CN209083324U - A kind of underground gas extraction hole doubles as the device in coal-bed flooding hole - Google Patents
A kind of underground gas extraction hole doubles as the device in coal-bed flooding hole Download PDFInfo
- Publication number
- CN209083324U CN209083324U CN201821562312.1U CN201821562312U CN209083324U CN 209083324 U CN209083324 U CN 209083324U CN 201821562312 U CN201821562312 U CN 201821562312U CN 209083324 U CN209083324 U CN 209083324U
- Authority
- CN
- China
- Prior art keywords
- pipe
- water injection
- hole
- coupler
- branch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Branch Pipes, Bends, And The Like (AREA)
Abstract
一种井下瓦斯抽采孔兼作煤层注水孔的装置,包括瓦斯抽采管、抽采软管、注水管、分接器、干路连接管、抽采干管和注水干管,分接器由相连通的分接器支管和分接器干管构成,多个分接器支管排布在分接器干管同一侧;瓦斯抽采管通过囊袋式注浆封孔器安装在钻孔内,或注水管再通过胶囊式封孔器密封安装在瓦斯抽采管内;瓦斯抽采管或注水管通过分接器与抽采干管或注水干管相连。本实用新型能够根据实际需要利用并改造常规抽采钻孔为注水钻孔,起到一孔两用的高效利用,并利用分路装置对多个钻孔进行集约化抽采‑注水,可优化抽采‑注水耦合钻孔封孔效果,缩短井下瓦斯抽采‑注水周期,提高井下作业人员工作效率,对高效、快捷、经济的井下开采具有重大意义。
The utility model relates to a device for the underground gas drainage hole which doubles as a coal seam water injection hole. It consists of the connected branch pipe of the branch and the main pipe of the branch. Multiple branch pipes of the branch are arranged on the same side of the main pipe of the branch. The gas extraction pipe is installed in the borehole through the bag type grouting hole sealer. , or the water injection pipe is sealed and installed in the gas extraction pipe through the capsule type hole sealer; The utility model can utilize and transform conventional drainage boreholes into water-injection boreholes according to actual needs, so as to achieve high-efficiency utilization of one hole for two purposes, and utilize a branching device to perform intensive drainage-water injection for multiple boreholes, which can be optimized Drainage-water injection coupled drilling and sealing effect shortens the underground gas drainage-water injection cycle, improves the work efficiency of underground operators, and is of great significance for efficient, fast and economical underground mining.
Description
技术领域technical field
本实用新型涉及一种井下瓦斯抽采孔兼作煤层注水孔的装置,尤其是一种集约化的可实现多个钻孔同时抽采、注水的装置。The utility model relates to a device with underground gas drainage holes also serving as coal seam water injection holes, in particular to an intensive device that can realize simultaneous drainage and water injection of multiple boreholes.
背景技术Background technique
我国煤炭资源丰富,地域分布广泛,但煤层赋存条件差异较大,含瓦斯煤层较多,瓦斯含量高,煤与瓦斯突出严重。根据《煤矿瓦斯抽采达标规定》,为贯彻落实“先抽后采、监测监控、以风定产”的瓦斯治理方针,建立“通风可靠、抽采达标、监控有效、管理到位”的瓦斯治理工作体系,遏制煤矿瓦斯事故,实现煤矿瓦斯抽采达标。如今井下瓦斯抽采已常态化、普遍化,并且为加强瓦斯抽采治理效果,合理利用井下资源,往往对抽采瓦斯后余留下的抽采钻孔进一步合理利用,通常结合钻孔注水方法。煤层注水是通过钻孔注入压力水,使其渗入煤体内部,破坏煤体内原有的煤-瓦斯两相体系的平衡,形成煤-瓦斯-水三相体系,体系内各个介质相互作用,使煤的物理化学性质、力学性质及热力学性质发生变化。煤层注水是减少采煤工作面粉尘产生的最根本、最有效的措施。my country is rich in coal resources and has a wide geographical distribution, but the coal seam occurrence conditions are quite different. There are many coal seams containing gas with high gas content, and coal and gas outbursts are serious. According to the "Regulations on Compliance of Coal Mine Gas Drainage", in order to implement the gas control policy of "extracting first, then mining, monitoring and monitoring, and determining production based on wind", a gas control system of "reliable ventilation, up to standard extraction, effective monitoring, and proper management" is established. Work system, curb coal mine gas accidents, and achieve coal mine gas extraction standards. Nowadays, underground gas extraction has been normalized and universalized. In order to strengthen the effect of gas extraction and control and rationally utilize underground resources, the remaining drainage holes after gas extraction are often further rationally utilized, usually combined with the drilling water injection method. . Coal seam water injection is to inject pressurized water through drilling holes, so that it penetrates into the coal body, destroys the original coal-gas two-phase system balance in the coal body, and forms a coal-gas-water three-phase system. The physical and chemical properties, mechanical properties and thermodynamic properties of coal change. Coal seam water injection is the most fundamental and effective measure to reduce dust generation in coal mining face.
但是,现有的抽采-注水耦合方法一般都是在原有抽采钻孔基础上施工一个注水钻孔,或者直接使用原有的抽采钻孔。前者由于套孔容易偏斜,且人力物力消耗较大,导致单孔成本较高。而后者一般采用黄泥进行钻孔封堵,导致钻孔密封性差,注水效果不达标。并且在抽采注水工艺上,现阶段普遍采用多条支管进行瓦斯抽采,管线复杂维护困难,而注水阶段则采用单孔单注,工作周期较长,注水效果差。However, the existing drainage-water injection coupling methods generally construct a water injection hole on the basis of the original drainage hole, or directly use the original drainage hole. In the former, the cost of a single hole is high because the sleeve hole is easy to be deflected, and the manpower and material resources are consumed. The latter generally uses yellow mud to plug the borehole, resulting in poor borehole sealing and substandard water injection. In addition, in the process of water extraction and water injection, multiple branch pipes are generally used for gas extraction at this stage, and the pipeline is complex and difficult to maintain. In the water injection stage, single-hole single injection is used, which has a long working cycle and poor water injection effect.
发明内容SUMMARY OF THE INVENTION
为了克服现有技术的上述不足,本实用新型提供一种井下瓦斯抽采孔兼作煤层注水孔的装置,能够根据实际需要利用并改造常规抽采钻孔为注水钻孔,起到一孔两用的高效利用,并能对多个钻孔进行集约化抽采-注水封孔,优化抽采-注水钻孔封孔效果,提高工作效率,加快井下采煤工作周期,降低采煤成本。In order to overcome the above-mentioned deficiencies of the prior art, the utility model provides a device in which the underground gas drainage hole doubles as a water injection hole in a coal seam, which can utilize and transform conventional drainage holes into water injection holes according to actual needs, and play a dual purpose of one hole. It can effectively utilize the coal mine, and can perform intensive drainage and water injection sealing for multiple boreholes, optimize the drainage and water injection drilling hole sealing effect, improve work efficiency, speed up the working cycle of underground coal mining, and reduce coal mining costs.
本实用新型解决其技术问题采用的技术方案是:包括瓦斯抽采管、抽采软管、注水管、分接器、干路连接管、抽采干管和注水干管,分接器由相连通的分接器支管和分接器干管构成,多个分接器支管间隔排布在分接器干管的同一侧,每个分接器支管以及分接器干管都附带阀门;瓦斯抽采管通过囊袋式注浆封孔器安装在钻孔内,或者注水管再通过胶囊式封孔器密封安装在瓦斯抽采管内;瓦斯抽采管经过抽采软管和分接器上的分接器支管相连接,或者注水管经通过转接头与分接器支管配合连接;分接器上的分接器干管经过干路连接管与抽采干管或注水干管相连。The technical scheme adopted by the utility model to solve the technical problem is as follows: the gas drainage pipe, the drainage hose, the water injection pipe, the tap, the trunk connecting pipe, the drainage trunk and the water injection trunk, and the tap is connected by It is composed of the tap branch pipe and the tap trunk pipe, and multiple tap branch pipes are arranged at intervals on the same side of the tap trunk pipe. The extraction pipe is installed in the borehole through the bag type grouting hole sealer, or the water injection pipe is sealed and installed in the gas extraction pipe through the capsule type hole sealer; the gas extraction pipe passes through the extraction hose and the tap. The branch pipe of the tap is connected with the branch pipe of the tap, or the water injection pipe is connected with the branch pipe of the tap through the adaptor;
相比现有技术,本实用新型的一种井下瓦斯抽采孔兼作煤层注水孔的装置,通过在煤层瓦斯抽采完毕后,利用余留下来的抽采钻孔对其进行胶囊封孔,将抽采钻孔转变为注水钻孔,省略了套孔施工注水钻孔或重新打钻注水钻孔的复杂工序,大大减轻了井下作业人员的工作量,也降低了井下瓦斯抽采、煤层注水的成本。并且瓦斯抽采管内嵌注水管,加强了对注水管的保护,降低了注水过程中由于外界因素导致的断杆,破裂等可能性。并且两堵一注的抽采钻孔封堵技术与胶囊密封的注水孔封孔技术结合使用,确保了注水钻孔的密封性,改善了注水孔密封性能差的缺点,提高了注水效率。且本实用新型所设计的分接器系统,通过不同性能的软管及分接器集约化的将抽采管路、注水管路连接起来,可以同时向多个钻孔进行瓦斯抽采及煤层注水,实现井下快速抽采-注水一体化,提高作业人员工作效率,加快井下采煤工作周期,降低采煤成本。对减小井下突出危险性,改善作业环境,优化生产结构具有重大意义。Compared with the prior art, the utility model provides a device in which the underground gas drainage hole doubles as a coal seam water injection hole. The drainage hole is transformed into a water injection hole, which omits the complicated process of constructing the water injection hole or re-drilling the water injection hole, which greatly reduces the workload of the underground operators, and also reduces the underground gas drainage and coal seam water injection. cost. In addition, the gas extraction pipe is embedded with a water injection pipe, which strengthens the protection of the water injection pipe and reduces the possibility of broken rods and ruptures caused by external factors during the water injection process. In addition, the two-blocking and one-injection drainage hole sealing technology is used in combination with the capsule-sealed water injection hole sealing technology to ensure the tightness of the water injection hole, improve the shortcoming of poor sealing performance of the water injection hole, and improve the water injection efficiency. In addition, the tap system designed by the utility model can intensively connect the extraction pipeline and the water injection pipeline through hoses and taps with different performances, so that gas extraction and coal seam can be carried out to multiple boreholes at the same time. Water injection can realize the integration of rapid underground drainage and water injection, improve the work efficiency of operators, speed up the working cycle of underground coal mining, and reduce the cost of coal mining. It is of great significance to reduce the risk of downhole prominence, improve the operating environment and optimize the production structure.
附图说明Description of drawings
下面结合附图和实施例对本实用新型进一步说明。The present utility model will be further described below in conjunction with the accompanying drawings and embodiments.
图1是本实用新型一个实施例的布置示意图。FIG. 1 is a schematic layout diagram of an embodiment of the present invention.
图2a是本实用新型一个实施例中钻孔作为瓦斯抽采孔的应用结构示意图。Fig. 2a is a schematic diagram of the application structure of drilling holes as gas drainage holes in an embodiment of the present invention.
图2b是图2a中瓦斯抽采孔改做注水孔的示意图。Figure 2b is a schematic diagram of the gas drainage hole in Figure 2a being changed to a water injection hole.
图3a是本实用新型实施例中瓦斯抽采管路的连接示意图。Figure 3a is a schematic diagram of the connection of the gas drainage pipeline in the embodiment of the present invention.
图3b是本实用新型实施例中煤层注水管路的连接示意图。Figure 3b is a schematic diagram of the connection of the coal seam water injection pipeline in the embodiment of the present invention.
图4是本实用新型实施例中分接器的结构示意图。FIG. 4 is a schematic structural diagram of a tap in an embodiment of the present invention.
图中:1、煤层,2、钻孔,4、抽采软管,5、分接器,6、干路连接管,7、抽采干管,8、注水干管,10、巷道,11、瓦斯抽采管,12、囊袋注浆管,15、封孔胶囊,16、胶囊注水管,17、注水管,18、堵头,转接头20、分接器支管,21、分接器干管。In the picture: 1. Coal seam, 2. Drilling hole, 4. Drainage hose, 5. Splitter, 6. Main road connecting pipe, 7. Drainage main pipe, 8. Water injection main pipe, 10, Roadway, 11 , gas extraction pipe, 12, bag grouting pipe, 15, sealed capsule, 16, capsule water injection pipe, 17, water injection pipe, 18, plug, adapter 20, branch pipe of tap, 21, tap dry pipe.
具体实施方式Detailed ways
为使本实用新型实施例的目的、技术方案和优点更加清楚,下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本实用新型的一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型的保护范围。In order to make the purposes, technical solutions and advantages of the embodiments of the present utility model clearer, the technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. The embodiments of the present invention are some of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.
图1至图4示出了本实用新型一个较佳的实施例的结构示意图,图1中的一种井下瓦斯抽采孔兼作煤层注水孔的装置,包括瓦斯抽采管11、抽采软管、注水管17、分接器5、抽采干管7、干路连接管6和注水干管8;参见图4,分接器5由相连通的分接器支管20和分接器干管21构成,多个分接器支管20间隔排布在分接器干管21的同一侧,所述的分接器支管20数量可以取为2-40个,分接器干管21为1-2个,每个分接器支管20以及分接器干管21都附带阀门。Fig. 1 to Fig. 4 are schematic structural diagrams of a preferred embodiment of the present utility model. In Fig. 1, a device in which the underground gas drainage hole doubles as a coal seam water injection hole includes a gas drainage pipe 11 and a drainage hose. , water injection pipe 17, tap 5, draining main pipe 7, trunk connecting pipe 6 and water injection main pipe 8; refer to Figure 4, the tap 5 is connected by the tap branch pipe 20 and the tap trunk pipe. 21, a plurality of tap branch pipes 20 are arranged at intervals on the same side of the tap trunk pipe 21, the number of the tap branch pipes 20 can be taken as 2-40, and the tap trunk pipe 21 is 1- 2, with valves attached to each tap branch 20 and tap main 21.
图2a和图3a所示的是用于抽采瓦斯的管路,瓦斯抽采管11通过囊袋式注浆封孔器安装在钻孔2内,囊袋式注浆封孔器包括两端的堵头18,两堵头18之间与外部连接有囊袋注浆管12,通过囊袋注浆管12向堵头18之间灌注浆液,浆液最终凝固成固态,实现封孔。瓦斯抽采管11经过抽采软管4和分接器5上的分接器支管20相连接,分接器5上的分接器干管21经过干路连接管6与抽采干管7相连。Figures 2a and 3a show pipelines for gas extraction. The gas extraction pipe 11 is installed in the borehole 2 through a pocket grouting hole sealer. The pocket grouting hole sealer includes two ends. The plugs 18 are connected with the outside of the two plugs 18 with a bag grouting pipe 12 , through which the slurry is poured into the plugs 18 through the bag grouting pipe 12 , and the slurry is finally solidified into a solid state to achieve hole sealing. The gas extraction pipe 11 is connected to the tap branch pipe 20 on the tap 5 through the tap hose 4, and the tap trunk 21 on the tap 5 is connected to the drain trunk 7 via the trunk connecting pipe 6 connected.
图2b和图3b所示的是在原有瓦斯抽采钻孔的基础上形成的注水管路,注水管17通过胶囊式封孔器密封安装在瓦斯抽采管11内,该胶囊式封孔器包括封孔胶囊15和与外部连通的胶囊注水管16,注水管17通过转接头19与分接器支管20配合连接;分接器5上的分接器干管21经过干路连接管6与注水干管8相连。Figures 2b and 3b show the water injection pipeline formed on the basis of the original gas extraction borehole. The water injection pipe 17 is sealed and installed in the gas extraction pipe 11 through a capsule type hole sealer. It includes a sealing capsule 15 and a capsule water injection pipe 16 that communicates with the outside. The water injection pipe 17 is connected to the branch pipe 20 of the tap through the adapter 19; The water injection main pipe 8 is connected.
在本实施例中,分接器5具有抗水力压裂能力,其所能承受压力为0-40兆帕;抽采软管4具有一定抗变形特性,管径较大可以直接配合分接器支管20使用;注水管17具有一定抗压特性,所能承受压力为0~40MPa,管径较小,需通过转接头19与分接器支管20配合使用;干路连接管6具有一定抗变形能力且具有一定抗压特性,所能承受压力为0~40MPa。上述瓦斯抽采管11、抽采软管4、注水管17及干路连接管6的接口均为快速接头,可以与分接器5和抽采干管7、注水干管8快速连接。In this embodiment, the tap 5 has the ability to resist hydraulic fracturing, and the pressure it can withstand is 0-40 MPa; the extraction hose 4 has certain anti-deformation characteristics, and the larger diameter can be directly matched with the tap The branch pipe 20 is used; the water injection pipe 17 has certain pressure resistance characteristics, and can withstand a pressure of 0-40MPa, and the pipe diameter is small, and it needs to be used in conjunction with the branch pipe 20 of the tap through the adapter 19; the main road connecting pipe 6 has a certain resistance to deformation It has certain pressure resistance characteristics, and can withstand pressures of 0 to 40MPa. The interfaces of the gas extraction pipe 11 , the extraction hose 4 , the water injection pipe 17 and the trunk connecting pipe 6 are all quick joints, which can be quickly connected with the tap 5 , the extraction trunk 7 and the water injection trunk 8 .
参见图1至图4,一种采用井下瓦斯抽采孔兼作煤层注水孔的装置进行的施工方法,包括以下步骤:Referring to Figures 1 to 4, a construction method using a device with an underground gas drainage hole that doubles as a coal seam water injection hole includes the following steps:
a.采用常规方法从底板岩巷或者顶板岩巷或者本煤层巷道向煤层1施工一个钻孔2,钻孔2施工完毕后,按照常规两堵一注钻孔密封方法或者常规囊袋注浆式钻孔密封方法密封钻孔2,封孔后瓦斯抽采管11穿过封孔段使得煤层1和外界连通;将钻孔2内的瓦斯抽采管11经过抽采软管4和分接器5上的一个分接器支管20相连接,并将分接器5上的分接器干管21经过干路连接管6与抽采干管7相连,打开分接器支管20和分接器干管21上的阀门,实施瓦斯抽采;a. Use conventional methods to construct a drill hole 2 from the floor rock roadway or roof rock roadway or the coal seam roadway to the coal seam 1. After the construction of the drill hole 2, follow the conventional two-blocking and one-injection hole sealing method or the conventional bag grouting method The borehole sealing method is used to seal borehole 2. After the borehole is sealed, the gas extraction pipe 11 passes through the sealing section so that the coal seam 1 is connected to the outside world; A tap branch pipe 20 on the 5 is connected, and the tap trunk pipe 21 on the tap 5 is connected to the extraction trunk pipe 7 through the trunk connecting pipe 6, and the tap branch pipe 20 and the tap are opened. The valve on the main pipe 21 implements gas extraction;
b.按照a步骤依次施工一组钻孔2,并将这一组钻孔2与同一个分接器5连接,实施一组钻孔2同步抽采瓦斯;b. Construct a group of boreholes 2 in sequence according to step a, and connect this group of boreholes 2 to the same tap 5, and implement a group of boreholes 2 to extract gas synchronously;
c.当失去瓦斯抽采效果,或者当掘进头距抽采孔20-60m时,关闭分接器支管20和分接器干管21上的阀门,拆除瓦斯抽采管11与分接器5的连接,停止抽采;同时拆除干路连接管6与抽采干管7的连接,并将干路连接管6与注水干管8相连接;c. When the gas extraction effect is lost, or when the excavation head is 20-60m away from the extraction hole, close the valves on the branch pipe 20 and the main pipe 21 of the tap, and remove the gas extraction pipe 11 and the tap 5 At the same time, remove the connection between the main road connecting pipe 6 and the draining main pipe 7, and connect the main road connecting pipe 6 with the water injection main pipe 8;
d.在瓦斯抽采管11内插入封孔胶囊15,封孔胶囊15位于注浆封孔段内,并通过胶囊注水管16向封孔胶囊15内注入高压水使得封孔胶囊15膨胀,与瓦斯抽采管11紧密贴合,实现封孔,将注水管17通过转接头19与分接器支管20相连接;d. Insert the sealing capsule 15 into the gas extraction pipe 11, the sealing capsule 15 is located in the grouting and sealing section, and inject high-pressure water into the sealing capsule 15 through the capsule water injection pipe 16 to make the sealing capsule 15 expand, and The gas extraction pipe 11 is closely attached to realize sealing, and the water injection pipe 17 is connected to the branch pipe 20 of the tap through the adapter 19;
e.将一组所有钻孔2都按照步骤c和步骤d操作,将一组所有钻孔2和同一分接器5相互连接;e. Operate all drill holes 2 in a group according to step c and step d, and connect all drill holes 2 in a group with the same tap 5;
f.打开分接器支管20和分接器干管21上的阀门,实现对一组钻孔2的同步注水。f. Open the valves on the branch pipe 20 of the tap and the main pipe 21 of the tap to realize synchronous water injection to a group of boreholes 2 .
本实用新型根据实际需要利用并改造常规抽采钻孔为注水钻孔,起到一孔两用的高效利用,并利用分路装置对多个钻孔2进行集约化抽采-注水,优化了抽采-注水钻孔封孔效果,缩短了井下瓦斯抽采-注水周期,提高了井下作业人员工作效率,对高效、快捷、经济的井下开采具有重大意义。The utility model utilizes and transforms conventional drainage boreholes into water-injection boreholes according to actual needs, so as to achieve high-efficiency utilization of one hole for two purposes, and utilizes a branching device to perform intensive drainage and water injection for a plurality of boreholes 2, thereby optimizing the The hole sealing effect of the drainage-water injection hole shortens the underground gas drainage-water injection cycle, improves the work efficiency of underground operators, and is of great significance to efficient, fast and economical underground mining.
以上所述,仅是本实用新型的较佳实施例,并非对本实用新型做任何形式上的限制,凡是依据本实用新型的技术实质,对以上实施例所做出任何简单修改和同等变化,均落入本实用新型的保护范围之内。The above are only preferred embodiments of the present invention, and are not intended to limit the present invention in any form. Any simple modifications and equivalent changes made to the above embodiments according to the technical essence of the present invention are fall within the protection scope of the present invention.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201821562312.1U CN209083324U (en) | 2018-09-20 | 2018-09-20 | A kind of underground gas extraction hole doubles as the device in coal-bed flooding hole |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201821562312.1U CN209083324U (en) | 2018-09-20 | 2018-09-20 | A kind of underground gas extraction hole doubles as the device in coal-bed flooding hole |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209083324U true CN209083324U (en) | 2019-07-09 |
Family
ID=67117359
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201821562312.1U Expired - Fee Related CN209083324U (en) | 2018-09-20 | 2018-09-20 | A kind of underground gas extraction hole doubles as the device in coal-bed flooding hole |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209083324U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109098750A (en) * | 2018-09-20 | 2018-12-28 | 中国矿业大学 | A kind of underground gas extraction hole doubles as the device and construction method in coal-bed flooding hole |
| CN112360345A (en) * | 2020-10-27 | 2021-02-12 | 山东科技大学 | Method and system for reinforcing grouting of gas extraction hole under extremely soft coal seam and application |
-
2018
- 2018-09-20 CN CN201821562312.1U patent/CN209083324U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109098750A (en) * | 2018-09-20 | 2018-12-28 | 中国矿业大学 | A kind of underground gas extraction hole doubles as the device and construction method in coal-bed flooding hole |
| CN109098750B (en) * | 2018-09-20 | 2023-12-15 | 中国矿业大学 | A device and construction method in which an underground gas extraction hole doubles as a coal seam water injection hole |
| CN112360345A (en) * | 2020-10-27 | 2021-02-12 | 山东科技大学 | Method and system for reinforcing grouting of gas extraction hole under extremely soft coal seam and application |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105840134B (en) | Wear layer single pouch injection hole sealing device of uplink drilling and its a method for sealing | |
| CN108678802B (en) | Coal mine drilling, punching and drawing integrated outburst prevention device and method | |
| CN105507940B (en) | One kind cuts envelope pressure integration and strengthens gas pumping device and method | |
| CN109098750B (en) | A device and construction method in which an underground gas extraction hole doubles as a coal seam water injection hole | |
| CN106930724A (en) | One kind is rich in water borehole sealing and gas pumping integral method | |
| CN105804786A (en) | Method for layer penetrating, drilling, pressing punching and permeability improving of soft coal seam floor | |
| CN110761734A (en) | Sealing device and sealing method for drilling of high-gas soft coal seam | |
| CN209261534U (en) | A combined coal seam water injection and gas drainage sealing device | |
| CN209083324U (en) | A kind of underground gas extraction hole doubles as the device in coal-bed flooding hole | |
| CN116624157A (en) | A method for underwater butt joint reinforcement in high water pressure and strong permeable formations | |
| CN209990483U (en) | Coal seam fracturing anti-reflection device | |
| CN111852556B (en) | Forward and reverse drainage method in downward through-layer drilling | |
| CN206477819U (en) | One kind drilling artesian water fast plugging device | |
| CN203702070U (en) | Coal mine low pumping lane borehole slag-returning sealing apparatus | |
| CN107780873A (en) | The three-stage capsule sealing device and its encapsulating method of a kind of mash gas pumping drilling | |
| CN203476278U (en) | Grouting type hole sealing and automatic water discharging device for underground drilling gas extraction | |
| CN112554839B (en) | Integral hose plug-in-free gas hole packer and hole sealing method thereof | |
| CN113503140B (en) | Two-stage bag pressurized strengthening hole sealing device and hole sealing method | |
| CN207177750U (en) | Integrated string | |
| CN2466348Y (en) | Fine diameter rigid external valve one-way segmented grouting device | |
| CN105317397A (en) | Double cloth bags type grouting sealing set and method | |
| CN212054655U (en) | Gas extraction system of coal seam substep water injection nitrogen injection fracturing | |
| CN104564105A (en) | Device and method for grouting and reinforcing secondary casing pipe of coal seam floor | |
| CN208040348U (en) | Slip casting bag pocket type hole packer | |
| CN108533223B (en) | A system for extraction and utilization of residual coalbed methane in underground goaf |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190709 Termination date: 20200920 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |