CN109066973A - A kind of method for visualizing of intelligent substation, system and terminal device - Google Patents
A kind of method for visualizing of intelligent substation, system and terminal device Download PDFInfo
- Publication number
- CN109066973A CN109066973A CN201810855242.7A CN201810855242A CN109066973A CN 109066973 A CN109066973 A CN 109066973A CN 201810855242 A CN201810855242 A CN 201810855242A CN 109066973 A CN109066973 A CN 109066973A
- Authority
- CN
- China
- Prior art keywords
- smart machine
- intelligent substation
- list
- virtual connections
- whole station
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00001—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the display of information or by user interaction, e.g. supervisory control and data acquisition systems [SCADA] or graphical user interfaces [GUI]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/16—Electric power substations
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/40—Display of information, e.g. of data or controls
Abstract
The present invention is suitable for field of communication technology, provide a kind of method for visualizing of intelligent substation, system and terminal device, the described method includes: obtaining the SCD whole station system configuration file of intelligent substation, the smart machine list of intelligent substation is obtained according to SCD whole station system configuration file and the virtual connections list for characterizing incidence relation between each smart machine, the protective device of an intelligent substation is chosen from smart machine list, and the associated association smart machine of protective device with selection is obtained according to virtual connections list, using the protective device of selection as center node, the association smart machine that would be associated with is as secondary nodes, Topology g eneration localised protection figure, the different corresponding localised protection figures of protective device is combined, generate the configuration figure in intelligent substation secondary circuit, realize intelligence Can substation secondary device visualization display, be able to use family and more clearly intuitively understand between equipment that there are virtual connections relationships.
Description
Technical field
The invention belongs to computer application technology more particularly to a kind of method for visualizing of intelligent substation, system
And terminal device.
Background technique
Intelligent substation is using advanced, reliable, integrated and environmentally friendly smart machine, with whole station information digitalization, communication
Platform network, information sharing are standardized as basic demand, are automatically performed information collection, measurement, control, protection, metering and inspection
Survey etc. basic functions, meanwhile, have support power grid automatically controls in real time, intelligence adjust, on-line analysis decision and collaboration interact etc.
The intelligent substation of Premium Features.
It currently, realizing that there are many intelligent substation secondary circuit visualization method, but is only capable of as unit of device
Show empty circuit, it, cannot be by entire intelligent substation if the output of visualization display single equipment inputs GOOSE, SV information
Secondary circuit configuration carries out visualization display.
Summary of the invention
In view of this, the embodiment of the invention provides a kind of method for visualizing of intelligent substation, system and terminal device,
Visualization display is carried out to solve the problems, such as in the prior art to configure the secondary circuit of entire intelligent substation.
The first aspect of the embodiment of the present invention provides a kind of method for visualizing of intelligent substation, comprising:
Obtain the SCD whole station system configuration file of intelligent substation.
The smart machine list of the intelligent substation is obtained according to the SCD whole station system configuration file and for table
Levy the virtual connections list of incidence relation between each smart machine.
The protective device of an intelligent substation is chosen from the smart machine list, and according to the virtual connections list
The associated association smart machine of protective device for obtaining and choosing.
Using the protective device of the selection as center node, the association smart machine that would be associated with is as secondary
Node, Topology g eneration localised protection figure.
The different corresponding localised protection figures of protective device is combined, matching for intelligent substation secondary circuit is generated
Set figure.
The second aspect of the embodiment of the present invention provides a kind of visualization system of intelligent substation, comprising:
Configuration file obtains module, for obtaining the SCD whole station system configuration file of intelligent substation.
List obtains module, for obtaining the intelligence of the intelligent substation according to the SCD whole station system configuration file
List of devices and virtual connections list for characterizing incidence relation between each smart machine.
It is associated with smart machine and obtains module, for choosing the protection of an intelligent substation from the smart machine list
Device, and the associated association smart machine of protective device with selection is obtained according to the virtual connections list.
Localised protection figure obtains module, for would be associated with using the protective device of the selection as center node
The association smart machine as secondary nodes, Topology g eneration localised protection figure.
It configures figure and obtains module, for the different corresponding localised protection figures of protective device to be combined, generate
The configuration figure in intelligent substation secondary circuit.
The third aspect of the embodiment of the present invention provides a kind of terminal device, including memory, processor and is stored in
In the memory and the computer program that can run on the processor, when the processor executes the computer program
The step of realizing method as described above.
The fourth aspect of the embodiment of the present invention provides a kind of computer readable storage medium, the computer-readable storage
Media storage has the step of computer program, the computer program realizes method as described above when being executed by processor.
Existing beneficial effect is the embodiment of the present invention compared with prior art: the present embodiment is by obtaining intelligent substation
SCD whole station system configuration file, according to SCD whole station system configuration file obtain intelligent substation smart machine list and
For characterizing the virtual connections list of incidence relation between each smart machine, an intelligent power transformation is chosen from smart machine list
The protective device stood, and the associated association smart machine of protective device with selection is obtained according to virtual connections list, with selection
Protective device is center node, and the association smart machine that would be associated with is as secondary nodes, Topology g eneration localised protection figure
The different corresponding localised protection figures of protective device is combined by shape, generates the configuration diagram in intelligent substation secondary circuit
Shape.The present embodiment is by the way that using the protective device of selection as center node, the association smart machine that would be associated with is as secondary
Node, Topology g eneration localised protection figure, and the different corresponding localised protection figures of protective device is combined, generate intelligence
The configuration figure of energy Substation secondary circuit, realizes the visualization display of secondary equipment of intelligent converting station, is able to use family more
Add and clearly intuitively understands between equipment that there are virtual connections relationships.
Detailed description of the invention
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art
Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only of the invention some
Embodiment for those of ordinary skill in the art without any creative labor, can also be according to these
Attached drawing obtains other attached drawings.
Fig. 1 is the implementation process schematic diagram of the method for visualizing of intelligent substation provided by one embodiment of the present invention;
Fig. 2 is the specific implementation flow schematic diagram of step S105 in Fig. 1 provided by one embodiment of the present invention;
Fig. 3 is the structural schematic diagram of the visualization system of intelligent substation provided by one embodiment of the present invention;
Fig. 4 is the concrete structure schematic diagram that configuration figure provided by one embodiment of the present invention obtains module;
Fig. 5 is the schematic diagram of terminal device provided by one embodiment of the present invention.
Specific embodiment
In being described below, for illustration and not for limitation, the tool of such as particular system structure, technology etc is proposed
Body details, to understand thoroughly the embodiment of the present invention.However, it will be clear to one skilled in the art that there is no these specific
The present invention also may be implemented in the other embodiments of details.In other situations, it omits to well-known system, device, electricity
The detailed description of road and method, in case unnecessary details interferes description of the invention.
In order to illustrate technical solutions according to the invention, the following is a description of specific embodiments.
Embodiment 1:
Fig. 1 shows the implementation process of the method for visualizing of the intelligent substation of one embodiment of the present of invention offer,
Details are as follows for process:
In step s101, the SCD whole station system configuration file of intelligent substation is obtained.
In the present embodiment, SCD (Substation Configuration Description) file is intelligent power transformation
The configuration file stood.
In the present embodiment, pre-stored SCD whole station system configuration file is obtained from local.
Further, in order to reduce the occupancy of local resource, the burden of terminal device is reduced, it can be by SCD whole station system
Configuration file is stored in advance in server end, and terminal device downloads the SCD whole station system configuration file from server.
In step s 102, according to SCD whole station system configuration file obtain intelligent substation smart machine list and
For characterizing the virtual connections list of incidence relation between each smart machine.
In one embodiment of the invention, step S102 includes:
1) SCD whole station system configuration file is parsed, complete smart machine list is obtained.
2) several smart machines to be shown are selected from complete smart machine list, obtain required smart machine column
Table.
3) filtered out from SCD whole station system configuration file with the associated virtual connections information of intelligent electronic device to be shown,
Obtain virtual connections list.
In the present embodiment, smart machine is the intelligent electronic device (Intelligent of intelligent substation
Electronic Device, IED).
In the present embodiment, smart machine to be shown includes No. 1 main transformer protection of main transformer protection 2,2 of main transformer protection 1,1
1, No. 2 main transformer protections 2,110kV segmentation prepared auto restart, 10kV are segmented prepared auto restart, 11-7 combining unit, 12-7 combining unit, No. 1 master
Become ontology intelligent terminal, 101 intelligent cells 1,101 intelligent cell, 2, No. 2 main transformer body intelligent terminals, 511 intelligent cells 1,151
Intelligent cell, 511 intelligent cells 2,152 intelligent cells 1,512A intelligent cell 1,512B intelligent cell 1,152 intelligent cells 2,
512A intelligent cell 2,512B intelligent cell 2 etc., wherein main transformer protection refers to the protective device of main transformer.
In the present embodiment, the smart machine of intelligent substation whole is first got from SCD whole station system configuration file,
Complete smart machine list is obtained, that then chooses that user pre-enters from complete smart machine list desired shows
Several (for example, 22) smart machines shown, that is, choose several intelligence to be shown from complete smart machine list and set
It is standby, obtain required smart machine list.
In the present embodiment, it filters out from the SCD whole station system configuration file and is closed with smart machine to be shown respectively
The virtual connections information of connection obtains virtual connections list, and virtual connections list includes the corresponding virtual connections information of whole equipment to be shown,
In, virtual connections refer to the logical connection between two smart machines.
In one embodiment of the invention, virtual connections information includes information input equipment, information input virtual terminator, information
It inputs virtual terminator meaning, information output device, information output virtual terminator and information and exports virtual terminator meaning.
In the present embodiment, indicated with the associated virtual connections information of smart machine to be shown in virtual connections information include should be to
Show smart machine, which can be information input equipment, or information output device.
In the present embodiment, virtual terminator is GOOSE (the Generic Object Oriented for describing intelligent electronic device
Substation Event, the intelligent substation event towards general object) input, output signal and SV input, output signal
Tie point general name, virtual terminator be meant that virtual terminator Chinese explain.
In step s 103, the protective device of an intelligent substation is chosen from smart machine list, and according to virtually connecting
Connect the associated association smart machine of protective device that list is obtained with chosen.
In the present embodiment, the protective device of an intelligent substation is chosen from required smart machine list, for example,
Main transformer protection device, and the virtual connections information of the protective device comprising choosing is filtered out from virtual connections list, and obtain screening
The smart machine that virtual connections information out includes obtains the associated association smart machine of protective device with selection.
By taking a concrete application scene as an example, the protective device chosen from smart machine list is A device, from virtual connections
It is a information and b information that the virtual connections information comprising A device is filtered out in list, and A device is information output device in a information,
Information output device is B smart machine in a information, and A device is information input equipment in b information, and information output is set in b information
Standby is C smart machine, then includes B smart machine and C smart machine with the associated association smart machine of A device.
In step S104, using the protective device of selection as center node, the association smart machine that would be associated with is made
For secondary nodes, Topology g eneration localised protection figure.
In the present embodiment, the protective device of selection is A device, and association smart machine has B smart machine and C intelligently to set
It is standby, it is secondary nodes, Topology g eneration localised protection figure by B smart machine and C smart machine using A device as center node.
In the present embodiment, the connecting line between smart machine be the connecting line with arrow, arrow indicate SV signal or
The direction of GOOSE signal, to clearly show information flow and flow direction.
In the present embodiment, there is connection between protective device and association smart machine, being associated with can also between smart machine
There is connection.
In step s105, the different corresponding localised protection figures of protective device is combined, generates intelligent power transformation
It stands the configuration figure of secondary circuit.
In the present embodiment, the corresponding localised protection of remaining protective device in required smart machine list is successively obtained
Whole localised protection figures are combined by figure, generate the configuration figure in intelligent substation secondary circuit.
In one embodiment of the invention, the method for visualizing of the intelligent substation, further includes:
1) equipment that user chooses on the configuration figure in intelligent substation secondary circuit is obtained, and as target device.
2) it is highlighted the equipment connecting in the configuration figure in intelligent substation secondary circuit with target device.
In the present embodiment, when detect user intelligent substation thus back configuration figure in choose smart machine
When, (for example, the smart machine that user chooses can be judged by the coordinate where detection mouse) then sets the intelligence chosen
Standby is target device, acquisition and the associated smart machine of target device, that is, obtains the equipment connecting with target device, be highlighted
Show the equipment that connect with target device in the configuration figure in intelligent substation secondary circuit, thus user can quickly check and
There are associated smart machines for target device.
In one embodiment of the invention, the method for visualizing of intelligent substation, further includes:
1) connecting line that user chooses on the configuration figure in intelligent substation secondary circuit is obtained, and is connected as target
Line.
2) the corresponding information input equipment of detection target link and information output device, and set as target information input
Standby and target information output equipment.
3) target input equipment and the corresponding virtual connections information of target information output equipment are obtained, and is shown in default position
It sets.
In the present embodiment, a certain item is chosen to connect when detecting user on the configuration figure in intelligent substation secondary circuit
When wiring, then using the connecting line chosen as target link, obtain the smart machine at target link both ends, can according to
Coordinate where the mouse of family determines target link, and obtains the corresponding smart machine of target link for prestoring record, that is, really
Targeting set and target information output equipment are made, target input equipment and target letter are obtained from virtual connections list
The corresponding at least virtual connections information of output equipment is ceased, is shown in predeterminated position according to preset format, preset format includes table, in advance
If position is position at one configured on figure in intelligent substation secondary circuit.
In the present embodiment, since there may be a plurality of virtual connections letters between information input equipment and information output device
Breath, but be only indicated by a connecting line, therefore, show virtual connections information whole between two smart machines, it can
So that user gets more comprehensive information.
