- pipe
- hole
- water injection
- extraction
- gas extraction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000605 extraction Methods 0.000 title claims abstract description 121
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 98
- 238000002347 injection Methods 0.000 title claims abstract description 97
- 239000007924 injection Substances 0.000 title claims abstract description 97
- 239000003245 coal Substances 0.000 title claims description 45
- 238000010276 construction Methods 0.000 title claims description 14
- 238000010079 rubber tapping Methods 0.000 claims abstract description 76
- 238000005553 drilling Methods 0.000 claims abstract description 49
- 238000007789 sealing Methods 0.000 claims abstract description 49
- 239000002775 capsule Substances 0.000 claims abstract description 29
- 230000000694 effects Effects 0.000 claims abstract description 9
- 238000000034 method Methods 0.000 claims description 9
- 239000011435 rock Substances 0.000 claims description 4
- 230000001360 synchronised effect Effects 0.000 claims description 3
- 230000005641 tunneling Effects 0.000 claims description 3
- 238000010168 coupling process Methods 0.000 abstract description 2
- 230000008878 coupling Effects 0.000 abstract 1
- 238000005859 coupling reaction Methods 0.000 abstract 1
- 238000005065 mining Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 230000006835 compression Effects 0.000 description 2
- 238000007906 compression Methods 0.000 description 2
- 230000007547 defect Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000012544 monitoring process Methods 0.000 description 2
- 239000002002 slurry Substances 0.000 description 2
- 239000000243 solution Substances 0.000 description 2
- 239000002817 coal dust Substances 0.000 description 1
- 239000003034 coal gas Substances 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000012466 permeate Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F7/00—Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F5/00—Means or methods for preventing, binding, depositing, or removing dust; Preventing explosions or fires
- E21F5/02—Means or methods for preventing, binding, depositing, or removing dust; Preventing explosions or fires by wetting or spraying
Abstract
The device comprises a gas extraction pipe, an extraction hose, a water injection pipe, a tapping device, a main connection pipe, an extraction main pipe and a water injection main pipe, wherein the tapping device consists of tapping device branch pipes and tapping device main pipes which are communicated, and a plurality of tapping device branch pipes are arranged on the same side of the tapping device main pipes; the gas extraction pipe is arranged in the drill hole through a bag type grouting hole packer, or the water injection pipe is arranged in the gas extraction pipe in a sealing way through a capsule type hole packer; the gas extraction pipe or the water injection pipe is connected with the extraction main pipe or the water injection main pipe through the tapping device. The invention can utilize and reform the conventional extraction drilling hole into the water injection drilling hole according to actual needs, plays a role in the dual-purpose high-efficiency utilization of one hole, utilizes the branching device to carry out intensive extraction-water injection on a plurality of drilling holes, can optimize the extraction-water injection coupling drilling hole sealing effect, shortens the underground gas extraction-water injection period, improves the working efficiency of underground operators, and has great significance for the efficient, quick and economic underground exploitation.
Description
Technical Field
The invention relates to a device and a construction method for simultaneously serving as underground gas extraction holes and coal seam water injection holes, in particular to an intensive device and method capable of realizing simultaneous extraction and water injection of a plurality of drilling holes.
Background
The coal resources of China are rich, the regional distribution is wide, but the occurrence condition difference of the coal beds is large, the coal beds containing gas are more, the gas content is high, and the coal and gas outburst is serious. According to the standard regulation of gas extraction of coal mine, a gas control working system with reliable ventilation, standard extraction, effective monitoring and in-place management is established for implementing the gas control guidelines of 'first extraction and then extraction, monitoring and control and wind fixed production', so that the gas accident of the coal mine is restrained, and the gas extraction of the coal mine is up to standard. The underground gas extraction is normalized and generalized, underground resources are reasonably utilized for enhancing the gas extraction treatment effect, the extraction drill holes left after extracting the gas are often further reasonably utilized, and a drill hole water injection method is usually combined. The coal seam water injection is to inject pressurized water into the coal body through drilling holes, so that the pressurized water permeates into the coal body, the balance of the original coal-gas two-phase system in the coal body is destroyed, a coal-gas-water three-phase system is formed, and all media in the system interact, so that the physicochemical property, mechanical property and thermodynamic property of the coal are changed. Coal seam water injection is the most fundamental and effective measure for reducing the generation of coal dust.
However, the existing extraction-water injection coupling method generally constructs a water injection drilling hole on the basis of the original extraction drilling hole, or directly uses the original extraction drilling hole. The former is easy to deviate due to the sleeve holes, and the consumption of manpower and material resources is large, so that the cost of single hole is high. And the latter generally adopts yellow mud to carry out drilling shutoff, leads to drilling leakproofness poor, and the water injection effect is not up to standard. In addition, in the extraction water injection process, a plurality of branch pipes are generally adopted for gas extraction at the present stage, the complex maintenance of pipelines is difficult, and in the water injection stage, single hole single injection is adopted, so that the working period is longer, and the water injection effect is poor.
Disclosure of Invention
In order to overcome the defects in the prior art, the invention provides the device and the construction method for using the underground gas extraction hole as the coal seam water injection hole, which can utilize and reform the conventional extraction hole into the water injection hole according to actual needs, achieve the dual-purpose efficient utilization of one hole, and can perform intensive extraction-water injection hole sealing on a plurality of holes, optimize the extraction-water injection hole sealing effect, improve the working efficiency, accelerate the underground coal mining working period and reduce the coal mining cost.
The technical scheme adopted for solving the technical problems is as follows:
the device comprises a gas extraction pipe, an extraction hose, a water injection pipe, a tapping device, a main connecting pipe, an extraction main pipe and a water injection main pipe, wherein the tapping device consists of tapping device branch pipes and tapping device main pipes which are communicated with each other, a plurality of tapping device branch pipes are arranged on the same side of the tapping device main pipes at intervals, and each tapping device branch pipe and tapping device main pipe are provided with valves; the gas extraction pipe is arranged in the drill hole through a bag type grouting hole packer, or the water injection pipe is arranged in the gas extraction pipe in a sealing way through a capsule type hole packer; the gas extraction pipe is connected with a tapping branch pipe on the tapping device through an extraction hose, or the water injection pipe is connected with the tapping branch pipe in a matching way through an adapter; and a tap main pipe on the tap is connected with a drainage main pipe or a water injection main pipe through a main connecting pipe.
The construction method of the device adopting the underground gas extraction hole to be used as the coal seam water injection hole comprises the following steps:
a. constructing a drilling hole from a roadway to a coal seam, sealing the drilling hole according to a two-plug one-injection drilling hole sealing method after the drilling hole construction is completed, and enabling a gas extraction pipe to pass through a hole sealing section after hole sealing to enable the coal seam to be communicated with the outside; connecting a gas extraction pipe in the drill hole with one tapping branch pipe on the tapping device through an extraction hose, connecting a tapping main pipe on the tapping device with the extraction main pipe through a main connecting pipe, and opening valves on the tapping branch pipe and the tapping main pipe to implement gas extraction;
b. c, sequentially constructing a group of drilling holes according to the step a, connecting the group of drilling holes with the same tapping device, and implementing synchronous gas extraction of the group of drilling holes;
c. when the gas extraction effect is lost or when the tunneling head is 20-60m away from the extraction hole or the extraction surface, closing valves on the branch pipe of the tapping device and the main pipe of the tapping device, dismantling the connection between the gas extraction pipe and the tapping device, and stopping extraction; meanwhile, the connection between the main connecting pipe and the extraction main pipe is removed, and the main connecting pipe is connected with the water injection main pipe;
d. inserting a hole sealing capsule into the gas extraction pipe, wherein the hole sealing capsule is positioned in the grouting hole sealing section, injecting high-pressure water into the hole sealing capsule through a capsule water injection pipe to expand the hole sealing capsule, tightly attaching the hole sealing capsule with the gas extraction pipe to realize hole sealing, and connecting the water injection pipe with a tapping device branch pipe through an adapter;
e. c and d, interconnecting the same tap 5 with a set of all bores;
f. and opening valves on the branch pipe and the main pipe of the tapping device to realize synchronous water injection of a group of drilling holes.
Compared with the prior art, the device and the construction method for using the underground gas extraction hole as the coal seam water injection hole have the advantages that after the coal seam gas extraction is finished, the residual extraction holes are used for sealing capsules, the extraction holes are converted into water injection holes, complex procedures of trepanning construction water injection holes or re-drilling water injection holes are omitted, the workload of underground operators is greatly reduced, and the cost of underground gas extraction and coal seam water injection is also reduced. And the gas extraction pipe is embedded with the water injection pipe, so that the protection of the water injection pipe is enhanced, and the possibility of rod breakage, breakage and the like caused by external factors in the water injection process is reduced. And the two-plug one-injection extraction drilling plugging technology is combined with the capsule sealing water injection hole sealing technology, so that the sealing performance of the water injection drilling is ensured, the defect of poor sealing performance of the water injection hole is overcome, and the water injection efficiency is improved. According to the tap-changer system designed by the invention, the extraction pipelines and the water injection pipelines are connected through hoses with different performances and tap-changer in an intensive manner, so that gas extraction and coal seam water injection can be performed on a plurality of drilling holes at the same time, the underground rapid extraction-water injection integration is realized, the working efficiency of operators is improved, the underground coal mining working period is accelerated, and the coal mining cost is reduced. Has great significance for reducing the underground outstanding danger, improving the operation environment and optimizing the production structure.
Drawings
The invention will be further described with reference to the drawings and examples.
FIG. 1 is a schematic layout of an embodiment of the present invention.
FIG. 2a is a schematic diagram of an application structure of drilling as a gas extraction hole in an embodiment of the present invention.
Fig. 2b is a schematic view of the water injection hole of the gas extraction Kong Gai of fig. 2 a.
Fig. 3a is a schematic diagram illustrating connection of gas extraction pipelines according to an embodiment of the present invention.
FIG. 3b is a schematic diagram showing connection of water injection pipelines of a coal seam in an embodiment of the invention.
Fig. 4 is a schematic view of the tap in an embodiment of the invention.
In the figure: 1. coal seam, 2, drilling, 4, extraction hose, 5, tap, 6, main road connecting pipe, 7, extraction main pipe, 8, water injection main pipe, 10, roadway, 11, gas extraction pipe, 12, bag grouting pipe, 15, hole sealing capsule, 16, capsule water injection pipe, 17, water injection pipe, 18, plug, 19, adapter, 20, tap branch pipe, 21 and tap main pipe.
Detailed Description
For the purpose of making the objects, technical solutions and advantages of the embodiments of the present invention more apparent, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is apparent that the described embodiments are some embodiments of the present invention, but not all embodiments of the present invention. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to fall within the scope of the invention.
FIGS. 1 to 4 show a schematic structural view of a preferred embodiment of the present invention, and an apparatus for using the downhole gas extraction hole of FIG. 1 as a coal seam water injection hole comprises a gas extraction pipe 11, an extraction hose, a water injection pipe 17, a tapping device 5, an extraction dry pipe 7, a dry pipe connection pipe 6 and a water injection dry pipe 8; referring to fig. 4, the tap 5 is composed of tap branches 20 and tap trunk 21 which are communicated, a plurality of tap branches 20 are arranged on the same side of the tap trunk 21 at intervals, the number of the tap branches 20 can be 2-40, the number of the tap trunk 21 is 1-2, and each tap branch 20 and the tap trunk 21 are provided with valves.
Fig. 2a and fig. 3a show a pipeline for extracting gas, a gas extraction pipe 11 is installed in a drill hole 2 through a bag type grouting hole packer, the bag type grouting hole packer comprises plugs 18 at two ends, a bag type grouting pipe 12 is connected between the two plugs 18 and outside, slurry is poured between the plugs 18 through the bag type grouting pipe 12, and finally the slurry is solidified into a solid state to realize hole sealing. The gas extraction pipe 11 is connected with a tapping branch pipe 20 on the tapping device 5 through an extraction hose 4, and a tapping main pipe 21 on the tapping device 5 is connected with the extraction main pipe 7 through a main connecting pipe 6.
Fig. 2b and 3b show a water injection pipeline formed on the basis of the original gas extraction drilling hole, wherein a water injection pipe 17 is hermetically arranged in a gas extraction pipe 11 through a capsule type hole packer, the capsule type hole packer comprises a hole sealing capsule 15 and a capsule type water injection pipe 16 communicated with the outside, and the water injection pipe 17 is in matched connection with a tapping device branch pipe 20 through an adapter 19; the tap main pipe 21 on the tap 5 is connected with the water injection main pipe 8 through the main connecting pipe 6.
In this embodiment, the tap 5 has hydraulic fracture resistance, which can withstand pressures of 0-40 mpa; the extraction hose 4 has certain deformation resistance, and the pipe diameter is larger, so that the extraction hose can be directly matched with the tapping branch pipe 20 for use; the water injection pipe 17 has certain compression resistance, can bear 0-40 MPa, has smaller pipe diameter and needs to be matched with the tapping branch pipe 20 through the adapter 19; the main connecting pipe 6 has certain deformation resistance and certain compression resistance, and can bear 0-40 MPa of pressure. The interfaces of the gas extraction pipe 11, the extraction hose 4, the water injection pipe 17 and the main connecting pipe 6 are all quick connectors, and can be quickly connected with the tapping device 5, the extraction main pipe 7 and the water injection main pipe 8.
Referring to fig. 1 to 4, a construction method using a device with a downhole gas extraction hole serving as a coal seam water injection hole comprises the following steps:
a. constructing a drilling hole 2 from a bottom plate rock roadway or a top plate rock roadway or the coal seam roadway to the coal seam 1 by adopting a conventional method, sealing the drilling hole 2 according to a conventional two-plug one-injection drilling hole sealing method or a conventional bag grouting drilling hole sealing method after the drilling hole 2 is constructed, and enabling a gas extraction pipe 11 to pass through a hole sealing section after hole sealing to enable the coal seam 1 to be communicated with the outside; connecting a gas extraction pipe 11 in the drill hole 2 with a tapping branch pipe 20 on the tapping device 5 through a extraction hose 4, connecting a tapping main pipe 21 on the tapping device 5 with a extraction main pipe 7 through a main connecting pipe 6, and opening valves on the tapping branch pipe 20 and the tapping main pipe 21 to implement gas extraction;
b. c, sequentially constructing a group of drilling holes 2 according to the step a, connecting the group of drilling holes 2 with the same tapping device 5, and synchronously extracting gas from the group of drilling holes 2;
c. when the gas extraction effect is lost or when the tunneling head is 20-60m away from the extraction hole, closing valves on the tapping device branch pipe 20 and the tapping device main pipe 21, dismantling the connection between the gas extraction pipe 11 and the tapping device 5, and stopping extraction; meanwhile, the connection between the main connecting pipe 6 and the extraction main pipe 7 is removed, and the main connecting pipe 6 is connected with the water injection main pipe 8;
d. inserting a hole sealing capsule 15 into the gas extraction pipe 11, wherein the hole sealing capsule 15 is positioned in a grouting hole sealing section, injecting high-pressure water into the hole sealing capsule 15 through a capsule water injection pipe 16 to expand the hole sealing capsule 15, tightly attaching the hole sealing capsule with the gas extraction pipe 11 to realize hole sealing, and connecting a water injection pipe 17 with a tapping branch pipe 20 through an adapter 19;
e. c and d, connecting the group of all drilling holes 2 to one another and the same tap 5;
f. valves on the tap manifold 20 and tap main 21 are opened to achieve simultaneous water injection into a set of boreholes 2.
The invention utilizes and reforms the conventional extraction drilling hole into the water injection drilling hole according to actual needs, plays a role in high-efficiency utilization of one hole, utilizes the branching device to carry out intensive extraction-water injection on a plurality of drilling holes 2, optimizes the hole sealing effect of the extraction-water injection drilling holes, shortens the underground gas extraction-water injection period, improves the working efficiency of underground operators, and has great significance for high-efficiency, rapid and economic underground exploitation.
The foregoing description is only a preferred embodiment of the present invention, and is not intended to limit the invention in any way, but any simple modification and equivalent variation of the above embodiment according to the technical spirit of the present invention falls within the scope of the present invention.
Claims (4)
1. The construction method of the device with the underground gas extraction hole serving as the coal seam water injection hole is characterized by comprising the following steps of: the device for the underground gas extraction hole serving as the coal seam water injection hole comprises a gas extraction pipe (11), an extraction hose (4), a water injection pipe (17), a tapping device (5), a main connecting pipe (6), an extraction main pipe (7) and a water injection main pipe (8), wherein the tapping device (5) is composed of tapping device branch pipes (20) and tapping device main pipes (21) which are communicated with each other, a plurality of tapping device branch pipes (20) are arranged on the same side of the tapping device main pipes (21) at intervals, and valves are attached to each tapping device branch pipe (20) and each tapping device main pipe (21);
the gas extraction pipe (11) is arranged in the drill hole (2) through a bag type grouting hole packer, or the water injection pipe (17) is arranged in the gas extraction pipe (11) in a sealing way through a capsule type hole packer;
the gas extraction pipe (11) is connected with a tapping branch pipe (20) on the tapping device (5) through an extraction hose (4), or the water injection pipe (17) is connected with the tapping branch pipe (20) in a matching way through an adapter (19);
the tap main pipe (21) on the tap (5) is connected with the extraction main pipe (7) or the water injection main pipe (8) through the main connecting pipe (6), and the underground gas extraction hole is also used as the construction method of the device of the coal seam water injection hole:
a, constructing a drilling hole (2) from a roadway (10) to a coal seam (1), sealing the drilling hole (2) according to a two-plug one-injection drilling hole sealing method after the drilling hole (2) is constructed, and enabling a gas extraction pipe (11) to pass through a hole sealing section after hole sealing to enable the coal seam (1) to be communicated with the outside; connecting a gas extraction pipe (11) in the drill hole (2) with a tapping branch pipe (20) on the tapping device (5) through a extraction hose (4), connecting a tapping main pipe (21) on the tapping device (5) with a extraction main pipe (7) through a main connecting pipe (6), and opening valves on the tapping branch pipe (20) and the tapping main pipe (21) to implement gas extraction;
b, sequentially constructing a group of drilling holes (2) according to the step a, connecting the group of drilling holes (2) with the same tapping device (5), and synchronously extracting gas from the group of drilling holes (2);
c, when the gas extraction effect is lost or when the tunneling head or the extraction surface is cut from an extraction hole by 20-60m, closing valves on the branch pipe (20) of the tapping device and the main pipe (21) of the tapping device, dismantling the connection between the gas extraction pipe (11) and the tapping device (5), and stopping extraction; meanwhile, the connection between the main connecting pipe (6) and the extraction main pipe (7) is removed, and the main connecting pipe (6) is connected with the water injection main pipe (8);
d, inserting a hole sealing capsule (15) into the gas extraction pipe (11), wherein the hole sealing capsule (15) is positioned in the grouting hole sealing section, injecting high-pressure water into the hole sealing capsule (15) through a capsule water injection pipe (16) to expand the hole sealing capsule (15), tightly attaching the hole sealing capsule to the gas extraction pipe (11) to realize hole sealing, and connecting a water injection pipe (17) with a tapping branch pipe (20) through an adapter (19);
c, operating a group of all drilling holes (2) according to the step c and the step d, and connecting the group of all drilling holes (2) with the same tapping device (5);
and f, opening valves on the branch pipe (20) and the main pipe (21) of the tapping device to realize synchronous water injection of a group of drilling holes.
2. The construction method of the device for combining the underground gas extraction hole with the coal seam water injection hole as claimed in claim 1, which is characterized by comprising the following steps: the number of the tapping branch pipes (20) is 2-40, and the number of the tapping main pipes (21) is 1-2.
3. The construction method of the device for combining the underground gas extraction hole with the coal seam water injection hole according to claim 1 or 2, which is characterized by comprising the following steps: the interfaces of the gas extraction pipe (11), the extraction hose (4), the water injection pipe (17) and the main connecting pipe (6) are quick connectors.
4. The construction method of the device for combining the underground gas extraction hole with the coal seam water injection hole according to claim 3, which is characterized in that: the drill holes (2) are formed by constructing a coal seam (1) from a bottom plate rock roadway, a top plate rock roadway or a coal seam roadway.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811098630.1A CN109098750B (en) | 2018-09-20 | 2018-09-20 | Device for underground gas extraction hole to be used as coal seam water injection hole and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811098630.1A CN109098750B (en) | 2018-09-20 | 2018-09-20 | Device for underground gas extraction hole to be used as coal seam water injection hole and construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109098750A CN109098750A (en) | 2018-12-28 |
CN109098750B true CN109098750B (en) | 2023-12-15 |
Family
ID=64866847
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811098630.1A Active CN109098750B (en) | 2018-09-20 | 2018-09-20 | Device for underground gas extraction hole to be used as coal seam water injection hole and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109098750B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112696177B (en) * | 2020-12-30 | 2022-04-01 | 太原理工大学 | Application method of coal bed gas pressure device based on compressed air system |
CN112855071A (en) * | 2021-02-04 | 2021-05-28 | 河南理工大学 | Device and method for plugging gas extraction drill hole by using microbial mineralization circulation |
CN113279737B (en) * | 2021-06-15 | 2022-11-15 | 中原工学院 | Extraction system and extraction method for coal seam water injection and coal seam gas extraction |
CN114718517B (en) * | 2022-03-24 | 2023-05-26 | 国能神东煤炭集团有限责任公司 | Method for recycling butterfly valve on gas extraction pipe in coal mining operation |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102121395A (en) * | 2011-01-24 | 2011-07-13 | 平顶山天安煤业股份有限公司十矿 | Method for integrated comprehensive management of gas in low-permeability single coal bed |
CN102182499A (en) * | 2011-04-21 | 2011-09-14 | 中国矿业大学 | Hydrofracturing-based method and equipment for diminishing dust and eliminating outburst of coal bed |
CN103075128A (en) * | 2012-12-31 | 2013-05-01 | 中国矿业大学 | Method for sealing gas extraction drill holes |
CN104213932A (en) * | 2014-08-07 | 2014-12-17 | 中国矿业大学 | Outburst coal bed hydraulic phase change cracking cross-cut coal uncovering method |
CN104234740A (en) * | 2014-09-03 | 2014-12-24 | 太原理工大学 | Low-medium pressure air displacement high-pressure coalbed gas system and method thereof |
CN104453983A (en) * | 2014-11-15 | 2015-03-25 | 安徽理工大学 | Upper-fracturing lower-release permeability improvement and extraction method adopting stratum-through drilled holes for heavy-pitch coal stratum |
CN105064967A (en) * | 2015-08-10 | 2015-11-18 | 中国矿业大学 | Coal seam gas fracturing and mash gas driving method |
CN209083324U (en) * | 2018-09-20 | 2019-07-09 | 中国矿业大学 | A kind of underground gas extraction hole doubles as the device in coal-bed flooding hole |
-
2018
- 2018-09-20 CN CN201811098630.1A patent/CN109098750B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102121395A (en) * | 2011-01-24 | 2011-07-13 | 平顶山天安煤业股份有限公司十矿 | Method for integrated comprehensive management of gas in low-permeability single coal bed |
CN102182499A (en) * | 2011-04-21 | 2011-09-14 | 中国矿业大学 | Hydrofracturing-based method and equipment for diminishing dust and eliminating outburst of coal bed |
CN103075128A (en) * | 2012-12-31 | 2013-05-01 | 中国矿业大学 | Method for sealing gas extraction drill holes |
CN104213932A (en) * | 2014-08-07 | 2014-12-17 | 中国矿业大学 | Outburst coal bed hydraulic phase change cracking cross-cut coal uncovering method |
CN104234740A (en) * | 2014-09-03 | 2014-12-24 | 太原理工大学 | Low-medium pressure air displacement high-pressure coalbed gas system and method thereof |
CN104453983A (en) * | 2014-11-15 | 2015-03-25 | 安徽理工大学 | Upper-fracturing lower-release permeability improvement and extraction method adopting stratum-through drilled holes for heavy-pitch coal stratum |
CN105064967A (en) * | 2015-08-10 | 2015-11-18 | 中国矿业大学 | Coal seam gas fracturing and mash gas driving method |
CN209083324U (en) * | 2018-09-20 | 2019-07-09 | 中国矿业大学 | A kind of underground gas extraction hole doubles as the device in coal-bed flooding hole |
Also Published As
Publication number | Publication date |
---|---|
CN109098750A (en) | 2018-12-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109098750B (en) | Device for underground gas extraction hole to be used as coal seam water injection hole and construction method | |
CN103195390B (en) | The nearly horizontal mash gas pumping drilling encapsulating method in this coal seam a kind of | |
CN106988719B (en) | Anti-reflection system and anti-reflection method for circularly injecting hot water and liquid nitrogen into coal seam | |
CN103195468A (en) | System process for conducting efficient strengthened extraction in surrounding rock | |
CN202560157U (en) | Grouting device | |
CN108643877A (en) | Coal mine underground coal bed long drilled holes staged fracturing is anti-reflection and mash gas extraction method | |
CN206722798U (en) | A kind of combined type coal-bed flooding pressure break and gas pumping one hole sealing device | |
CN203430473U (en) | Underground hydraulic fracturing drill hole sealing device of coal mine | |
CN102704905A (en) | Segmental hydraulic fracturing coal seam pressure releasing device and method | |
CN104141470A (en) | Pore-forming and sealing method for hydraulic fracturing borehole casing section in underground coal mine | |
CN104989356A (en) | Underground coal mine coal seam drilling high-pressure gas fracturing and permeability increasing method and system | |
CN205858333U (en) | A kind of three plug hydraulic fracturing detecting earth stress systems | |
CN102937011A (en) | Secondary grouting and plugging device and method of regional crack field of gas extraction and drilling group | |
CN103912304A (en) | Method for locally extracting gas of soft coal seams | |
CN212958558U (en) | Drilling dynamic sealing multi-section hole packer device | |
CN205876263U (en) | Airtight sexual type large aperture of moment of couple increase gas drilling is taken out and is adopted hole sealing device | |
CN205400702U (en) | Hard strata shallow layer geothermal well fracturing unit | |
CN105804786A (en) | Method for layer penetrating, drilling, pressing punching and permeability improving of soft coal seam floor | |
CN103031847B (en) | Reducing overlap joint combined type orifice pipe grouting method | |
CN203515458U (en) | Double-hole pipe slurry filling hole sealing device | |
CN209083324U (en) | A kind of underground gas extraction hole doubles as the device in coal-bed flooding hole | |
CN206233896U (en) | For the anti-pumping blocking of gas pumping and the outer plugging device of drainage holes | |
CN108533223B (en) | Residual coal bed gas extraction and utilization system in underground goaf | |
CN109113784B (en) | Coal seam gas extraction-water injection coupling device and method | |
CN103541679B (en) | Method for sealing underground hydraulic fracture drilled hole of coal mine in combined manner |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |