CN109066459A CN201810956265.7A CN201810956265A CN109066459A CN 109066459 A CN109066459 A CN 109066459A CN 201810956265 A CN201810956265 A CN 201810956265A CN 109066459 A CN109066459 A CN 109066459A
Authority
CN
China
Prior art keywords
industrial personal
personal computer
cable
set casing
electrically connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810956265.7A
Other languages
Chinese (zh)
Inventor
陈二东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810956265.7A priority Critical patent/CN109066459A/en
Publication of CN109066459A publication Critical patent/CN109066459A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/16Devices for removing snow or ice from lines or cables

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The present invention relates to technical field of power rush-repair, specifically a kind of power transmission line pipeline quick-speed first-aid repair method, method includes the following steps: S1, is removed the ice cube on electric wire using cable deicing device;S2 removes the ice cube on power tower by manually tapping on the basis of S1;S3 replaces the fuse in substation while S1 and S2 works, and after the completion of the work of S1 and S2, the circuit in substation is closed a floodgate, circuit is connected, to realize energization.This method realizes the removal to the ice sheet on electric wire by means of unmanned plane, has first-aid repair efficiency fast, the feature that work efficiency is high, easy to operate.

Description

A kind of power transmission line pipeline quick-speed first-aid repair method
Technical field
The present invention relates to technical field of power rush-repair, specifically a kind of power transmission line pipeline quick-speed first-aid repair method.
Background technique
UAV is to utilize radio robot and the process control provided for oneself referred to as " unmanned plane " (" UAV ") The not manned vehicle of device manipulation, unmanned plane are widely used in police, city management, agricultural, geology, meteorology, electric power, speedily carry out rescue work The industries such as the disaster relief, video capture, unmanned plane Electric Power Line Overhaul are exactly the cable that can't see using unmanned plane observer's eyesight, hair It is manually overhauled after the route damage of existing cable.
However traditional high-altitude Electric Power Line Overhaul device based on unmanned plane is all to cooperate camera pair using unmanned plane Dry weather cable surface carries out inspection and maintenance, in winter the snow long-time on some severe cold area heavy snow weather cables Not melting causes to freeze, if without checking and maintenance causes cable and wire to break influences the normal power supplies such as resident.
Summary of the invention
For the problems of the prior art, the present invention provides a kind of power transmission line pipeline quick-speed first-aid repair method, this method The removal to the ice sheet on electric wire is realized by means of unmanned plane, has first-aid repair efficiency fast, the spy that work efficiency is high, easy to operate Point.
The technical solution adopted by the present invention to solve the technical problems is: a kind of power transmission line pipeline quick-speed first-aid repair method, Method includes the following steps:
S1 is removed the ice cube on electric wire using cable deicing device;
S2 removes the ice cube on power tower by manually tapping on the basis of S1;
S3 replaces the fuse in substation while S1 and S2 works, and the work to S1 and S2 is completed Afterwards, the circuit in substation is closed a floodgate, circuit is connected, to realize energization;
The cable deicing device that this method uses includes unmanned plane, battery, industrial personal computer, camera, bindiny mechanism, power supply Line, heating mechanism, open-and-close mechanism and fixed mechanism;It is used to support one of sidewall weld of the whole supporting mechanism For placing the placement mechanism of the foot of user, the bottom installation of the unmanned plane for inspection cable run is used for Control receives, sends signal and handles the industrial personal computer of data, and the top of the industrial personal computer is installed for providing the institute of electric power Battery is stated, the industrial personal computer and the battery are electrically connected, and the industrial personal computer and the unmanned plane are electrically connected, the work The camera be electrically connected with the industrial personal computer, for checking power circuit, institute are installed at the bottom edge of control machine The bottom for stating industrial personal computer is equipped with rotatable bindiny mechanism, and the bottom of the bindiny mechanism is equipped in winter by cable meter The ice melting heating mechanism in face, the heating mechanism is electrically connected by the power supply line and the industrial personal computer, described The lower rotation of heating mechanism is connected with the fixed mechanism of the " U "-shaped structure in cross section, the fixed mechanism and the work Control machine is electrically connected, one end of the fixed mechanism be equipped with it is walking for realizing the fixed mechanism in cable, by cable The open-and-close mechanism that the nilas on line surface is wiped off, the open-and-close mechanism and the industrial personal computer are electrically connected.
Specifically, the bindiny mechanism includes fixed column, connector, pull rod, mounting post and spring, the bottom of the industrial personal computer Portion is fixedly connected with the fixed column, and the lower rotation connection side of the fixed column is in the connector of " mouth " character form structure, The lower rotation connection section of the connector is in the pull rod of inverse-T-shaped structure, and the pull rod is slidably connected to hollow circle The inside of the mounting post of column construction, the surface wrap of the pull rod inside the mounting post are used for damping, keep away Exempt to draw the spring of bad cable, if the heating mechanism walking is on the surface of the cable at work, cable surface not Usually, the spring contraction can avoid the unmanned plane and draw bad cable in flight.
Specifically, the heating mechanism includes set casing, several first heating sheets, the second heating sheet and two mounting plates, The bottom of the mounting post is fixedly connected with the set casing that side is in arc structure, and the inner top surface of the set casing is stepped Be mounted equidistant it is being electrically connected with several industrial personal computers, be arc-shaped for dissolve the nilas of cable surface, side First heating sheet of structure, the diameters of several first heating sheets, thickness are once from one end of set casing to the other end Successively decrease, the bottom of the set casing is fixedly connected with two mounting plates in rectangular parallelepiped structure, the bottom of two mounting plates Portion is equipped with second heating sheet that the secondary nilas by cable surface melts, and first heating sheet, described second add Backing and the industrial personal computer are electrically connected, and when unmanned plane is in flight, the industrial personal computer is by first heating sheet, described second It is ice melting on heating sheet connection realization cable, it avoids the overweight cable of ice cube that property occurs and becomes, cause to be broken, influence to supply Electricity.
Specifically, the fixed mechanism includes electric pushrod, shaft, fixed plate, sliding slot and sliding block, the set casing and institute It states and is rotatablely connected between the fixed plate of the " U "-shaped structure in cross section by the shaft, the sidewall symmetry of the set casing The electric pushrod is installed, one end of the electric pushrod is rotationally connected with the surface of the sliding block, the electric pushrod and institute Industrial personal computer electric connection is stated, the sliding block is slidably connected to the inside of the sliding slot of the fixed plate side, the set casing, Structure triangular in shape between the electric pushrod and the fixed plate, the set casing cable uplink until then will be described Open-and-close mechanism is opened, engages the fixed plate by the electric pushrod with the set casing, realizes the set casing and exists It walks on cable.
It scrapes slab, two gag lever posts, two screw rods, two placement plates specifically, the open-and-close mechanism includes two and watches Motor is taken, the relatively fixed connection in the company side of the fixed plate is used to install the placement plate of two servo motors, The servo motor and the industrial personal computer are electrically connected, and one end of two servo motors is relatively fixed to connect the screw rod, Two screw rods are threadedly coupled through the inside of the fixed plate with the slab of scraping, and the inner sidewall of the fixed plate is relatively solid Surely two gag lever posts connected are scraped slab and are rotated on the relative inner wall of the fixed plate respectively described in two Slab conflict is scraped on the surface of the gag lever post described in two, in the set casing by the servo motor before cable walking Rotated counterclockwise by the industrial personal computer, realize two described in scrape slab open by cable be wrapped in set casing and fixed plate it Between after, the servo motor is rotated clockwise to scrape slab described in realization two and close and wipes the ice cube not melted off.
Specifically, the arc-shaped structure in the top for scraping slab, is in triangle between two gag lever posts, the screw rod Shape distribution, when the servo motor rotates the screw rod, the slab of scraping passes through the gag lever post limit realization silk Bar rotation is scraped described slab and is moved back and forth in the inner sidewall of the fixed plate.
Beneficial effects of the present invention:
(1) a kind of power transmission line pipeline quick-speed first-aid repair method of the present invention, the cable deicing device that this method uses The bottom of industrial personal computer be equipped with bindiny mechanism, when encountering uneven cable during unmanned plane during flying, mounting post it is interior Portion's spring contraction can avoid unmanned plane follow-on mission and break cable.
(2) a kind of power transmission line pipeline quick-speed first-aid repair method of the present invention, the cable deicing device that this method uses The bottom of mounting post be fixedly connected with the set casing of the arc-shaped structure in section, the equidistant stepped installation first in the top of set casing Heating sheet, and the diameter of several first heating sheets successively decreases from one end of set casing to one end of camera, increases the first heating Piece is to the area of the nilas heating on cable surface, and faster, the bottom symmetrical of set casing is fixedly connected the speed for melting nilas The inner sidewall of two mounting plates, mounting plate installs the second heating sheet, increases nilas melting speed, avoiding cable from breaking causes It is unable to normal power supply.
(3) a kind of power transmission line pipeline quick-speed first-aid repair method of the present invention, the cable deicing device that this method uses Set casing and fixed plate by shaft be rotatablely connected, positioned at set casing side wall fill electric pushrod, open-and-close mechanism close after Cable is located at set casing and scrapes between slab, will scrape not melted for slab and cable bottom by the contraction of electric pushrod Full nilas contradicts, and comprehensive deicing prevents from breaking.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 is the structural schematic diagram for the cable deicing device that this method uses;
Fig. 2 is bindiny mechanism's schematic diagram shown in FIG. 1;
Fig. 3 is the portion A structure enlarged structure schematic diagram shown in FIG. 1;
Fig. 4 is heating mechanism schematic diagram shown in Fig. 3.
Fig. 5 is fixed plate shown in Fig. 3, open-and-close mechanism connection schematic diagram.
In figure: 1, unmanned plane, 2, battery, 3, industrial personal computer, 4, camera, 5, bindiny mechanism, 51, fixed column, 52, connection Head, 53, pull rod, 54, mounting post, 55, spring, 6, power supply line, 7, heating mechanism, 71, set casing, the 72, first heating sheet, 73, Second heating sheet, 74, mounting plate, 8, open-and-close mechanism, 81, scrape slab, 82, gag lever post, 83, screw rod, 84, placement plate, 85, servo Motor, 9, fixed mechanism, 91, electric pushrod, 92, shaft, 93, fixed plate, 94, sliding slot, 95, sliding block.
Specific embodiment
In order to be easy to understand the technical means, the creative features, the aims and the efficiencies achieved by the present invention, tie below Specific embodiment is closed, the present invention is further explained.
As shown in figures 1 and 3, a kind of power transmission line pipeline quick-speed first-aid repair method of the present invention, this method includes following Step:
S1 is removed the ice cube on electric wire using cable deicing device;
S2 removes the ice cube on power tower by manually tapping on the basis of S1;
S3 replaces the fuse in substation while S1 and S2 works, and the work to S1 and S2 is completed Afterwards, the circuit in substation is closed a floodgate, circuit is connected, to realize energization;
The cable deicing device that this method uses includes unmanned plane 1, battery 2, industrial personal computer 3, camera 4, bindiny mechanism 5, power supply line 6, heating mechanism 7, open-and-close mechanism 8 and fixed mechanism 9;It is used to support the whole supporting mechanism 6 wherein One sidewall weld is used to place the placement mechanism 7 of the foot of user, the unmanned plane 1 for inspection cable run Bottom installation for controlling, receiving, sending signal and handle the industrial personal computer 3 of data, the top of the industrial personal computer 3 is installed For providing the battery 2 of electric power, the industrial personal computer 3 is electrically connected with the battery 2, the industrial personal computer 3 with it is described Unmanned plane 1 is electrically connected, be equipped at the bottom edge of the industrial personal computer 1 it is being electrically connected with the industrial personal computer 1, for checking The camera 4 of power circuit, the bottom of the industrial personal computer 3 are equipped with rotatable bindiny mechanism 5, the bindiny mechanism 5 Bottom be equipped with for the heating mechanism 7 that cable surface is ice melting in winter, the heating mechanism 7 passes through the electricity Source line 6 and the industrial personal computer 3 are electrically connected, and the lower rotation of the heating mechanism 7 is connected with the institute of the " U "-shaped structure in cross section Fixed mechanism 9 is stated, the fixed mechanism 9 is electrically connected with the industrial personal computer 3, and one end of the fixed mechanism 9, which is equipped with, to be used for Realize the open-and-close mechanism 8 that the fixed mechanism 9 is walked in cable, wiping the nilas on cable surface off, the folding Mechanism 8 and the industrial personal computer 3 are electrically connected.
Specifically, as shown in Figure 1, Figure 2 and Figure 3, a kind of power transmission line pipeline quick-speed first-aid repair method of the present invention is described Bindiny mechanism 5 includes fixed column 51, connector 52, pull rod 53, mounting post 54 and spring 55, and the bottom of the industrial personal computer 3 is fixed The fixed column 51 is connected, the lower rotation connection side of the fixed column 51 is in the connector 52 of " mouth " character form structure, The lower rotation connection section of the connector 52 is in the pull rod 53 of inverse-T-shaped structure, and the pull rod 53 is slidably connected to The inside of the mounting post 54 of hollow cylindrical structure, the surface wrap of the pull rod 53 inside the mounting post 54 For damping, the spring 55 for avoiding drawing bad cable, if the walking of heating mechanism 7 is on the surface of the cable at work, When being cable uneven surface, the contraction of spring 55 can avoid the unmanned plane 1 and draw bad cable in flight.
Specifically, a kind of power transmission line pipeline quick-speed first-aid repair method of the present invention is described shown in as shown in Figure 1, Figure 3 and Figure 4 Heating mechanism 7 includes set casing 71, several first heating sheets 72, the second heating sheet 73 and two mounting plates 74, the mounting post 54 bottom is fixedly connected with the set casing 71 that side is in arc structure, and the inner top surface of the set casing 71 is stepped equidistant Be equipped with it is being electrically connected with several industrial personal computers 3, be a circular-arc structure for dissolve the nilas of cable surface, side First heating sheet 72, the diameters of several first heating sheets, thickness are once from one end of set casing 71 to the other end Successively decrease, the bottom of the set casing 71 is fixedly connected with two mounting plates 74 in rectangular parallelepiped structure, two mounting plates 74 bottom is equipped with second heating sheet 73 that the secondary nilas by cable surface melts, first heating sheet 72, Second heating sheet 73 is electrically connected with the industrial personal computer 3, and when unmanned plane 1 is in flight, the industrial personal computer 3 is by described first It is ice melting on heating sheet 72, second heating sheet 73 connection realization cable, avoid the overweight cable of ice cube that property occurs Become, causes to be broken, influence to power.
Specifically, as shown in figure 3, a kind of power transmission line pipeline quick-speed first-aid repair method of the present invention, the fixed mechanism 9 Including electric pushrod 91, shaft 92, fixed plate 93, sliding slot 94 and sliding block 95, the set casing 71 and the cross section are " U "-shaped It is rotatablely connected between the fixed plate 93 of structure by the shaft 92, the sidewall symmetry of the set casing 71 installs the electricity Dynamic push rod 91, one end of the electric pushrod 91 are rotationally connected with the surface of the sliding block 95, the electric pushrod 91 with it is described Industrial personal computer 3 is electrically connected, and the sliding block 95 is slidably connected to the inside of the sliding slot 94 of 93 side of fixed plate, described solid Structure triangular in shape between shell 71, the electric pushrod 91 and the fixed plate 93 is determined, in the set casing 71 on cable The open-and-close mechanism 8 is opened before walking, blocks the fixed plate 93 by the electric pushrod 91 with the set casing 71 It closes, realizes the set casing 71 and walk on cable.
Specifically, as shown in Figure 1 and Figure 5, a kind of power transmission line pipeline quick-speed first-aid repair method of the present invention, the folding Mechanism 8 includes two and scrapes 83, two placement plates 84 of the screw rod of gag lever post 82, two of slab 81, two and servo motor 85, described solid The relatively fixed connection in the company side of fixed board 93 is for installing the placement plate 84 of two servo motors 85, the servo Motor 85 and the industrial personal computer 3 are electrically connected, the relatively fixed connection screw rod 83 in one end of two servo motors 85, and two A screw rod 83 is threadedly coupled through the inside of the fixed plate 93 with the slab 81 of scraping, the inner sidewall of the fixed plate 93 Two gag lever posts 82 of relatively fixed connection, scrape slab 81 and rotate in the phase positioned at the fixed plate 93 respectively described in two To the surface of the gag lever post 82 on inner sidewall, the conflict of slab 81 is scraped described in two, in the set casing 71 in cable row The servo motor 85 is rotated counterclockwise by the industrial personal computer 3 before walking, slab 81 is scraped described in realization two and is opened cable After line is wrapped between set casing 71 and fixed plate 93, the servo motor 85 is rotated clockwise and scrapes slab described in realization two The ice cube not melted is wiped in 81 closings off.
Specifically, as shown in figure 5, a kind of power transmission line pipeline quick-speed first-aid repair method of the present invention, described to scrape slab 81 The arc-shaped structure in top, distribution triangular in shape between two gag lever posts 82, the screw rod 83, in the servo motor 93 when rotating the screw rod 83, described to scrape slab 81 and realize that the screw rod 83 rotation be described by the gag lever post 82 limit The inner sidewall that slab 81 is scraped in the fixed plate 93 moves back and forth.
Industrial personal computer 3, battery 2 are electrically connected first, the opening of electric pushrod 91 is controlled by industrial personal computer 3, passes through industry control Machine 3, which controls servo motor 85 and rotates counterclockwise, to be scraped slab 81 for two and opens, and unmanned plane 1 is controlled by remote control machine to cable Top, set casing 71 is hanging in the surface of the cable of icing, by electric pushrod 91 close realize fixed plate 93 with Set casing 71 engages, and the first heating sheet 72 and the second heating sheet 73 are further powered on to the walking of cooperation unmanned plane 1, will The nilas on cable surface melts, and servo motor 85 is rotated clockwise, and gag lever post is to scraping slab 81 after screw rod 83 rotates synchronously It is limited, realizes the engaging that two are scraped slab 81 cable is wrapped in set casing 71 and scraped and scraped between slab 81 Ice;Specifically have:
(1), electric pushrod 91 opened by the control of industrial personal computer 3, two scraped slab 81 and passes through 85 inverse time of servo motor Separation is realized in needle rotation, and unmanned plane 1 is flown to the top of cable, will be fixedly connected with fixed column 51 in the bottom of industrial personal computer 3, Gu The lower rotation connection side of fixed column 51 is in the connector 52 of " mouth " character form structure, and the lower rotation connection section of connector 52 is in The pull rod 53 of inverse-T-shaped structure, pull rod 53 are slidably connected to the inside of the mounting post 54 of hollow cylindrical structure, are located at mounting post The surface wrap of pull rod 53 inside 54 exists for damping, the spring 55 for avoiding drawing bad cable, the at work walking of heating mechanism 7 If when the surface of cable, cable uneven surface, spring 55 shrinks avoidable unmanned plane 1 and draws bad cable in flight.
(2) set casing 71 that side is in arc structure, the inner top surface of set casing 71 are fixedly connected in the bottom of mounting post 54 It is stepped be mounted equidistant with several industrial personal computers 3 be electrically connected, for dissolve the nilas of cable surface, side in circle First heating sheet 72 of arcuate structure, the diameters of several first heating sheets, thickness are once from one end of set casing 71 to the other end Successively decrease, the bottom of set casing 71 is fixedly connected with two mounting plates 74 in rectangular parallelepiped structure, the bottom installation of two mounting plates 74 The second heating sheet 73 for thering is the secondary nilas by cable surface to melt, the first heating sheet 72, the second heating sheet 73 and industrial personal computer 3 It is electrically connected, when unmanned plane 1 is in flight, the first heating sheet 72, the second heating sheet 73 are connected and realized on cable by industrial personal computer 3 It is ice melting, avoid the overweight cable of ice cube that property occurs and become, cause to be broken, influence to power, electronic 91 bars that push away are closed, will be watched Taking motor 85 and rotating clockwise realization two to scrape slab 81 and the bottom of cable is to melt complete nilas to melt.
(3) receive to shrink electric pushrod 91 after signal by industrial personal computer 3 after checking, servo motor 85 is counterclockwise Rotation is scraped slab 81 for two and is separated, and realizes that overall structure separates cable.
The bottom of industrial personal computer 3 of the invention is equipped with bindiny mechanism 5, and uneven electricity is encountered during unmanned plane 1 flies When cable, the contained spring 55 of mounting post 54 shrinks avoidable unmanned plane follow-on mission and breaks cable;The bottom of mounting post 54 Portion is fixedly connected with the set casing 71 of the arc-shaped structure in section, the first heating sheet of the equidistant stepped installation in top of set casing 71 72, and the diameter of several first heating sheets 72 successively decreases from one end of set casing 71 to one end of camera 4, increases the first heating Piece 72 is to the area of the nilas heating on cable surface, and the speed for melting nilas faster, fix by the bottom symmetrical of set casing 71 Two mounting plates 93 are connected, the inner sidewall of mounting plate 93 installs the second heating sheet 73, increases nilas melting speed, avoid cable Line, which is broken, to be caused to be unable to normal power supply;Set casing 71 is rotatablely connected with fixed plate 93 by shaft 92, positioned at the side of set casing 71 Wall electric pushrod 91, cable is located at set casing 71 and scrapes between slab 81 after the closing of open-and-close mechanism 8, passes through electric pushrod 91 contraction contradicts the complete nilas that do not melt for scraping slab 81 and cable bottom, and comprehensive deicing prevents from breaking.
The basic principles, main features and advantages of the invention have been shown and described above.The technical staff of the industry should Understand, the present invention is not limited to the above embodiments, and the description in above embodiment and specification only illustrates the present invention Principle, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these variation and Improvement is both fallen in the scope of protection of present invention.The claimed scope of the invention is by appended claims and its equivalent Object defines.

Claims (6)

1. a kind of power transmission line pipeline quick-speed first-aid repair method, which is characterized in that method includes the following steps:
S1 is removed the ice cube on electric wire using cable deicing device;
S2 removes the ice cube on power tower by manually tapping on the basis of S1;
S3 replaces the fuse in substation while S1 and S2 works, will after the completion of the work of S1 and S2 Circuit in substation closes a floodgate, and circuit is connected, to realize energization;
The cable deicing device that this method uses includes unmanned plane (1), battery (2), industrial personal computer (3), camera (4), connection Mechanism (5), power supply line (6), heating mechanism (7), open-and-close mechanism (8) and fixed mechanism (9);It is used to support the whole branch One of sidewall weld of support mechanism (6) is used to place the placement mechanism (7) of the foot of user, is used for inspection cable The bottom of the unmanned plane (1) of route is installed for controlling, receiving, sending signal and handle the industrial personal computer (3) of data, The top installation of the industrial personal computer (3) is for providing the battery (2) of electric power, the industrial personal computer (3) and the battery (2) it is electrically connected, the industrial personal computer (3) and the unmanned plane (1) are electrically connected, and are pacified at the bottom edge of the industrial personal computer (1) Equipped with the camera (4) being electrically connected with the industrial personal computer (1), for checking power circuit, the industrial personal computer (3) Bottom is equipped with rotatable bindiny mechanism (5), and the bottom of the bindiny mechanism (5) is equipped in winter by cable surface ice The heating mechanism (7) that block melts, the heating mechanism (7) are electrically connected by the power supply line (6) with the industrial personal computer (3) It connects, the lower rotation of the heating mechanism (7) is connected with the fixed mechanism (9) of the " U "-shaped structure in cross section, the fixation Mechanism (9) and the industrial personal computer (3) are electrically connected, and one end of the fixed mechanism (9) is equipped with for realizing the fixed machine The open-and-close mechanism (8) that structure (9) is walked in cable, wiping the nilas on cable surface off, the open-and-close mechanism (8) and institute State industrial personal computer (3) electric connection.
2. a kind of power transmission line pipeline quick-speed first-aid repair method according to claim 1, it is characterised in that: the bindiny mechanism It (5) include fixed column (51), connector (52), pull rod (53), mounting post (54) and spring (55), the bottom of the industrial personal computer (3) Portion is fixedly connected the fixed column (51), and the lower rotation connection side of the fixed column (51) is in the described of " mouth " character form structure Connector (52), the lower rotation connection section of the connector (52) are in the pull rod (53) of inverse-T-shaped structure, the drawing Bar (53) is slidably connected to the inside of the mounting post (54) of hollow cylindrical structure, is located at the mounting post (54) inside The surface wrap of the pull rod (53) is for damping, the spring (55) for avoiding drawing bad cable.
3. a kind of power transmission line pipeline quick-speed first-aid repair method according to claim 2, it is characterised in that: the heating mechanism It (7) include set casing (71), several first heating sheets (72), the second heating sheet (73) and two mounting plates (74), the installation The bottom of column (54) is fixedly connected with the set casing (71) that side is in arc structure, and the inner top surface of the set casing (71) is in rank Scalariform be mounted equidistant it is being electrically connected with several industrial personal computers (3), for dissolve the nilas of cable surface, side be in First heating sheet (72) of arc-shaped structure, the diameters of several first heating sheets, thickness are once from set casing (71) One end successively decrease to the other end, the bottom of the set casing (71) be fixedly connected two be in rectangular parallelepiped structure the mounting plate (74), the bottom of two mounting plates (74) is equipped with second heating sheet that the secondary nilas by cable surface melts (73), first heating sheet (72), second heating sheet (73) and the industrial personal computer (3) are electrically connected.
4. a kind of power transmission line pipeline quick-speed first-aid repair method according to claim 3, it is characterised in that: the fixed mechanism It (9) include electric pushrod (91), shaft (92), fixed plate (93), sliding slot (94) and sliding block (95), the set casing (71) and institute It states and is rotatablely connected between the fixed plate (93) of the " U "-shaped structure in cross section by the shaft (92), the set casing (71) sidewall symmetry installs the electric pushrod (91), and one end of the electric pushrod (91) is rotationally connected with the sliding block (95) surface, the electric pushrod (91) and the industrial personal computer (3) are electrically connected, and the sliding block (95) is slidably connected to described The inside of the sliding slot (94) of fixed plate (93) side, the set casing (71), the electric pushrod (91) and the fixation Structure triangular in shape between plate (93).
5. a kind of power transmission line pipeline quick-speed first-aid repair method according to claim 4, it is characterised in that: the open-and-close mechanism (8) include two and scrape slab (81), two gag lever posts (82), two screw rods (83), two placement plates (84) and servo motor (85), the relatively fixed connection in the company side of the fixed plate (93) is put for installing the described of two servo motors (85) It sets plate (84), the servo motor (85) and the industrial personal computer (3) are electrically connected, one end phase of two servo motors (85) To being fixedly connected the screw rod (83), two screw rods (83) scrape slab with described through the inside of the fixed plate (93) (81) it is threadedly coupled, two gag lever posts (82) of the relatively fixed connection of the inner sidewall of the fixed plate (93), described in two Scrape the surface for the gag lever post (82) that slab (81) is rotated in respectively on the relative inner wall of the fixed plate (93), two A described scrape slab (81) contradict.
6. a kind of power transmission line pipeline quick-speed first-aid repair method according to claim 5, it is characterised in that: described to scrape slab (81) the arc-shaped structure in top, distribution triangular in shape between two gag lever posts (82), the screw rod (83).
CN201810956265.7A 2018-08-21 2018-08-21 A kind of power transmission line pipeline quick-speed first-aid repair method Withdrawn CN109066459A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810956265.7A CN109066459A (en) 2018-08-21 2018-08-21 A kind of power transmission line pipeline quick-speed first-aid repair method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810956265.7A CN109066459A (en) 2018-08-21 2018-08-21 A kind of power transmission line pipeline quick-speed first-aid repair method

Publications (1)

Publication Number Publication Date
CN109066459A true CN109066459A (en) 2018-12-21

Family

ID=64686755

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810956265.7A Withdrawn CN109066459A (en) 2018-08-21 2018-08-21 A kind of power transmission line pipeline quick-speed first-aid repair method

Country Status (1)

Country Link
CN (1) CN109066459A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110601096A (en) * 2019-09-11 2019-12-20 吴若望 Power transmission and transformation circuit repairing device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106025981A (en) * 2016-06-23 2016-10-12 陈晨 Deicing aircraft for power transmission line
CN106898986A (en) * 2017-04-19 2017-06-27 四川智航慧飞无人机科技有限公司 To aerial cables deicing except the unmanned plane of accumulated snow
CN107039943A (en) * 2017-05-19 2017-08-11 合肥尚强电气科技有限公司 Intelligent deicing device for power transmission and transformation line
CN107302203A (en) * 2016-04-15 2017-10-27 天津市盛佳怡电子有限公司 A kind of power cable deicer

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107302203A (en) * 2016-04-15 2017-10-27 天津市盛佳怡电子有限公司 A kind of power cable deicer
CN106025981A (en) * 2016-06-23 2016-10-12 陈晨 Deicing aircraft for power transmission line
CN106898986A (en) * 2017-04-19 2017-06-27 四川智航慧飞无人机科技有限公司 To aerial cables deicing except the unmanned plane of accumulated snow
CN107039943A (en) * 2017-05-19 2017-08-11 合肥尚强电气科技有限公司 Intelligent deicing device for power transmission and transformation line

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110601096A (en) * 2019-09-11 2019-12-20 吴若望 Power transmission and transformation circuit repairing device
CN110601096B (en) * 2019-09-11 2020-11-20 绍兴市上虞区舜兴电力有限公司 Power transmission and transformation circuit repairing device

Similar Documents

Publication Publication Date Title
CN109066458A (en) A kind of high-altitude Electric Power Line Overhaul device based on unmanned plane
CN103117525B (en) A kind of built on stilts power transmission and distribution cable effectively power deicer
CN107887872B (en) Six rotor electric-power deicing unmanned plane of flexibility for power line deicing
CN106695852A (en) Mechanical clamping jaw mechanism, unmanned aerial vehicle and method for line patrol robot to go on or off line
CN109103837B (en) Deicing device for overhead transmission line
CN102227076B (en) Robot used for automatically deicing high tension transmission line
CN109586232A (en) The UAV system and its application method of high-voltage and ultra-high overhead transmission line deicing
CN109066459A (en) A kind of power transmission line pipeline quick-speed first-aid repair method
CN103151749A (en) Electromagnetic induction de-icing method and device
CN212343287U (en) Unmanned aerial vehicle deicing device for overhead transmission line
WO2024093068A1 (en) Anti-icing and de-icing device, sub-conductor spacer and system for bundled conductor of overhead line
CN210430869U (en) High-voltage wire deicing aircraft
CN113328405B (en) Full-automatic direct current ice-melt short circuit control device of 220kV transmission line wire
WO2024093069A1 (en) Line bundle conductor anti-icing and deicing device, sub-conductor spacer, and system
WO2024093067A1 (en) Anti-icing and de-icing device, spacer, insulator, and system
CN115833013A (en) System for automatically controlling icing thickness of power transmission line
CN216751140U (en) Movable integrated device for monitoring icing and deicing of power line
CN109728560A (en) A kind of removing ice of power transmission line system
CN215897257U (en) Ice and snow removing device suitable for power line
CN101692569B (en) Automatic ice and snow remover used for high voltage wires
CN213948772U (en) Convenient to use's measuring device for territory space planning
CN208797463U (en) Novel three-phase linkage T connects ware and T to connect distribution lines
CN209055627U (en) A kind of high-voltage corona detection device preventing icing
CN110112680A (en) It is a kind of for charging the component and its application method of the convenient installation of transmission line of electricity R type pin
CN216351028U (en) All-round monitoring facilities is used in insulating monitoring of high-speed railway distribution network

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20181221

WW01 Invention patent application withdrawn after publication