CN109098441A - H profile steel rail mounted moulding bed with stopper - Google Patents

H profile steel rail mounted moulding bed with stopper Download PDF

Info

Publication number
CN109098441A
CN109098441A CN201811022653.4A CN201811022653A CN109098441A CN 109098441 A CN109098441 A CN 109098441A CN 201811022653 A CN201811022653 A CN 201811022653A CN 109098441 A CN109098441 A CN 109098441A
Authority
CN
China
Prior art keywords
profile steel
moulding bed
steel pipe
steel
profile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811022653.4A
Other languages
Chinese (zh)
Other versions
CN109098441B (en
Inventor
陈二平
余明贵
田振
张春春
李启宏
王丽丽
戴伟
朱学保
梅伟
董佳佳
俞振威
徐庆平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Provincial Construction Group Co Ltd
Nanjing Tongli Construction Group Co Ltd
Original Assignee
Jiangsu Provincial Construction Group Co Ltd
Nanjing Tongli Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Provincial Construction Group Co Ltd, Nanjing Tongli Construction Group Co Ltd filed Critical Jiangsu Provincial Construction Group Co Ltd
Priority to CN201811022653.4A priority Critical patent/CN109098441B/en
Publication of CN109098441A publication Critical patent/CN109098441A/en
Application granted granted Critical
Publication of CN109098441B publication Critical patent/CN109098441B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/04Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for lintels, beams, or transoms to be encased separately; Special tying or clamping means therefor

Abstract

The invention discloses a kind of H profile steel rail mounted moulding beds with stopper, it applies in steel structural roof construction field, its key points of the technical solution are that: including pouring armored concrete terrace and full hall fastener type steel pipe scaffold on the ground, full hall fastener type steel pipe scaffold is equipped with several double steel pipe main joists being parallel to each other, the flitch for being used to support steel pipe truss beam is equipped on double steel pipe main joist, flitch is equipped with H profile steel moulding bed, H profile steel moulding bed is equipped with several jack for being used to support steel pipe truss beam, the load-bearing pillar at supporting steel pipe girder truss length direction both ends is respectively used to there are two pouring on armored concrete terrace, its advantage is that: since full hall fastener type steel pipe scaffold is dismountable and recycle after construction, reduce construction cost.

Description

H profile steel rail mounted moulding bed with stopper
Technical field
The present invention relates to steel structural roof construction field, in particular to a kind of H profile steel rail mounted moulding bed with stopper.
Background technique
The structure that steel construction is made of steel material is one of main building construction types, and structure is mainly by fashioned iron With the components composition such as joist steel, steel column, steel truss made of billet etc., have that self weight is relatively light, antivibration (shake) property, anti-impacts of steel The advantages that hitting property is good.
When modern large space structure public building is constructed, since its span is big, space is high, and roofing generallys use steel construction Roofing mainly includes beam across steel pipe truss greatly, H profile steel secondary beam and jack truss beam.
But during actual construction, it is confined to the local industrialized level of construction, no large-scale steel structure processing factory, without large size Hoisting and hanging is mechanical, therefore the main member greatly across steel pipe truss beam is taken after being transported to scene in installation position by factory's sectional making If high-altitude operation platform completes aerial spelling, and heavy temporary support columns is arranged in segmentation junction, while considering steel pipe purlin That sets a roof beam in place is installed as one-off construction process, and heavy temporary support columns (lattice column) complete in factory together and transport to applying Building site, due to lattice column be it is disposable, amortization can not be formed, non-recovery utility value increases so as to cause construction cost.
Summary of the invention
The object of the present invention is to provide a kind of H profile steel rail mounted moulding beds with stopper, its advantage is that: due to full hall button Part formula steel pipe scaffold is dismountable after construction and recycles, to reduce construction cost.
Above-mentioned technical purpose of the invention has the technical scheme that a kind of H-type with stopper Steel track formula moulding bed, including pouring armored concrete terrace and full hall fastener type steel pipe scaffold on the ground, the full hall Fastener type steel pipe scaffold is equipped with several double steel pipe main joists being parallel to each other, and is equipped with wood on the double steel pipe main joist Side, the flitch are equipped with H profile steel moulding bed, and the H profile steel moulding bed is equipped with several jack for being used to support steel pipe truss beam, The load-bearing pillar at supporting steel pipe girder truss length direction both ends is respectively used to there are two pouring on the armored concrete terrace.
Through the above technical solutions, operator passes through crane for each of steel pipe truss beam in spelling steel pipe truss beam Duan Yici is hoisted to above jack, and is supported by the mandril of jack, to be welded on one for each section of steel pipe truss beam After rising, the both ends of steel pipe truss beam are fixed with load-bearing pillar, later the mandril of descending jack;Full hall fastener type steel pipe foot Hand cradle provides carrying basis to the splicing of steel pipe truss beam, and operator can tear full hall fastener type steel pipe scaffold open after construction It unloads, reuse, save engineering resource, reduce construction cost.
The present invention is further arranged to: the H profile steel moulding bed is equipped with several cross along the distribution of H profile steel moulding bed length direction Beam, the both ends of the crossbeam are all provided with that there are two the upright bars that are parallel to each other.
Through the above technical solutions, when steel pipe truss beam is supported on the mandril of jack, the lower purlin of steel pipe truss beam Mobile jib is located between the upright bar that two are parallel to each other, and reduces steel pipe truss beam and occurs lateral shaking in spelling, protects The precision of spelling is demonstrate,proved.
The present invention is further arranged to: the bearing height of the jack drops step by step from the middle part of steel pipe truss beam to both ends It is low.
Through the above technical solutions, springing height when according to specification regulation girder truss installation, reduces jack and withdraws Afterwards steel pipe truss beam occur deforming or under a possibility that disturbing.
The present invention is further arranged to: the H profile steel moulding bed is equipped with billet, and the jack is arranged in billet On, fixed cylinder is arranged on the mandril of the jack, the fixed cylinder is equipped with arc steel pallet.
Through the above technical solutions, the billet of setting plays the contact area for increasing jack and H profile steel moulding bed, point The pressure effect of jack is dissipated;The arc steel pallet of setting then reduces mandril of lifting jack and directly contacts truss steel pipe, causes The case where steel pipe Inward deflection, occurs, conducive to the sliding of steel pipe truss beam and precisely in place.
The present invention is further arranged to: two positioning symmetrical about axis are welded on the billet Angle steel.
Through the above technical solutions, not only having played the positioning action to jack by positioning angle steel, but also reduce very heavy The case where being deviated during withstanding on carrying and unloading.
The present invention is further arranged to: the H profile steel moulding bed includes two the first H profile steels and several settings being parallel to each other The second H profile steel between two the first H profile steels, second H profile steel are distributed in perpendicular to the first H profile steel, the billet On the node that first H profile steel is connected with the second H profile steel, the billet of the two neighboring diagonal Node distribution of second H profile steel is logical Cross bridging connection.
Through the above technical solutions, the connection between billet and H profile steel moulding bed is strengthened by bridging, simultaneously because cutting The length of knife support is fixed, and quick positioning of the operator to billet position is facilitated.
The present invention is further arranged to: the full hall fastener type steel pipe scaffold is equipped with flak jacket railing, institute in flitch side Flak jacket railing is stated equipped with safety net.
Through the above technical solutions, the flak jacket railing and safety net of setting play protective action, reduces operator and exist When construction the case where accidental falling.
The present invention is further arranged to: the two neighboring flitch is connected by galvanized wire.
Through the above technical solutions, making each flitch connect into an entirety by galvanized wire, reduces single flitch and occur The case where sliding, improves the stability of flitch support construction.
The present invention is further arranged to: the flitch is with a thickness of 60mm.
Through the above technical solutions, the flitch of 60mm thickness ensure that its reliability as carrying basis.
The present invention is further arranged to: the flitch is equipped with dry powder extinguisher.
Through the above technical solutions, some burst feelings when the dry powder extinguisher of setting makes operator is removable to construct Condition provides guarantee to the personal safety of operator.
In conclusion the invention has the following advantages: full hall fastener type steel pipe scaffold is mentioned to steel pipe truss beam When for carrying basis and operation platform, itself is detachable and reusable, saves the waste of resource, reduces and be constructed into This;The case where being pressed by the steel pipe that arc steel pallet reduces steel pipe truss beam by the mandril of jack;Simultaneously in crossbeam and Under the cooperation of upright bar, shaking of the steel pipe truss beam in spelling is reduced, is provided convenience to the spelling work of operator.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the present embodiment;
Fig. 2 is the structural schematic diagram that the present embodiment is used to embody H profile steel moulding bed;
Fig. 3 is enlarged drawing at A in Fig. 2;
Fig. 4 is the structural schematic diagram that the present embodiment is used to embody galvanized wire;
Fig. 5 is the structural schematic diagram that the present embodiment is used to embody arc steel pallet;
Fig. 6 is enlarged drawing at B in Fig. 5;
Fig. 7 is the structural schematic diagram that the present embodiment is used to embody safety net
Appended drawing reference: 1, armored concrete terrace;11, full hall fastener type steel pipe scaffold;12, double steel pipe main joist;13, wooden Side;14, H profile steel moulding bed;141, the first H profile steel;142, the second H profile steel;15, jack;16, load-bearing pillar;17, crossbeam;171, Upright bar;2, billet;21, fixed cylinder;22, arc steel pallet;23, angle steel is positioned;24, bridging;3, flak jacket railing;31, pacify The whole network;32, galvanized wire;33, dry powder extinguisher.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
Embodiment: a kind of H profile steel rail mounted moulding bed with stopper, as shown in Figure 1, including the steel poured on the ground Reinforced concrete terrace 1 and full hall fastener type steel pipe scaffold 11, armored concrete terrace 1 is as full hall fastener type steel pipe scaffold The whole load of full hall fastener type steel pipe scaffold 11 can be directly passed to ground by 11 basis;Full hall fastener type steel pipe foot Hand cradle 11 is equipped with several double steel pipe main joist 12(such as Fig. 3 being parallel to each other), as shown in Fig. 2, 12 upper berth of double steel pipe main joist Equipped with several flitches 13 along the distribution of 12 length direction of double steel pipe main joist, using as operating platform and bearing platform, flitch 13 With a thickness of 60mm, and two neighboring flitch 13 passes through galvanized wire 32(such as Fig. 4) connection protects so that flitch 13 is linked to be an entirety Demonstrate,prove the bearing capacity of flitch 13.
As shown in Figure 5 and Figure 6, flitch 13 is equipped with H profile steel moulding bed 14, and H profile steel moulding bed 14 is equipped with several be used to support The jack 15 of steel pipe truss beam, fixed cylinder 21 is arranged on the mandril of jack 15, and fixed cylinder 21 is equipped with arc steel pallet 22, the Internal periphery of arc steel pallet 22 is adapted with the lower purlin mobile jib of steel pipe truss beam, has also been poured on armored concrete terrace 1 Two are respectively used to the load-bearing pillar 16 at supporting steel pipe girder truss length direction both ends.
As depicted in figs. 1 and 2, during actual construction, operator first adjusts the absolute altitude of each arc steel pallet 22, then benefit With truck crane by steel pipe truss girder steel segmental hoisting to arc steel pallet 22, to each arc steel pallet 22 by steel pipe truss beam Welding spelling work is carried out after supporting & stablizing;Steel pipe truss beam integrally stands 72 hours later, is fully cooled each weld seam, will The both ends of steel pipe truss beam are consolidated with load-bearing pillar 16 by concreting, and full hall fastener type steel pipe foot hand is finally dismantled Frame 11 and remaining support member;Due to the full hall fastener type steel pipe scaffold 11 as offer carrying platform, component part Light-weight, convenient transportation, and it is reusable, buildings and resources are not only saved, but also reduce construction cost.
As shown in figure 5, H profile steel moulding bed 14 is equipped with several crossbeams 17 along the distribution of 14 length direction of H profile steel moulding bed, crossbeam 17 both ends, which are all provided with, works as steel pipe so that the both ends of crossbeam 17 respectively form a U-frame frame there are two the upright bar 171 that is parallel to each other When girder truss is supported in arc steel pallet 22, the lower purlin mobile jib of steel pipe truss beam is located in two U-frame framves, is limited Steel pipe truss beam occurs lateral shaking in spelling, improves welding quality.
As shown in figure 5, it is further, arch camber, therefore jack 15 are answered according to specification regulation steel pipe truss beam during installation Bearing height reduced step by step from the middle part of steel pipe truss beam to both ends, conducive to reduce steel pipe truss beam removed after spelling Occur deforming when jack 15 or under a possibility that disturbing.
As shown in figure 5, H profile steel moulding bed 14 is equipped with billet 2, billet 2 is connect with H profile steel moulding bed 14 by spot welding, Jack 15 is supported on billet 2, and when ballast of the jack 15 by steel pipe truss beam, pressure is dispersed by jack 15 Disperse the stability that on the one hand ensure that jack 15 is supported to H profile steel moulding bed 14 onto billet 2, then by billet 2, separately On the one hand the case where jack 15 directly contacts with flitch 13, flitch 13 is caused to be destroyed is also reduced;While jack 15 When insufficient height, operator can also stack multilayer billet 2, increase the relative altitude of jack 15.
As shown in fig. 6, two positioning angle steel 23 about the distribution of 15 axisymmetrical of jack are welded on billet 2, thousand The pedestal on jin top 15 is located between two positioning angle steel 23 and blocks with by positioning angle steel 23, reduces jack 15 and touches in external force Hit down the case where being displaced.
As shown in figure 5, H profile steel moulding bed 14 includes two the first H profile steels 141 being parallel to each other and several settings at two the The second H profile steel 142 between one H profile steel 141, the second H profile steel 142 is perpendicular to the first H profile steel 141, so that two the first H profile steels It is divided into rectangular area one by one between 141, several jack 15 are divided into two groups at this time, two groups of jack, 15 correspondences one first H profile steel 141, while billet 2 is distributed on the node of the first H profile steel 141 and the connection of the second H profile steel 142, two neighboring second The billet 2 of the diagonal Node distribution of H profile steel 142 is connected by bridging 24, i.e. the four of bridging 24 end is separately connected one A billet 2 ensure that the reliability that billet 2 connects.Simultaneously because the distance that jack 15 is spaced is identical, bridging 24 is For two diagonal lines of rectangular area, the length that operator need to only control bridging 24 can position the position of billet 2, convenient Fast.
As shown in fig. 7, in addition, full hall fastener type steel pipe scaffold 11 is equipped with flak jacket railing 3, flak jacket column in 13 side of flitch Bar 3 is equipped with safety net 31, reduces a possibility that operator surprisingly falls from flitch 13 in construction;Simultaneously on flitch 13 It is additionally provided with dry powder extinguisher 33, in order to which operator copes with some emergency cases.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art Member can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as at this All by the protection of Patent Law in the scope of the claims of invention.

Claims (10)

1. a kind of H profile steel rail mounted moulding bed with stopper, it is characterised in that: including pouring armored concrete on the ground Terrace (1) and full hall fastener type steel pipe scaffold (11), described full hall fastener type steel pipe scaffold (11) be equipped with it is several mutually Parallel double steel pipe main joist (12) is equipped with flitch (13) on the double steel pipe main joist (12), sets on the flitch (13) Have H profile steel moulding bed (14), the H profile steel moulding bed (14) is equipped with several jack (15) for being used to support steel pipe truss beam, institute State the load-bearing pillar that supporting steel pipe girder truss length direction both ends are respectively used to there are two pouring on armored concrete terrace (1) (16).
2. H profile steel rail mounted moulding bed with stopper according to claim 1, it is characterised in that: the H profile steel moulding bed (14) several crossbeams (17) along the distribution of H profile steel moulding bed (14) length direction are equipped with, the both ends of the crossbeam (17) are equipped with Two upright bars (171) being parallel to each other.
3. H profile steel rail mounted moulding bed with stopper according to claim 1, it is characterised in that: the jack (15) bearing height reduces step by step from the middle part of steel pipe truss beam to both ends.
4. H profile steel rail mounted moulding bed with stopper according to claim 3, it is characterised in that: the H profile steel moulding bed (14) billet (2) are equipped with, the jack (15) is arranged on billet (2), covers on the mandril of the jack (15) Equipped with fixed cylinder (21), the fixed cylinder (21) is equipped with arc steel pallet (22).
5. H profile steel rail mounted moulding bed with stopper according to claim 4, it is characterised in that: the billet (2) On be welded with two about jack (15) axisymmetrical distribution positioning angle steel (23).
6. H profile steel rail mounted moulding bed with stopper according to claim 5, it is characterised in that: the H profile steel moulding bed It (14) include two the first H profile steels (141) being parallel to each other and several the 2nd H being arranged between two the first H profile steels (141) Fashioned iron (142), second H profile steel (142) are distributed in the first H profile steel perpendicular to the first H profile steel (141), the billet (2) (141) and on the node of the second H profile steel (142) connection, the steel of the diagonal Node distribution of two neighboring second H profile steel (142) Backing plate (2) is connected by bridging (24).
7. H profile steel rail mounted moulding bed with stopper according to claim 1, it is characterised in that: the full hall fastener Formula steel pipe scaffold (11) is equipped with flak jacket railing (3) in flitch (13) side, and the flak jacket railing (3) is equipped with safety net (31).
8. H profile steel rail mounted moulding bed with stopper according to claim 7, it is characterised in that: two neighboring described Flitch (13) is connected by galvanized wire (32).
9. H profile steel rail mounted moulding bed with stopper according to claim 8, it is characterised in that: the flitch (13) With a thickness of 60mm.
10. H profile steel rail mounted moulding bed with stopper according to claim 9, it is characterised in that: the flitch (13) It is equipped with dry powder extinguisher (33).
CN201811022653.4A 2018-09-03 2018-09-03 H-shaped steel jig frame Active CN109098441B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811022653.4A CN109098441B (en) 2018-09-03 2018-09-03 H-shaped steel jig frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811022653.4A CN109098441B (en) 2018-09-03 2018-09-03 H-shaped steel jig frame

Publications (2)

Publication Number Publication Date
CN109098441A true CN109098441A (en) 2018-12-28
CN109098441B CN109098441B (en) 2020-11-20

Family

ID=64864974

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811022653.4A Active CN109098441B (en) 2018-09-03 2018-09-03 H-shaped steel jig frame

Country Status (1)

Country Link
CN (1) CN109098441B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112854140A (en) * 2021-01-08 2021-05-28 中国地质调查局成都地质调查中心 Intercepting truss dam for middle and upper reaches of debris flow channel and construction method thereof
CN114278102A (en) * 2021-12-21 2022-04-05 中铁三局集团建筑安装工程有限公司 Combined beam column joint and construction method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3742296A1 (en) * 1987-12-14 1989-06-29 Jun Ernst Hohrenk Lifting appliance for heavy loads
JPH07292780A (en) * 1994-04-22 1995-11-07 Kajima Corp Push-up construction method for steel structure
CN101033636A (en) * 2007-03-23 2007-09-12 北京城建集团有限责任公司 Large span bidirectional string stretching girders rope accumulation slippage construction method
CN101886466A (en) * 2010-07-09 2010-11-17 中国二十二冶集团有限公司 Construction method for support structure of coal tower template for tamping type coke oven
CN201794297U (en) * 2010-09-28 2011-04-13 杨峰 Early-dismantling formwork support system for large-span cast-in-place beam ribbed floorslabs
CN102235092A (en) * 2010-04-22 2011-11-09 上海市机械施工有限公司 Layered hoisting construction process for suspended steel structure
CN103276893A (en) * 2013-06-04 2013-09-04 河南国基建设集团有限公司 Novel composite structure for supporting rigid building template and construction method
CN203213019U (en) * 2013-04-23 2013-09-25 中国十九冶集团有限公司 Cast-in-situ construction bracket system of long cantilever bent cap

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3742296A1 (en) * 1987-12-14 1989-06-29 Jun Ernst Hohrenk Lifting appliance for heavy loads
JPH07292780A (en) * 1994-04-22 1995-11-07 Kajima Corp Push-up construction method for steel structure
CN101033636A (en) * 2007-03-23 2007-09-12 北京城建集团有限责任公司 Large span bidirectional string stretching girders rope accumulation slippage construction method
CN102235092A (en) * 2010-04-22 2011-11-09 上海市机械施工有限公司 Layered hoisting construction process for suspended steel structure
CN101886466A (en) * 2010-07-09 2010-11-17 中国二十二冶集团有限公司 Construction method for support structure of coal tower template for tamping type coke oven
CN201794297U (en) * 2010-09-28 2011-04-13 杨峰 Early-dismantling formwork support system for large-span cast-in-place beam ribbed floorslabs
CN203213019U (en) * 2013-04-23 2013-09-25 中国十九冶集团有限公司 Cast-in-situ construction bracket system of long cantilever bent cap
CN103276893A (en) * 2013-06-04 2013-09-04 河南国基建设集团有限公司 Novel composite structure for supporting rigid building template and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112854140A (en) * 2021-01-08 2021-05-28 中国地质调查局成都地质调查中心 Intercepting truss dam for middle and upper reaches of debris flow channel and construction method thereof
CN114278102A (en) * 2021-12-21 2022-04-05 中铁三局集团建筑安装工程有限公司 Combined beam column joint and construction method thereof

Also Published As

Publication number Publication date
CN109098441B (en) 2020-11-20

Similar Documents

Publication Publication Date Title
CN106337589B (en) Adjustable frustum of a cone class Hold Ceiling lift umbrella shape load steel structure and its construction method
CN103628680A (en) Construction method for large-area steel structure hanging layer
JP7172916B2 (en) Bridge superstructure removal method
US5471694A (en) Prefabricated bridge with prestressed elements
CN105952133A (en) Suspended large-span reinforced concrete structure construction steel platform and construction method
JP2023164950A (en) Heavy object movement device and heavy object movement method using the heavy object movement device
CN109098441A (en) H profile steel rail mounted moulding bed with stopper
CN111254800A (en) Combined beam suitable for urban bridge and construction method thereof
CN102154988A (en) Arch-after-girder construction method of large-span steel box tacked arch bridge
CN207974601U (en) A kind of large size earthing concrete tank dome steel support structure
CN209114884U (en) A kind of high-altitude steel structure on-site consolidation H profile steel rail mounted moulding bed
CN103774838A (en) Assembly type safe operation platform for elevator shaft construction and use method thereof
CN206329024U (en) Hanging large-span steel-reinforced concrete structure construction steel platform
CN102767282A (en) Assembly-type high-formwork construction method for cantilever of oversized special-shaped conversion layer
CN108547225A (en) A kind of assembly moving type security construction of prevention work job platform and construction method and application
CN102251666B (en) Overhanging type discharging platform
CN109610346B (en) Cantilever beam adjusting method
CN102587649B (en) Template profiled bar supporting system of high and large cantilever structure
CN101664963B (en) Multifunctional operating platform for large-volume prestressed concrete box girder tensioning
KR20190122925A (en) Bridges Construction Vents
JP2016142097A (en) Portable hoist unit and horizontal member dismantling method
CN211142816U (en) Construction platform
JPH09195227A (en) Built-up trestle for bridge pier reinforcing work and using method thereof
CN112854702A (en) Large-span silo roof construction platform and erection method
CN206844680U (en) Steel vestibule installation on ground load transfer device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant