CN107090842A - A kind of processing method of the big thickness collapsible loess foundation in subway station - Google Patents

A kind of processing method of the big thickness collapsible loess foundation in subway station Download PDF

Info

Publication number
CN107090842A
CN107090842A CN201710351885.3A CN201710351885A CN107090842A CN 107090842 A CN107090842 A CN 107090842A CN 201710351885 A CN201710351885 A CN 201710351885A CN 107090842 A CN107090842 A CN 107090842A
Authority
CN
China
Prior art keywords
bed course
diaphram wall
collapsibility
processing method
fill
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710351885.3A
Other languages
Chinese (zh)
Inventor
王丽丽
王二磊
梁庆国
孙文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GANSU PROVINCIAL SEISMOLOGICAL BUREAU
Original Assignee
GANSU PROVINCIAL SEISMOLOGICAL BUREAU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GANSU PROVINCIAL SEISMOLOGICAL BUREAU filed Critical GANSU PROVINCIAL SEISMOLOGICAL BUREAU
Priority to CN201710351885.3A priority Critical patent/CN107090842A/en
Publication of CN107090842A publication Critical patent/CN107090842A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/34Foundations for sinking or earthquake territories
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/18Making embankments, e.g. dikes, dams
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/18Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons, e.g. diaphragms made from bituminous or clay material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • E02D31/025Draining membranes, sheets or fabric specially adapted therefor, e.g. with dimples
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • E02D31/04Watertight packings for use under hydraulic pressure

Abstract

The present invention relates to a kind of processing method of the big thickness collapsible loess foundation in subway station, this method includes:Along subway station(1)Ground periphery sets diaphram wall(3);Yellow soil horizon of collapsibility is made using pre- immersion mode(5)Self-weight collapsible sedimentation is carried out, and the epibasal tier soil body carries out consolidation process over the ground after sedimentation and deformation is stable;In back fill course(10)On fill waterproof bed course(11);In diaphram wall(3)Outside vertical opens up inlet well(4);In waterproof bed course(11)And inlet well(4)On fill water guide bed course(12), and set wherein and inlet well(4)The horizontal drain pipe being connected(2);In water guide bed course(12)On fill the bed course that blocks water(13).The present invention considers "+draining of soaking+block water " three aspect, reduces the influence that the factors such as rainfall and the underground water in later stage are produced to the yellow soil horizon of collapsibility in ground, effectively reduces the possibility that saturated yielding occurs again for yellow soil horizon of collapsibility.

Description

A kind of processing method of the big thickness collapsible loess foundation in subway station
Technical field
The present invention relates to big thickness collapsible loess foundation processing technology field, more particularly to a kind of big thickness in subway station The processing method of collapsible loess foundation.
Background technology
It is well known that collapsible loess is a kind of special geology soil, its soil property is more uniform, short texture, pores'growth, tool There is higher water sensitivity.When not by water-soaked, common intensity is higher, and compressibility is smaller, when under a certain pressure by water-soaked, Soil structure can be destroyed rapidly, produce larger additional sinking, and intensity is reduced rapidly.
China's loess area coverage accounts for the 6.6% of China's territory area, the Northwest is China up to 640,000 square kilometres The main Distribution Area of loess, loess thickness is from several meters to more than 400 meters, generally 100m or so.In recent years, in order to alleviate city Traffic congestion pressure, increasing city starts to build subway, and the western provincial capital such as Xi'an, Lanzhou has also begun to ground ironworker The construction of journey, due to the special geologic condition of collapsible loess, the more common soil base of method when handling Subway station groundwork Certainly it is different.
The processing mode of big thickness collapsible loess foundation is varied, for different engineering characteristics and requirement, selects Suitable processing method is extremely important.Dynamically high energy level compaction, DDC methods(Deep dynamic compaction inside pile hole), compacting method and presoaking etc. All be the big effective method of thickness collapsible loess foundation of processing, but these methods there is also treatment effect it is bad, apply The limitation such as work difficulty is big or construction costs is expensive, in this regard, Wang Jizhong proposes a kind of processing side of big thickness collapsible loess Method(CN 105970911A):First loess formation is entered saturated yielding state in advance using water flooding regime in stake, allow loess formation to be conducted oneself with dignity Settlement by soaking is settled, after it is determined that the sedimentation and deformation of loess formation is stable, and using filler compacting method or strong poor method, epibasal tier is native over the ground Body carries out consolidation process.This is actually the processing method that one kind considers " pre- immersion ", and still, this processing method can not be protected The settlement by soaking of card yellow soil horizon of collapsibility is all eliminated, in the presence of the factor such as the rainfall in later stage and underground water, and settlement by soaking is yellow Saturated yielding may occur again for soil layer, so as to cause structural damage.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of processing of the big thickness collapsible loess foundation in subway station Method, what this processing method can reduce that after immersion self-weight collapsible sedimentation in advance saturated yielding occurs again for yellow soil horizon of collapsibility can Energy property, and then ensure the stability of whole ground.
To solve the above problems, a kind of processing side of the big thickness collapsible loess foundation in subway station of the present invention Method, this method comprises the following steps:
Step S1, it is determined that after the scope of Subway station groundwork, set one to enclose diaphram wall along ground periphery, wherein, it is described Diaphram wall is core wall and its bottom penetrates yellow soil horizon of collapsibility into non-yellow soil horizon of collapsibility;
Step S2, using pre- immersion mode the yellow soil horizon of collapsibility is set to carry out self-weight collapsible sedimentation, and it is steady in sedimentation and deformation The epibasal tier soil body carries out consolidation process over the ground after fixed;
Step S3, being constructed in excavation of subway foundation pit, subway main body structure and accessory structure completes and after back fill course formed, in institute State and waterproof bed course is filled on back fill course, wherein, the waterproof bed course top edge is concordant with the diaphram wall top edge;
Step S4, in the diaphram wall outside vertical several inlet wells are opened up, and fill sand thereto, wherein, it is described Water guide bottom penetrates the yellow soil horizon of collapsibility into the non-yellow soil horizon of collapsibility, the upper end open of the inlet well and institute State diaphram wall top edge concordant;
Step S5, fill water guide bed course on the waterproof bed course and the inlet well, and set in the water guide bed course with The horizontal drain pipe that the inlet well is connected;
Step S6, on the water guide bed course fill the bed course that blocks water.
Preferably, in step S1 before the diaphram wall is set, use finite element software carry out sunykatuib analysis with The safe distance between the diaphram wall and the ground periphery is calculated, and sets the underground to connect by this safe distance Continuous wall.
Preferably, four corners are respectively perpendicular and open up a water guide on the outside of the diaphram wall in step S4 Well;Along the circle water of diaphram wall periphery laying one in the water guide bed course above the inlet well in step S5 Flat raft water pipe, the horizontal drain pipe is connected with each inlet well around the corner.
Preferably, one is being set to enclose after diaphram wall along ground periphery in step S1, on the inside of the diaphram wall Paste one layer of waterproof geotextiles.
Preferably, the waterproof bed course is filled using dirt is closely knit in step S3.
Preferably, the water guide bed course is filled using grit in step S5.
Preferably, using the bed course that blocked water described in the closely knit building of dirt in step S6.
The present invention has advantages below compared with prior art:
1st, the present invention considers "+draining of soaking+block water " three aspect to handle big thickness collapsible loess foundation, i.e., pre- immersion Realize that self-weight collapsible is settled, set diaphram wall, waterproof bed course and the bed course that blocks water to realize and blocks water, set horizontal aqueduct and Inlet well realizes draining, so, and the factor such as the rainfall in later stage and underground water can not produce shadow to the yellow soil horizon of collapsibility in ground Ring, can effectively reduce the possibility that saturated yielding occurs again for yellow soil horizon of collapsibility, and then ensure the stability of whole ground.
2nd, based on above-mentioned advantage, the present invention further by the inside of diaphram wall add one layer of geotextiles come strengthen every Water, improves water proof effect, and economic and practical is strong.
Brief description of the drawings
The embodiment to the present invention is described in further detail below in conjunction with the accompanying drawings.
Fig. 1 is a kind of floor map provided in an embodiment of the present invention.
Fig. 2 is Fig. 1 underground structure schematic diagram.
In figure:1-subway station, 2-horizontal drain pipe, 3-diaphram wall, 4-inlet well, 5-collapsible loess Layer, 6-non-yellow soil horizon of collapsibility, 7-DDC, 8-station layer, 9-station hall layer, 10-back fill course, 11-waterproof bed course, 12-water guide bed course, 13-block water bed course.
Embodiment
In a kind of processing method of the big thickness collapsible loess foundation in subway station of the embodiment of the present invention, floor map is such as Shown in Fig. 1, the square surrounding of subway station 1 sets diaphram wall 3, and the periphery of diaphram wall 3 was wrapped by one week horizontal drain pipe 2 Enclose, horizontal drain pipe 2 imports the inlet well 4 of four corners;The processing method can include step in detail below:
Step S1, it is determined that after the scope of the ground of subway station 1, set one to enclose diaphram wall 3 along ground periphery.
Wherein, diaphram wall 3 is core wall and its bottom penetrates yellow soil horizon of collapsibility 5 and enters non-yellow soil horizon of collapsibility 6, For the moisture on periphery to be kept off outside to ensure the yellow soil horizon of collapsibility 5 in the diaphram wall 3 not by the shadow of periphery moisture Ring.In practical application, the process of construction of diaphram wall 3 can be:Along ground periphery axis, under the conditions of mud off, first Excavate out after a long and narrow deep trouth, clear groove, steel reinforcement cage is hung in groove, then build up one with tremie method underwater concreting with tremie method Individual unit groove section, is so carried out paragraph by paragraph, and continuous armored concrete wall together is built up in underground, is cut as a kind of have concurrently simultaneously Water, antiseepage, load-bearing, the structure of dash.
In practical application, first basis《Code for investigation of geotechnical engineering》The saturated yielding for intending processing is found out in GB50021-2001 requirement The geological condition and the thickness of yellow soil horizon of collapsibility 5 of property loessland foundation soil;Undisturbed is taken, is pressed《Earthwork test rule》JTG E40-2007 requirement carries out room to the moisture content of each soil layer, density, specific gravity of soil partical, void ratio, coefficient of collapsibility and the compressed coefficient Interior soil test;Simultaneously according to roadbed natural ground level and circuit design altitude grading roads surveying setting-out, subway is determined Stand 1 peripheral red line, that is, determine ground scope.
In addition, before diaphram wall 3 is set, sunykatuib analysis need to be carried out using finite element software, underground company is calculated Continuous wall 3 and ground periphery(I.e. peripheral red line)Between safe distance, and by this safe distance set diaphram wall 3.
Step S2, yellow soil horizon of collapsibility 5 is set using pre- immersion mode to carry out self-weight collapsible sedimentation, and it is steady in sedimentation and deformation The epibasal tier soil body carries out consolidation process over the ground after fixed.
The step concrete operations may be referred to Wang Jizhong(CN 105970911A)The method of proposition, that is, first pass through vibration or Hammering squeezes into small steel pipe casing in yellow soil horizon of collapsibility 5(Depth is slightly less than loess formation thickness);Into casing, insertion is with more The water filling device of individual nozzle, is extracted after casing to water filling in water filling device or pressure water injection, makes yellow soil horizon of collapsibility 5 in immersion Self-weight collapsible sedimentation is carried out afterwards;Record is observed to the saturated yielding settling amount of foundation soil body, until foundation soil body Collapsing Deformation It is stable;Using deep dynamic compaction inside pile hole, i.e. using DDC stakes 7, hypobasal's soil body carries out consolidation process over the ground;The depth of reinforcing is from non- Yellow soil horizon of collapsibility 6 is arrived at the foundation ditch base absolute altitude of subway station 1.It is of course also possible to use other presoakings and method for strengthening, The present invention not considered critical herein.
In above process, after the saturated yielding sedimentation of the bottom of foundation ditch soil body of subway station 1 reaches requirement, if in the soil body Water content is higher, can accelerate the consolidation of the soil body by water filling device reversely to extracardiac pumping and shorten the duration.
Step S3, excavation of subway foundation pit, subway main body structure and accessory structure construct complete and back fill course 10 formed Afterwards, waterproof bed course 11 is filled on back fill course 10.
Specifically, after Metro Excavation foundation ditch, it can build station layer 8 as shown in Figure 2 and station hall layer 9 is awaited a subway structure, After the completion of subway agent structure and accessory structure construction, it is backfilling into and the level of diaphram wall 3, formation back fill course 10, reality Last layer basement process layer would generally be done in the application of border on back fill course 10;Then it is close using dirt on basement process layer One layer of waterproof bed course 11 is filled in fact, it is concordant with the top edge of diaphram wall 3 by tamping the top edge of rear defence water subfill 11.
Step S4, in the outside vertical of diaphram wall 3 several inlet wells 4 are opened up, and fill sand thereto.
Wherein, the bottom of inlet well 4 penetrates yellow soil horizon of collapsibility 5 into non-yellow soil horizon of collapsibility 6 so that moisture will not be to wet Fall into property loess formation 5 and produce influence;The upper end open of inlet well 4 is concordant with the top edge of diaphram wall 3.
Step S5, on waterproof bed course 11 and inlet well 4 water guide bed course 12 filled using grit, and in water guide bed course 12 It is middle that the horizontal drain pipe 2 being connected with inlet well 4 is set.
Wherein, horizontal drain pipe 2 uses U-shaped or V-type pvc pipe, and is set at the middle part of each section of drainpipe of surrounding 2 along water guide 2% longitudinal slope in the direction of well 4, it is convenient that water is discharged into inlet well 4.
In practical application, it can be respectively perpendicular in four corners in the outside of diaphram wall 3 and open up an inlet well 4, Horizontal drain pipe 2 is enclosed along the periphery of diaphram wall 3 laying one in the water guide bed course 12 of the top of inlet well 4, horizontal drain pipe 2 is being turned It is mutually perpendicular to and connects with each inlet well 4 at angle;Wherein, horizontal drain pipe 2 is in same level with water guide bed course 12.
Step S6, blocked water bed course 13 using the closely knit building of dirt on water guide bed course 12.
During actual construction of subway, repaired the roads according to actual needs after step S6, build the operation such as greenbelt .

Claims (7)

1. a kind of processing method of the big thickness collapsible loess foundation in subway station, this method comprises the following steps:
Step S1, it is determined that subway station(1)After the scope of ground, one is set to enclose diaphram wall along ground periphery(3), its In, the diaphram wall(3)For core wall and its bottom penetrates yellow soil horizon of collapsibility(5)Into non-yellow soil horizon of collapsibility(6);
Step S2, the yellow soil horizon of collapsibility made using pre- immersion mode(5)Self-weight collapsible sedimentation is carried out, and in sedimentation and deformation The epibasal tier soil body carries out consolidation process over the ground after stable;
Step S3, excavation of subway foundation pit, subway main body structure and accessory structure construct complete and back fill course(10)After formation, In the back fill course(10)On fill waterproof bed course(11), wherein, the waterproof bed course(11)Top edge connects with the underground Continuous wall(3)Top edge is concordant;
Step S4, in the diaphram wall(3)Outside vertical opens up several inlet wells(4), and sand is filled thereto, its In, the inlet well(4)Bottom penetrates the yellow soil horizon of collapsibility(5)Into the non-yellow soil horizon of collapsibility(6), the water guide Well(4)Upper end open and the diaphram wall(3)Top edge is concordant;
Step S5, in the waterproof bed course(11)With the inlet well(4)On fill water guide bed course(12), and in the water guide pad Layer(12)Middle setting and the inlet well(4)The horizontal drain pipe being connected(2);
Step S6, in the water guide bed course(12)On fill the bed course that blocks water(13).
2. processing method as claimed in claim 1, it is characterised in that:The diaphram wall is being set in step S1(3)It Before, use finite element software to carry out sunykatuib analysis to calculate the diaphram wall(3)With the peace between the ground periphery Full distance, and the diaphram wall is set by this safe distance(3).
3. processing method as claimed in claim 1, it is characterised in that:In the diaphram wall in step S4(3)Outside four Individual corner, which is respectively perpendicular, opens up an inlet well(4);In the inlet well in step S5(4)The water guide pad of top Layer(12)It is middle along the diaphram wall(3)The circle horizontal drain pipe of periphery laying one(2), the horizontal drain pipe(2) Corner and each inlet well(4)It is connected.
4. processing method as claimed in claim 1, it is characterised in that:One is being set to enclose the land lower company along ground periphery in step S1 Continuous wall(3)Afterwards, in the diaphram wall(3)Paste one layer of waterproof geotextiles in inner side.
5. processing method as claimed in claim 1, it is characterised in that:In step S3 the collision mat is filled using dirt is closely knit Layer(11).
6. processing method as claimed in claim 1, it is characterised in that:The water guide bed course is filled using grit in step S5 (12).
7. processing method as claimed in claim 1, it is characterised in that:Using the pad that blocked water described in the closely knit building of dirt in step S6 Layer(13).
CN201710351885.3A 2017-05-18 2017-05-18 A kind of processing method of the big thickness collapsible loess foundation in subway station Pending CN107090842A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710351885.3A CN107090842A (en) 2017-05-18 2017-05-18 A kind of processing method of the big thickness collapsible loess foundation in subway station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710351885.3A CN107090842A (en) 2017-05-18 2017-05-18 A kind of processing method of the big thickness collapsible loess foundation in subway station

Publications (1)

Publication Number Publication Date
CN107090842A true CN107090842A (en) 2017-08-25

Family

ID=59638261

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710351885.3A Pending CN107090842A (en) 2017-05-18 2017-05-18 A kind of processing method of the big thickness collapsible loess foundation in subway station

Country Status (1)

Country Link
CN (1) CN107090842A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107761708A (en) * 2017-09-18 2018-03-06 庆阳敦博科技发展有限公司 The processing method that big thickness Collapsible Loess District Subway station groundwork is reinforced
CN108118684A (en) * 2017-11-28 2018-06-05 浙江大学城市学院 A kind of Tidal Flat Reclamation blowing-filling sludge burning into sand layer foundation reinforcing structure and construction method
CN110230310A (en) * 2019-06-06 2019-09-13 上海斐晟企业管理有限公司 A kind of method and discharge structure preventing and treating collapsible loess depression
CN110409494A (en) * 2019-07-23 2019-11-05 中国十七冶集团有限公司 A kind of region of FuShui piping lane backfill waterproofing protection method
CN113006039A (en) * 2021-03-05 2021-06-22 中电建路桥集团有限公司 Dynamic compaction reinforcing construction method for collapsible loess foundation

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002138461A (en) * 2000-11-06 2002-05-14 Teito Rapid Transit Authority Structure of diaphragm wall, lowering method of ground water level and restoration method of ground water level
CN1807773A (en) * 2006-02-09 2006-07-26 西安理工大学 Treatment method for thick collapsed loess foundation
CN101591904A (en) * 2008-05-28 2009-12-02 徐立新 The reinforcement means of grouting following drainage prepressing type drainage body composite pile foundation
CN102080373A (en) * 2010-12-09 2011-06-01 西安建筑科技大学 Construction method for jointly treating collapsibility of loess foundation by using DDC (Downhole Dynamic Compaction) pile and pile foundation
CN102425153A (en) * 2011-12-20 2012-04-25 宁夏回族自治区电力设计院 Method for immersing collapsed loess site
CN105970911A (en) * 2016-07-01 2016-09-28 王继忠 Treatment method for large-thickness collapsible loess

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002138461A (en) * 2000-11-06 2002-05-14 Teito Rapid Transit Authority Structure of diaphragm wall, lowering method of ground water level and restoration method of ground water level
CN1807773A (en) * 2006-02-09 2006-07-26 西安理工大学 Treatment method for thick collapsed loess foundation
CN101591904A (en) * 2008-05-28 2009-12-02 徐立新 The reinforcement means of grouting following drainage prepressing type drainage body composite pile foundation
CN102080373A (en) * 2010-12-09 2011-06-01 西安建筑科技大学 Construction method for jointly treating collapsibility of loess foundation by using DDC (Downhole Dynamic Compaction) pile and pile foundation
CN102425153A (en) * 2011-12-20 2012-04-25 宁夏回族自治区电力设计院 Method for immersing collapsed loess site
CN105970911A (en) * 2016-07-01 2016-09-28 王继忠 Treatment method for large-thickness collapsible loess

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李丽民,蒋建清,林宇亮: "《土力学与基础工程》", 31 March 2016, 北京:北京理工大学出版社 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107761708A (en) * 2017-09-18 2018-03-06 庆阳敦博科技发展有限公司 The processing method that big thickness Collapsible Loess District Subway station groundwork is reinforced
CN108118684A (en) * 2017-11-28 2018-06-05 浙江大学城市学院 A kind of Tidal Flat Reclamation blowing-filling sludge burning into sand layer foundation reinforcing structure and construction method
CN108118684B (en) * 2017-11-28 2023-06-16 浙江大学城市学院 Beach reclamation dredger fill silt sand inclusion layer foundation reinforcing structure and construction method
CN110230310A (en) * 2019-06-06 2019-09-13 上海斐晟企业管理有限公司 A kind of method and discharge structure preventing and treating collapsible loess depression
CN110409494A (en) * 2019-07-23 2019-11-05 中国十七冶集团有限公司 A kind of region of FuShui piping lane backfill waterproofing protection method
CN113006039A (en) * 2021-03-05 2021-06-22 中电建路桥集团有限公司 Dynamic compaction reinforcing construction method for collapsible loess foundation

Similar Documents

Publication Publication Date Title
CN103233454B (en) Processing method of soaking, vacuum preloading and slurry injecting for sand piles of collapsible loess foundation
CN104196034B (en) A kind of utilize steel sheet pile as the foundation ditch construction method in supporting cofferdam
CN107090842A (en) A kind of processing method of the big thickness collapsible loess foundation in subway station
CN107761708A (en) The processing method that big thickness Collapsible Loess District Subway station groundwork is reinforced
CN105178125B (en) A kind of lake region High-filled emkankment is blown sand embankments construction method and embankment structure
CN103437371B (en) Construction method of water drainage uplift pile
CN103758113B (en) A kind of grid encloses the anti-liquefied foundation reinforcement means of hoop
CN107299630A (en) A kind of deep & thick silt matter riverbed piping lane crosses the river double steel plate pile cofferdam structure and construction method
CN107299650B (en) A kind of remote open caisson casting method for correcting error
CN101806055B (en) Vacuum pre-pressed joint rigid pile composite foundation reinforcing method
CN107587516A (en) A kind of efficient sealing of Follow-up type hinders sand precipitation hybrid system and its construction method
CN107724401A (en) The construction method of bridge pier foundation ditch
CN105804007B (en) A kind of reinforced earth quaywall structure based on the soft base of beach
CN102888834A (en) Construction method of large-diameter crushed stone pile
CN108316339A (en) A kind of construction method of water penetration geology large size arch bridge base
CN103924602A (en) Deep soft soil foundation pit construction method
CN105113478A (en) Dynamic compaction treatment method of deep foundation displacement
CN207331740U (en) A kind of heightening and consolidation structure of in-service reinforced concrete retaining wall
CN108797578A (en) Crushed stone grouting pile and its construction method with classification enlarged footing
CN106869153B (en) A kind of method of the quick soft soil foundation treatment of well-points dewatering
CN101591906A (en) The method for processing foundation of intubate, multipass vacuum well-point dewatering dynamic consolidation
CN109113045A (en) A kind of soft-soil foundation treatment method
CN207659986U (en) A kind of building or structures foundation stabilization underpin pier
CN207176700U (en) A kind of solid matter perfusion inner support of pile foundation ditch permanent support structure under complex environment
CN102966109A (en) Method for constructing zonal deep foundation pit bottom sealing of soft soil foundation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170825

RJ01 Rejection of invention patent application after publication