B (en) Fast charging method
CN107838057A (en) A kind of quick method for separating of ternary lithium ion battery
CN207852740U (en) A kind of screening system of lithium iron phosphate dynamic battery group self discharge consistency
CN110865307A (en) Battery module complementary energy detection method
CN107045105B (en) A kind of Li-ion batteries piles utilisable energy calculation method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant