CN109113058A - A kind of new type cement soil composite pile - Google Patents

A kind of new type cement soil composite pile Download PDF

Info

Publication number
CN109113058A
CN109113058A CN201810930779.5A CN201810930779A CN109113058A CN 109113058 A CN109113058 A CN 109113058A CN 201810930779 A CN201810930779 A CN 201810930779A CN 109113058 A CN109113058 A CN 109113058A
Authority
CN
China
Prior art keywords
pile
stake
buried
new type
cloth bag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810930779.5A
Other languages
Chinese (zh)
Inventor
孙军
杨泓斌
张亮亮
郑泽杭
李缙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Bozhilin Robot Co Ltd
Original Assignee
Green Mountain High Tech Construction Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Green Mountain High Tech Construction Technology Co Ltd filed Critical Green Mountain High Tech Construction Technology Co Ltd
Priority to CN201810930779.5A priority Critical patent/CN109113058A/en
Publication of CN109113058A publication Critical patent/CN109113058A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/50Piles comprising both precast concrete portions and concrete portions cast in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/60Piles with protecting cases

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention proposes a kind of new type cement soil composite pile, including main pile body, stake core, sand-gravel cushion and soil around pile, the middle position inside main pile body is arranged in the stake core, the stake core is internally provided with filling cavity, the outside of main pile body is uniformly arranged in the soil around pile, and the two sides inside the soil around pile are all equipped with pre-buried drainpipe, the top of main pile body is arranged in the sand-gravel cushion, the bottom of the stake core is welded with button muscle mounting plate, the surface of the button muscle mounting plate is welded with fixing button muscle, a stem is installed at the top of the fixing button muscle, the surface wrap of the stake stem has reinforcing bar, buffer layer is provided on the outside of the stake core, geotechnological cloth bag layer is provided on the outside of the buffer layer, the inside of geotechnique's cloth bag layer is filled with geotechnological cloth bag.The present invention makes the present apparatus have the characteristics that stable structure by the way that a series of structure is arranged, is easily installed and good fixing effect.

Description

A kind of new type cement soil composite pile
Technical field
The present invention relates to building engineering fields, and in particular to a kind of new type cement soil composite pile.
Background technique
Composite pile is that ground field proposes a kind of new pile-type in recent years, solves stratum limitation, the work of traditional pile-type Problems, the ways such as skill backwardness, project cost height are soil cement stud of first constructing, certain after the outer pile driving construction of soil cement Construction core stake in time, forms the composite pile of external flexible, internal rigid.The construction method of soil cement stud is revolved frequently with high pressure Spray, cement mixing or mixing jet-grouting etc. use the methods of to sink to, drill or hammer after pile and are inserted into core stake, formed multiple Stake is closed, although compound pile installation and construction method type are many, most pile-type is by the otherness on stratum, the condensation of soil cement Time, the influence difficulty of construction of core pile forming technology are larger, and construction quality and duration are not easy to guarantee.
The relatively flourishing coastal region in east China of economy in China, widely distributed moisture content is high, compressibility is big, permeability Difference, intensity is low, mud of high sensitivity and Muddy Bottoms bury, and mixing pile pile strength size and play degree by soil property, The influence of the factors such as underground water is very big, especially encounters muck soil, peat soil etc., construction quality is difficult to control;Precast concrete Core stake needs to be aligned before sinking to stirring pile center, in the actual construction process, it is difficult to ensure that core stake stake position is absolute placed in the middle, and It is easily glanced off during sinking to, is finally difficult to reach the desired effect of composite pile;The stake of injection core, not only needs in soil cement Biggish energy is consumed, and it is also larger to surrounding environment influence to vibrate itself, simultaneously because vibration-extrusion acts on, in stake week The excess pore water pressure generated in soil is also not easy to dissipate.
Summary of the invention
In view of the above-mentioned problems, the present invention proposes a kind of new type cement soil composite pile, including main pile body, stake core, sandstone pad The middle position inside main pile body is arranged in layer and soil around pile, the stake core, and being internally provided with for the stake core is filling Cavity, by being provided with filling cavity, enable the present apparatus cylinder be earthed it is inner before, be in cavity structure, total Quality is small, and the outside of main pile body, and two inside the soil around pile are uniformly arranged in easy to remove and installation, the soil around pile Side is all equipped with pre-buried drainpipe, and the top of main pile body is arranged in the sand-gravel cushion, and pre-buried drainpipe and main pile body stake top are spread If sand-gravel cushion collectively form consolidation draining channel, can quickly be discharged in work progress and the work groundwork soil body in it is extra Pore water.
The present invention proposes a kind of new type cement soil composite pile, including main pile body, stake core, sand-gravel cushion and soil around pile, institute The middle position that a core is arranged in inside main pile body is stated, the stake core is internally provided with filling cavity, the stake week The native outside that main pile body is uniformly set, and the two sides inside the soil around pile are all equipped with pre-buried drainpipe, the sandstone The top of main pile body is arranged in bed course.
Further improvement lies in that: the bottom of the stake core is welded with button muscle mounting plate, the surface of the button muscle mounting plate It is welded with fixing button muscle.
Further improvement lies in that: a stem is installed, the surface wrap of the stake stem has at the top of the fixing button muscle Reinforcing bar.
Further improvement lies in that: buffer layer is provided on the outside of the stake core, the inside of the buffer layer, which is filled with, to be subtracted Blanket, geotechnological cloth bag layer is provided on the outside of the buffer layer, and the inside of geotechnique's cloth bag layer is filled with geotechnological cloth bag, institute The inside for stating geotechnological cloth bag layer is equipped with fixed plate against pressure.
Further improvement lies in that: the inside of the stake core is equipped with pre-buried Screw Pile, the surface of the pre-buried Screw Pile It is provided with screw thread, is welded with Screw Pile plush copper at the top of the pre-buried Screw Pile.
Further improvement lies in that: the fixing button muscle, stake stem, pre-threaded stake and pre-buried drainpipe surface be all arranged There is anticorrosive coating.
Further improvement lies in that: the surface of the pre-buried drainpipe is provided with radial hole, the top of the pre-buried drainpipe It is provided with discharge outlet, the two sides of main pile body are arranged in the discharge outlet.
Further improvement lies in that: the quantity of the pre-buried drainpipe is 2~4, the length of every pre-buried drainpipe It is identical as the geotextiles bag length, pre-buried drainpipe is fixed on the outside of geotextiles every 50cm~100cm using adhesive tape.
Further improvement lies in that: the material of the pre-threaded stake is steel alloy material, and inside is solid construction.
Beneficial effects of the present invention:
One, the present invention is by being provided with filling cavity, enable the present apparatus cylinder be earthed it is inner before, be in cavity knot Structure, total quality is small, and the outside of main pile body, and the stake is uniformly arranged in easy to remove and installation, the soil around pile The internal two sides of all soil are all equipped with pre-buried drainpipe, and the sand-gravel cushion is arranged in the top of main pile body, pre-buried drainpipe and The sand-gravel cushion that main pile body stake top is laid with collectively forms consolidation draining channel, can quickly be discharged in work progress and work groundwork Extra pore water in the soil body;
Two, by being provided with geotechnological cloth bag layer and being filled with geotechnological cloth bag, geotechnological cloth bag in the inside of geotechnological cloth bag layer Use, play package effect of contraction, can effectively control the pile quality and stake diameter of cement earth pile, avoid the bad water in underground The erosion damage of confrontation pile body, even if it is good, strong also to obtain pile body uniformity in the soft foundations such as muck soil, peat soil Spend high cement earth pile;
Three, by being welded with button muscle mounting plate in the bottom of stake core, fixing button muscle is installed at the top of button muscle mounting plate, A stem is installed at the top of fixing button muscle, the surface wrap of stake stem has reinforcing bar, so that the present apparatus is being embedded in face of ground, it can By fixing button muscle in depth bottom, ground grip ability are strong, are structure as a whole by fixing button muscle and stake stem, so that the present apparatus is whole Stable structure;
Four, by being provided with buffer layer on the outside of stake core, buffer layer is internally provided with vibration-absorptive material, so that this dress Set can be carried out effectively it is shockproof;
Five, by being equipped with pre-buried Screw Pile, pre-threaded stake is installed after stake core pours, and passes through prefabricated spiral shell The crowd in-out effects that line stake generates cement earth pile during merging, so that present apparatus stake core is more firm and pre-buried screw thread The top of stake is provided with Screw Pile plush copper, effectively other people can be reminded to be embedded with composite pile herein.
Detailed description of the invention
Fig. 1 is whole structural schematic diagram of the invention;
Fig. 2 is sectional view of the present invention;
Fig. 3 is the structural schematic diagram of the pre-buried drainpipe of the present invention.
In figure: 1- cores, 2- soil around pile, the pre-buried drainpipe of 3-, 4- geotechnique's cloth bag, 5- vibration-absorptive material, 6- fixing button muscle, 7- button muscle mounting plate, 8- fixed plate against pressure, 9- stems, 10- reinforcing bar, the filling cavity of 11-, 12- pre-threaded stake, 13- screw thread, 14- sand-gravel cushion, 15- Screw Pile plush copper, 16- discharge outlet, 17- main pile body, 18- grouting mouth, 19- buffer layer, 20- geotechnique's cloth bag Layer, 21- radial hole, 22- anticorrosion material.
Specific embodiment
In order to deepen the understanding of the present invention, the present invention is further described below in conjunction with embodiment, the present embodiment For explaining only the invention, it is not intended to limit the scope of the present invention..
A kind of novel concrete composite pile according to shown in Fig. 1-3, including main pile body 17, stake core 1, sand-gravel cushion 14 and stake All soil 2, the middle position inside main pile body 17 is arranged in stake core 1, and stake core 1 is internally provided with filling cavity 11, leads to Cross and be provided with filling cavity 11, enable the present apparatus cylinder be earthed it is inner before, be in cavity structure, total quality Small, easy to remove and installation, the outside of main pile body 17 is uniformly arranged in soil around pile 2, and the two sides inside soil around pile 2 are all installed There is pre-buried drainpipe 3, the top of main pile body 17 is arranged in sand-gravel cushion 14, what pre-buried drainpipe 3 was laid with 17 stake top of main pile body Sand-gravel cushion 14 collectively forms consolidation draining channel, and hole extra in work progress and in the work groundwork soil body can quickly be discharged Gap water.
In the present embodiment: the bottom of stake core 1 is welded with button muscle mounting plate 7, and the surface of button muscle mounting plate 7 is welded with solid Determine button muscle 6, by being welded with button muscle mounting plate 7 in the bottom of stake core 1, the top of button muscle mounting plate 7 is equipped with fixing button muscle 6, so that the present apparatus is in face of embedment ground, it can in depth bottom, ground grip ability be strong by fixing button muscle 6.
In the present embodiment: the top of fixing button muscle 6 is equipped with a stem 9, and the surface wrap of stake stem 9 has reinforcing bar 10, The top of fixing button muscle 6 is equipped with a stem 1, and the surface wrap of stake stem 1 has reinforcing bar 10, passes through fixing button muscle 6 and stake stem 1 It is structure as a whole, so that the stable structure of present apparatus entirety.
In the present embodiment: the outside of stake core 1 is provided with buffer layer 19, and the inside of buffer layer 19 is filled with vibration-absorptive material 5, the outside of buffer layer 19 is provided with geotechnological cloth bag layer 20, and the inside of geotechnological cloth bag layer 20 is filled with geotechnological cloth bag 4, geotechnological cloth bag The inside of layer 20 is equipped with fixed plate 8 against pressure, and the use of geotechnological cloth bag 4 plays package effect of contraction, can effectively control water The pile quality and stake diameter of soil stake, avoid underground undesired water to the erosion damage of pile body, even if in muck soil, peat soil In equal soft foundations, the cement earth pile that pile body uniformity is good, intensity is high can be also obtained.
In the present embodiment: the inside of stake core 1 is equipped with pre-buried Screw Pile 12, and the surface of pre-buried Screw Pile 12 is provided with The top of screw thread 13, pre-buried Screw Pile 12 is welded with Screw Pile plush copper 15, by being equipped with pre-buried Screw Pile 12, pre-threaded stake 12 are installed after stake core 1 pours well, are generated during merging to cement earth pile by pre-threaded stake 12 compacted Effect, so that the top of the more firm and pre-buried Screw Pile 12 of present apparatus stake core 1 is provided with Screw Pile plush copper 15, Neng Gouyou The prompting of effect other people be embedded with composite pile herein.
In the present embodiment: fixing button muscle 6, stake stem 9, pre-threaded stake 12 and pre-buried drainpipe 3 surface be all arranged There is anticorrosive coating 22, by being provided with anticorrosion material, so that the resistance to corrosion of the present apparatus is strong, enhances the use of the present apparatus Service life.
In the present embodiment: the surface of pre-buried drainpipe 3 is provided with radial hole 21, and the top of pre-buried drainpipe 3 is provided with The two sides of main pile body 17 are arranged in discharge outlet 16, discharge outlet 16, by being provided with discharge outlet 16, cylinder can effectively be discharged and pour The connate water generated after filling.
In the present embodiment: the quantity of pre-buried drainpipe 3 is 2~4, the length and geotextiles of every pre-buried drainpipe 3 4 length of bag are identical, and pre-buried drainpipe 3 is fixed on the outside of geotextiles every 50cm~100cm using adhesive tape, is easily installed pre-buried Drainpipe 3.
In the present embodiment: the material of pre-threaded stake 12 is steel alloy material, and inside is solid construction, so that the present apparatus Whole internal structure is more stable, long service life.
Beneficial effects of the present invention: by being provided with filling cavity 11, enable the present apparatus cylinder be earthed it is inner before, In cavity structure, total quality is small, and the outside of main pile body 17 is uniformly arranged in easy to remove and installation, soil around pile 2, And the two sides inside soil around pile 2 are all equipped with pre-buried drainpipe 3, the top of main pile body 17, pre-buried row is arranged in sand-gravel cushion 14 The sand-gravel cushion 14 that water pipe 3 and 17 stake top of main pile body are laid with collectively forms consolidation draining channel, and work progress can quickly be discharged In and the work groundwork soil body in extra pore water, the bottom of stake core 1 is welded with button muscle mounting plate 7, the table of button muscle mounting plate 7 Face is welded with fixing button muscle 6, by being welded with button muscle mounting plate 7, the top installation of button muscle mounting plate 7 in the bottom of stake core 1 There is fixing button muscle 6, so that the present apparatus is in face of embedment ground, it can be by the in depth bottom of fixing button muscle 6, ground grip ability are strong, fixed The top of button muscle 6 is equipped with a stem 9, and the surface wrap of stake stem 9 has reinforcing bar 10, and the top of fixing button muscle 6 is equipped with a core Column 1, the surface wrap of stake stem 1 have reinforcing bar 10, are structure as a whole by fixing button muscle 6 and stake stem 1, so that the present apparatus is whole Stable structure, the outside of stake core 1 is provided with buffer layer 19, and the inside of buffer layer 19 is filled with vibration-absorptive material 5, buffer layer 19 Outside be provided with geotechnological cloth bag layer 20, the inside of geotechnological cloth bag layer 20 is filled with geotechnological cloth bag 4, the inside of geotechnological cloth bag layer 20 Fixed plate 8 against pressure is installed, the use of geotechnological cloth bag 4 plays package effect of contraction, can effectively control cement earth pile at Quality of pile and stake diameter, avoid underground undesired water to the erosion damage of pile body, even if in soft foundations such as muck soil, peat soils In, the cement earth pile that pile body uniformity is good, intensity is high can be also obtained, the inside of stake core 1 is equipped with pre-buried Screw Pile 12, pre-buried The surface of Screw Pile 12 is provided with screw thread 13, and the top of pre-buried Screw Pile 12 is welded with Screw Pile plush copper 15, pre- by being equipped with Screw Pile 12 is buried, pre-threaded stake 12 is installed after stake core 1 pours well, through pre-threaded stake 12 during merging To the crowd in-out effects that cement earth pile generates, so that the top of the more firm and pre-buried Screw Pile 12 of present apparatus stake core 1 is arranged There is Screw Pile plush copper 15, other people can effectively be reminded to be embedded with composite pile, fixing button muscle 6, stake stem 9, pre-threaded stake herein 12 and the surface of pre-buried drainpipe 3 be all provided with anticorrosive coating 22, by being provided with anticorrosion material, so that the present apparatus is anti- Corrosive power is strong, enhances the service life of the present apparatus.
Working principle: in use, first checking the safety of each inner body of the present apparatus, main pile body 17 is passed through into drilling machine first The region for needing to carry out pile anchoring is pierced, then fills geotechnological cloth bag 4 in the surrounding of main pile body 17, pre-buried drainpipe 3 is being installed, it is pre-buried The quantity of drainpipe 3 is 2~4, and the length of every pre-buried drainpipe 3 is identical as geotechnique's 4 length of cloth bag, using adhesive tape every Pre-buried drainpipe 3 is fixed on geotechnological 4 outside of cloth bag by 50cm~100cm, then fills soil around pile in the outside of geotechnological cloth bag layer 20 2, then by grouting mouth 18 to the inside filling concrete mixing slurry for pouring cavity 11, after internal cement mixing slurry solidification, By drilling machine to piercing pre-threaded stake 12 inside main pile body 17.
The basic principles, main features and advantages of the invention have been shown and described above.The technical staff of the industry should Understand, the present invention is not limited to the above embodiments, and the above embodiments and description only describe originals of the invention Reason, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes and improvements It all fall within the protetion scope of the claimed invention.The claimed scope of the invention is by appended claims and its equivalent circle It is fixed.

Claims (9)

1. a kind of new type cement soil composite pile, it is characterised in that: including main pile body (17), stake core (1), sand-gravel cushion (14) and Soil around pile (2), stake core (1) setting middle position internal in main pile body (17), the inside of the stake core (1) is set It is equipped with filling cavity (11), the soil around pile (2) is uniformly arranged in the outside of main pile body (17), and in the soil around pile (2) The two sides in portion are all equipped with pre-buried drainpipe (3), top of sand-gravel cushion (14) setting in main pile body (17).
2. a kind of new type cement soil composite pile according to claim 1, it is characterised in that: the bottom of the stake core (1) It is welded with button muscle mounting plate (7), the surface of the button muscle mounting plate (7) is welded with fixing button muscle (6).
3. a kind of new type cement soil composite pile according to claim 2, it is characterised in that: the top of the fixing button muscle (6) Portion is equipped with a stem (9), and the surface wrap of the stake stem (9) has reinforcing bar (10).
4. a kind of new type cement soil composite pile according to claim 1, it is characterised in that: the outside of the stake core (1) It is provided with buffer layer (19), the inside of the buffer layer (19) is filled with vibration-absorptive material (5), sets on the outside of the buffer layer (19) It is equipped with geotechnological cloth bag layer (20), the inside of geotechnique's cloth bag layer (20) is filled with geotechnological cloth bag (4), geotechnique's cloth bag layer (20) inside is equipped with fixed plate against pressure (8).
5. a kind of new type cement soil composite pile according to claim 1, it is characterised in that: the inside of the stake core (1) It is equipped with pre-buried Screw Pile (12), the surface of the pre-buried Screw Pile (12) is provided with screw thread (13), the pre-buried Screw Pile (12) Screw Pile plush copper (15) are welded at the top of.
6. a kind of new type cement soil composite pile according to claim 1, it is characterised in that: the fixing button muscle (6), stake core The surface of column (9), pre-threaded stake (12) and pre-buried drainpipe (3) is all provided with anticorrosive coating (22).
7. a kind of new type cement soil composite pile according to claim 1, it is characterised in that: the pre-buried drainpipe (3) Surface is provided with radial hole (21), is provided with discharge outlet (16) at the top of the pre-buried drainpipe (3), the discharge outlet (16) sets Set the two sides in main pile body (17).
8. a kind of new type cement soil composite pile according to claim 1, it is characterised in that: the pre-buried drainpipe (3) quantity is 2~4, and the length of every pre-buried drainpipe (3) is identical as geotechnological cloth bag (4) length, every using adhesive tape Pre-buried drainpipe (3) is fixed on the outside of geotextiles every 50cm~100cm.
9. a kind of new type cement soil composite pile according to claim 5, it is characterised in that: the pre-threaded stake (12) Material is steel alloy material, and inside is solid construction.
CN201810930779.5A 2018-08-15 2018-08-15 A kind of new type cement soil composite pile Withdrawn CN109113058A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810930779.5A CN109113058A (en) 2018-08-15 2018-08-15 A kind of new type cement soil composite pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810930779.5A CN109113058A (en) 2018-08-15 2018-08-15 A kind of new type cement soil composite pile

Publications (1)

Publication Number Publication Date
CN109113058A true CN109113058A (en) 2019-01-01

Family

ID=64852323

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810930779.5A Withdrawn CN109113058A (en) 2018-08-15 2018-08-15 A kind of new type cement soil composite pile

Country Status (1)

Country Link
CN (1) CN109113058A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112030649A (en) * 2020-09-07 2020-12-04 中国电建市政建设集团有限公司 CFG pile-forming construction method suitable for fluid plastic soil layer

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002097637A (en) * 2000-09-22 2002-04-02 Sekkeishitsu Soil:Kk Construction method for composite pile
CN202073110U (en) * 2011-05-04 2011-12-14 江苏建华管桩有限公司 Concrete pile and bearing platform connecting structure
CN203924036U (en) * 2014-05-16 2014-11-05 杭州江润科技有限公司 A kind of pile for prestressed pipe of outsourcing active material pile body
CN205975626U (en) * 2016-06-28 2017-02-22 昆明理工大学 Strut integrated configuration with stagnant water unification in soft soil layer foundation ditch
CN107023002A (en) * 2016-08-30 2017-08-08 北京荣创岩土工程股份有限公司 Down-the-hole impacts churning composite pile pile making method
CN206916735U (en) * 2017-04-09 2018-01-23 上海时代建筑设计有限公司 Stake is built in a kind of damping
CN107630450A (en) * 2017-10-18 2018-01-26 河海大学 A kind of carbon-fiber cement mixing pile combines electro-osmosis method reinforcing flexible foundation construction method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002097637A (en) * 2000-09-22 2002-04-02 Sekkeishitsu Soil:Kk Construction method for composite pile
CN202073110U (en) * 2011-05-04 2011-12-14 江苏建华管桩有限公司 Concrete pile and bearing platform connecting structure
CN203924036U (en) * 2014-05-16 2014-11-05 杭州江润科技有限公司 A kind of pile for prestressed pipe of outsourcing active material pile body
CN205975626U (en) * 2016-06-28 2017-02-22 昆明理工大学 Strut integrated configuration with stagnant water unification in soft soil layer foundation ditch
CN107023002A (en) * 2016-08-30 2017-08-08 北京荣创岩土工程股份有限公司 Down-the-hole impacts churning composite pile pile making method
CN206916735U (en) * 2017-04-09 2018-01-23 上海时代建筑设计有限公司 Stake is built in a kind of damping
CN107630450A (en) * 2017-10-18 2018-01-26 河海大学 A kind of carbon-fiber cement mixing pile combines electro-osmosis method reinforcing flexible foundation construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112030649A (en) * 2020-09-07 2020-12-04 中国电建市政建设集团有限公司 CFG pile-forming construction method suitable for fluid plastic soil layer

Similar Documents

Publication Publication Date Title
CN102518135B (en) Horizontal jet grouting soil anchor and castinplace pile Composite Foundation Pit supporting construction engineering method
CN104499479B (en) It is a kind of to pass through the dug pile construction method that sand gravel backfills layer
CN102733378B (en) Construction method of concrete pile
CN101736738B (en) Production method of pressure resistance and pull-out resistance grouted gravel pile
CN104404838B (en) The above railway collapsible loess subgrade substrate treating method of speed 200km
CN106759297A (en) A kind of construction method of support pile and three pipe high-pressure rotary jet grouting pile deep basal pits
CN110965595B (en) Raft foundation building lifting reinforcement structure and method under corrosive geological environment
CN109611102A (en) Construction of the flyover method is worn under a kind of cold excavation
US11840820B2 (en) Method for strengthening and lifting high-rise building having raft foundation
CN108166513A (en) Anchor hole and the pore-forming technique in the dual-purpose hole of osculum in a kind of dregs side slope
CN102877470B (en) Combined soil nailing construction method for supporting
CN108343068A (en) Composite soil nailing wall and pile-anchor retaining composite supporting construction and construction method
CN112081157B (en) Construction method for forming reinforced composite pile foundation by high-rise building retreating type grouting
CN208201874U (en) A kind of open-cell cloth bag grouting structure
CN207862925U (en) A kind of slip casting casing device
CN204000848U (en) A kind of socketed pile for subaqueous construction
CN101586341B (en) Water sealing method for civil engineering groundwork
CN109113058A (en) A kind of new type cement soil composite pile
CN102286979A (en) Construction method for deep foundation pit supporting by adopting steel pipe piles-self-drilling prestressed anchor bars
RU2354778C2 (en) Method of soil stabilisation
CN104727295A (en) Pre-hole-forming padding substitution hammer flattener dynamic compaction method
US3469405A (en) Mine water barrier
CN105421446A (en) Mixed soil extruded and cured precast pile for soft foundation treatment as well as construction method
CN106013143B (en) A kind of construction of underground engineering anti-floating system anchor pole and construction method
CN107747498B (en) A kind of mould bag filled type anchor bolt grouting device and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190930

Address after: 528300 East Office Building 201-11, No. 11 Junye East Road, Beijiao Town, Shunde District, Foshan City, Guangdong Province

Applicant after: Guangdong Bozhilin Robot Co., Ltd.

Address before: 519000 -46218, 105 room 6, Baohua Road, Hengqin New District, Zhuhai, Guangdong (centralized office area)

Applicant before: Green mountain high tech Construction Technology Co., Ltd.

TA01 Transfer of patent application right
WW01 Invention patent application withdrawn after publication

Application publication date: 20190101

WW01 Invention patent application withdrawn after publication