CN108183814A - The malfunction elimination method and apparatus of the communication channel of power information acquisition system - Google Patents

The malfunction elimination method and apparatus of the communication channel of power information acquisition system Download PDF

Info

Publication number
CN108183814A
CN108183814A CN201711293705.7A CN201711293705A CN108183814A CN 108183814 A CN108183814 A CN 108183814A CN 201711293705 A CN201711293705 A CN 201711293705A CN 108183814 A CN108183814 A CN 108183814A
Authority
CN
China
Prior art keywords
information acquisition
power information
acquisition system
malfunction elimination
channel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711293705.7A
Other languages
Chinese (zh)
Other versions
CN108183814B (en
Inventor
张超
冯波
王立斌
张洋瑞
张亚杰
赵俊鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd
State Grid Hebei Energy Technology Service Co Ltd
Marketing Service Center of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd
State Grid Hebei Energy Technology Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd, State Grid Hebei Energy Technology Service Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201711293705.7A priority Critical patent/CN108183814B/en
Publication of CN108183814A publication Critical patent/CN108183814A/en
Application granted granted Critical
Publication of CN108183814B publication Critical patent/CN108183814B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/06Management of faults, events, alarms or notifications
    • H04L41/0677Localisation of faults
    • GPHYSICS
    • G08SIGNALLING
    • G08CTRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
    • G08C19/00Electric signal transmission systems

Abstract

The present invention is suitable for channel-failures and investigates technical field, provides a kind of malfunction elimination method and apparatus based on power information acquisition system.The method includes:The channel that the power information acquisition system main website communicates with information collecting device is obtained by power information acquisition system to go offline information;It is gone offline the fault type that information judges that the power information acquisition system main website communicates with described information collecting device according to the channel;The malfunction elimination and maintenance program of the power information acquisition system master device are generated according to the fault type, so that maintenance personal carries out malfunction elimination and repair to the power information acquisition system master device.The present invention can realize that when communication channel breaks down real-time fault location shortens the time of investigation failure, loss is greatly reduced to user and company.

Description

The malfunction elimination method and apparatus of the communication channel of power information acquisition system
Technical field
The invention belongs to channel-failures investigation technical field more particularly to a kind of communication channels of power information acquisition system Malfunction elimination method and apparatus.
Background technology
Power information acquisition system carries power information automatic collection, efficiently shared and real time monitoring vital task, It realizes covering Corporation system whole user, acquisition power information, the target for supporting comprehensive electricity charge control, is to build strong intelligence electricity The important foundation of net.Power information acquisition system is long-range in automatic data logging, remote bill control, line loss monitoring, application of opposing electricity-stealing, electricity price Issue, distribution transforming operational monitoring, ordered electric, power quality on-line monitoring etc. suffer from vital effect.With intelligence Energy power grid construction gos deep into, the Novel electrics industry such as distributed generation resource access, electric vehicle charge and discharge, demand response, energy efficiency management The development of business, the effect that will bigger be played to power information acquisition system.Power information acquisition system is in electric system software Leading position it is more and more prominent, ensureing the safe and stable operation of power information acquisition system seems most important.
In the prior art, when event occurs for power information acquisition system main website and the channel of the wireless communication of information collecting device During barrier, the communication channel of bulk information collecting device is offline, cause information collecting device and power information acquisition system main website without Method communicates, if positioning investigation cannot be carried out to communication channel failure in time, power information acquisition system is to power information data Can not just acquire, such case can to company's automatic data logging, remote bill control, line loss monitoring, application of opposing electricity-stealing, electricity price it is long-range under Hair, distribution transforming operational monitoring, ordered electric, power quality on-line monitoring etc. work affect, and also give electric company each portion Door causes extreme loss.
Invention content
In view of this, an embodiment of the present invention provides a kind of malfunction elimination sides of the communication channel of power information acquisition system Method and device, to solve in the prior art when power information acquisition system main website and the channel of the wireless communication of information collecting device When breaking down, it is impossible to the problem of positioning the position broken down in time, extreme loss is caused to each department of electric company.
The first aspect of the embodiment of the present invention provides a kind of malfunction elimination of the communication channel of power information acquisition system Method, including:
Obtain what the power information acquisition system main website communicated with information collecting device by power information acquisition system Channel goes offline information;
Judge that the power information acquisition system main website leads to described information collecting device according to the channel information that goes offline The fault type of letter;
The malfunction elimination and maintenance program of the power information acquisition system master device are generated according to the fault type, So that maintenance personal carries out malfunction elimination and repair to the power information acquisition system master device.
Optionally, the power information acquisition system obtains the power information acquisition system main website and information collecting device The channel of the communication information that goes offline is:
The power information acquisition system obtains the power information acquisition system main website and at least one urban district or counties and districts The channel drop rate of power information acquisition terminal communication;
The power information acquisition system obtains the power information acquisition system main website and an at least common carrier The channel drop rate of communication apparatus communication.
Optionally, it is described that the power information acquisition system main website and described information are judged according to the channel information that goes offline Collecting device communication fault type be:
It communicates when the power information acquisition system main website at least one urban district or counties and districts' power information acquisition terminal When channel drop rate is greater than or equal to the first drop rate threshold value, the fault type is Fisrt fault type;
It communicates when the power information acquisition system main website at least one urban district or counties and districts' power information acquisition terminal Channel drop rate is less than the first drop rate threshold value, and the power information acquisition system main website leads to an at least common carrier When the channel drop rate of letter equipment communication is respectively less than the second drop rate threshold value, the fault type is the second fault type;
It communicates when the power information acquisition system main website at least one urban district or counties and districts' power information acquisition terminal Channel drop rate is less than the first drop rate threshold value, and the power information acquisition system main website communicates with a common carrier and sets When the channel drop rate of standby communication is greater than or equal to the second drop rate threshold value, the fault type is third fault type;
When the channel that the power information acquisition system main website communicates with a urban district or counties and districts' power information acquisition terminal Drop rate is greater than or equal to the first drop rate threshold value, and the power information acquisition system main website and one urban district or counties and districts The channel drop rate of at least one common carrier communication apparatus communication when being respectively less than the second drop rate threshold value, the failure classes Type is the 4th fault type;
When the channel that the power information acquisition system main website communicates with a urban district or counties and districts' power information acquisition terminal Drop rate is less than the first drop rate threshold value, and one of the power information acquisition system main website and one urban district or counties and districts When the channel drop rate of common carrier communication apparatus communication is greater than or equal to the second drop rate threshold value, the fault type is the Five fault types.
Optionally, the power information acquisition system master device includes:Communicate front server, the preposition service of acquisition Device, load-balancing device, acquisition fire wall, core switch and common carrier channel unit.
Optionally, the malfunction elimination that the power information acquisition system master device is generated according to the fault type And maintenance program, so that maintenance personal carries out malfunction elimination and repair specifically to the power information acquisition system master device For:
When the fault type is the Fisrt fault type, the power information acquisition system master device is generated Fisrt fault is investigated and maintenance program, so that the maintenance personal is preposition to the communication front server, the acquisition successively Server, the load-balancing device, the acquisition fire wall and the core switch carry out malfunction elimination and repair;
When the fault type is second fault type, the power information acquisition system master device is generated Second malfunction elimination and maintenance program, so that the maintenance personal is preposition to the communication front server, the acquisition successively Server, the load-balancing device, the acquisition fire wall and the core switch carry out malfunction elimination and repair;
When the fault type is the third fault type, the power information acquisition system master device is generated Third malfunction elimination and maintenance program, so that the maintenance personal leads to the channel drop rate more than the second drop rate threshold value Believe that operators communication equipment carries out malfunction elimination and repair;
When the fault type is four fault type, the power information acquisition system master device is generated 4th malfunction elimination and maintenance program, so that the maintenance personal is preposition to the communication front server, the acquisition successively Server, the load-balancing device carry out malfunction elimination and repair;
When the fault type is five fault type, the power information acquisition system master device is generated 5th malfunction elimination and maintenance program, so that the maintenance personal is more than the channel drop rate in one urban district or counties and districts the The common carrier communication equipment of two drop rate threshold values carries out malfunction elimination and repair.
Optionally, the method further includes:
When the fault type is second fault type, in the maintenance personal successively to the preposition clothes of communication Business device, the acquisition front server, the load-balancing device, the acquisition fire wall and the core switch carry out event After barrier investigation and repair, if failure does not exclude, the second malfunction elimination and repair emergency plan are generated, for the repair people Member carries out malfunction elimination and repair at least one common carrier communication equipment at least one urban district or counties and districts;
When the fault type is four fault type, in the maintenance personal successively to the preposition clothes of communication It is engaged in after device, the acquisition front server, load-balancing device progress malfunction elimination and repair, if failure does not exclude, The maintenance personal carries out malfunction elimination and repair to the acquisition fire wall and the core switch successively;If failure does not have It excludes, then generates the 4th malfunction elimination and repair emergency plan, so that the maintenance personal is to one urban district or counties and districts At least one common carrier communication equipment carries out malfunction elimination and repair.
The second aspect of the embodiment of the present invention provides a kind of device of the malfunction elimination based on power information acquisition system, Including:
Data obtaining module goes offline for obtaining the channel that power information acquisition system main website communicates with information collecting device Information, and the channel information that goes offline is sent to judgment module;
The judgment module, for judging the power information acquisition system main website and institute according to the channel information that goes offline The fault type of information collecting device communication is stated, is additionally operable to generate the power information acquisition system master according to the fault type The malfunction elimination and maintenance program of station equipment.
Optionally, described information acquisition module includes:First acquisition unit and second acquisition unit;
The first acquisition unit, for obtaining the power information acquisition system main website and at least one urban district or counties and districts The channel of power information acquisition terminal communication goes offline information;
The second acquisition unit obtains the power information acquisition system main website and communicates at least one common carrier The channel of equipment communication goes offline information.
The third aspect of the embodiment of the present invention provides a kind of malfunction elimination of the communication channel of power information acquisition system Control device, including memory, processor and be stored in the meter that can be run in the memory and on the processor Calculation machine program, which is characterized in that the processor realizes any of the above-described kind of power information acquisition when performing the computer program The step of malfunction elimination method of the communication channel of system.
The fourth aspect of the embodiment of the present invention provides a kind of computer readable storage medium, including:The computer can It reads storage medium and is stored with computer program, which is characterized in that the computer program realizes above-mentioned when being executed by processor The step of a kind of malfunction elimination method of communication channel of power information acquisition system.
Existing advantageous effect is the embodiment of the present invention compared with prior art:Pass through power information in the embodiment of the present invention Acquisition system obtains the channel that the power information acquisition system main website communicates with information collecting device and goes offline information;According to described The channel information that goes offline judges the fault type that the power information acquisition system main website communicates with described information collecting device;According to The fault type generates the malfunction elimination and maintenance program of the power information acquisition system master device, for maintenance personal Malfunction elimination and repair are carried out to the power information acquisition system master device, realized when communication channel breaks down, Real-time fault location shortens the time of investigation failure, loss is greatly reduced to user and company.
Description of the drawings
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description be only the present invention some Embodiment, for those of ordinary skill in the art, without having to pay creative labor, can also be according to these Attached drawing obtains other attached drawings.
Fig. 1 is the realization of the malfunction elimination method of the communication channel of power information acquisition system provided in an embodiment of the present invention Flow diagram;
Fig. 2 is the reality of the malfunction elimination of the communication channel of another power information acquisition system provided in an embodiment of the present invention Existing flow diagram;
Fig. 3 is the control device of the malfunction elimination of the communication channel of power information acquisition system provided in an embodiment of the present invention Structure diagram;
Fig. 4 is the control device of the malfunction elimination of the communication channel of power information acquisition system provided in an embodiment of the present invention Schematic diagram.
Specific embodiment
In being described below, in order to illustrate rather than in order to limit, it is proposed that such as tool of particular system structure, technology etc Body details, to understand thoroughly the embodiment of the present invention.However, it will be clear to one skilled in the art that there is no these specifically The present invention can also be realized in the other embodiments of details.In other situations, it omits to well-known system, device, electricity Road and the detailed description of method, in case unnecessary details interferes description of the invention.
In order to illustrate technical solutions according to the invention, illustrated below by specific embodiment.
Embodiment one
An a kind of implementation of method of the malfunction elimination of the communication channel of power information acquisition system is provided referring to Fig. 1 Example realizes flow diagram, and details are as follows:
Step S101 obtains the power information acquisition system main website by power information acquisition system and is set with information collection The channel of standby communication goes offline information.
Specifically, described information collecting device includes at least one urban district or counties and districts' power information acquisition terminal.
It is described the power information acquisition system main website is obtained by power information acquisition system to lead to information collecting device The channel of the letter information that goes offline is specially:
By the power information acquisition system obtain the power information acquisition system main website and at least one urban district or The channel drop rate of counties and districts' power information acquisition terminal communication;The power information is obtained by the power information acquisition system Acquisition system main website and the channel drop rate of at least one common carrier communication apparatus communication.Optionally, the power information Acquisition system can also realize that automatic data logging, remote bill control, line loss monitoring, application of opposing electricity-stealing, electricity price remotely issues, distribution transforming is run Monitoring and power quality on-line monitoring etc..
Judge the power information acquisition system main website and at least one urban district by obtaining the channel drop rate Or whether the communication of counties and districts' power information acquisition terminal and the common carrier communication equipment is abnormal.
Preferably, the communication operator can be operator of China Mobile, China Unicom operator and China Telecom's fortune Quotient is sought, but is not limited only to this three communication operators.
Step S102 judges that the power information acquisition system main website is adopted with described information according to the channel information that goes offline Collect the fault type of equipment communication.
Specifically, the power information acquisition system main website and at least one obtained according to the power information acquisition system The channel drop rate and the power information acquisition system main website of a urban district or the communication of counties and districts power information acquisition terminals at least The channel drop rate of one common carrier communication apparatus communication judges the power information acquisition system main website and described information The fault type of collecting device communication.
Optionally, the fault type includes:Fisrt fault type, the second fault type, third fault type, the 4th event Hinder type and the 5th fault type.
The Fisrt fault type refers to, the power information acquisition system main website and at least one urban district or counties and districts' electricity consumption The channel drop rate of information acquisition terminal communication is greater than or equal to the first drop rate threshold value.Illustratively, first drop rate Threshold value is 90%, when the power information acquisition system main website communicates at least one urban district or counties and districts' power information acquisition terminal The channel drop rate be greater than or equal to 90% when, the fault type be Fisrt fault type.
Second fault type refers to, the power information acquisition system main website and at least one urban district or counties and districts' electricity consumption Information acquisition terminal communication channel drop rate be less than the first drop rate threshold value, and the power information acquisition system main website with extremely The channel drop rate of a few common carrier communication apparatus communication is respectively less than the second drop rate threshold value.Illustratively, described One drop rate threshold value is 90%, and the second drop rate threshold value is 70%, when the power information acquisition system main website and at least The channel drop rate of one urban district or counties and districts' power information acquisition terminal communication is less than 90%, and the power information acquisition system When the channel drop rate of main website and at least one common carrier communication apparatus communication is respectively less than 70%, the fault type is the Two fault types.
Optionally, when the power information acquisition system main website and at least one urban district or counties and districts' power information acquisition terminal The channel drop rate of communication is less than the first drop rate threshold value, and the power information acquisition system main website and at least one fortune that communicates May be the second fault type when seeking the channel drop rate equilibrium of quotient's communication apparatus communication.
Third fault type refers to, the power information acquisition system main website and at least one urban district or counties and districts' power information Acquisition terminal communication channel drop rate be less than the first drop rate threshold value, and the power information acquisition system main website with one lead to Believe that the channel drop rate of operators communication equipment communication is greater than or equal to the second drop rate threshold value.Illustratively, described first falls Line rate threshold value be 90%, the second drop rate threshold value be 70%, when the power information acquisition system main website with it is at least one The channel drop rate of urban district or counties and districts' power information acquisition terminal communication is less than 90%, and the power information acquisition system main website When being greater than or equal to 70% with the channel drop rate of a common carrier communication apparatus communication, the fault type is third event Hinder type.
4th fault type refers to that the power information acquisition system main website and a urban district or counties and districts' power information acquire Terminal communication channel drop rate be greater than or equal to the first drop rate threshold value, and the power information acquisition system main website with it is described The channel drop rate of at least one common carrier communication apparatus communication of one urban district or counties and districts is respectively less than the second drop rate threshold Value.Illustratively, the first drop rate threshold value is 90%, and the second drop rate threshold value is 70%, when the power information The channel drop rate that acquisition system main website communicates with a urban district or counties and districts' power information acquisition terminal be greater than or equal to 90%, and The power information acquisition system main website and one urban district or an at least common carrier communication apparatus communication for counties and districts Channel drop rate when being respectively less than 70%, the fault type is the 4th fault type.
Optionally, when the power information acquisition system main website communicates with a urban district or counties and districts' power information acquisition terminal Channel drop rate be greater than or equal to the first drop rate threshold value, and the power information acquisition system main website and one urban district Or at least one common carrier communication apparatus communication of counties and districts channel drop rate equilibrium when, the fault type also be the 4th Fault type.
5th fault type refers to that the power information acquisition system main website and a urban district or counties and districts' power information acquire The channel drop rate of terminal communication is less than the first drop rate threshold value, and the power information acquisition system main website and one city The channel drop rate of one common carrier communication apparatus communication of area or counties and districts is greater than or equal to the second drop rate threshold value.Example Property, the first drop rate threshold value is 90%, and the second drop rate threshold value is 70%, when the power information acquisition system The channel drop rate that main website communicates with a urban district or counties and districts' power information acquisition terminal is less than 90%, and the power information is adopted The channel drop rate of one common carrier communication apparatus communication of collecting system main website and one urban district or counties and districts be more than or During equal to 70%, the fault type is the 5th fault type.
Step S103, according to the fault type generate the power information acquisition system master device malfunction elimination and Maintenance program, so that maintenance personal carries out malfunction elimination and repair to the power information acquisition system master device.
Specifically, the power information acquisition system master device includes:Communicate front server, the preposition service of acquisition Device, load-balancing device, acquisition fire wall, core switch and common carrier channel unit.
Further, it is described that the power information acquisition system master device is generated according to the fault type referring to Fig. 2 Malfunction elimination and maintenance program, for maintenance personal to the power information acquisition system master device carry out malfunction elimination and Repair is specially:
When the fault type is the Fisrt fault type, the power information acquisition system master device is generated Fisrt fault is investigated and maintenance program, so that the maintenance personal is preposition to the communication front server, the acquisition successively Server, the load-balancing device, the acquisition fire wall and the core switch carry out malfunction elimination and repair.
Optionally, when the Fisrt fault investigation and maintenance program for generating the power information acquisition system master device, Maintenance personal first carries out malfunction elimination and repair to the communication front server, and after repair, system is acquired by power information System obtains the channel that power information acquisition system main website communicates with information collecting device and goes offline information again, if described telecommunications ought be used The channel drop rate that breath acquisition system main website communicates at least one urban district or counties and districts' power information acquisition terminal reduces, and repairs people Member does not reexamine other power information acquisition system master devices and carries out malfunction elimination and repair, if when the power information is adopted Collecting system main website is not reduced with the channel drop rate that at least one urban district or counties and districts' power information acquisition terminal communicate, then is repaired Personnel continue successively to hand over the acquisition front server, the load-balancing device, the acquisition fire wall and the core It changes planes and carries out malfunction elimination and repair, until when the power information acquisition system main website and at least one urban district or counties and districts' electricity consumption The channel drop rate of information acquisition terminal communication reduces, and power information acquisition system main website communicates normally with information collecting device.
When the fault type is second fault type, the power information acquisition system master device is generated Second malfunction elimination and maintenance program, so that the maintenance personal is preposition to the communication front server, the acquisition successively Server, the load-balancing device, the acquisition fire wall and the core switch carry out malfunction elimination and repair.It is optional , when the maintenance personal successively sets the communication front server, the acquisition front server, the load balancing After standby, described acquisition fire wall and the core switch all carry out malfunction elimination and repair, if failure does not exclude, generate Second malfunction elimination and repair emergency plan, so that the maintenance personal is at least one of at least one urban district or counties and districts Common carrier communication equipment carries out malfunction elimination and repair.
When the fault type is the third fault type, the power information acquisition system master device is generated Third malfunction elimination and maintenance program, so that the maintenance personal leads to the channel drop rate more than the second drop rate threshold value Believe that operators communication equipment carries out malfunction elimination and repair.
Optionally, in the generation third fault type that power information acquisition system main website communicates with information collecting device, Maintenance personal leads to the channel drop rate more than the second drop rate threshold value according to the third malfunction elimination and maintenance program After believing that operators communication equipment carries out malfunction elimination and repair, power information acquisition system is obtained again by power information acquisition system The channel that communicates with information collecting device of system main website goes offline information, if the power information acquisition system main website communicates with one The channel drop rate of operators communication equipment communication reduces, and maintenance personal does not reexamine other power information acquisition system main websites and sets It is standby to carry out malfunction elimination and repair, if the power information acquisition system main website and a common carrier communication apparatus communication Channel drop rate do not reduce, continue to carry out which kind of failure is failure judgement belong to again according to the channel of the acquisition information that goes offline Type.
When the fault type is four fault type, the power information acquisition system master device is generated 4th malfunction elimination and maintenance program, so that the maintenance personal is preposition to the communication front server, the acquisition successively Server, the load-balancing device carry out malfunction elimination and repair.Optionally, when the fault type is the 4th failure During type, the maintenance personal successively sets the communication front server, the acquisition front server, the load balancing Standby to carry out malfunction elimination and repair, if failure does not exclude, the maintenance personal is successively to the acquisition fire wall and the core Heart interchanger carries out malfunction elimination and repair, if failure does not exclude still, generates the 4th malfunction elimination and quick-acting prescription is answered in repair Case, so that the maintenance personal carries out failure row at least one common carrier communication equipment in one urban district or counties and districts It looks into and repairs.
When the fault type is five fault type, the power information acquisition system master device is generated 5th malfunction elimination and maintenance program, so that the maintenance personal is more than the channel drop rate in one urban district or counties and districts the The common carrier communication equipment of two drop rate threshold values carries out malfunction elimination and repair.Optionally, if in malfunction elimination and dimension After repairing, obtain the channel that power information acquisition system main website communicates with information collecting device again by power information acquisition system and fall Line information is set if the power information acquisition system main website communicates with a common carrier in one urban district or counties and districts The channel drop rate of standby communication reduces, and maintenance personal does not reexamine other power information acquisition system master devices and carries out failure row It looks into and repairs, if the power information acquisition system main website communicates with a common carrier of one urban district or counties and districts The channel drop rate of equipment communication does not reduce, and continues to carry out which failure judgement belongs to again according to the channel of the acquisition information that goes offline A kind of fault type.
The malfunction elimination method of the communication channel of above-mentioned power information acquisition system, is obtained by power information acquisition system The channel that the power information acquisition system main website communicates with information collecting device goes offline information;It is gone offline information according to the channel Judge the fault type that the power information acquisition system main website communicates with described information collecting device;According to the fault type The malfunction elimination and maintenance program of the power information acquisition system master device are generated, so that maintenance personal uses telecommunications to described It ceases acquisition system main website equipment and carries out malfunction elimination and repair, realize when communication channel breaks down, real-time positioning failure Position shortens the time of investigation failure, loss is greatly reduced to user and company.
It should be understood that the size of the serial number of each step is not meant to the priority of execution sequence, each process in above-described embodiment Execution sequence should determine that the implementation process without coping with the embodiment of the present invention forms any limit with its function and internal logic It is fixed.
Embodiment two
Corresponding to the method for the malfunction elimination of the communication channel of the power information acquisition system described in foregoing embodiments one, figure The control device of the malfunction elimination of the communication channel of power information acquisition system provided in an embodiment of the present invention is shown in 3.For Convenient for explanation, part related to the present embodiment is illustrated only.
The device includes data obtaining module 110 and judgment module 120.
Data obtaining module 110, for obtaining the channel that power information acquisition system main website communicates with information collecting device Go offline information, and the channel information that goes offline is sent to judgment module 120.
Judgment module 120, for judging the power information acquisition system main website and institute according to the channel information that goes offline State the fault type of information collecting device communication;It is additionally operable to generate the power information acquisition system master according to the fault type The malfunction elimination and maintenance program of station equipment.
Optionally, data obtaining module 110 includes:First acquisition unit 111 and second acquisition unit 112.
First acquisition unit 111, for obtaining the power information acquisition system main website and at least one urban district or counties and districts The channel of power information acquisition terminal communication goes offline information.
Second acquisition unit 112, for obtaining the power information acquisition system main website and at least one common carrier The channel of communication apparatus communication goes offline information.
Above-mentioned control device obtains the power information acquisition system main website by data obtaining module 110 and is adopted with information The channel of collection equipment communication goes offline information;Judgment module 120 judges that the power information acquires according to the channel information that goes offline The fault type that system main website communicates with described information collecting device;The power information acquisition is generated according to the fault type The malfunction elimination and maintenance program of system master device, for maintenance personal to the power information acquisition system master device into Row malfunction elimination and repair are realized when communication channel breaks down, real-time fault location, shorten investigation failure Time greatly reduces loss to user and company.
Embodiment three
Fig. 4 is the control dress of the malfunction elimination of the communication channel of power information acquisition system provided by Embodiment 2 of the present invention Put 100 schematic diagram.As shown in figure 4, the control of the malfunction elimination of the communication channel of the power information acquisition system of the embodiment Device 100 includes:It processor 130, memory 140 and is stored in the memory 140 and can be on the processor 130 The computer program 141 of operation, such as the control program of the malfunction elimination of the communication channel of power information acquisition system.The place Reason device 130 realizes the failure of the communication channel of above-mentioned each power information acquisition system when performing the computer program 141 Step in the embodiment of the method for investigation, such as step S101 to S103 shown in FIG. 1.Alternatively, the processor 130 performs institute The function of each module/unit in above-mentioned each device embodiment, such as the He of module 110 shown in Fig. 3 are realized when stating computer program 141 The function of module 120.
Illustratively, the computer program 141 can be divided into one or more module/units, it is one or Multiple module/the units of person are stored in the memory 140, and are performed by the processor 130, to complete the present invention.Institute It can be the series of computation machine program instruction section that can complete specific function to state one or more module/units, the instruction segment For describing implementation procedure of the computer program 141 in the control device 100 of the PDF Word Inputs.It is for example, described Computer program 141 can be divided into data obtaining module and judgment module, and each module concrete function is as follows:
Data obtaining module goes offline for obtaining the channel that power information acquisition system main website communicates with information collecting device Information, and the channel information that goes offline is sent to judgment module.
Judgment module, for judging the power information acquisition system main website and the letter according to the channel information that goes offline Cease the fault type of collecting device communication;It is additionally operable to be set according to the fault type generation power information acquisition system main website Standby malfunction elimination and maintenance program.
Optionally, described information acquisition module includes:First acquisition unit and second acquisition unit.
The first acquisition unit, for obtaining the power information acquisition system main website and at least one urban district or counties and districts The channel of power information acquisition terminal communication goes offline information.
The second acquisition unit, for obtaining the power information acquisition system main website and at least one common carrier The channel of communication apparatus communication goes offline information.
The control device 100 of the malfunction elimination of the communication channel of the power information acquisition system can be that desktop calculates The computing devices such as machine, notebook, palm PC and cloud server.The failure of the communication channel of the power information acquisition system The control device 100 of investigation may include, but be not limited only to, processor 130, memory 140.Those skilled in the art can manage Solution, Fig. 4 is only the example of the control device 100 of the malfunction elimination of the communication channel of the power information acquisition system, not Form the restriction of the control device 100 to the malfunction elimination of the communication channel of the power information acquisition system, can include than It illustrates more or fewer components and either combines certain components or different components, such as the power information acquisition system The control device 100 of malfunction elimination of communication channel can also include input-output equipment, network access equipment, bus etc..
Alleged processor 130 can be central processing unit (Central Processing Unit, CPU), can also be Other general processors, digital signal processor (Digital Signal Processor, DSP), application-specific integrated circuit (Application Specific Integrated Circuit, ASIC), ready-made programmable gate array (Field- Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic, Discrete hardware components etc..General processor can be microprocessor or the processor can also be any conventional processor Deng.
The memory 140 can be the control device of the malfunction elimination of the communication channel of the power information acquisition system 100 internal storage unit, such as the hard disk of the control device 100 of the malfunction elimination of the communication channel of power information acquisition system Or memory.The memory 140 can also be the control dress of the malfunction elimination of the communication channel of the power information acquisition system Put 100 External memory equipment, such as the control device 100 of the malfunction elimination of the communication channel of the power information acquisition system The plug-in type hard disk of upper outfit, intelligent memory card (Smart Media Card, SMC), secure digital (Secure Digital, SD) block, flash card (Flash Card) etc..Further, the memory 140 can also both include power information acquisition The internal storage unit of the control device 100 of the malfunction elimination of the communication channel of system also includes External memory equipment.It is described to deposit Reservoir 140 is used to store the control of the malfunction elimination of the communication channel of the computer program and the power information acquisition system Other programs and data needed for device 100 processed.The memory 140, which can be also used for temporarily storing, to have exported or has incited somebody to action The data to be exported.
It is apparent to those skilled in the art that for convenience of description and succinctly, only with above-mentioned each work( Can unit, module division progress for example, in practical application, can be as needed and by above-mentioned function distribution by different Functional unit, module are completed, i.e., the internal structure of described device are divided into different functional units or module, more than completion The all or part of function of description.Each functional unit, module in embodiment can be integrated in a processing unit, also may be used To be that each unit is individually physically present, can also two or more units integrate in a unit, it is above-mentioned integrated The form that hardware had both may be used in unit is realized, can also be realized in the form of SFU software functional unit.In addition, each function list Member, the specific name of module are not limited to the protection domain of the application also only to facilitate mutually distinguish.Above system The specific work process of middle unit, module can refer to the corresponding process in preceding method embodiment, and details are not described herein.
In the above-described embodiments, it all emphasizes particularly on different fields to the description of each embodiment, is not described in detail or remembers in some embodiment The part of load may refer to the associated description of other embodiments.
Those of ordinary skill in the art may realize that each exemplary lists described with reference to the embodiments described herein Member and algorithm steps can be realized with the combination of electronic hardware or computer software and electronic hardware.These functions are actually It is performed with hardware or software mode, specific application and design constraint depending on technical solution.Professional technician Described function can be realized using distinct methods to each specific application, but this realization is it is not considered that exceed The scope of the present invention.
In embodiment provided by the present invention, it should be understood that disclosed device/terminal device and method, it can be with It realizes by another way.For example, device described above/terminal device embodiment is only schematical, for example, institute The division of module or unit is stated, only a kind of division of logic function can have other dividing mode in actual implementation, such as Multiple units or component may be combined or can be integrated into another system or some features can be ignored or does not perform.Separately A bit, shown or discussed mutual coupling or direct-coupling or communication connection can be by some interfaces, device Or the INDIRECT COUPLING of unit or communication connection, can be electrical, machinery or other forms.
The unit illustrated as separating component may or may not be physically separate, be shown as unit The component shown may or may not be physical unit, you can be located at a place or can also be distributed to multiple In network element.Some or all of unit therein can be selected according to the actual needs to realize the mesh of this embodiment scheme 's.
In addition, each functional unit in each embodiment of the present invention can be integrated in a processing unit, it can also That each unit is individually physically present, can also two or more units integrate in a unit.Above-mentioned integrated list The form that hardware had both may be used in member is realized, can also be realized in the form of SFU software functional unit.
If the integrated module/unit realized in the form of SFU software functional unit and be independent product sale or In use, it can be stored in a computer read/write memory medium.Based on such understanding, the present invention realizes above-mentioned implementation All or part of flow in example method, can also instruct relevant hardware to complete, the meter by computer program Calculation machine program can be stored in a computer readable storage medium, the computer program when being executed by processor, it can be achieved that on The step of stating each embodiment of the method..Wherein, the computer program includes computer program code, the computer program Code can be source code form, object identification code form, executable file or certain intermediate forms etc..Computer-readable Jie Matter can include:Can carry the computer program code any entity or device, recording medium, USB flash disk, mobile hard disk, Magnetic disc, CD, computer storage, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium etc..It is it should be noted that described The content that computer-readable medium includes can carry out appropriate increasing according to legislation in jurisdiction and the requirement of patent practice Subtract, such as in certain jurisdictions, according to legislation and patent practice, computer-readable medium does not include electric carrier signal and electricity Believe signal.
Embodiment described above is merely illustrative of the technical solution of the present invention, rather than its limitations;Although with reference to aforementioned reality Example is applied the present invention is described in detail, it will be understood by those of ordinary skill in the art that:It still can be to aforementioned each Technical solution recorded in embodiment modifies or carries out equivalent replacement to which part technical characteristic;And these are changed Or replace, the spirit and scope for various embodiments of the present invention technical solution that it does not separate the essence of the corresponding technical solution should all It is included within protection scope of the present invention.

Claims (10)

  1. A kind of 1. malfunction elimination method based on power information acquisition system, which is characterized in that including:
    The channel that the power information acquisition system main website communicates with information collecting device is obtained by power information acquisition system Go offline information;
    Judge what the power information acquisition system main website communicated with described information collecting device according to the channel information that goes offline Fault type;
    The malfunction elimination and maintenance program of the power information acquisition system master device are generated according to the fault type, for Maintenance personal carries out malfunction elimination and repair to the power information acquisition system master device.
  2. 2. the malfunction elimination method based on power information acquisition system as described in claim 1, which is characterized in that the electricity consumption Information acquisition system obtains the channel that the power information acquisition system main website communicates with the information collecting device information that goes offline:
    The power information acquisition system obtains the power information acquisition system main website and at least one urban district or counties and districts' electricity consumption The channel drop rate of information acquisition terminal communication;
    The power information acquisition system obtains the power information acquisition system main website and communicates with an at least common carrier The channel drop rate of equipment communication.
  3. 3. the malfunction elimination method based on power information acquisition system as claimed in claim 2, which is characterized in that the basis The channel information that goes offline judges the fault type that the power information acquisition system main website communicates with described information collecting device For:
    When the channel that the power information acquisition system main website communicates at least one urban district or counties and districts' power information acquisition terminal When drop rate is greater than or equal to the first drop rate threshold value, the fault type is Fisrt fault type;
    When the channel that the power information acquisition system main website communicates at least one urban district or counties and districts' power information acquisition terminal Drop rate is less than the first drop rate threshold value, and the power information acquisition system main website communicates with an at least common carrier and sets When the channel drop rate of standby communication is respectively less than the second drop rate threshold value, the fault type is the second fault type;
    When the channel that the power information acquisition system main website communicates at least one urban district or counties and districts' power information acquisition terminal Drop rate is less than the first drop rate threshold value, and the power information acquisition system main website leads to a common carrier communication equipment When the channel drop rate of letter is greater than or equal to the second drop rate threshold value, the fault type is third fault type;
    When the power information acquisition system main website goes offline with the channel that a urban district or counties and districts' power information acquisition terminal communicate Rate is greater than or equal to the first drop rate threshold value, and the power information acquisition system main website and one urban district or counties and districts are extremely When the channel drop rate of a few common carrier communication apparatus communication is respectively less than the second drop rate threshold value, the fault type is 4th fault type;
    When the power information acquisition system main website goes offline with the channel that a urban district or counties and districts' power information acquisition terminal communicate Rate is less than the first drop rate threshold value, and one of the power information acquisition system main website and one urban district or counties and districts communicates When the channel drop rate of operators communication equipment communication is greater than or equal to the second drop rate threshold value, the fault type is the 5th event Hinder type.
  4. 4. the malfunction elimination method based on power information acquisition system as claimed in claim 3, which is characterized in that the electricity consumption Information acquisition system master device includes:Communicate front server, acquisition front server, load-balancing device, acquisition fire prevention Wall, core switch and common carrier channel unit.
  5. 5. the malfunction elimination method based on power information acquisition system as claimed in claim 4, which is characterized in that the basis The fault type generates the malfunction elimination and maintenance program of the power information acquisition system master device, for maintenance personal Malfunction elimination is carried out to the power information acquisition system master device and repair is specially:
    When the fault type is the Fisrt fault type, the first of the power information acquisition system master device is generated Malfunction elimination and maintenance program, so that the maintenance personal is successively to the communication front server, the preposition service of acquisition Device, the load-balancing device, the acquisition fire wall and the core switch carry out malfunction elimination and repair;
    When the fault type is second fault type, the second of the power information acquisition system master device is generated Malfunction elimination and maintenance program, so that the maintenance personal is successively to the communication front server, the preposition service of acquisition Device, the load-balancing device, the acquisition fire wall and the core switch carry out malfunction elimination and repair;
    When the fault type is the third fault type, the third of the power information acquisition system master device is generated Malfunction elimination and maintenance program, so that the communication that the maintenance personal is more than the channel drop rate the second drop rate threshold value is transported It seeks quotient's communication equipment and carries out malfunction elimination and repair;
    When the fault type is four fault type, the 4th of the power information acquisition system master device is generated Malfunction elimination and maintenance program, so that the maintenance personal is successively to the communication front server, the preposition service of acquisition Device, the load-balancing device carry out malfunction elimination and repair;
    When the fault type is five fault type, the 5th of the power information acquisition system master device is generated Malfunction elimination and maintenance program, so that the maintenance personal falls the channel drop rate in one urban district or counties and districts more than second The common carrier communication equipment of line rate threshold value carries out malfunction elimination and repair.
  6. 6. the malfunction elimination method based on power information acquisition system as claimed in claim 5, which is characterized in that the method It further includes:
    When the fault type is second fault type, in the maintenance personal successively to the preposition service of communication Device, the acquisition front server, the load-balancing device, the acquisition fire wall and the core switch carry out failure After investigation and repair, if failure does not exclude, the second malfunction elimination and repair emergency plan are generated, for the maintenance personal Malfunction elimination and repair are carried out at least one common carrier communication equipment at least one urban district or counties and districts;
    When the fault type is four fault type, in the maintenance personal successively to the preposition service of communication After device, the acquisition front server, the load-balancing device carry out malfunction elimination and repair, if failure does not exclude, institute It states maintenance personal and malfunction elimination and repair is carried out to the acquisition fire wall and the core switch successively;If failure is not arranged Remove, then generate the 4th malfunction elimination and repair emergency plan, for the maintenance personal to one urban district or counties and districts extremely A few common carrier communication equipment carries out malfunction elimination and repair.
  7. 7. a kind of device of the malfunction elimination based on power information acquisition system, which is characterized in that including:
    Data obtaining module goes offline letter for obtaining the channel that power information acquisition system main website communicates with information collecting device Breath, and the channel information that goes offline is sent to judgment module;
    The judgment module, for judging the power information acquisition system main website and the letter according to the channel information that goes offline The fault type of collecting device communication is ceased, is additionally operable to be set according to the fault type generation power information acquisition system main website Standby malfunction elimination and maintenance program.
  8. 8. the device of the malfunction elimination based on power information acquisition system as claimed in claim 7, which is characterized in that the letter Breath acquisition module includes:First acquisition unit and second acquisition unit;
    The first acquisition unit, for obtaining the power information acquisition system main website and at least one urban district or counties and districts' electricity consumption The channel of information acquisition terminal communication goes offline information;
    The second acquisition unit communicates for obtaining the power information acquisition system main website at least one common carrier The channel of equipment communication goes offline information.
  9. 9. a kind of control device of the malfunction elimination based on power information acquisition system, including memory, processor and storage In the memory and the computer program that can run on the processor, which is characterized in that the processor performs institute It is realized when stating computer program such as the step of any one of claim 1 to 6 the method.
  10. 10. a kind of computer readable storage medium, the computer-readable recording medium storage has computer program, and feature exists In when the computer program is executed by processor the step of realization such as any one of claim 1 to 6 the method.
CN201711293705.7A 2017-12-08 2017-12-08 Troubleshooting method and device for communication channel of electricity utilization information acquisition system Active CN108183814B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711293705.7A CN108183814B (en) 2017-12-08 2017-12-08 Troubleshooting method and device for communication channel of electricity utilization information acquisition system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711293705.7A CN108183814B (en) 2017-12-08 2017-12-08 Troubleshooting method and device for communication channel of electricity utilization information acquisition system

Publications (2)

Publication Number Publication Date
CN108183814A true CN108183814A (en) 2018-06-19
CN108183814B CN108183814B (en) 2020-12-08

Family

ID=62545712

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711293705.7A Active CN108183814B (en) 2017-12-08 2017-12-08 Troubleshooting method and device for communication channel of electricity utilization information acquisition system

Country Status (1)

Country Link
CN (1) CN108183814B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112148463A (en) * 2020-10-23 2020-12-29 新华三大数据技术有限公司 Business process control method and device
CN112578222A (en) * 2020-11-27 2021-03-30 国网山东省电力公司济宁供电公司 Power distribution terminal off-line detection method, system and platform
CN113259427A (en) * 2021-05-08 2021-08-13 德微电技术(深圳)有限公司 System fault rapid troubleshooting method and device and computer equipment
WO2021196521A1 (en) * 2020-04-02 2021-10-07 深圳市国电科技通信有限公司 Remote operation and maintenance management system and method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040208507A1 (en) * 2002-01-21 2004-10-21 Ross Saunders Network diagnostic tool for an optical transport network
CN102156447A (en) * 2010-12-03 2011-08-17 中冶南方工程技术有限公司 Basic automation-based plant-level equipment management and alarming system and method
CN104360208A (en) * 2014-12-05 2015-02-18 国家电网公司 Acquisition failure analyzing and processing method of electricity utilization information acquisition operating and maintaining system
CN105207822A (en) * 2015-10-14 2015-12-30 国网四川省电力公司信息通信公司 Electric power communication equipment alarm information processing method and device
CN105450448A (en) * 2015-11-30 2016-03-30 国网冀北电力有限公司信息通信分公司 Failure analysis method and device based on power communication network
CN106789646A (en) * 2016-12-09 2017-05-31 国网北京市电力公司 Service transmission path determines method and device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040208507A1 (en) * 2002-01-21 2004-10-21 Ross Saunders Network diagnostic tool for an optical transport network
CN102156447A (en) * 2010-12-03 2011-08-17 中冶南方工程技术有限公司 Basic automation-based plant-level equipment management and alarming system and method
CN104360208A (en) * 2014-12-05 2015-02-18 国家电网公司 Acquisition failure analyzing and processing method of electricity utilization information acquisition operating and maintaining system
CN105207822A (en) * 2015-10-14 2015-12-30 国网四川省电力公司信息通信公司 Electric power communication equipment alarm information processing method and device
CN105450448A (en) * 2015-11-30 2016-03-30 国网冀北电力有限公司信息通信分公司 Failure analysis method and device based on power communication network
CN106789646A (en) * 2016-12-09 2017-05-31 国网北京市电力公司 Service transmission path determines method and device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021196521A1 (en) * 2020-04-02 2021-10-07 深圳市国电科技通信有限公司 Remote operation and maintenance management system and method
CN112148463A (en) * 2020-10-23 2020-12-29 新华三大数据技术有限公司 Business process control method and device
CN112148463B (en) * 2020-10-23 2023-07-21 新华三大数据技术有限公司 Business process control method and device
CN112578222A (en) * 2020-11-27 2021-03-30 国网山东省电力公司济宁供电公司 Power distribution terminal off-line detection method, system and platform
CN113259427A (en) * 2021-05-08 2021-08-13 德微电技术(深圳)有限公司 System fault rapid troubleshooting method and device and computer equipment

Also Published As

Publication number Publication date
CN108183814B (en) 2020-12-08

Similar Documents

Publication Publication Date Title
CN102084569B (en) Method and system for managing a power grid
CN108183814A (en) The malfunction elimination method and apparatus of the communication channel of power information acquisition system
CN109241772B (en) Invoice block chain recording method, invoice block chain recording device, block chain gateway server and invoice block chain recording medium
CN103617561A (en) System and method for evaluating state of secondary device of power grid intelligent substation
CN104123134A (en) Intelligent electricity use data management method and system based on AMI and J2EE
CN107392502A (en) Management method, managing device and the terminal device of electric power apparatus examination
CN106771448A (en) A kind of electric energy meter shunting anti-electricity-theft early warning analysis method of analysis
WO2018210028A1 (en) Energy information system, and method and device for processing energy information
CN104601723A (en) Power marketing management system SOA framework based on internal service bus
CN109299846A (en) A kind of nuclear power plant equipment analysis method for reliability, system and terminal device
CN108171362A (en) Power supply facilities breakdown repair method, system and terminal device
CN108268383A (en) Automatic addressing and data distributing method, device, main control device, from control equipment and computer readable storage medium
CN109447496A (en) Electricity stealing determination method and terminal device
CN109064104A (en) Material equipment management method, system and terminal device
Peng et al. Risk-limiting unit commitment in smart grid with intelligent periphery
CN109450089B (en) Transformer area low voltage identification method and device and terminal equipment
CN112307003A (en) Power grid data multidimensional auxiliary analysis method, system, terminal and readable storage medium
CN106447209A (en) Determination method and device for evaluation factor of power distribution network project
CN107609797A (en) Electric operating checking method and terminal device
CN108228785A (en) The check method and check device of device parameter
CN108072858A (en) Electric energy meter method for quality control, system and terminal device
CN111756760B (en) User abnormal behavior detection method based on integrated classifier and related equipment
CN106771570A (en) One kind is based on information-based statistics electrical energy system
CN107909350A (en) High-tension electricity user defect management method, system and terminal device
CN115471215A (en) Business process processing method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 050011 no.238, TIYU South Street, Shijiazhuang City, Hebei Province

Patentee after: STATE GRID HEBEI ELECTRIC POWER Research Institute

Patentee after: STATE GRID CORPORATION OF CHINA

Patentee after: STATE GRID HEBEI ENERGY TECHNOLOGY SERVICE Co.,Ltd.

Address before: 050011 no.238, TIYU South Street, Shijiazhuang City, Hebei Province

Patentee before: ELECTRIC POWER RESEARCH INSTITUTE, STATE GRID HEBEI ELECTRIC POWER SUPPLY Co.,Ltd.

Patentee before: State Grid Corporation of China

Patentee before: STATE GRID HEBEI ENERGY TECHNOLOGY SERVICE Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211012

Address after: 050021 No. 238 South Sports street, Hebei, Shijiazhuang

Patentee after: STATE GRID HEBEI ELECTRIC POWER Research Institute

Patentee after: Marketing service center of State Grid Hebei Electric Power Co.,Ltd.

Patentee after: STATE GRID CORPORATION OF CHINA

Patentee after: STATE GRID HEBEI ENERGY TECHNOLOGY SERVICE Co.,Ltd.

Address before: 050011 no.238, TIYU South Street, Shijiazhuang City, Hebei Province

Patentee before: STATE GRID HEBEI ELECTRIC POWER Research Institute

Patentee before: STATE GRID CORPORATION OF CHINA

Patentee before: STATE GRID HEBEI ENERGY TECHNOLOGY SERVICE Co.,Ltd.