CN109099529A - Atrium air conditioning wind system and its operation method based on air-treatment unit - Google Patents

Atrium air conditioning wind system and its operation method based on air-treatment unit Download PDF

Info

Publication number
CN109099529A
CN109099529A CN201811051149.7A CN201811051149A CN109099529A CN 109099529 A CN109099529 A CN 109099529A CN 201811051149 A CN201811051149 A CN 201811051149A CN 109099529 A CN109099529 A CN 109099529A
Authority
CN
China
Prior art keywords
air
treatment unit
zhongting
atrium
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201811051149.7A
Other languages
Chinese (zh)
Inventor
李飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Li Long Yun Intellectual Property Operation Co Ltd
Original Assignee
Sichuan Li Long Yun Intellectual Property Operation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Li Long Yun Intellectual Property Operation Co Ltd filed Critical Sichuan Li Long Yun Intellectual Property Operation Co Ltd
Priority to CN201811051149.7A priority Critical patent/CN109099529A/en
Publication of CN109099529A publication Critical patent/CN109099529A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/89Arrangement or mounting of control or safety devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/02Ducting arrangements
    • F24F13/06Outlets for directing or distributing air into rooms or spaces, e.g. ceiling air diffuser
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F3/00Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Central Air Conditioning (AREA)

Abstract

It further include for the bottom tuyeres of summer and use in winter, top air port the invention discloses a kind of atrium air conditioning wind system based on air-treatment unit, including air-treatment unit.The operation method of above-mentioned Zhongting air conditioning duct system: when summer: the gas of Zhongting bottom successively passes through bottom tuyeres, air-treatment unit and top air port, eventually enters at the top of Zhongting;When winter: the gas at the top of Zhongting successively passes through top air port, air-treatment unit and bottom tuyeres, eventually enters into Zhongting bottom.It is an object of the invention to: for the problem that can not adjust Architectural Atrium space Vertical Temperature Gradient with summer in winter existing for existing atrium air conditioning system, provide a kind of atrium air conditioning wind system and its operation method based on air-treatment unit.In winter with summer, the operation of the air conditioning duct system can make the temperature field of Atrium Space vertically tend to be uniform.

Description

Atrium air conditioning wind system and its operation method based on air-treatment unit
Technical field
The invention belongs to building air-conditioner System Engineering Design technical fields.Air processing machine is based in particular it relates to one kind The air conditioning duct system and its operation method in the energy even regulation Architectural Atrium temperature field of group.
Background technique
Zhongting refers to the courtyard space of building interior, and maximum feature is to be formed to have to be located at building interior " outdoor Space " is that a kind of peculiar form be not only isolated but also merged with exterior space is built in architectural design, or perhaps building interior ring A kind of mode of border sharing external elements.In Modern Public Building, improved in building using Zhongting more and more Portion space is contemporary popular one of space form.However, since Atrium Space vertical height is higher, therefore stack effect Obviously.On the one hand, hot-air rises, and causes the temperature of top layer and close top layer higher;On the other hand, cold air declines, and causes Bottom and lower by the temperature of near-bottom.Cause Vertical Temperature Gradient in such large space room such as Zhongting larger as a result, occurs The phenomenon that bottom temp is lower, temperature of top higher significant " upper heat and lower cold ".
The major design method of existing atrium air conditioning system is that setting Independent air conditioning equipment is Zhongting and communicates with Zhongting The service of ring corridor.But the using effect of existing atrium air conditioning system only realizes air blowing function, no matter is arranged at the top of Zhongting, still sets It sets in Zhongting bottom, can not meet the air-conditioning use demand of winter and summer simultaneously.For example, only using being arranged at the top of Zhongting The mode of vertical air-conditioning equipment carries out air conditioning to Zhongting, since summer air-conditioning cold wind direct supplies to Zhongting top, therefore can be with The heat space on Zhongting top is cooled down first, the case where so as to reduce " upper heat and lower cold ".But which is only able to satisfy The demand of room temperature is reduced when summer;Because when the set-up mode is applied in winter, under being higher than due to upper air temperature Portion's air themperature, and the supply of the air-conditioning equipment at the top of Zhongting is arranged at this time is hotter air, which can then aggravate " upper heat and lower cold " phenomenon., whereas if being arranged air-conditioning equipment in Zhongting bottom, the service condition in winter can only be equally adapted to, The phenomenon that aggravating " upper heat and lower cold " if when in summer.
Therefore, it is influenced by Atrium Space stack effect, existing atrium air conditioning system is only able to satisfy certain single season Air-conditioning use demand, and the using effect completely contradicted can then be brought for another season.Can not in winter with summer equal energy It enough satisfies the use demand, to can not solve the problems, such as that Architectural Atrium space Vertical Temperature Gradient is larger at all.
Summary of the invention
It is an object of the invention to: for existing for existing atrium air conditioning system, can not be adjusted with summer in winter The problem of saving Architectural Atrium space Vertical Temperature Gradient, provide a kind of atrium air conditioning wind system based on air-treatment unit and its Operation method.In winter with summer, the operation of the air conditioning duct system can be such that the temperature field of Atrium Space vertically tends to Uniformly.
To achieve the goals above, the technical solution adopted by the present invention are as follows:
A kind of atrium air conditioning wind system based on air-treatment unit, including air-treatment unit further include for summer And use in winter, the bottom tuyeres of Zhongting bottom are set and are arranged at the top of Zhongting top air port;Bottom tuyeres and sky Gas disposal unit air inlet is connected to by first pipe, and top air port and air-treatment unit air outlet are connected by second pipe It is logical;Top air port is connected to air-treatment unit air inlet by third pipeline, bottom tuyeres and air-treatment unit air outlet It is connected to by the 4th pipeline;First pipe, third pipeline and air-treatment unit air inlet connectivity part are provided with confluent type threeway Valve, air-treatment unit air outlet and second pipe, the 4th pipeline connectivity part are provided with bypass type triple valve.
The operation method of the above-mentioned atrium air conditioning wind system based on air-treatment unit:
When summer: the first pipe end of confluent type triple valve being connected to air-treatment unit air inlet end, by bypass type The second pipe end of triple valve is connected to air-treatment unit air opening end;The gas of Zhongting bottom successively pass through bottom tuyeres, First pipe, air-treatment unit, second pipe and top air port eventually enter at the top of Zhongting;
When winter: the third pipe end of confluent type triple valve being connected to air-treatment unit air inlet end, by bypass type 4th pipe end of triple valve is connected to air-treatment unit air opening end;Gas at the top of Zhongting successively pass through top air port, Third pipeline, air-treatment unit, the 4th pipeline and bottom tuyeres, eventually enter into Zhongting bottom.
Above scheme adds corresponding pipeline on the basis of existing air-treatment unit, and passes through the unlatching of valve and pass It closes to convert the connected state in air duct, to realize the switching of air supply position.Above scheme is using change Zhongting air current composition Mode improves atrium temperature field distribution, can overcome " upper heat and lower cold " phenomenon of atrium building large space, fundamentally improve Air-conditioning using effect in Architectural Atrium, improves space comfort.
Preferably, bottom tuyeres are located at Zhongting lowermost end.Atrium Space more than bottom tuyeres, with top Air port cooperation, can be realized air circulation.Therefore, bottom tuyeres are arranged in Zhongting lowermost end, it is complete that Zhongting bottom end may be implemented The air circulation in portion space further improves summer and the use in winter effect of air-conditioning system.
Preferably, top air port is located at Zhongting top.Positioned at top air port Atrium Space below, with bottom Air port cooperation, can be realized air circulation.Therefore, top air port is arranged in Zhongting top, it is complete that Zhongting top may be implemented The air circulation in portion space further improves summer and the use in winter effect of air-conditioning system.
Preferably, confluent type triple valve and bypass type triple valve are motor-driven valve.Motor-driven valve is by Electric Actuator Carry out control valve, to realize the electronic Switching to pipeline or adjust purpose.
Preferably, Zhongting is internally provided with temperature controller, and motor-driven valve is connect with temperature controller, and temperature controller is automatic with building Change control equipment connection.
Preferably, Zhongting ground is provided with ground heating system.Ground heating system is set in Zhongting ground floor, guarantees winter The air themperature of Zhongting bottom.Under air conditioning duct system operating status, when atrium temperature is higher or lower than setting value, temperature controller Opening or closing for motor-driven valve can be automatically controlled, i.e. realization thermostatic control, and equipment realization is controlled to building by building automatic Build the overall monitor and management of air conditioning duct system valve in object.
Preferably, solar protection devices is provided at the top of Zhongting.Since Zhongting mostly uses shared lighting roof, Zhongting top Solar protection devices, such as movable sunshade blinds, sunshade scrim, sun protection glass measure are set, solar radiation can be effectively reduced to Zhongting The influence of temperature.
Preferably, the setting of air-treatment unit is in Zhongting bottom, and top air port is by extending at pipeline and air Manage unit connection.Air-treatment unit equipment volume is huge, and occupied area and weight are larger, is arranged in Zhongting bottom, is conducive to Equipment installation and later maintenance.
In conclusion by adopting the above-described technical solution, compared with the prior art, the beneficial effects of the present invention are: by It is provided only with an air outlet and an air inlet in air-treatment unit, and not can be carried out function between the air inlet and air outlet It can switching.The present invention adds corresponding pipeline on the basis of existing air-treatment unit, and by the open and close of valve come The connected state for converting air duct, to realize the switching of air supply position.The present invention is changed by the way of changing Zhongting air current composition Kind atrium temperature field distribution, can overcome " upper heat and lower cold " phenomenon of atrium building large space, fundamentally improve in building Air-conditioning using effect in front yard, improves space comfort.
In addition, it also have the advantage that
1. avoiding in the past being made in such a way that Zhongting and ring corridor add air-conditioning equipment with improving the air-conditioning of Zhongting and ring corridor Use effect.Variable parameter operation can be thus achieved using an air-conditioning equipment in the present invention, and air-supply operating condition operation both may be implemented, can also To realize that air draft operating condition is run;So as to reduce the arrangement quantity of air-conditioning equipment, initial cost is saved, system is reduced and runs energy Consumption, reaches energy-saving and emission-reduction purpose.
2. mobile to top using the distinctive lower part hot-air of Zhongting large space, top cold air moves to the lower part, real Existing self-loopa cold and heat supply reduces system operation energy consumption to reduce the supply of air-conditioning system cold source and heat source.
3. not increasing extra air duct for building, building usable floor area is saved.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of embodiment.
Fig. 2 is operating status schematic diagram of the embodiment in summer.
Fig. 3 is the operating status schematic diagram of embodiment in winter.
Position, component and corresponding label: 1- air-treatment unit, 2- air-treatment unit air inlet are shown in attached drawing Mouthful, 3- air-treatment unit air outlet, 4- bottom tuyeres, the top 5- air port, 6- first pipe, 7- second pipe, 8- third pipe Road, the 4th pipeline of 9-, 10- confluent type triple valve, 11- bypass type triple valve, 12- extend pipeline.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that described herein, specific examples are only used to explain the present invention, not For limiting the present invention.
Present embodiment discloses a kind of atrium air conditioning wind systems based on air-treatment unit, as shown in Figure 1, including existing Air-treatment unit (Air Handing Unit-AHU), further include it is for summer and use in winter, be arranged at Zhongting bottom The bottom tuyeres in portion and the top air port being arranged at the top of Zhongting;Bottom tuyeres and air-treatment unit air inlet pass through first Pipeline connection, top air port is connected to air-treatment unit air outlet by second pipe;Top air port and air-treatment unit Air inlet is connected to by third pipeline, and bottom tuyeres are connected to air-treatment unit air outlet by the 4th pipeline;First pipe, Third pipeline and air-treatment unit air inlet connectivity part are provided with confluent type triple valve, air-treatment unit air outlet and second Pipeline, the 4th pipeline connectivity part are provided with bypass type triple valve.
In addition, bottom tuyeres are located at Zhongting lowermost end.Top air port is located at Zhongting top.Confluent type triple valve and shunting Type triple valve is motor-driven valve.Zhongting is internally provided with temperature controller, and motor-driven valve is connect with temperature controller, temperature controller and building automatic control Control equipment (Building Automation-BA) connection.Zhongting ground is provided with ground heating system.Sunshade is provided at the top of Zhongting Device.As shown in Figure 1, the setting of air-treatment unit is in Zhongting bottom, top air port is by extending pipeline and air-treatment unit Connection.Inner wall of the pipe is provided with fine, soft fur, when air flows through fine, soft fur, the vapor in air can be liquefied to fine, soft fur;Together When, in inner wall of the pipe and the position setting catch basin that is located at below fine, soft fur for collecting liquefied water avoids ponding from setting air-conditioning Standby operation has an impact.
The operation method of the above-mentioned atrium air conditioning wind system based on air-treatment unit:
When summer: as shown in Fig. 2, the first pipe end of confluent type triple valve and air-treatment unit air inlet end are connected It is logical, the second pipe end of bypass type triple valve is connected to air-treatment unit air opening end;The gas of Zhongting bottom successively passes through Bottom tuyeres, first pipe, air-treatment unit, second pipe and top air port are crossed, is eventually entered at the top of Zhongting.Due to Zhongting There is intrinsic " upper heat and lower cold " phenomenon in large space, this kind of mode may be implemented the cold air of Zhongting bottom space directly to supply Zhongting upper space should be arrived, it is possible to reduce air-conditioner set cold source offer amount can also be realized and quickly solve asking for " upper heat and lower cold " Topic.Since summer needs to freeze, the air that air conditioner is sent out is cold air, since middle inner air chamber is distributed as " upper heat and lower cold ", Therefore air conditioner sends out cold air and is directly sent to Zhongting top, first freeze to the air on top.
When winter: as shown in figure 3, the third pipe end of confluent type triple valve and air-treatment unit air inlet end are connected It is logical, the 4th pipe end of bypass type triple valve is connected to air-treatment unit air opening end;Gas at the top of Zhongting successively passes through Top air port, third pipeline, air-treatment unit, the 4th pipeline and bottom tuyeres are crossed, Zhongting bottom is eventually entered into.Due to Zhongting There is intrinsic " upper heat and lower cold " phenomenon in large space, this kind of mode may be implemented the hot-air of Zhongting headspace directly to supply Zhongting lower space should be arrived, it is possible to reduce air-conditioner set heat source offer amount can also be realized and quickly solve asking for " upper heat and lower cold " Topic.Since winter needs to heat, the air that air conditioner is sent out is hot-air, since middle inner air chamber is distributed as " upper heat and lower cold ", Therefore the hot-air that air conditioner is sent out is directly sent to Zhongting lower part, first heat the air of lower part.
In field of air conditioning, need to open the refrigeration system in operation air-conditioning system in winter or summer section;So winter or summer section Referred to as air-conditioning season.And winter, summer demiseason alternating, i.e. spring, two season of autumn are referred to as transition season;The morning and evening of summer or yin The temperature such as it relatively mild period, also referred to as transition season.And winter, summer mentioned in the present embodiment, with Four seasons in 1 year astronomically divided are not identical concept, and the winter, summer in the present embodiment are interpreted as needing The time that air-conditioning equipment is heated, freezed.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (9)

1. a kind of atrium air conditioning wind system based on air-treatment unit, including air-treatment unit, it is characterised in that: further include For summer and use in winter, the bottom tuyeres of Zhongting bottom are arranged in and are arranged at the top of Zhongting top air port;Bottom Air port is connected to air-treatment unit air inlet by first pipe, and top air port and air-treatment unit air outlet pass through second Pipeline connection;Top air port is connected to air-treatment unit air inlet by third pipeline, bottom tuyeres and air-treatment unit Air outlet is connected to by the 4th pipeline;First pipe, third pipeline and air-treatment unit air inlet connectivity part are provided with interflow Type triple valve, air-treatment unit air outlet and second pipe, the 4th pipeline connectivity part are provided with bypass type triple valve.
2. the atrium air conditioning wind system according to claim 1 based on air-treatment unit, it is characterised in that: bottom tuyeres Positioned at Zhongting lowermost end.
3. the atrium air conditioning wind system according to claim 1 based on air-treatment unit, it is characterised in that: top air port Positioned at Zhongting top.
4. the atrium air conditioning wind system according to claim 1 based on air-treatment unit, it is characterised in that: confluent type three Port valve and bypass type triple valve are motor-driven valve.
5. the atrium air conditioning wind system according to claim 4 based on air-treatment unit, it is characterised in that: inside Zhongting It is provided with temperature controller, motor-driven valve is connect with temperature controller, and temperature controller is connect with building automatic control equipment.
6. the atrium air conditioning wind system according to claim 1 based on air-treatment unit, it is characterised in that: Zhongting ground It is provided with ground heating system.
7. the atrium air conditioning wind system according to claim 1 based on air-treatment unit, it is characterised in that: at the top of Zhongting It is provided with solar protection devices.
8. the atrium air conditioning wind system according to claim 1 based on air-treatment unit, it is characterised in that: air-treatment In Zhongting bottom, top air port is connected to by extending pipeline with air-treatment unit for unit setting.
9. the operation method of the atrium air conditioning wind system according to claim 1 based on air-treatment unit, feature exist In:
When summer: the first pipe end of confluent type triple valve being connected to air-treatment unit air inlet end, by bypass type threeway The second pipe end of valve is connected to air-treatment unit air opening end;The gas of Zhongting bottom successively passes through bottom tuyeres, first Pipeline, air-treatment unit, second pipe and top air port eventually enter at the top of Zhongting;
When winter: the third pipe end of confluent type triple valve being connected to air-treatment unit air inlet end, by bypass type threeway 4th pipe end of valve is connected to air-treatment unit air opening end;Gas at the top of Zhongting successively passes through top air port, third Pipeline, air-treatment unit, the 4th pipeline and bottom tuyeres, eventually enter into Zhongting bottom.
CN201811051149.7A 2018-09-10 2018-09-10 Atrium air conditioning wind system and its operation method based on air-treatment unit Withdrawn CN109099529A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811051149.7A CN109099529A (en) 2018-09-10 2018-09-10 Atrium air conditioning wind system and its operation method based on air-treatment unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811051149.7A CN109099529A (en) 2018-09-10 2018-09-10 Atrium air conditioning wind system and its operation method based on air-treatment unit

Publications (1)

Publication Number Publication Date
CN109099529A true CN109099529A (en) 2018-12-28

Family

ID=64865712

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811051149.7A Withdrawn CN109099529A (en) 2018-09-10 2018-09-10 Atrium air conditioning wind system and its operation method based on air-treatment unit

Country Status (1)

Country Link
CN (1) CN109099529A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113494765A (en) * 2020-03-19 2021-10-12 佛山市云米电器科技有限公司 Air supply control method, air supply device and system based on air conditioner and storage medium
CN113494760A (en) * 2020-03-19 2021-10-12 佛山市云米电器科技有限公司 Control method for air supply device, air supply system, and storage medium

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113494765A (en) * 2020-03-19 2021-10-12 佛山市云米电器科技有限公司 Air supply control method, air supply device and system based on air conditioner and storage medium
CN113494760A (en) * 2020-03-19 2021-10-12 佛山市云米电器科技有限公司 Control method for air supply device, air supply system, and storage medium

Similar Documents

Publication Publication Date Title
CN104453039B (en) A kind of temperature control method of Combined temperature control curtain wall
US20080271881A1 (en) Automatic Switching Two Pipe Hydronic System
CN207990779U (en) A kind of clean operating room temperature and humidity control system
CN102306044A (en) Automatic control refrigeration system for high-density computer room and method thereof
US20210364174A1 (en) Fabricated air conditioner wall and operation method thereof
CN103904568B (en) A kind of convergence control cabinet ventilation drying system and method
CN208652748U (en) All-air air conditioning system for one family dwelling
CN104976704A (en) Working method of secondary heat recovery fresh air processing device
CN106592848A (en) Ventilating and energy-saving wall, air-conditioned room and ventilating control method
CN104033986B (en) Total heat recovery type is collapsible to be sent, return, the control method of air draft integrated air conditioner unit
CN104818779A (en) Ventilation heat recovery radiation external wall system
CN109099527A (en) Atrium air conditioning wind system and its operation method based on heat exchanger
CN203501341U (en) Radiation tail end air conditioning system
CN103673208B (en) A kind of temperature-controlled process, Apparatus and system
CN109099529A (en) Atrium air conditioning wind system and its operation method based on air-treatment unit
CN102913991B (en) Central heating distributive frequency conversion two-stage pump system energy-saving control method
CN108518791B (en) Layered air conditioner ventilation system for large-space building
CN110260434A (en) A kind of roof top air-conditioner system based on solar energy and waste heat recycling
CN203704192U (en) Air conditioning water system of hospital building
CN204063468U (en) Multi-stage heat with water circulation reclaims Fresh air handing device
CN207945732U (en) Fan coil and air-conditioner water system
CN206337712U (en) Ventilated energy-saving wall and air-conditioned room
CN109140649A (en) A kind of air conditioning duct system in energy even regulation Architectural Atrium temperature field
CN109099528A (en) Atrium air conditioning wind system and its operation method based on air-treatment unit
CN109099534A (en) Atrium air conditioning wind system and its operation method based on air-treatment unit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20181228

WW01 Invention patent application withdrawn after publication