In the present embodiment, the first association smart machine that using the protective device chosen as center node, would be associated with
As secondary nodes, Topology g eneration localised protection figure, and the different corresponding localised protection figures of protective device is subjected to group
It closes, generates the configuration figure in intelligent substation secondary circuit, realize the visualization display of secondary equipment of intelligent converting station, comprehensively
The information flow at whole station is illustrated, family is able to use and more clearly intuitively understands between equipment there are virtual connections relationship, work as maintenance
When personnel overhaul intelligent substation secondary circuit, the virtual connections relationship between whole station secondary device can be familiarized, formulation has
Targetedly safety measure, therefore have more practicability.
As shown in Fig. 2, in one embodiment of the invention, step S105 is specifically included in embodiment corresponding to Fig. 1:
In step s 201, according to virtual connections list, the association between different protective devices is determined, so that it is determined that different
The corresponding localised protection figure of protective device it is whole station topological diagram in position.
In the present embodiment, it according to virtual connections list, can determine with two protective devices there are associated smart machine,
So that it is determined that position of the corresponding localised protection figure of different protective devices in whole station topological diagram, for example, No. 1 main transformer body
Intelligent terminal all exists with No. 1 main transformer protection 1 and No. 1 main transformer protection 2 to be associated with, then needs to place No. 1 main transformer body intelligent terminal
Between No. 1 corresponding localised protection figure of main transformer protection 1 and No. 1 corresponding localised protection figure of main transformer protection 2, that is, determine
The position in whole station topological diagram of each localised protection figure.
In the present embodiment, when smart machine and a protective device are associated, at most with another protective device
It is associated, i.e. a smart machine, which at most exists with two protective devices, to be associated with.
Optionally, the smart machine that grade is predetermined level (for example, 31 grades) is obtained, the smart machine of predetermined level indicates
At least exist with two protective devices and is associated with.It prestores and whole smart machines is classified.
By taking a concrete application scene as an example, 4 protective devices, respectively A, B and C are shared, all exists with A and B and is associated with
Smart machine be a, with B and C all exist associated smart machine be b, with A and C all exist associated smart machine be c, then
A equipment need to be placed between the corresponding localised protection figure of A and the corresponding localised protection figure of B, b equipment is placed on B pairs
Between the localised protection figure answered and the corresponding localised protection figure of C, c equipment is placed on the corresponding localised protection figure of A and C
Between corresponding localised protection figure, if A is placed on the upper left corner, B can be placed to the upper right corner, C can be prevented in A and B
Lower section, thus, it is possible to determine the corresponding localised protection figure of A, the corresponding localised protection figure of B and C it is corresponding part protect
Protect position of the figure in whole station topological diagram.
In the present embodiment, if add new smart machine, new smart machine can be added in whole station topological diagram,
Expansibility is strong.
In step S202, localised protection figure is placed on corresponding position.
In the present embodiment, the corresponding localised protection figure of each protective device is placed on corresponding position.
In step S203, the identical smart machine of title in whole station topological diagram is merged into a smart machine, and
Do not change the connection relationship of itself and other smart machines, generates the configuration figure in intelligent substation secondary circuit.
In the present embodiment, it is associated with since a smart machine can exist with multiple smart machines, therefore, it is necessary to will be whole
The identical smart machine of title in topological diagram of standing merges into a smart machine, and does not change the company of itself and other smart machines
Connect relationship.
By taking a concrete application scene as an example, there are smart machine a, and the intelligence in the corresponding topological graph of protective device A
Equipment a is also connect with smart machine b, also has smart machine a in the corresponding topological graph of protective device B, then merges two intelligence
Equipment a only remains next smart machine A, and protective device A, smart machine b and protective device B are also set with the intelligence after merging
Standby a connection.
It should be understood that the size of the serial number of each step is not meant that the order of the execution order in above-described embodiment, each process
Execution sequence should be determined by its function and internal logic, the implementation process without coping with the embodiment of the present invention constitutes any limit
It is fixed.
Embodiment 2:
Fig. 3 shows the visualization system 100 of the intelligent substation of one embodiment of the present of invention offer, for executing figure
Method and step in embodiment corresponding to 1 comprising:
Configuration file obtains module 110, for obtaining the SCD whole station system configuration file of intelligent substation.
List obtains module 120, and the smart machine for obtaining intelligent substation according to SCD whole station system configuration file arranges
Table and virtual connections list for characterizing incidence relation between each smart machine.
It is associated with smart machine and obtains module 130, for choosing the protection of an intelligent substation from smart machine list
Device, and the associated association smart machine of protective device with selection is obtained according to virtual connections list.
Localised protection figure obtains module 140, for would be associated with using the protective device of selection as center node
Smart machine is associated with as secondary nodes, Topology g eneration localised protection figure.
It configures figure and obtains module 150, it is raw for the different corresponding localised protection figures of protective device to be combined
At the configuration figure in intelligent substation secondary circuit.
In one embodiment of the invention, list acquisition module 120 includes:
First list acquiring unit obtains complete smart machine list for parsing SCD whole station system configuration file.
Second list acquiring unit, for selecting several smart machines to be shown from complete smart machine list,
Obtain required smart machine list.
Third list acquiring unit is set for filtering out from SCD whole station system configuration file with smart electronics to be shown
Standby associated virtual connections information, obtains virtual connections list.
In one embodiment of the invention, virtual connections information includes information input equipment, information input virtual terminator, information
It inputs virtual terminator meaning, information output device, information output virtual terminator and information and exports virtual terminator meaning.
In one embodiment of the invention, the visualization system 100 of intelligent substation further include:
First object equipment obtains module, chooses on the configuration figure in intelligent substation secondary circuit for obtaining user
Equipment, and as target device.
First processing module is connect for being highlighted in the configuration figure in intelligent substation secondary circuit with target device
Equipment.
In one embodiment of the invention, the visualization system 100 of intelligent substation further include:
Target link obtains module, is chosen on the configuration figure in intelligent substation secondary circuit for obtaining user
Connecting line, and as target link.
Second target device obtains module, sets for detecting the corresponding information input equipment of target link and information output
It is standby, and as targeting set and target information output equipment.
Second processing module, for obtaining target input equipment and the corresponding virtual connections information of target information output equipment,
And it is shown in predeterminated position.
As shown in figure 4, configuring figure in one embodiment of the invention, in embodiment corresponding to Fig. 3 obtains module
150 specifically include:
Position determination unit 151, for determining the association between different protective devices according to virtual connections list, thus
Determine position of the corresponding localised protection figure of different protective devices in whole station topological diagram.
Figure placement unit 152, for localised protection figure to be placed on corresponding position.
Figure acquiring unit 153 is configured, for the identical smart machine of title in whole station topological diagram to be merged into an intelligence
Energy equipment, and do not change the connection relationship of itself and other smart machines, generate the configuration figure in intelligent substation secondary circuit.
In one embodiment, the visualization system 100 of intelligent substation further includes other function module/unit, is used for
Realize the method and step in embodiment 1 in each embodiment.
Embodiment 3:
Fig. 5 is the schematic diagram for the terminal device that one embodiment of the invention provides.As shown in figure 5, the terminal of the embodiment is set
Standby 5 include: processor 50, memory 51 and are stored in the meter that can be run in the memory 51 and on the processor 50
Calculation machine program 52.The processor 50 realizes each embodiment as described in example 1 above when executing the computer program 52
Step, such as step S101 shown in FIG. 1 to step S105.Alternatively, when the processor 50 executes the computer program 52
Realize the function of each module/unit in each system embodiment as described in example 2 above, for example, module 110 shown in Fig. 3 to
150 function.
Illustratively, the computer program 52 can be divided into one or more module/units, it is one or
Multiple module/units are stored in the memory 51, and are executed by the processor 50, to complete the present invention.Described one
A or multiple module/units can be the series of computation machine program instruction section that can complete specific function, which is used for
Implementation procedure of the computer program 52 in the terminal device 5 is described.For example, the computer program 52 can be divided
Be cut into configuration file obtain module, list obtain module, association smart machine obtain module, localised protection figure obtain module and
It configures figure and obtains module.Each module concrete function is as follows:
Configuration file obtains module, for obtaining the SCD whole station system configuration file of intelligent substation.
List obtains module, for obtaining the smart machine list of intelligent substation according to SCD whole station system configuration file
And the virtual connections list for characterizing incidence relation between each smart machine.
It is associated with smart machine and obtains module, for choosing the protection dress an of intelligent substation from smart machine list
It sets, and the associated association smart machine of protective device with selection is obtained according to virtual connections list.
Localised protection figure obtains module, for using the protective device of selection as center node, the pass that would be associated with
Join smart machine as secondary nodes, Topology g eneration localised protection figure.
It configures figure and obtains module, for the different corresponding localised protection figures of protective device to be combined, generate
The configuration figure in intelligent substation secondary circuit.
The terminal device 5 can be the calculating such as desktop PC, notebook, palm PC and cloud server and set
It is standby.The terminal device 5 may include, but be not limited only to, processor 50, memory 51.It will be understood by those skilled in the art that figure
5 be only the example of terminal device 5, does not constitute the restriction to terminal device 5, may include than illustrating more or fewer portions
Part perhaps combines certain components or different components, such as the terminal device can also include input-output equipment, net
Network access device, bus etc..
Alleged processor 50 can be central processing unit (Central Processing Unit, CPU), can also be
Other general processors, digital signal processor (Digital Signal Processor, DSP), specific integrated circuit
(Application Specific Integrated Circuit, ASIC), field programmable gate array (Field-
Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic,
Discrete hardware components etc..General processor can be microprocessor or the processor is also possible to any conventional processor
Deng.
The memory 51 can be the internal storage unit of the terminal device 5, such as the hard disk or interior of terminal device 5
It deposits.The memory 51 is also possible to the External memory equipment of the terminal device 5, such as be equipped on the terminal device 5
Plug-in type hard disk, intelligent memory card (Smart Media Card, SMC), secure digital (Secure Digital, SD) card dodge
Deposit card (Flash Card) etc..Further, the memory 51 can also both include the storage inside list of the terminal device 5
Member also includes External memory equipment.The memory 51 is for storing needed for the computer program and the terminal device
Other programs and data.The memory 51 can be also used for temporarily storing the data that has exported or will export.
Embodiment 4:
The embodiment of the invention also provides a kind of computer readable storage medium, computer-readable recording medium storage has meter
Calculation machine program is realized the step in each embodiment as described in example 1 above, such as is schemed when computer program is executed by processor
Step S101 shown in 1 to step S105.Alternatively, realizing when the computer program is executed by processor such as institute in embodiment 2
The function of each module/unit in each system embodiment stated, such as the function of module 110 to 150 shown in Fig. 3.
The computer program can be stored in a computer readable storage medium, and the computer program is by processor
When execution, it can be achieved that the step of above-mentioned each embodiment of the method.Wherein, the computer program includes computer program code,
The computer program code can be source code form, object identification code form, executable file or certain intermediate forms etc..Institute
State computer-readable medium may include: can carry the computer program code any entity or device, recording medium,
USB flash disk, mobile hard disk, magnetic disk, CD, computer storage, read-only memory (ROM, Read-Only Memory), arbitrary access
Memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium etc..It needs
It is bright, the content that the computer-readable medium includes can according in jurisdiction make laws and patent practice requirement into
Row increase and decrease appropriate, such as in certain jurisdictions, according to legislation and patent practice, computer-readable medium do not include be electricity
Carrier signal and telecommunication signal.
In the above-described embodiments, it all emphasizes particularly on different fields to the description of each embodiment, is not described in detail or remembers in some embodiment
The part of load may refer to the associated description of other embodiments.
The steps in the embodiment of the present invention can be sequentially adjusted, merged and deleted according to actual needs.
Module or unit in system of the embodiment of the present invention can be combined, divided and deleted according to actual needs.
Those of ordinary skill in the art may be aware that list described in conjunction with the examples disclosed in the embodiments of the present disclosure
Member and algorithm steps can be realized with the combination of electronic hardware or computer software and electronic hardware.These functions are actually
It is implemented in hardware or software, the specific application and design constraint depending on technical solution.Professional technician
Each specific application can be used different methods to achieve the described function, but this realization is it is not considered that exceed
The scope of the present invention.
In embodiment provided by the present invention, it should be understood that disclosed device/terminal device and method, it can be with
It realizes by another way.For example, device described above/terminal device embodiment is only schematical, for example, institute
The division of module or unit is stated, only a kind of logical function partition, there may be another division manner in actual implementation, such as
Multiple units or components can be combined or can be integrated into another system, or some features can be ignored or not executed.Separately
A bit, shown or discussed mutual coupling or direct-coupling or communication connection can be through some interfaces, device
Or the INDIRECT COUPLING or communication connection of unit, it can be electrical property, mechanical or other forms.
Embodiment described above is merely illustrative of the technical solution of the present invention, rather than its limitations;Although referring to aforementioned reality
Applying example, invention is explained in detail, those skilled in the art should understand that: it still can be to aforementioned each
Technical solution documented by embodiment is modified or equivalent replacement of some of the technical features;And these are modified
Or replacement, the spirit and scope for technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution should all
It is included within protection scope of the present invention.
Claims (10)
1. a kind of method for visualizing of intelligent substation characterized by comprising
Obtain the SCD whole station system configuration file of intelligent substation;
The smart machine list of the intelligent substation is obtained according to the SCD whole station system configuration file and for characterizing respectively
The virtual connections list of incidence relation between a smart machine;
The protective device of an intelligent substation is chosen from the smart machine list, and is obtained according to the virtual connections list
With the associated association smart machine of protective device of selection;
Using the protective device of the selection as center node, the association smart machine that would be associated with is as secondary section
Point, Topology g eneration localised protection figure;
The different corresponding localised protection figures of protective device is combined, the configuration diagram in intelligent substation secondary circuit is generated
Shape.
2. the method for visualizing of intelligent substation as described in claim 1, which is characterized in that described according to the SCD whole station
System configuration file obtains the smart machine list of the intelligent substation and is associated between each smart machine for characterizing
The virtual connections list of relationship, comprising:
The SCD whole station system configuration file is parsed, complete smart machine list is obtained;
Several smart machines to be shown are selected from the complete smart machine list, obtain the required smart machine
List;
It filters out from the SCD whole station system configuration file and believes with the associated virtual connections of intelligent electronic device to be shown
Breath, obtains the virtual connections list.
3. the method for visualizing of intelligent substation as claimed in claim 2, which is characterized in that the virtual connections information includes letter
Cease input equipment, information input virtual terminator, information input virtual terminator meaning, information output device, information output virtual terminator and letter
Breath output virtual terminator meaning.
4. the method for visualizing of intelligent substation as described in claim 1, which is characterized in that described by different protective devices
Corresponding localised protection figure is combined, and generates the configuration figure in intelligent substation secondary circuit, comprising:
According to the virtual connections list, the association between different protective devices is determined, so that it is determined that different protective devices pair
Position of the localised protection figure answered in whole station topological diagram;
The localised protection figure is placed on corresponding position;
The identical smart machine of title in the whole station topological diagram is merged into a smart machine, and do not change its with it is other
The connection relationship of smart machine generates the configuration figure in the intelligent substation secondary circuit.
5. the method for visualizing of intelligent substation as described in claim 1, which is characterized in that further include:
The equipment that user chooses on the configuration figure in the intelligent substation secondary circuit is obtained, and as target device;
It is highlighted the equipment connecting in the configuration figure in the intelligent substation secondary circuit with the target device.
6. the method for visualizing of intelligent substation as described in claim 1, which is characterized in that further include:
The connecting line that user chooses on the configuration figure in the intelligent substation secondary circuit is obtained, and is connected as target
Line;
The corresponding information input equipment of the target link and information output device are detected, and as targeting set
With target information output equipment;
The target input equipment and the corresponding virtual connections information of the target information output equipment are obtained, and is shown in default position
It sets.
7. a kind of visualization system of intelligent substation characterized by comprising
Configuration file obtains module, for obtaining the SCD whole station system configuration file of intelligent substation;
List obtains module, for obtaining the smart machine of the intelligent substation according to the SCD whole station system configuration file
List and virtual connections list for characterizing incidence relation between each smart machine;
It is associated with smart machine and obtains module, for choosing the protection dress an of intelligent substation from the smart machine list
It sets, and the associated association smart machine of protective device with selection is obtained according to the virtual connections list;
Localised protection figure obtains module, the institute for would be associated with using the protective device of the selection as center node
Association smart machine is stated as secondary nodes, Topology g eneration localised protection figure;
It configures figure and obtains module, for the different corresponding localised protection figures of protective device to be combined, generate intelligence
The configuration figure of Substation secondary circuit.
8. the visualization system of intelligent substation as claimed in claim 7, which is characterized in that the configuration figure obtains mould
Block, comprising:
Position determination unit, for determining the association between different protective devices according to the virtual connections list, so that it is determined that
Position of the corresponding localised protection figure of different protective devices in whole station topological diagram;
Figure placement unit, for the localised protection figure to be placed on corresponding position;
Figure acquiring unit is configured, is set for the identical smart machine of title in the whole station topological diagram to be merged into an intelligence
It is standby, and do not change the connection relationship of itself and other smart machines, generate the configuration figure in the intelligent substation secondary circuit.
9. a kind of terminal device, including memory, processor and storage are in the memory and can be on the processor
The computer program of operation, which is characterized in that the processor realizes such as claim 1 to 6 when executing the computer program
The step of any one the method.
10. a kind of computer readable storage medium, the computer-readable recording medium storage has computer program, and feature exists
In when the computer program is executed by processor the step of any one of such as claim 1 to 6 of realization the method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810855242.7A CN109066973B (en) | 2018-07-31 | 2018-07-31 | Visualization method and system for intelligent substation and terminal equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810855242.7A CN109066973B (en) | 2018-07-31 | 2018-07-31 | Visualization method and system for intelligent substation and terminal equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109066973A true CN109066973A (en) | 2018-12-21 |
CN109066973B CN109066973B (en) | 2021-06-15 |
Family
ID=64831420
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810855242.7A Active CN109066973B (en) | 2018-07-31 | 2018-07-31 | Visualization method and system for intelligent substation and terminal equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109066973B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112558488A (en) * | 2019-09-10 | 2021-03-26 | 珠海格力电器股份有限公司 | Method and device for controlling intelligent equipment |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100002348A1 (en) * | 2007-10-09 | 2010-01-07 | Donolo Marcos A | Distributed bus differential protection using time-stamped data |
CN103441571A (en) * | 2013-06-18 | 2013-12-11 | 国家电网公司 | Integrated monitoring system information platform for transformer substation |
CN104133953A (en) * | 2014-07-24 | 2014-11-05 | 贵阳供电局 | Secondary design system of intelligent substation |
CN104993590A (en) * | 2015-06-30 | 2015-10-21 | 许昌许继软件技术有限公司 | CID model-based relay protection device secondary loop self-monitoring method |
CN106126830A (en) * | 2016-06-23 | 2016-11-16 | 许继电气股份有限公司 | Intelligent substation secondary void loop based on graphic configuration plug-in unit method for visualizing |
-
2018
- 2018-07-31 CN CN201810855242.7A patent/CN109066973B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100002348A1 (en) * | 2007-10-09 | 2010-01-07 | Donolo Marcos A | Distributed bus differential protection using time-stamped data |
CN103441571A (en) * | 2013-06-18 | 2013-12-11 | 国家电网公司 | Integrated monitoring system information platform for transformer substation |
CN104133953A (en) * | 2014-07-24 | 2014-11-05 | 贵阳供电局 | Secondary design system of intelligent substation |
CN104993590A (en) * | 2015-06-30 | 2015-10-21 | 许昌许继软件技术有限公司 | CID model-based relay protection device secondary loop self-monitoring method |
CN106126830A (en) * | 2016-06-23 | 2016-11-16 | 许继电气股份有限公司 | Intelligent substation secondary void loop based on graphic configuration plug-in unit method for visualizing |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112558488A (en) * | 2019-09-10 | 2021-03-26 | 珠海格力电器股份有限公司 | Method and device for controlling intelligent equipment |
CN112558488B (en) * | 2019-09-10 | 2022-02-15 | 珠海格力电器股份有限公司 | Method and device for controlling intelligent equipment |
Also Published As
Publication number | Publication date |
---|---|
CN109066973B (en) | 2021-06-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10325062B2 (en) | Method and device for generating engineering topology of digital substation | |
CN102622463B (en) | Drawing-model uniformity based method for automatic check of design drawings | |
CN103729557B (en) | Static N-X batch processing method based on PSD-BPA | |
CN109344476B (en) | CIM model-based power distribution network single line diagram line branch structure generation method and device | |
CN109299846A (en) | A kind of nuclear power plant equipment analysis method for reliability, system and terminal device | |
CN105354680B (en) | GIS-based power grid section auxiliary determination analysis method | |
CN107317394A (en) | Dispatching anti-misoperation method, device and system | |
CN107609797A (en) | Electric operating checking method and terminal device | |
CN103729734A (en) | Distribution network intelligent operation ticket issuing system | |
CN105302954A (en) | Multiplayer online intelligent transformer substation design system | |
CN110556920A (en) | Distribution automation monitoring method, system, terminal and storage medium | |
CN115441448B (en) | Power conversion and supply verification method, device and equipment for power distribution network line and storage medium | |
CN111625964B (en) | Method, system and equipment for constructing transformer substation graph model based on logical relationship | |
CN106844432A (en) | Data processing method and device | |
CN108183814A (en) | The malfunction elimination method and apparatus of the communication channel of power information acquisition system | |
CN115842342A (en) | Topology identification method and device for distributed power distribution network | |
CN111159897A (en) | Target optimization method and device based on system modeling application | |
CN109066973A (en) | A kind of method for visualizing of intelligent substation, system and terminal device | |
CN109409026A (en) | Electric efficiency optimization method, device and design of electrical motor parameter determination method | |
CN109687592A (en) | Substation information display control method, device and electronic equipment | |
CN115689181A (en) | Method, system and non-transitory computer readable medium for error proofing of power system | |
CN108197179A (en) | Facility information querying method and terminal device | |
CN107958370A (en) | Project cost data verification method and terminal device | |
CN109658213A (en) | A kind of method, system and the terminal device of clearance of sharing in the benefit | |
CN112347078A (en) | Power distribution Internet of things data product construction method and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |