CN109083172A - Coastal beach area adapts to the earth rock cofferdam and its construction method that northern ice slush influences - Google Patents

Coastal beach area adapts to the earth rock cofferdam and its construction method that northern ice slush influences Download PDF

Info

Publication number
CN109083172A
CN109083172A CN201811107377.1A CN201811107377A CN109083172A CN 109083172 A CN109083172 A CN 109083172A CN 201811107377 A CN201811107377 A CN 201811107377A CN 109083172 A CN109083172 A CN 109083172A
Authority
CN
China
Prior art keywords
cofferdam
ice slush
earth rock
construction method
gabion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811107377.1A
Other languages
Chinese (zh)
Inventor
徐兴利
周锋
老志方
关荣军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Xingli Luqiao Engineering Co Ltd
Original Assignee
Dalian Xingli Luqiao Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Xingli Luqiao Engineering Co Ltd filed Critical Dalian Xingli Luqiao Engineering Co Ltd
Priority to CN201811107377.1A priority Critical patent/CN109083172A/en
Publication of CN109083172A publication Critical patent/CN109083172A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/02Restraining of open water
    • E02D19/04Restraining of open water by coffer-dams, e.g. made of sheet piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The earth rock cofferdam and its construction method that a kind of Coastal beach area adaptation north ice slush influences belong to technical field of civil engineering, and in particular to a kind of Coastal beach area adapts to the earth rock cofferdam and its construction method of northern ice slush influence.The present invention provides a kind of earth rock cofferdam and its construction method for adapting to northern ice slush influence.Earth rock cofferdam of the invention includes two parallel Cipolletti weir bodies, it is native hardcore between two Cipolletti weir bodies, it is characterized by: the Cipolletti weir body is formed by least three layers of Stacking units stacking, the Stacking units include packed sand stone layer, packed sand stone layer outer cladding is provided with geotextiles, the external side surface of Cipolletti weir is provided with gabion, has been filled with filler in gabion.

Description

Coastal beach area adapts to the earth rock cofferdam and its construction method that northern ice slush influences
Technical field
The invention belongs to technical field of civil engineering, and in particular to a kind of Coastal beach area adaptation north ice slush influences Earth rock cofferdam and its construction method.
Background technique
When coastal area carries out road or bridge construction, due to being influenced by tide, native stone is often built on beach Cofferdam.And beach is mostly soft soil foundation, weak soil is usually to deposit in flowing water environment, and moisture content is high and compressibility is big, is resisted It is low to cut intensity.Since common earth rock cofferdam is levelled to the ground quickly under the washing away of tide wave, therefore mostly use geotextiles It is built.
But in northern area, in the ice slush phase, wave pushes ice slush, can cut geotextiles quickly, native stone is rapidly losing, makes soil Stone cofferdam is quickly destroyed and ineffective.
Summary of the invention
The present invention addresses the above problem, provides a kind of earth rock cofferdam and its construction party for adapting to northern ice slush and influencing Method.
In order to realize that above-mentioned purpose of the invention, the present invention adopt the following technical scheme that, earth rock cofferdam of the invention includes Two parallel Cipolletti weir bodies are native hardcore between two Cipolletti weir bodies, it is characterised in that: the Cipolletti weir body is by least three layers Stacking units stacking forms, and the Stacking units include packed sand stone layer, and packed sand stone layer outer cladding is provided with geotextiles, described The external side surface of Cipolletti weir is provided with gabion, has been filled with filler in gabion.
A kind of preferred embodiment of earth rock cofferdam of the present invention: between upper and lower two adjacent Stacking units, along the axis of Cipolletti weir body Arrangement is provided with more wires, one end of metal wire is set to the inside of Cipolletti weir body and fixes with an anchorage block;Metal The other end of line is fixed with the gabion.
Another preferred embodiment of earth rock cofferdam of the present invention: the filler in the gabion is sheet stone.
The construction method of earth rock cofferdam of the present invention, it is characterised in that: the following steps are included:
Step 1: setting out survey;Determine central axes and the width in cofferdam, on the ebb rear setting out survey.
Step 2: preparation of construction;Platform is formed by the overall with constructing soil stone in cofferdam filling starting point;Prepare bagged sand Stone;Prepare geotextiles, geotechnological cloth length is that shop fixtures length+Stacking units height+upper layer laminates length.
Step 3: paving geotextiles pile up packed sandstone;First layer geotextiles are laid with according to cofferdam setting-out, by packed sandstone It is neatly packed in geotextiles, packed sandstone is wrapped up and fixed with geotextiles;Along the pre-buried gold of cofferdam axis vertical direction Belong to line, metal wire is securely connect by side with anchorage block in Cipolletti weir body, completes the laying of a Stacking units;Then with same Method is laid with the Stacking units of the second layer and the second layer or more;Until reaching predetermined altitude, and to the end in cofferdam before flood tide Complete U-shaped closing.
Step 4: earth rock material is filled on the inside of two Cipolletti weir bodies.
Step 5: after ebbing tide, one~step 4 of repeating said steps extends cofferdam forward, until completing all to enclose Weir major project.
Step 6: it is laid with gabion;Before the ice slush phase arrives, the slope that is influenced the external side of Cipolletti weir by ice slush using gabion Face is covered, and is linked to be entirety, and connect with built-in metal line;Then filler is filled in gabion.
A kind of preferred embodiment of earth rock cofferdam construction method of the present invention: in step 1, setting out survey is according in cofferdam Line coordinates releases the central axes in cofferdam, determines cofferdam height according to three flood tide peak level, wave height, safe altitude parameters Degree, determines cofferdam bottom width according to the inside and outside gradient and top width in cofferdam.Then cofferdam bottom outer contour is released.
Another preferred embodiment of earth rock cofferdam construction method of the present invention: in step 2, starting point is being filled by cofferdam Overall with constructing soil stone forms platform.
The third preferred embodiment of earth rock cofferdam construction method of the present invention: in step 3, according to flux and reflux cycle time It determines cofferdam construction length, completes U-shaped closing in time before flood tide.
4th kind of preferred embodiment of earth rock cofferdam construction method of the present invention: in step 4, road is pressed in the inside of Cipolletti weir body Requirement placement in layers soil hardcore and the sealing compacting that base fills, until flat with Cipolletti weir body height one.
5th kind of preferred embodiment of earth rock cofferdam construction method of the present invention: in step 5, before the ice slush phase arrives, by stone Cage is layered on the external side slope of Cipolletti weir, and is fixed with pre-buried metal wire;Then it is loaded with slabstone, is carried out after filling up Encapsulation, makes gabion be linked to be entirety with sheet, slope surface is completely covered.
Beneficial effects of the present invention: earth-rock cofferdam structure of the invention is firm, by the way that gabion is arranged, and loads in gabion Slabstone can effectively stop washing away for ice slush, the geotextiles of Cipolletti weir body is avoided to be destroyed by ice slush, ensure that the use of earth rock cofferdam Service life.
The construction method of earth rock cofferdam of the invention is simple and easy to do, adapts to the variation in tide and season, completes native stone and encloses The engineering construction on weir, and can guarantee in northern ice slush period, earth rock cofferdam not will receive ice slush destruction.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention.
Fig. 2 is the structural schematic diagram of Cipolletti weir body.
In attached drawing 1 be gabion, 2 be Stacking units, 3 be native hardcore, 4 be Cipolletti weir body, 5 be packed sand stone layer, 6 be soil Work cloth, 7 be metal wire, 8 be anchorage block.
Specific embodiment
Earth rock cofferdam of the invention is native hardcore 3 between two Cipolletti weir bodies 4 including two parallel Cipolletti weir bodies 4, Be characterized in that: the Cipolletti weir body 4 is formed by least three layers of 2 stacking of Stacking units, and the Stacking units 2 include packed sandstone Layer 5, packed 5 outer cladding of sand stone layer is provided with geotextiles 6, and 4 outer surface of Cipolletti weir body is provided with gabion 1, fills out in gabion 1 It fills and is provided with filler.
A kind of preferred embodiment of earth rock cofferdam of the present invention: between upper and lower two adjacent Stacking units 2, along Cipolletti weir body 4 Axial arranging is provided with more wires 7, and one end of metal wire 7 is set to the inside of Cipolletti weir body 4 and consolidates with an anchorage block 8 It is fixed;The other end of metal wire 7 and the gabion 1 are fixed.
Another preferred embodiment of earth rock cofferdam of the present invention: the filler in the gabion 1 is sheet stone.
The construction method of earth rock cofferdam of the present invention, it is characterised in that: the following steps are included:
Step 1: setting out survey;Determine central axes and the width in cofferdam, on the ebb rear setting out survey.
Step 2: preparation of construction;Platform is formed by the overall with constructing soil stone in cofferdam filling starting point;Prepare bagged sand Stone;Prepare geotextiles 6,6 length of geotextiles is that shop fixtures length+2 height+upper layer of Stacking units laminates length.
Step 3: paving geotextiles 6 pile up packed sandstone;First layer geotextiles 6 are laid with according to cofferdam setting-out, by bagged sand Stone is neatly packed in geotextiles 6, and packed sand stone layer 5 is wrapped up and fixed with geotextiles 6;Along cofferdam axis vertical direction Metal wire 7 securely connect with anchorage block 8 in 4 inside of Cipolletti weir body, completes the paving of a Stacking units 2 by built-in metal line 7 If;Then the Stacking units 2 of the second layer and the second layer or more are in kind laid with;Until reaching predetermined altitude, and in flood tide Complete U-shaped closing in the preceding end to cofferdam.
Step 4: earth rock material is filled in the inside of two Cipolletti weir bodies 4.
Step 5: after ebbing tide, one~step 4 of repeating said steps extends cofferdam forward, until completing all to enclose Weir major project.
Step 6: it is laid with gabion 1;Before the ice slush phase arrives, 4 outside of Cipolletti weir body is influenced by ice slush using gabion 1 Slope surface covered, be linked to be entirety, and connect with built-in metal line 7;Then filler is filled in gabion 1.
A kind of preferred embodiment of earth rock cofferdam construction method of the present invention: in step 1, setting out survey is according in cofferdam Line coordinates releases the central axes in cofferdam, determines cofferdam height according to three flood tide peak level, wave height, safe altitude parameters Degree, determines cofferdam bottom width according to the inside and outside gradient and top width in cofferdam.Then cofferdam bottom outer contour is released.
Another preferred embodiment of earth rock cofferdam construction method of the present invention: in step 2, starting point is being filled by cofferdam Overall with constructing soil stone forms platform.
The third preferred embodiment of earth rock cofferdam construction method of the present invention: in step 3, according to flux and reflux cycle time It determines cofferdam construction length, completes U-shaped closing in time before flood tide.
4th kind of preferred embodiment of earth rock cofferdam construction method of the present invention: in step 4, road is pressed in the inside of Cipolletti weir body 4 Requirement placement in layers soil hardcore 3 and the sealing compacting that base fills, until flat with 4 height one of Cipolletti weir body.
5th kind of preferred embodiment of earth rock cofferdam construction method of the present invention: in step 5, before the ice slush phase arrives, by stone Cage 1 is layered on the outer side slope of Cipolletti weir body 4, and is fixed with pre-buried metal wire 7;Then it is loaded with slabstone, after filling up It is packaged, so that gabion 1 is linked to be entirety with sheet, slope surface is completely covered.
The metal wire 7 is every one meter pre-buried one.
Two layers of packed sand stone layer can be laid with by packed sandstone in the Stacking units 2, then be wrapped with geotextiles.
It is understood that being merely to illustrate the present invention above with respect to specific descriptions of the invention and being not limited to this Technical solution described in inventive embodiments, those skilled in the art should understand that, still the present invention can be carried out Modification or equivalent replacement, to reach identical technical effect;As long as meet use needs, all protection scope of the present invention it It is interior.

Claims (10)

1. Coastal beach area adapts to the earth rock cofferdam that northern ice slush influences, including two parallel Cipolletti weir bodies (4), two Cipolletti weirs It is native hardcore (3) between body (4), it is characterised in that: the Cipolletti weir body (4) is by least three layers Stacking units (2) stacking It forms, the Stacking units (2) include packed sand stone layer (5), and packed sand stone layer (5) outer cladding is provided with geotextiles (6), described Cipolletti weir body (4) outer surface is provided with gabion (1), has been filled with filler in gabion (1).
2. Coastal beach area according to claim 1 adapts to the earth rock cofferdam that northern ice slush influences, it is characterised in that: on Between lower two adjacent Stacking units (2), the axial arranging of Cipolletti weir body (4) is provided with more wires (7), metal wire (7) one end is set to the inside of Cipolletti weir body (4) and fixes with an anchorage block (8);The other end and the stone of metal wire (7) Cage (1) is fixed.
3. Coastal beach area according to claim 1 adapts to the earth rock cofferdam that northern ice slush influences, it is characterised in that: institute Stating the filler in gabion (1) is sheet stone.
4. Coastal beach area adapts to the construction method for the earth rock cofferdam that northern ice slush influences according to claim 1, special Sign is: the following steps are included:
Step 1: setting out survey;Determine central axes and the width in cofferdam, on the ebb rear setting out survey;
Step 2: preparation of construction;Platform is formed by the overall with constructing soil stone in cofferdam filling starting point;Prepare packed sandstone;It is quasi- Standby geotextiles (6), geotextiles (6) length are that shop fixtures length+Stacking units (2) height+upper layer laminates length;
Step 3: paving geotextiles (6) piles up packed sandstone;First layer geotextiles (6) are laid with according to cofferdam setting-out, by bagged sand Stone is neatly packed on geotextiles (6), and packed sand stone layer (5) are wrapped up and fixed with geotextiles (6);It hangs down along cofferdam axis Metal wire (7) is securely connect by histogram to built-in metal line (7) on the inside of Cipolletti weir body (4) with anchorage block (8), completes one The laying of Stacking units (2);Then the Stacking units (2) of the second layer and the second layer or more are in kind laid with;Until reaching Predetermined altitude, and U-shaped closing is completed to the end in cofferdam before flood tide;
Step 4: earth rock material is filled on the inside of two Cipolletti weir bodies (4);
Step 5: after ebbing tide, one~step 4 of repeating said steps extends cofferdam forward, until completing whole cofferdam masters Body engineering;
Step 6: it is laid with gabion (1);Before the ice slush phase arrives, using gabion (1) by Cipolletti weir body (4) outside by ice slush shadow Loud slope surface is covered, and is linked to be entirety, and connect with built-in metal line (7);Then filler is filled in gabion (1).
5. Coastal beach area adapts to the construction method for the earth rock cofferdam that northern ice slush influences according to claim 4, special Sign is: in step 1, setting out survey is the central axes that cofferdam is released according to the Coordinate of central line in cofferdam, according to flood tide highest water Three position, wave height, safe altitude parameters determine cofferdam height, determine cofferdam according to the inside and outside gradient and top width in cofferdam Bottom width;Then cofferdam bottom outer contour is released.
6. Coastal beach area adapts to the construction method for the earth rock cofferdam that northern ice slush influences according to claim 4, special Sign is: in step 2, forming platform by the overall with constructing soil stone in cofferdam filling starting point.
7. Coastal beach area adapts to the construction method for the earth rock cofferdam that northern ice slush influences according to claim 4, special Sign is: in step 3, determining cofferdam construction length according to flux and reflux cycle time, completes U-shaped closing in time before flood tide.
8. Coastal beach area adapts to the construction method for the earth rock cofferdam that northern ice slush influences according to claim 4, special Sign is: in step 4, in the inside of Cipolletti weir body (4) by the requirement placement in layers soil hardcore (3) and sealing of roadbed filling Compacting, until flat with Cipolletti weir body (4) height one.
9. Coastal beach area adapts to the construction method for the earth rock cofferdam that northern ice slush influences according to claim 4, special Sign is: in step 5, before the ice slush phase arrives, gabion (1) is layered on Cipolletti weir body (4) outer side slope, and with it is pre-buried Metal wire (7) is fixed;Then it is loaded with slabstone, is packaged after filling up, gabion (1) is made to be linked to be entirety with sheet, Slope surface is completely covered.
10. Coastal beach area adapts to the construction method for the earth rock cofferdam that northern ice slush influences according to claim 4, special Sign is: the metal wire (7) is every one meter pre-buried one.
CN201811107377.1A 2018-09-21 2018-09-21 Coastal beach area adapts to the earth rock cofferdam and its construction method that northern ice slush influences Pending CN109083172A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811107377.1A CN109083172A (en) 2018-09-21 2018-09-21 Coastal beach area adapts to the earth rock cofferdam and its construction method that northern ice slush influences

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811107377.1A CN109083172A (en) 2018-09-21 2018-09-21 Coastal beach area adapts to the earth rock cofferdam and its construction method that northern ice slush influences

Publications (1)

Publication Number Publication Date
CN109083172A true CN109083172A (en) 2018-12-25

Family

ID=64842292

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811107377.1A Pending CN109083172A (en) 2018-09-21 2018-09-21 Coastal beach area adapts to the earth rock cofferdam and its construction method that northern ice slush influences

Country Status (1)

Country Link
CN (1) CN109083172A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113073665A (en) * 2021-03-19 2021-07-06 中国葛洲坝集团市政工程有限公司 Cofferdam dike dam filling and closure construction method
CN113863340A (en) * 2021-10-13 2021-12-31 中电建十一局工程有限公司 Cofferdam construction method under complex terrain condition

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002194721A (en) * 2000-12-26 2002-07-10 Hiroshi Komori Sandbag combining tool
RU2240398C2 (en) * 2002-06-03 2004-11-20 Кабардино-Балкарская государственная сельскохозяйственная академия Building method for gabion slope stabilizing structure
CN102261053A (en) * 2011-05-12 2011-11-30 河海大学 Aseismatic measure of high earth-rock dam and construction method thereof
CN102296571A (en) * 2011-06-08 2011-12-28 西安理工大学 Rock-fill dam of anchoring panel and construction method thereof
CN103821105A (en) * 2014-03-03 2014-05-28 中交上海航道勘察设计研究院有限公司 Method for building dike by filling geotextile bag with silt
CN204849509U (en) * 2015-07-31 2015-12-09 宁夏大学 Highway roadbed structure of antidetonation sand prevention
CN106284374A (en) * 2016-09-26 2017-01-04 广东省建筑设计研究院 A kind of old dam entirety increases structure and the attachment structure on new and old dam
CN206495187U (en) * 2017-02-24 2017-09-15 中铁十局集团第二工程有限公司 A kind of firm reinforcement connection molding sand pillow dam
CN208899508U (en) * 2018-09-21 2019-05-24 大连兴利路桥工程有限公司 A kind of Coastal beach area adapts to the earth rock cofferdam of northern ice slush influence

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002194721A (en) * 2000-12-26 2002-07-10 Hiroshi Komori Sandbag combining tool
RU2240398C2 (en) * 2002-06-03 2004-11-20 Кабардино-Балкарская государственная сельскохозяйственная академия Building method for gabion slope stabilizing structure
CN102261053A (en) * 2011-05-12 2011-11-30 河海大学 Aseismatic measure of high earth-rock dam and construction method thereof
CN102296571A (en) * 2011-06-08 2011-12-28 西安理工大学 Rock-fill dam of anchoring panel and construction method thereof
CN103821105A (en) * 2014-03-03 2014-05-28 中交上海航道勘察设计研究院有限公司 Method for building dike by filling geotextile bag with silt
CN204849509U (en) * 2015-07-31 2015-12-09 宁夏大学 Highway roadbed structure of antidetonation sand prevention
CN106284374A (en) * 2016-09-26 2017-01-04 广东省建筑设计研究院 A kind of old dam entirety increases structure and the attachment structure on new and old dam
CN206495187U (en) * 2017-02-24 2017-09-15 中铁十局集团第二工程有限公司 A kind of firm reinforcement connection molding sand pillow dam
CN208899508U (en) * 2018-09-21 2019-05-24 大连兴利路桥工程有限公司 A kind of Coastal beach area adapts to the earth rock cofferdam of northern ice slush influence

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
袁光裕: "《水利工程施工》", vol. 3, 中国水利水电出版社, pages: 16 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113073665A (en) * 2021-03-19 2021-07-06 中国葛洲坝集团市政工程有限公司 Cofferdam dike dam filling and closure construction method
CN113863340A (en) * 2021-10-13 2021-12-31 中电建十一局工程有限公司 Cofferdam construction method under complex terrain condition

Similar Documents

Publication Publication Date Title
CN106703050B (en) Cut Slopes of Expansive Soil reinforced earth back-pressure antiseepage supporting construction and its construction method
CN203320549U (en) Reinforced gabion retaining wall of high slope in airport engineering
CN105297570B (en) Special soil subgrade structure and construction method thereof
CN113445396B (en) High-fill road foundation filling construction method for high liquid limit soil road section
CN107761708A (en) The processing method that big thickness Collapsible Loess District Subway station groundwork is reinforced
CN109853608A (en) A kind of offshore wind turbine gravity type foundation composite foundation and its processing method
CN103233444B (en) Underwater dumped rockfill bedding and side slope Anti-scouring structure and construction method thereof
CN107090842A (en) A kind of processing method of the big thickness collapsible loess foundation in subway station
CN102926376A (en) Treatment method for soft soil foundation in coastal reclamation region
CN102619206A (en) Foundation platform structure of bare rock and karst pile in deep water
CN105350511A (en) Border dike water bag strip, water storing border dike, and method for performing water bag strip pile-loading and prepressing
CN109778831A (en) Ram-compaction gravel piles reinforce Artifical Fill Ground construction
CN208415273U (en) Interstitital texture around subterranean tunnel
CN109083172A (en) Coastal beach area adapts to the earth rock cofferdam and its construction method that northern ice slush influences
CN108166509A (en) A kind of longitudinally spaced excavation of slope construction and protection construction method stage by stage
CN203908552U (en) Surface subsidence leveling measuring and monitoring device
CN102817298B (en) Construction method on frozen soil
CN204000848U (en) A kind of socketed pile for subaqueous construction
CN208899508U (en) A kind of Coastal beach area adapts to the earth rock cofferdam of northern ice slush influence
CN107761668A (en) A kind of strand Bin Ku makes ground type bank protection structure and its construction process
CN104141285A (en) Seepage-proofing seawall
CN207244552U (en) A kind of ecology flexible geogrid reinforcement harbour
CN207452938U (en) Composite foundation reinforced cantilever retaining wall structure
CN206220108U (en) Cut Slopes of Expansive Soil reinforced earth back-pressure antiseepage supporting construction
CN202925538U (en) Rammer constructed on frozen soil

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination