CN109116246A - Lead-acid accumulator abuses over-discharge property evaluation and capacity restoration method - Google Patents

Lead-acid accumulator abuses over-discharge property evaluation and capacity restoration method Download PDF

Info

Publication number
CN109116246A
CN109116246A CN201810795279.5A CN201810795279A CN109116246A CN 109116246 A CN109116246 A CN 109116246A CN 201810795279 A CN201810795279 A CN 201810795279A CN 109116246 A CN109116246 A CN 109116246A
Authority
CN
China
Prior art keywords
discharge
capacity
lead
acid accumulator
abuse
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810795279.5A
Other languages
Chinese (zh)
Other versions
CN109116246B (en
Inventor
薛奎网
吴宏亮
徐小亮
曾刘芳
刘巍
杨宝峰
楼志强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shuangdeng Group Co Ltd
Original Assignee
Shuangdeng Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shuangdeng Group Co Ltd filed Critical Shuangdeng Group Co Ltd
Priority to CN201810795279.5A priority Critical patent/CN109116246B/en
Priority to PCT/CN2018/112341 priority patent/WO2020015226A1/en
Priority to AU2018432963A priority patent/AU2018432963A1/en
Publication of CN109116246A publication Critical patent/CN109116246A/en
Application granted granted Critical
Publication of CN109116246B publication Critical patent/CN109116246B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/06Lead-acid accumulators
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries

Abstract

The invention discloses a kind of abuse over-discharge property evaluations of lead-acid accumulator, the evaluation mainly passes through abuse over-discharge property test, obtain abuse over-discharge capacitance rate Caod, again by being circulated throughout discharge test, it obtains over-discharge capacitance fall-off rate Caoc, related design scheme superiority and inferiority and overdischarge ability is commented in advance with this.The invention also discloses lead-acid accumulators to abuse the capacity restoration method after overdischarge, and this method activates built-in active material by deep discharge, to promote behindhand battery capacity restoration.Generally speaking, the present invention uses quantitative evaluation method, and not only easy is that accurately, and timeliness is good, is conducive to design, can substantially reduce R&D cycle and cost again.User can optimize and revise the operational efficiency of mating battery pack using the present invention in time.

Description

Lead-acid accumulator abuses over-discharge property evaluation and capacity restoration method
Technical field
The invention belongs to Lead-acid Battery Technology fields, in particular it relates to which a kind of lead-acid accumulator was abused Discharge performance evaluation further relates to make capacity restoration method to the behindhand battery that abuse overdischarge generates.
Background technique
There is " bucket effect " in lead-acid batteries use process, i.e., the performance that behindhand battery drags down other batteries refers to Mark.Since the industry is vacant few to behindhand battery evaluation means in advance, especially to lead-acid accumulator abuse overdischarge evaluation, There is no a kind of pair of behindhand battery to make the method for capacity restoration.So estimated performance index is not achieved in the battery pack applied in engineering The case where happen occasionally, such technical problem solves bad easy initiation supply and demand side contradiction.In reality, made by different designs scheme Cycle life of lead-acid accumulator, overdischarge ability and homogeneity of product have a certain amount of otherness, and these othernesses Qualitative assessment can not be made in the R & D design stage, detection in kind can only be made of manufactured sample can just obtain relatively reliable number According to.Although present technology is easy with detection realization in kind, method is easy, data are accurate, proving period is too long, and timeliness is poor, It is unfavorable for Instructing manufacture.In addition, lead-acid accumulator also brings along micro performance difference in the fabrication process because of fabrication error, only Wanting performance indicator not overproof is qualified product.But user has overdischarge in use, owes charging situation, such situation It is easy to cause behindhand battery.In view of above-mentioned two situations, study it is a kind of for lead-acid accumulator abuse over-discharge property evaluation and Capacity restoration method is necessary, is conducive to manufacturer and carries out Development Scheme in time to score folding, quantitative analysis, due to analysis side Method is reasonable, accurately and reliably, reduces blindness, can shorten the R&D cycle, reduces research and development cost.On the other hand it is timely to be also convenient for user Make capacity resuming, creates a good basic condition to improve the operational efficiency of battery.
Summary of the invention
The problem of lacking present invention is generally directed to the industry to lead-acid accumulator correlated performance detection method, proposes a kind of side Method is easy, implements lead acid storage battery abuse over-discharge property evaluation that is easy, can making quantitative analysis.The invention also includes to abusing The behindhand battery that electric discharge generates makees capacity restoration method.
The present invention is achieved through the following technical solutions technical goal.
Lead-acid accumulator abuse over-discharge property evaluation, the improvement is that the evaluation under 25 DEG C of ± 2 DEG C of environment into Row, the specific steps are as follows:
1.1, the lead-acid accumulator of 6 same sizes in the conventional arrangement, is selected to be connected into one group, first progress I10A electric discharge, so 2.35V current limliting 2I is used afterwards10A charges 16 hours;
1.2, therefrom optional 1 lead-acid accumulator individually uses I10A current discharge 4 hours, then with other 5 full charge of lead Acid accumulator is serially connected in battery group;
1.3, battery group is with I10A current discharge, until 5 lead-acid accumulator voltages of original full charge are down to total voltage 5* When 1.80V, stop electric discharge, stands 2 hours;
1.4, to battery group with constant pressure 2.35V/ only, current limliting 2I10A, trickle charge 144 hours;
1.5, when battery group is with I10When A is discharged to total voltage 6*1.80V, capacity check is carried out, and is converted into 25 DEG C of benchmark Capability value under state;
1.6, the reality for calculating battery group puts capacity and rated capacity C10Ratio, obtain abuse over-discharge capacitance rate Caod;
1.7, to battery group with I10A enters electric discharge, final voltage 6*1.4V;
1.8, in constant pressure 6*2.35V, current limliting 2I10Under the conditions of A, to the connection of battery group charging 36 hours;
1.9, totally 5 steps of repetition 1.7 and 1.8;
1.10, battery group is with I10When A is discharged to final voltage 6*1.80V, capacity check is carried out;
1.11, calculating accumulator group puts capacity and rated capacity ratio in fact, obtains and is circulated throughout discharge capacity attenuation rate Caoc.
Lead-acid accumulator abuse overdischarge after capacity restoration method, the improvement is that this method follow these steps into Row:
2.1 will abuse the behindhand battery of overdischarge, with I10A carries out deep discharge, and final voltage is 1.25 V;
2.2, in constant pressure 2.35V, current limliting 2I10Under the conditions of A, trickle charge 36 hours;
2.3, totally 3 steps of repetition 2.1 and 2.2;
2.4, with I10A is discharged to final voltage 1.80V, carries out capacity check, calculates the real ratio for putting capacity and rated capacity, Obtain the capacity restoration rate Caor after repairing.
Compared with prior art, the present invention having the positive effect that:
1, method is reasonable, step is easy, operability is good;
2, abuse over-discharge capacitance rate is accurately obtained by test and is circulated throughout discharge capacity attenuation rate, such quantitative pre assessment side Method accuracy is high, is conducive to timely design, to achieve the purpose that reduce R&D cycle and cost;
3, method and the behindhand battery capacity restoration side of a kind of Fast Evaluation lead-acid accumulator over-discharge property are provided for user Method can optimize and revise the operational efficiency of Accessory Battery group in time.
Specific embodiment
The evaluation of abuse over-discharge property was abused below by the lead-acid accumulator of different designs scheme, to further illustrate The present invention.
A design scheme and B design scheme is selected to prepare sample respectively before evaluation, sample specification is in the present embodiment 2V, 200AH lead-acid accumulator, quantity are each 9, have 6 to be served only for lead-acid accumulator abuse overdischarge of the present invention in every scheme Performance evaluation and capacity restoration method, every scheme remaining 3 are served only for the test of 100%DOD cycle life.
Lead-acid accumulator abuses over-discharge property evaluation, takes A design scheme and B design scheme prepares sample respectively, comment Valence environment is 25 DEG C ± 2 DEG C, the specific steps are as follows:
1.1, the lead-acid accumulator of 6 same sizes in the conventional arrangement, is selected to be connected into one group, first progress I10A electric discharge, so 2.35V current limliting 2I is used afterwards10A charges 16 hours;
1.2, therefrom optional 1 lead-acid accumulator individually uses I10A current discharge 4 hours, then with other 5 full charge of lead Acid accumulator is serially connected in battery group;
1.3, battery group is with I10A current discharge, until 5 lead-acid accumulator voltages of original full charge are down to total voltage 5* When 1.80V, stop electric discharge, stands 2 hours;
1.4, to battery group with constant pressure 2.35V/ only, current limliting 2I10A, trickle charge 144 hours;
1.5, when battery group is with I10When A is discharged to total voltage 6*1.80V, capacity check is carried out, and is converted into 25 DEG C of benchmark Capability value under state;
1.6, the reality for calculating battery group puts capacity and rated capacity C10Ratio, obtain abuse over-discharge capacitance rate Caod;
1.7, to battery group with I10A enters electric discharge, final voltage 6*1.4V;
1.8, in constant pressure 6*2.35V, current limliting 2I10Under the conditions of A, to the connection of battery group charging 36 hours;
1.9, totally 5 steps of repetition 1.7 and 1.8;
1.10, battery group is with I10When A is discharged to final voltage 6*1.80V, capacity check is carried out;
1.11, calculating accumulator group puts capacity and rated capacity ratio in fact, obtains and is circulated throughout discharge capacity attenuation rate Caoc.
Lead-acid accumulator abuses the capacity restoration method after overdischarge, it is necessary to carry out after above-mentioned evaluation, specific steps It is as follows:
2.1 will abuse the behindhand battery of overdischarge, with I10A carries out deep discharge, and final voltage is 1.25 V;
2.2, in 2.35 V of constant pressure, current limliting 2I10Under the conditions of A, trickle charge 36 hours;
2.3, totally 3 steps of repetition 2.1 and 2.2;
2.4, with I10A is discharged to 1.80 V of final voltage, carries out capacity check, calculates the real ratio for putting capacity and rated capacity, Obtain the capacity restoration rate Caor after repairing.
The sample of A design scheme and the sample of B design scheme obtain abuse over-discharge capacitance after above-mentioned steps respectively Rate Caod, it is circulated throughout capacity restoration rate after discharge capacity attenuation rate Caoc and reparation, specific data see the table below:
A, the evaluation of B design scheme sample abuse over-discharge property, the capacity restoration data table of comparisons
In order to further verify the similitude of test result and reality of the present invention, the sample and B design of A design scheme are taken Each 3 reserved samples of scheme make the test of 100%DOD cycle life, specific test condition and steps are as follows respectively:
Firstly, lead-acid accumulator sample is discharged with 20A, until final voltage is 1.80V;
Then, trickle charge 16 hours under the conditions of constant pressure 7.05V, current limliting 40A;
Upper two steps are repeated, until capacity is less than 80% rated capacity.
Test result:
The sample depth of discharge 100%DOD cycle life of A design scheme is 507 times, B design scheme sample depth of discharge 100% DOD cycle life is 302 times, is compared A design scheme sample significantly better than B design scheme sample.
The present invention uses quantitative evaluation method, not only easy but also accurate, and timeliness is good, is conducive to further instruct to set Meter, to achieve the purpose that reduce R&D cycle and cost.User is with the application of the invention, the backwardness of overdischarge generation can will be abused Battery carries out capacity restoration, is conducive to the operational efficiency for optimizing and revising mating battery pack in time.

Claims (2)

1. a kind of lead-acid accumulator abuse over-discharge property evaluation, it is characterised in that the evaluation carries out under 25 DEG C of ± 2 DEG C of environment, Specific step is as follows:
1.1, the lead-acid accumulator of 6 same sizes in the conventional arrangement, is selected to be connected into one group, first progress I10A electric discharge, then Using 2.35V current limliting 2I10A charges 16 hours;
1.2, therefrom optional 1 lead-acid accumulator individually uses I10A current discharge 4 hours, then with other 5 full charge of plumbic acids Battery is serially connected in battery group;
1.3, battery group is with I10A current discharge, until 5 lead-acid accumulator voltages of original full charge are down to total voltage 5* When 1.80V, stop electric discharge, stands 2 hours;
1.4, to battery group with constant pressure 2.35V/ only, current limliting 2I10A, trickle charge 144 hours;
1.5, when battery group is with I10When A is discharged to total voltage 6*1.80V, capacity check is carried out, and is converted into 25 DEG C of benchmark Capability value under state;
1.6, the reality for calculating battery group puts capacity and rated capacity C10Ratio, obtain abuse over-discharge capacitance rate Caod;
1.7, to battery group with I10A enters electric discharge, final voltage 6*1.4V;
1.8, in constant pressure 6*2.35V, current limliting 2I10Under the conditions of A, to the connection of battery group charging 36 hours;
1.9, totally 5 steps of repetition 1.7 and 1.8;
1.10, battery group is with I10When A is discharged to final voltage 6*1.80V, capacity check is carried out;
1.11, calculating accumulator group puts capacity and rated capacity ratio in fact, obtains and is circulated throughout discharge capacity attenuation rate Caoc.
2. the capacity restoration method after mating lead-acid accumulator abuse overdischarge described in claim 1, it is characterised in that the party Method follows these steps to carry out:
2.1 will abuse the behindhand battery of overdischarge, with I10A carries out deep discharge, and final voltage is 1.25 V;
2.2, in 2.35 V of constant pressure, current limliting 2I10Under the conditions of A, trickle charge 36 hours;
2.3, totally 3 steps of repetition 2.1 and 2.2;
2.4, with I10A is discharged to 1.80 V of final voltage, carries out capacity check, calculates the real ratio for putting capacity and rated capacity, Obtain the capacity restoration rate Caor after repairing.
CN201810795279.5A 2018-07-19 2018-07-19 Lead-acid storage battery abuse overdischarge performance evaluation method and capacity recovery method Active CN109116246B (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201810795279.5A CN109116246B (en) 2018-07-19 2018-07-19 Lead-acid storage battery abuse overdischarge performance evaluation method and capacity recovery method
PCT/CN2018/112341 WO2020015226A1 (en) 2018-07-19 2018-10-29 Abuse and over-discharge performance evaluation and capacity recovery method for lead-acid battery
AU2018432963A AU2018432963A1 (en) 2018-07-19 2018-10-29 Abuse and over-discharge performance evaluation and capacity recovery method for lead-acid battery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810795279.5A CN109116246B (en) 2018-07-19 2018-07-19 Lead-acid storage battery abuse overdischarge performance evaluation method and capacity recovery method

Publications (2)

Publication Number Publication Date
CN109116246A true CN109116246A (en) 2019-01-01
CN109116246B CN109116246B (en) 2020-04-28

Family

ID=64862997

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810795279.5A Active CN109116246B (en) 2018-07-19 2018-07-19 Lead-acid storage battery abuse overdischarge performance evaluation method and capacity recovery method

Country Status (3)

Country Link
CN (1) CN109116246B (en)
AU (1) AU2018432963A1 (en)
WO (1) WO2020015226A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111999671A (en) * 2020-08-04 2020-11-27 中汽研汽车检验中心(天津)有限公司 Lithium ion battery overdischarge excess capacity value calculation method
CN113113684A (en) * 2021-03-30 2021-07-13 天能电池集团股份有限公司 Lead storage battery treatment method for improving wet pressure and discharge performance of unit cell

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112098862B (en) * 2020-08-04 2023-03-28 中汽研汽车检验中心(天津)有限公司 Method for testing and evaluating overdischarge tolerance of lithium ion battery monomer

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011127973A (en) * 2009-12-16 2011-06-30 Kawasaki Heavy Ind Ltd State of charge estimation method and device for secondary battery
CN105790376A (en) * 2016-04-28 2016-07-20 王托 Activation method of over-discharged lead acid valve-regulated battery
CN106093787A (en) * 2016-07-01 2016-11-09 天能电池集团有限公司 A kind of battery of electric bicycle deeper cavity life detecting method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011127973A (en) * 2009-12-16 2011-06-30 Kawasaki Heavy Ind Ltd State of charge estimation method and device for secondary battery
CN105790376A (en) * 2016-04-28 2016-07-20 王托 Activation method of over-discharged lead acid valve-regulated battery
CN106093787A (en) * 2016-07-01 2016-11-09 天能电池集团有限公司 A kind of battery of electric bicycle deeper cavity life detecting method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111999671A (en) * 2020-08-04 2020-11-27 中汽研汽车检验中心(天津)有限公司 Lithium ion battery overdischarge excess capacity value calculation method
CN111999671B (en) * 2020-08-04 2023-01-10 中汽研汽车检验中心(天津)有限公司 Lithium ion battery overdischarge excess capacity value calculation method
CN113113684A (en) * 2021-03-30 2021-07-13 天能电池集团股份有限公司 Lead storage battery treatment method for improving wet pressure and discharge performance of unit cell
CN113113684B (en) * 2021-03-30 2022-06-10 天能电池集团股份有限公司 Lead storage battery treatment method for improving wet pressure and discharge performance of unit cell

Also Published As

Publication number Publication date
CN109116246B (en) 2020-04-28
AU2018432963A1 (en) 2020-04-16
WO2020015226A1 (en) 2020-01-23

Similar Documents

Publication Publication Date Title
CN104459558B (en) Lithium ion battery screening technique
CN103611692B (en) Lithium iron phosphate power battery consistency matching screening method
CN104269574B (en) A kind of set of cells method for separating
CN110548702B (en) Consistency screening method for power type lithium battery
CN105322245B (en) A kind of charging method for improving lithium ion battery charge efficiency
CN107607881A (en) A kind of evaluation method of lithium-ion-power cell self discharge uniformity
CN102074757A (en) Method for estimating charge states of lithium ion battery
CN106824831A (en) A kind of manufacture method of the motive-power battery for improving lithium ion battery uniformity
CN104438138B (en) Lithium ion battery screening method
US10073145B2 (en) Method and system for estimating state of charge of battery
CN103163480A (en) Method for estimating health state of lithium battery
CN110085933B (en) Lead storage battery matching method
CN109116246A (en) Lead-acid accumulator abuses over-discharge property evaluation and capacity restoration method
CN107843846A (en) A kind of health state of lithium ion battery method of estimation
CN104577226B (en) A kind of method for group matching improving power battery pack service life cycle
CN103594742A (en) Sorting and grouping method for power lead-acid storage battery set
CN113285132B (en) Method for making lithium ion battery step charging system and application
CN104991196A (en) Battery power measurement method
CN110726940A (en) Method for rapidly evaluating cycle performance of high-nickel cathode material of lithium ion battery
CN113533981B (en) Lithium ion battery self-discharge detection method, equipment and computer readable storage medium
CN101614793B (en) Method for evaluating consistency of batteries
CN112186278A (en) Lithium ion battery matching method
CN107838057A (en) A kind of quick method for separating of ternary lithium ion battery
CN207852740U (en) A kind of screening system of lithium iron phosphate dynamic battery group self discharge consistency
CN102456912A (en) Lithium iron phosphate lithium ion battery as well as electricity quantity status test method and pairing method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant