CN205858333U - A kind of three plug hydraulic fracturing detecting earth stress systems - Google Patents
A kind of three plug hydraulic fracturing detecting earth stress systems Download PDFInfo
- Publication number
- CN205858333U CN205858333U CN201620443103.XU CN201620443103U CN205858333U CN 205858333 U CN205858333 U CN 205858333U CN 201620443103 U CN201620443103 U CN 201620443103U CN 205858333 U CN205858333 U CN 205858333U
- Authority
- CN
- China
- Prior art keywords
- packer
- main drilling
- pressure
- pipe
- hydraulic fracturing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
This utility model relates to a kind of three plug hydraulic fracturing detecting earth stress systems.The purpose of this utility model is to provide a kind of simple in construction, cost is relatively low, be applicable to three plug hydraulic fracturing detecting earth stress systems of high-stress state.The technical solution of the utility model is: a kind of three plug hydraulic fracturing detecting earth stress systems, there is test water supply installation and main drilling packer for pressure device, and be placed in boring build-in test section, two main drilling packers of lower layout, test water supply installation is through the water inlet of the upper main drilling packer of penstock connection, the outlet of upper main drilling packer connects lower main drilling packer through floral tube, main drilling packer supplies pressure device on flexible pipe is sequentially communicated, lower main drilling packer, it is characterized in that: in boring, upper main drilling packer be provided above time packer, this packer secondary packer confession pressure device outside soft pipe connection is holed.This utility model is applicable to the detecting earth stress under the rock mass engineering project supertension stress states such as water power, traffic, oil and mine.
Description
Technical field
This utility model relates to a kind of three plug hydraulic fracturing detecting earth stress systems.It is applicable to water power, traffic, oil
With the detecting earth stress under the rock mass engineering project supertension stress states such as mine.
Background technology
Sichuan Jinping hydropower station diversion tunnel top covering rockmass buried depth 1500~2000m, maximum buried depth is about 2525m,
Have that buried depth is big, feature that hole line length, footpath, hole are big, for super deep and long tunnels super-huge subsoil water electrical engineering.Maximally stress can
Reaching more than 70MPa, during tunnel excavation, owing to there is the crustal stress of superelevation, locally rock mass occurs in that strong rock burst
And deformation, bring the biggest difficulty and hidden danger to the design of tunnel, construction and safety.Conventional hydraulic fracturing detecting earth stress
System mainly includes packer, penstock, hydraulic pump and test pipeline etc.) it is difficult to meet requirement.
Existing Hydraulic and Hydro-Power Engineering rock mass stress test procedure (DL-T5367-2007) and " water conservancy and hydropower rock test
Code SL264-2001) in the method recommended have: Strain Method at the bottom of hole wall Strain Method, hole, aperture Strain Method, hydraulic fracturing and
Surface strain method five clock.
In griotte rock mass under high-stress state, in the case of pie occurs in drilling core, use hydraulic fracturing
It it is more effective rock mass stress method of testing.And the hydraulic fracturing ground rock mass stress test equipment of routine and the maximum of system
Test pressure is 30~40MPa, it is clear that do not reach far away test request, need to develop the pressure new equipment more than 100MPa and
System, and take corresponding method of testing.
Fig. 1 is conventional hydraulic fracturing ground rock mass stress test equipment and system, uses double inserting method, i.e. will by drilling rod
Two expandable rubber packers are placed into selected fracturing section, and pressurization makes it expand, setting on hole wall, form pressure-bearing section
Space.But when being affected by condition of high ground stress, in instrument connection drilling process, it may appear that aperture becomes big or deformation, when rock mass fracturing
When pressure is more than 80MPa, owing to the external and internal pressure difference of upper packer is very big, upper packer top sebific duct can be caused to rupture, cause
Test cannot proceed.
Summary of the invention
The technical problems to be solved in the utility model is: for the problem of above-mentioned existence, it is provided that a kind of simple in construction, cost
Relatively low, be applicable to three plug hydraulic fracturing detecting earth stress systems of high-stress state.
This utility model be the technical scheme is that a kind of three plug hydraulic fracturing detecting earth stress systems, has
Test water supply installation and main drilling packer are for pressure device, and are placed in two main drilling packers of upper and lower layout in boring, and test is supplied water
Device connects lower main drilling packer through the water inlet of the upper main drilling packer of penstock connection, the outlet of upper main drilling packer through floral tube,
Main drilling packer is sequentially communicated upper and lower main drilling packer through flexible pipe for pressure device, it is characterised in that: in boring, upper main drilling packer upper
Side arranges time packer, this packer secondary packer confession pressure device outside soft pipe connection is holed.
In described packer, there is triple channel, lead to for pressure passageway, a main drilling packer voltage supply including one packer
Road, and a central passage supplied water.
Described time packer has feed pipe, the confession pressure pipe being coaxially placed on outside feed pipe, and is coaxially placed on outside voltage supply pipe
Rubber tube;
Wherein for leaving gap between pressure pipe and feed pipe, for the two ends end count seal envelope in gap between pressure pipe and feed pipe
Close;
Leaving gap between described rubber tube and confession pressure pipe, rubber tube two ends are connected to through union joint and connecting tube the most successively
Feed pipe two ends;
Be shaped with in the union joint of one end with for main voltage supply pipeline that between pressure pipe, feed pipe, gap connects and with rubber tube,
For the secondary voltage supply pipeline of gap connection between pressure pipe, it is shaped with in the union joint of the other end and connects for gap between pressure pipe and feed pipe
Logical main voltage supply pipeline.
The beneficial effects of the utility model are: this utility model, by being provided above time packer at upper main drilling packer, is kept away
Exempt from the problem that upper main drilling packer causes upper packer to rupture because of external pressure difference, it is ensured that rock mass hydrofracturing under high-stress state
Method detecting earth stress is successful.
Accompanying drawing explanation
Fig. 1 is the structural representation of prior art.
Fig. 2 is the structural representation of embodiment.
Fig. 3 is the structural representation of time packer in embodiment.
Fig. 4 is the A portion enlarged drawing of time packer.
Detailed description of the invention
As in figure 2 it is shown, the present embodiment is a kind of three plug hydraulic fracturing detecting earth stress systems, there is test water supply dress
Put, main drilling packer supplies pressure device (high-pressure hydraulic pump/oil pump) for pressure device (high-pressure hydraulic pump/oil pump) and time packer, and is placed in
The secondary packer 2 being from top to bottom sequentially arranged in boring and upper and lower two main drilling packers 1.The most secondary packer 2 seals for triple channel
Every device, key component includes: rubber tube, dual pathways center-pole and dual pathways end ferrum head.
As it is shown on figure 3, time packer 2 includes feed pipe 201 in this example, the confession pressure pipe 202 being coaxially placed on outside feed pipe, with
And the rubber tube 203 being coaxially placed on outside voltage supply pipe.Wherein for leaving gap, for pressure pipe and confession between pressure pipe 201 and feed pipe 202
Between water pipe, the two ends end count seal 204 in gap is closed.Supply the two ends of pressure pipe 201 through external screw thread threaded water supply connecting tube
203, the cooperation of this water supply connecting tube compresses sealing ring 204 for pressure pipe 201.In the present embodiment, rubber tube 203 two ends are individually fixed in
On union joint 205, this union joint is threadeded with the connecting tube 206 of homonymy, between leaving between rubber tube 203 and confession pressure pipe
Gap.
The present embodiment is shaped with in the union joint 205 of rubber tube 203 one end and connects with for gap between pressure pipe and feed pipe
Main voltage supply pipeline 2051, and with rubber tube and the secondary voltage supply pipeline 2052 that connects for gap between pressure pipe;Rubber tube 203 is another
The main voltage supply pipeline 2051 connected with for gap between pressure pipe and feed pipe it is shaped with in the union joint 205 of one end.
Having the central passage of water supply in this example in feed pipe 201, to test section voltage supply, designing the highest test pressure is
100MPa;Main voltage supply pipeline 2051 coordinates between pressure pipe and feed pipe, gap formation main drilling packer is for pressure passageway, to lower section
The voltage supply of two main drilling packers 1, designing the highest test pressure is 100MPa;Secondary voltage supply pipeline 2052 compound rubber cylinder and for pressure pipe it
Between gap form time packer for pressure passageway, to self packer voltage supply, designing the highest test pressure is 40MPa.
The present embodiment is tested water supply installation and connects main drilling packer 1 through the central passage of penstock 3 with time packer 2
Water inlet, the outlet of upper main drilling packer 1 connects lower main drilling packer 1 through floral tube 5;Main drilling packer supplies pressure device through flexible pipe 4 He
It is the main drilling packer 1 upper and lower main drilling packer of voltage supply channel connection 1 in secondary packer 2;Secondary packer connects through flexible pipe 4 for pressure device
Secondary packer 2.
The operation principle of the present embodiment is as follows: the present embodiment is further added by one in the upper end of double plug packers can provide independent
The secondary packer of pressure, it may be assumed that a triple channel packer in parallel in original pair of plug packer (two main drilling packers 1) system
(secondary packer 2), constitutes three plug packer systems.
In this example during hydraulic fracturing detecting earth stress, connection is had test steel pipe and inflatable three envelopes of high-pressure oil pipe
After arriving predetermined hole depth position under device, pressurize to primary and secondary packer respectively so that the rubber tube of three packers of primary and secondary is continuous
Expand and be also in close contact with hole wall rock mass, when in packer, pressure reaches predetermined packing pressure (pressure of secondary packer 2 is pre-
Estimate the half of the highest test pressure), then stop pressurization;Start detecting earth stress.In test process, the pressure of main drilling packer 1 will
Improve along with the increase of test section pressure, and the pressure increasing degree of secondary packer 2 is less.
Claims (3)
1. a three plug hydraulic fracturing detecting earth stress system, has test water supply installation and main drilling packer for pressure device,
And it being placed in two main drilling packers (1) of boring build-in test position upper and lower layout, test water supply installation is through penstock (3) even
The water inlet of logical upper main drilling packer, the outlet of upper main drilling packer connects lower main drilling packer through floral tube (5), and main drilling packer is for press-fiting
Put and be sequentially communicated upper and lower main drilling packer through flexible pipe (4), it is characterised in that: in boring, upper main drilling packer be provided above time packing
Device (2), this packer connects the secondary packer outside holing for pressure device through flexible pipe (4).
Three plug hydraulic fracturing detecting earth stress systems the most according to claim 1, it is characterised in that: described packing
Device has triple channel in (2), and including one packer for pressure passageway, a main drilling packer is for pressure passageway, and a water supply
Central passage.
Three plug hydraulic fracturing detecting earth stress systems the most according to claim 2, it is characterised in that: described packing
Device (2) has feed pipe (201), the confession pressure pipe (202) being coaxially placed on outside feed pipe, and is coaxially placed on the rubber outside voltage supply pipe
Cylinder (203);
Wherein for leaving gap, for two ends end count seal (204) in gap between pressure pipe and feed pipe between pressure pipe and feed pipe
Close;
Leaving gap between described rubber tube (203) and confession pressure pipe, rubber tube (203) two ends are respectively successively through union joint (205)
It is connected to feed pipe (201) two ends with connecting tube (206);
Be shaped with in the union joint (205) of one end with for main voltage supply pipeline (2051) that between pressure pipe, feed pipe, gap connects and with
Rubber tube, the secondary voltage supply pipeline (2052) connected for gap between pressure pipe, be shaped with in the union joint (205) of the other end and supply pressure pipe
And the main voltage supply pipeline (2051) of gap connection between feed pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620443103.XU CN205858333U (en) | 2016-05-13 | 2016-05-13 | A kind of three plug hydraulic fracturing detecting earth stress systems |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620443103.XU CN205858333U (en) | 2016-05-13 | 2016-05-13 | A kind of three plug hydraulic fracturing detecting earth stress systems |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205858333U true CN205858333U (en) | 2017-01-04 |
Family
ID=57643400
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620443103.XU Active CN205858333U (en) | 2016-05-13 | 2016-05-13 | A kind of three plug hydraulic fracturing detecting earth stress systems |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205858333U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105804735A (en) * | 2016-05-13 | 2016-07-27 | 浙江华东工程安全技术有限公司 | Three-plunger type hydraulic fracturing ground stress measurement system |
CN106907146A (en) * | 2017-04-19 | 2017-06-30 | 中国电建集团中南勘测设计研究院有限公司 | One kind control valve and hydrofracturing geodetic stress test device |
CN108049847A (en) * | 2017-12-14 | 2018-05-18 | 中国地质调查局水文地质环境地质调查中心 | A kind of twin packer layering water plug and method |
CN108999586A (en) * | 2018-08-10 | 2018-12-14 | 中国地震局地壳应力研究所 | Minor diameter rock mass hydrofracturing tests straddle packer |
CN111677497A (en) * | 2020-06-28 | 2020-09-18 | 中国地质科学院地质力学研究所 | Hydrofracturing stress detection device and detecting system |
-
2016
- 2016-05-13 CN CN201620443103.XU patent/CN205858333U/en active Active
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105804735A (en) * | 2016-05-13 | 2016-07-27 | 浙江华东工程安全技术有限公司 | Three-plunger type hydraulic fracturing ground stress measurement system |
CN106907146A (en) * | 2017-04-19 | 2017-06-30 | 中国电建集团中南勘测设计研究院有限公司 | One kind control valve and hydrofracturing geodetic stress test device |
CN106907146B (en) * | 2017-04-19 | 2023-04-07 | 中国电建集团中南勘测设计研究院有限公司 | Control valve and hydrofracturing geodesic stress test device |
CN108049847A (en) * | 2017-12-14 | 2018-05-18 | 中国地质调查局水文地质环境地质调查中心 | A kind of twin packer layering water plug and method |
CN108999586A (en) * | 2018-08-10 | 2018-12-14 | 中国地震局地壳应力研究所 | Minor diameter rock mass hydrofracturing tests straddle packer |
CN111677497A (en) * | 2020-06-28 | 2020-09-18 | 中国地质科学院地质力学研究所 | Hydrofracturing stress detection device and detecting system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105804735A (en) | Three-plunger type hydraulic fracturing ground stress measurement system | |
CN205858333U (en) | A kind of three plug hydraulic fracturing detecting earth stress systems | |
CN103061684B (en) | Open-hole horizontal well segmentation many bunches of homogeneous acidification tubing strings and acidization tool thereof | |
CN201757686U (en) | Hydraulic fracturing crustal stress measuring apparatus | |
CN105756599A (en) | Coal mine two-end gas plug and middle water seal layer penetrating drill hole sealing device and method | |
AU2019201471B2 (en) | High-pressure self-locking packer and setting method thereof | |
CN105840134A (en) | Single-bag grouting hole sealing device for upward crossing boreholes and hole sealing method adopting single-bag grouting hole sealing device | |
CN103758533B (en) | A kind of high-low pressure integratedization roadway grouting reinforcement means | |
CN109488299B (en) | Hydraulic fracturing softening device and method for hard rock of fully-mechanized rock-digging roadway | |
CN207080207U (en) | Oil field separates adopts technology tubular column | |
CN113250670B (en) | Single-hole multi-section synchronous control fracturing coal body permeability increasing system and method | |
CN205063929U (en) | Colliery is sealed in pit and is pressed integration segmentation hydraulic fracturing device | |
CN102155251A (en) | Waterpower hole packer | |
CN104989356A (en) | Underground coal mine coal seam drilling high-pressure gas fracturing and permeability increasing method and system | |
CN109098750B (en) | Device for underground gas extraction hole to be used as coal seam water injection hole and construction method | |
CN108086945A (en) | A kind of layer-through drilling separate type whole process gas drainage hole sealing device and its method for sealing | |
CN205400702U (en) | Hard strata shallow layer geothermal well fracturing unit | |
CN102434192A (en) | Device and method for enhancing coal seam fracturing effect | |
CN205908279U (en) | Slip casting hole sealing device | |
CN105715228A (en) | Single-pipe airbag type gas drilled hole sealing device | |
CN204827256U (en) | Seal up and adopt down screen pipe and fill sand control integration operating tool string | |
CN111411915A (en) | Downhole variable-diameter type layered structure sealing device and method | |
CN203572747U (en) | Hydraulic-pressure-type high-pressure pressurized water tester with double plugs | |
CN105134285A (en) | Three-blocking and two-injecting gas extraction hole sealing method | |
CN202228038U (en) | Shallow casing leakage water injection well plugging pipe column |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210712 Address after: Room 609 and 610, North building, Huadong Hospital, 22 Chaowang Road, Hangzhou, Zhejiang 310014 Patentee after: Zhejiang Huadong mapping and Engineering Safety Technology Co.,Ltd. Address before: 1-2 / F, building 5, 355 Tianmu Shanxi Road, Xianlin street, Hangzhou City, Zhejiang Province Patentee before: ZHEJIANG HUADONG ENGINEERING SAFETY TECHNOLOGY Co.,Ltd. |