CN109058052A - 新能源风力发电设备的集成式固定安装架 - Google Patents

新能源风力发电设备的集成式固定安装架 Download PDF

Info

Publication number
CN109058052A
CN109058052A CN201810991985.7A CN201810991985A CN109058052A CN 109058052 A CN109058052 A CN 109058052A CN 201810991985 A CN201810991985 A CN 201810991985A CN 109058052 A CN109058052 A CN 109058052A
Authority
CN
China
Prior art keywords
frame body
fixed
hole
groups
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810991985.7A
Other languages
English (en)
Other versions
CN109058052B (zh
Inventor
李华青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pano Changshu New Energy Technology Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810991985.7A priority Critical patent/CN109058052B/zh
Publication of CN109058052A publication Critical patent/CN109058052A/zh
Application granted granted Critical
Publication of CN109058052B publication Critical patent/CN109058052B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D13/00Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/20Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
    • F03D13/25Arrangements for mounting or supporting wind motors; Masts or towers for wind motors specially adapted for offshore installation
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D13/00Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/20Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
    • F03D13/22Foundations specially adapted for wind motors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/727Offshore wind turbines
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines

Abstract

本发明提供了一种新能源风力发电设备的集成式固定安装架,包括A架体,固定块,固定鞘,导向筒,固定螺孔,传动螺孔,B架体,C架体,延伸板,推进螺孔,集成定位板,间隔固定柱,连接孔,固定锁紧块,活动锁紧块,轴承,伸缩导杆和推进螺栓;所述固定块外端均开设有螺孔,且固定块均通过螺栓穿过固定鞘通孔插入固定块螺孔固定设置于固定鞘中;所述A架体与B架体顶部中间开设有四组螺孔;所述拆除架四周底部开设有八组通孔,且拆除架通过螺栓穿过通孔插入A架体与B架体螺孔固定于A架体与B架体顶部中间;通过固定风力发电设备的支柱来达到稳定浇筑连接的效果,相比吊机与手工的拼装方式效率更高。

Description

新能源风力发电设备的集成式固定安装架
技术领域
本发明涉及风力发电配套设施技术领域,更具体地说,特别涉及一种新能源风力发电设备的集成式固定安装架。
背景技术
风力发电是世界上发展最快的绿色能源技术,由于海上丰富的风能资源和当今技术的可行性,海洋成为一个迅速发展的风电市场,海上风机的支撑技术主要有底部固定式支撑和悬浮式支撑2类,通过人工定位后使用机械将桩体嵌入海底,通过浇筑在桩体顶部安装风力发电机,而在水中进行安装作业具有诸多不便,影响了效率和速度。
经过检索例如专利号为CN201280006757.0的专利公开了一种借助于起重机提升风力发电设备的混凝土塔的第一塔部段的起重装置,特别是横梁,包括至少一个用于将所述塔部段固定在所述起重装置上的固定机构和至少一个用于松开所述起重装置和所述塔部段之间的连接的松脱装置。
再例如专利号为CN201010237939.1的专利公开了一种水上风力发电塔架基础和结构及其安装施工方法,水上风力发电塔架的基础,包括一中心桩和若干围绕中心桩的卫星桩;中心桩桩顶设一个中心结构节点,卫星桩桩顶上设卫星结构节点,中心、卫星结构节点之间,各卫星结构节点之间通过构件连接,构成水面上结构层;中心桩顶端正上方设置中心柱,中心桩和中心柱通过一个结构节点连接;中心柱顶端下方设第一结构节点,第一结构节点和卫星结构节点间设斜柱或斜缆连接,形成风力发电塔架的空间对称结构;中心柱顶端设第二结构节点,第二结构节点上安装风力发电设备。本发明在保持塔架功能的同时降低其成本,并结合现有的常规水上施工装备提供施工船只容易搁浅的浅水或静水区域安装施工水上风力发电塔架。
因此,现有的水中安装风电设备的技术都存在:安装实施难度大,效率低下,不具备集成安装的能力,不能有效定位固定支撑的支架辅助浇筑连接,不具备拆除浇筑后的设备的能力。
发明内容
(一)技术问题
综上所述,本发明提供一种新能源风力发电设备的集成式固定安装架,通过结构与功能性的改进,以解决安装实施难度大,效率低下,不具备集成安装的能力,不能有效定位固定支撑的支架辅助浇筑连接,不具备拆除浇筑后的设备的能力的问题。
(二)技术方案
本发明提供了一种新能源风力发电设备的集成式固定安装架,用于对在水中使用的风力发电机的支架进行拼装固定和拆除。在本发明提供的新能源风力发电设备的集成式固定安装架中,具体包括:
A架体,固定块,固定鞘,导向筒,固定螺孔,传动螺孔,B架体,C架体,延伸板,固定圆柱筒,滑动柱,连接矩形孔,螺栓槽,固定螺孔,D架体,延伸连接板,延伸孔,半丝螺纹,拆除架,顶推块,滑动销柱,固定孔,滑动块,推进螺孔,集成定位板,间隔固定柱,连接孔,固定锁紧块,活动锁紧块,轴承,伸缩导杆和推进螺栓;所述A架体与C架体底部内侧均一体式设置有两组固定块,且A架体与C架体顶部内侧均一体式设置有两组固定鞘;所述B架体与D架体顶部内侧均一体式设置有两组固定块,且B架体与D架体底部内侧均一体式设置有两组固定鞘,且固定鞘外端均开设有通孔;所述固定块外端均开设有螺孔,且固定块均通过螺栓穿过固定鞘通孔插入固定块螺孔固定设置于固定鞘中;所述A架体与B架体顶部中间开设有四组螺孔;所述拆除架四周底部开设有八组通孔,且拆除架通过螺栓穿过通孔插入A架体与B架体螺孔固定于A架体与B架体顶部中间。
优选地,所述A架体与B架体上下两侧中间均一体式设置有导向筒;所述C架体与D架体顶部中间均一体式设置有固定圆柱筒,且固定圆柱筒顶部内侧开设有矩形槽,且固定圆柱筒外端均贯穿方形槽开设螺孔并安装有顶丝,且固定圆柱筒与导向筒垂直位置一致。
优选地,所述B架体与D架体中间外侧均一体式设置有固定锁紧块,且固定锁紧块与活动锁紧块外端均设置为磨砂面;所述A架体与C架体内侧一端均开设有四组螺孔;所述活动锁紧块一侧一体式设置有伸缩导杆,且伸缩导杆后侧四周均开设有通孔,且活动锁紧块通过螺栓穿过伸缩导杆通孔插入A架体与C架体内侧开设的螺孔固定于A架体与C架体内侧。
优选地,所述A架体与C架体外侧一端均开设有传动螺孔;所述活动锁紧块一端通过开设圆槽嵌入设置有轴承;所述推进螺栓前端设置为无螺纹结构,且推进螺栓穿过传动螺孔通过过盈配合固定设置于轴承内侧。
优选地,所述C架体外侧一体式设置有两组延伸板,且延伸板外端均开设有四组通孔;所述D架体外端中间开设有两组延伸孔,且延伸孔中间处通过开设圆孔嵌入设置有轴承;所述延伸连接板中间开设有螺孔,且延伸连接板两侧外端均开设有四组通孔;所述半丝螺纹前端设置为无螺纹结构,且半丝螺纹穿过延伸连接板螺孔通过过盈配合固定设置于延伸孔中间轴承中。
优选地,所述集成定位板中间均开设有四组螺孔,且集成定位板中间通过螺栓固定设置有间隔固定柱;所述集成定位板两侧均开设有四组通孔,且集成定位板通过螺栓依次穿过集成定位板通孔与延伸板通孔固定于C架体外侧;所述集成定位板可通过螺栓依次穿过集成定位板通孔与延伸连接板两侧通孔固定于另一组的延伸连接板一端。
优选地,所述拆除架两侧顶部中间开设有四组方形通孔,且拆除架顶部中间开设有两组推进螺孔,且螺孔内活动设置有螺柱;所述顶推块两侧均一体式设置有两组滑动块,且顶推块通过滑动块活动设置于拆除架两侧方形孔中;所述顶推块均于一侧一体式设置有两组滑动销柱,且顶推块均于一侧开设有两组方形孔,且滑动销柱与方形孔中间均开设有通孔;所述滑动销柱穿过顶推块方形孔并通过螺栓穿过通孔固定连接。
优选地,所述滑动柱底部一体式设置有矩形结构,且滑动柱通过顶丝固定于固定圆柱筒顶部内侧的方形槽中;所述滑动柱顶部均开设有连接矩形孔,且连接矩形孔内部两侧均贯穿滑动柱开设有固定螺孔;所述固定螺孔外端口处均开设有螺栓槽,且螺栓槽两侧均进行倒角处理。
(三)有益效果
1.本发明提供了一种新能源风力发电设备的集成式固定安装架,通过设置有固定锁紧块和活动锁紧块,为安装架带来固定效果,相比目前的安装方式具有极大的稳定性,通过固定风力发电设备的支柱来达到稳定浇筑连接的效果,相比吊机与手工的拼装方式效率更高。
2.通过设置有集成定位板,可以为固定安装架带来拼接并固定的功能,通过拼接和调节可以固定多组固定安装架的位置,方便通过移动延伸连接板调节安装架间距后进行多组安装架整体集成式的进行安装,相比目前使用的吊机安装的方法,提高了安装的效率。
3.通过设置有顶推块,使安装架具有可双向移动的结构,可以通过螺纹传动反复的推拉风力发电设备的主杆将浇筑处松脱已达拆卸的目的,相比常见的安装架具有更多的实用性。
4.通过设置有滑动柱,为安装架提供导向的能力,将四组架体的位置固定,形成稳固的浇筑条件,并且可以通过螺栓固定增加滑动柱的数量进行加长,适用于水深的地点使用。
附图说明
图1为本发明实施例中的主视结构示意图;
图2为本发明实施例中A架体的立体结构示意图;
图3为本发明实施例中B架体的立体结构示意图;
图4为本发明实施例中C架体的立体结构示意图;
图5为本发明实施例中D架体的立体结构示意图;
图6为本发明实施例中滑动柱的立体结构示意图;
图7为本发明实施例中A局部的结构示意图;
图8为本发明实施例中拆除架的立体结构示意图;
图9为本发明实施例中集成定位板的立体结构示意图;
图10为本发明实施例中活动锁紧块的立体结构示意图;
在图1至图10中,部件名称或线条与附图编号的对应关系为:
1-A架体,101-固定块,102-固定鞘,103-导向筒,104-固定螺孔,105-传动螺孔,2-B架体,3-C架体,301-延伸板,302-固定圆柱筒,303-滑动柱,304-连接矩形孔,305-螺栓槽,306-固定螺孔,4-D架体,401-延伸连接板,402-延伸孔,403-半丝螺纹,5-拆除架,6-顶推块,601-滑动销柱,602-固定孔,603-滑动块,604-推进螺孔,7-集成定位板,701-间隔固定柱,702-连接孔,8-固定锁紧块,9-活动锁紧块,901-轴承,902-伸缩导杆,903-推进螺栓。
具体实施方式
下面结合附图和实施例对本发明的实施方式作进一步详细描述。以下实施例用于说明本发明,但不能用来限制本发明的范围。
在本发明的描述中,除非另有说明,“多个”的含义是两个或两个以上;术语“上”、“下”、“左”、“右”、“内”、“外”、“前端”、“后端”、“头部”、“尾部”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。此外,术语“第一”、“第二”、“第三”等仅用于描述目的,而不能理解为指示或暗示相对重要性。
在本发明的描述中,需要说明的是,除非另有明确的规定和限定,术语“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本发明中的具体含义。
请参考图1至图10。
为了解决现有技术中新能源风力发电设备的集成式固定安装架功能单一效率慢的问题,本发明提出了一种新能源风力发电设备的集成式固定安装架,用于对在水中使用的风力发电机的支架进行拼装固定和拆除,包括:A架体1,固定块101,固定鞘102,导向筒103,固定螺孔104,传动螺孔105,B架体2,C架体3,延伸板301,固定圆柱筒302,滑动柱303,连接矩形孔304,螺栓槽305,固定螺孔306,D架体4,延伸连接板401,延伸孔402,半丝螺纹403,拆除架5,顶推块6,滑动销柱601,固定孔602,滑动块603,推进螺孔604,集成定位板7,间隔固定柱701,连接孔702,固定锁紧块8,活动锁紧块9,轴承901,伸缩导杆902和推进螺栓903;A架体1与C架体3底部内侧均一体式设置有两组固定块101,且A架体1与C架体3顶部内侧均一体式设置有两组固定鞘102;B架体2与D架体4顶部内侧均一体式设置有两组固定块101,且B架体2与D架体4底部内侧均一体式设置有两组固定鞘102,且固定鞘102外端均开设有通孔;固定块101外端均开设有螺孔,且固定块101均通过螺栓穿过固定鞘102通孔插入固定块101螺孔固定设置于固定鞘102中;A架体1与B架体2顶部中间开设有四组螺孔;拆除架5四周底部开设有八组通孔,且拆除架5通过螺栓穿过通孔插入A架体1与B架体2螺孔固定于A架体1与B架体2顶部中间。
其中,A架体1与B架体2上下两侧中间均一体式设置有导向筒103;C架体3与D架体4顶部中间均一体式设置有固定圆柱筒302,且固定圆柱筒302顶部内侧开设有矩形槽,且固定圆柱筒302外端均贯穿方形槽开设螺孔并安装有顶丝,且固定圆柱筒302与导向筒103垂直位置一致,通过设置固定圆柱筒302与导向筒103可以安装固定滑动柱303的位置。
其中,B架体2与D架体4中间外侧均一体式设置有固定锁紧块8,且固定锁紧块8与活动锁紧块9外端均设置为磨砂面;A架体1与C架体3内侧一端均开设有四组螺孔;活动锁紧块9一侧一体式设置有伸缩导杆902,且伸缩导杆902后侧四周均开设有通孔,且活动锁紧块9通过螺栓穿过伸缩导杆902通孔插入A架体1与C架体3内侧开设的螺孔固定于A架体1与C架体3内侧,通过设置固定锁紧块8与活动锁紧块9并通过磨砂面增加摩擦力可以固定风力发电设备的支架,进行定位。
其中,A架体1与C架体3外侧一端均开设有传动螺孔105;活动锁紧块9一端通过开设圆槽嵌入设置有轴承901;推进螺栓903前端设置为无螺纹结构,且推进螺栓903穿过传动螺孔105通过过盈配合固定设置于轴承901内侧,通过设置传动螺孔105可以推动锁紧活动锁紧块9的位置。
其中,C架体3外侧一体式设置有两组延伸板301,且延伸板301外端均开设有四组通孔;D架体4外端中间开设有两组延伸孔402,且延伸孔402中间处通过开设圆孔嵌入设置有轴承;延伸连接板401中间开设有螺孔,且延伸连接板401两侧外端均开设有四组通孔;半丝螺纹403前端设置为无螺纹结构,且半丝螺纹403穿过延伸连接板401螺孔通过过盈配合固定设置于延伸孔402中间轴承中,通过设置延伸板301可以与另一组风机支撑架连接进行集成定位。
其中,集成定位板7中间均开设有四组螺孔,且集成定位板7中间通过螺栓固定设置有间隔固定柱701;集成定位板7两侧均开设有四组通孔,且集成定位板7通过螺栓依次穿过集成定位板7通孔与延伸板301通孔固定于C架体3外侧;集成定位板7可通过螺栓依次穿过集成定位板7通孔与延伸连接板401两侧通孔固定于另一组的延伸连接板401一端,通过设置集成定位板7可以增加风机支撑架的集成位置间的间隔,并通过延伸连接板401调整位置。
其中,拆除架5两侧顶部中间开设有四组方形通孔,且拆除架5顶部中间开设有两组推进螺孔604,且螺孔内活动设置有螺柱;顶推块6两侧均一体式设置有两组滑动块603,且顶推块6通过滑动块603活动设置于拆除架5两侧方形孔中;顶推块6均于一侧一体式设置有两组滑动销柱601,且顶推块6均于一侧开设有两组方形孔,且滑动销柱601与方形孔中间均开设有通孔;滑动销柱601穿过顶推块6方形孔并通过螺栓穿过通孔固定连接,通过设置顶推块6可以通过螺纹传动反复的推拉风力发电设备的主杆将浇筑处松脱已达拆卸的目的。
其中,滑动柱303底部一体式设置有矩形结构,且滑动柱303通过顶丝固定于固定圆柱筒302顶部内侧的方形槽中;滑动柱303顶部均开设有连接矩形孔304,且连接矩形孔304内部两侧均贯穿滑动柱303开设有固定螺孔306;固定螺孔306外端口处均开设有螺栓槽305,且螺栓槽305两侧均进行倒角处理,通过设置滑动柱303可以固定A架体1与C架体和B架体2与D架体4的周向位置,起到导向定向的作用。
本实施例的具体使用方式与作用:本发明中,在A架体1与C架体3底部内侧均一体式设置两组固定块101,在A架体1与C架体3顶部内侧均一体式设置两组固定鞘102,在B架体2与D架体4顶部内侧均一体式设置两组固定块101,在B架体2与D架体4底部内侧均一体式设置两组固定鞘102,在固定鞘102外端均开设通孔,在固定块101外端均开设螺孔,将固定块101均通过螺栓穿过固定鞘102通孔插入固定块101螺孔固定设置于固定鞘102中,在A架体1与B架体2顶部中间开设四组螺孔,在拆除架5四周底部开设八组通孔,将拆除架5通过螺栓穿过通孔插入A架体1与B架体2螺孔固定于A架体1与B架体2顶部中间,在A架体1与B架体2上下两侧中间均一体式设置导向筒103,在C架体3与D架体4顶部中间均一体式设置固定圆柱筒302,在固定圆柱筒302顶部内侧开设矩形槽,在固定圆柱筒302外端均贯穿方形槽开设螺孔并安装顶丝,在固定圆柱筒302与导向筒103垂直位置一致,在B架体2与D架体4中间外侧均一体式设置固定锁紧块8,在固定锁紧块8与活动锁紧块9外端均设置为磨砂面,在A架体1与C架体3内侧一端均开设四组螺孔,在活动锁紧块9一侧一体式设置伸缩导杆902,在伸缩导杆902后侧四周均开设通孔,将活动锁紧块9通过螺栓穿过伸缩导杆902通孔插入A架体1与C架体3内侧开设的螺孔固定于A架体1与C架体3内侧,在A架体1与C架体3外侧一端均开设传动螺孔105,在活动锁紧块9一端通过开设圆槽嵌入设置轴承901,在推进螺栓903前端设置为无螺纹结构,将推进螺栓903穿过传动螺孔105通过过盈配合固定设置于轴承901内侧,在C架体3外侧一体式设置两组延伸板301,在延伸板301外端均开设四组通孔,在D架体4外端中间开设两组延伸孔402,在延伸孔402中间处通过开设圆孔嵌入设置轴承,在延伸连接板401中间开设螺孔,在延伸连接板401两侧外端均开设四组通孔,在半丝螺纹403前端设置为无螺纹结构,将半丝螺纹403穿过延伸连接板401螺孔通过过盈配合固定设置于延伸孔402中间轴承中,在集成定位板7中间均开设四组螺孔,在集成定位板7中间通过螺栓固定设置间隔固定柱701,在集成定位板7两侧均开设四组通孔,将集成定位板7通过螺栓依次穿过集成定位板7通孔与延伸板301通孔固定于C架体3外侧,将集成定位板7可通过螺栓依次穿过集成定位板7通孔与延伸连接板401两侧通孔固定于另一组的延伸连接板401一端,在拆除架5两侧顶部中间开设四组方形通孔,在拆除架5顶部中间开设两组推进螺孔604,在螺孔内活动设置螺柱,在顶推块6两侧均一体式设置两组滑动块603,将顶推块6通过滑动块603活动设置于拆除架5两侧方形孔中,在顶推块6一侧一体式设置两组滑动销柱601,在顶推块6一侧开设两组方形孔,在滑动销柱601与方形孔中间均开设通孔,在滑动销柱601穿过顶推块6方形孔并通过螺栓穿过通孔固定连接,在滑动柱303底部一体式设置矩形结构,将滑动柱303通过顶丝固定于固定圆柱筒302顶部内侧的方形槽中,在滑动柱303顶部均开设连接矩形孔304,在连接矩形孔304内部两侧均贯穿滑动柱303开设固定螺孔306,在固定螺孔306外端口处均开设螺栓槽305,在螺栓槽305两侧均进行倒角处理;通过机械设备将支撑桩设置入海底,将C架体3与D架体4在支撑桩外通过固定块101和固定鞘102以及螺栓进行拼接,拧紧推进螺栓903使固定锁紧块8和活动锁紧块9锁紧,将C架体3与D架体4的位置固定,将滑动柱303通过顶丝固定于固定圆柱筒302中,并在海水较深的时候拼接多组固定圆柱筒302进行延长;将A架体与B架体2在风力发电设备的枝干外端通过固定块101和固定鞘102以及螺栓进行拼接,拧紧推进螺栓903使固定锁紧块8和活动锁紧块9将发电设备枝干固定,将A架体与B架体2通过导向筒103安装于滑动柱303顶部,通过滑动柱303的导向和引力的滑动使A架体与B架体周向固定发电设备向C架体3与D架体4移动,使设备枝干与固定桩触碰,通过浇筑连接将设备进行固定使用;当需要进行拆卸的时候,将A架体与B架体2间的推进螺栓903松开使设备枝干外部无阻碍,安装拆除架5并将顶推块6固定在设备枝干外,在推进螺孔604中活动设置螺栓,通过机械力转动螺栓由一侧推动枝干进行松晃,通过两侧的推进螺孔604中的螺栓进行互相一紧一松的操作将浇筑处进行机械力的推拉,在浇筑处的物质受机械力过多疲劳后脱落。
本发明的实施例是为了示例和描述起见而给出的,而并不是无遗漏的或者将本发明限于所公开的形式。很多修改和变化对于本领域的普通技术人员而言是显而易见的。选择和描述实施例是为了更好说明本发明的原理和实际应用,并且使本领域的普通技术人员能够理解本发明从而设计适于特定用途的带有各种修改的各种实施例。

Claims (8)

1.一种新能源风力发电设备的集成式固定安装架,用于对在水中使用的风力发电机的支架进行拼装固定和拆除,其特征在于,包括:A架体(1),固定块(101),固定鞘(102),导向筒(103),固定螺孔(104),传动螺孔(105),B架体(2),C架体(3),延伸板(301),固定圆柱筒(302),滑动柱(303),连接矩形孔(304),螺栓槽(305),固定螺孔(306),D架体(4),延伸连接板(401),延伸孔(402),半丝螺纹(403),拆除架(5),顶推块(6),滑动销柱(601),固定孔(602),滑动块(603),推进螺孔(604),集成定位板(7),间隔固定柱(701),连接孔(702),固定锁紧块(8),活动锁紧块(9),轴承(901),伸缩导杆(902)和推进螺栓(903);所述A架体(1)与C架体(3)底部内侧均一体式设置有两组固定块(101),且A架体(1)与C架体(3)顶部内侧均一体式设置有两组固定鞘(102);所述B架体(2)与D架体(4)顶部内侧均一体式设置有两组固定块(101),且B架体(2)与D架体(4)底部内侧均一体式设置有两组固定鞘(102),且固定鞘(102)外端均开设有通孔;所述固定块(101)外端均开设有螺孔,且固定块(101)均通过螺栓穿过固定鞘(102)通孔插入固定块(101)螺孔固定设置于固定鞘(102)中;所述A架体(1)与B架体(2)顶部中间开设有四组螺孔;所述拆除架(5)四周底部开设有八组通孔,且拆除架(5)通过螺栓穿过通孔插入A架体(1)与B架体(2)螺孔固定于A架体(1)与B架体(2)顶部中间。
2.根据权利要求1所述的新能源风力发电设备的集成式固定安装架,其特征在于,所述A架体(1)与B架体(2)上下两侧中间均一体式设置有导向筒(103);所述C架体(3)与D架体(4)顶部中间均一体式设置有固定圆柱筒(302),且固定圆柱筒(302)顶部内侧开设有矩形槽,且固定圆柱筒(302)外端均贯穿方形槽开设螺孔并安装有顶丝,且固定圆柱筒(302)与导向筒(103)垂直位置一致。
3.根据权利要求1所述的新能源风力发电设备的集成式固定安装架,其特征在于,所述B架体(2)与D架体(4)中间外侧均一体式设置有固定锁紧块(8),且固定锁紧块(8)与活动锁紧块(9)外端均设置为磨砂面;所述A架体(1)与C架体(3)内侧一端均开设有四组螺孔;所述活动锁紧块(9)一侧一体式设置有伸缩导杆(902),且伸缩导杆(902)后侧四周均开设有通孔,且活动锁紧块(9)通过螺栓穿过伸缩导杆(902)通孔插入A架体(1)与C架体(3)内侧开设的螺孔固定于A架体(1)与C架体(3)内侧。
4.根据权利要求3所述的新能源风力发电设备的集成式固定安装架,其特征在于,所述A架体(1)与C架体(3)外侧一端均开设有传动螺孔(105);所述活动锁紧块(9)一端通过开设圆槽嵌入设置有轴承(901);所述推进螺栓(903)前端设置为无螺纹结构,且推进螺栓(903)穿过传动螺孔(105)通过过盈配合固定设置于轴承(901)内侧。
5.根据权利要求1所述的新能源风力发电设备的集成式固定安装架,其特征在于,所述C架体(3)外侧一体式设置有两组延伸板(301),且延伸板(301)外端均开设有四组通孔;所述D架体(4)外端中间开设有两组延伸孔(402),且延伸孔(402)中间处通过开设圆孔嵌入设置有轴承;所述延伸连接板(401)中间开设有螺孔,且延伸连接板(401)两侧外端均开设有四组通孔;所述半丝螺纹(403)前端设置为无螺纹结构,且半丝螺纹(403)穿过延伸连接板(401)螺孔通过过盈配合固定设置于延伸孔(402)中间轴承中。
6.根据权利要求1所述的新能源风力发电设备的集成式固定安装架,其特征在于,所述集成定位板(7)中间均开设有四组螺孔,且集成定位板(7)中间通过螺栓固定设置有间隔固定柱(701);所述集成定位板(7)两侧均开设有四组通孔,且集成定位板(7)通过螺栓依次穿过集成定位板(7)通孔与延伸板(301)通孔固定于C架体(3)外侧;所述集成定位板(7)可通过螺栓依次穿过集成定位板(7)通孔与延伸连接板(401)两侧通孔固定于另一组的延伸连接板(401)一端。
7.根据权利要求1所述的新能源风力发电设备的集成式固定安装架,其特征在于,所述拆除架(5)两侧顶部中间开设有四组方形通孔,且拆除架(5)顶部中间开设有两组推进螺孔(604),且螺孔内活动设置有螺柱;所述顶推块(6)两侧均一体式设置有两组滑动块(603),且顶推块(6)通过滑动块(603)活动设置于拆除架(5)两侧方形孔中;所述顶推块(6)均于一侧一体式设置有两组滑动销柱(601),且顶推块(6)均于一侧开设有两组方形孔,且滑动销柱(601)与方形孔中间均开设有通孔;所述滑动销柱(601)穿过顶推块(6)方形孔并通过螺栓穿过通孔固定连接。
8.根据权利要求1所述的新能源风力发电设备的集成式固定安装架,其特征在于,所述滑动柱(303)底部一体式设置有矩形结构,且滑动柱(303)通过顶丝固定于固定圆柱筒(302)顶部内侧的方形槽中;所述滑动柱(303)顶部均开设有连接矩形孔(304),且连接矩形孔(304)内部两侧均贯穿滑动柱(303)开设有固定螺孔(306);所述固定螺孔(306)外端口处均开设有螺栓槽(305),且螺栓槽(305)两侧均进行倒角处理。
CN201810991985.7A 2018-08-29 2018-08-29 新能源风力发电设备的集成式固定安装架 Active CN109058052B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810991985.7A CN109058052B (zh) 2018-08-29 2018-08-29 新能源风力发电设备的集成式固定安装架

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810991985.7A CN109058052B (zh) 2018-08-29 2018-08-29 新能源风力发电设备的集成式固定安装架

Publications (2)

Publication Number Publication Date
CN109058052A true CN109058052A (zh) 2018-12-21
CN109058052B CN109058052B (zh) 2020-08-21

Family

ID=64756437

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810991985.7A Active CN109058052B (zh) 2018-08-29 2018-08-29 新能源风力发电设备的集成式固定安装架

Country Status (1)

Country Link
CN (1) CN109058052B (zh)

Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201368886Y (zh) * 2009-03-05 2009-12-23 九江整流器厂 一种元件专用测试夹具
CN201714605U (zh) * 2010-04-16 2011-01-19 辽宁中科天道新能源装备工业有限公司 风力发电机组轮毂装配结构
CN201811876U (zh) * 2010-09-10 2011-04-27 攀钢集团钢铁钒钛股份有限公司 横截面样品粘合夹具
CN102337746A (zh) * 2010-07-27 2012-02-01 宝山钢铁股份有限公司 水上风力发电塔架基础和结构及其安装施工方法
CN103476696A (zh) * 2011-01-26 2013-12-25 乌本产权有限公司 用于建立风力发电设备的塔的方法和装置
CN104005918A (zh) * 2013-02-27 2014-08-27 苏州工业园区欧霸动力设备有限公司 风力发电机安装架
CN104009432A (zh) * 2014-05-13 2014-08-27 镇江西门子母线有限公司 一种风能导电轨安装支架
CN104701794A (zh) * 2015-03-27 2015-06-10 国网辽宁省电力有限公司辽阳供电公司 可垂直安装的多功能过流夹具
CN205406241U (zh) * 2016-03-07 2016-07-27 国网山东省电力公司巨野县供电公司 一种具有固定装置的变压器安装架
CN206189033U (zh) * 2016-10-12 2017-05-24 广东溢达纺织有限公司 可更换车缝模具
CN206845393U (zh) * 2017-05-28 2018-01-05 柏小梅 一种风力发电机组用组装平台
CN207245942U (zh) * 2017-08-15 2018-04-17 浙江运达风电股份有限公司 新型变桨轴承加固环夹紧装置
CN108000183A (zh) * 2017-12-11 2018-05-08 合肥挺泰环保科技有限公司 一种车床夹具锁紧装置
CN108050020A (zh) * 2017-12-07 2018-05-18 王红燕 一种风力发电用的安装架
CN207408080U (zh) * 2017-10-10 2018-05-25 曼胡默尔滤清器(上海)有限公司 一种用于滤清器滤芯测试的压边框架装置
CN207431797U (zh) * 2017-11-07 2018-06-01 江苏华祥机械制造有限公司 一种装夹不同的小型零件钻床夹具
CN108180116A (zh) * 2017-12-22 2018-06-19 新昌县吉利标准件厂 一种风力发电安装支架
CN108443662A (zh) * 2018-05-14 2018-08-24 安徽目然信信息科技有限公司 一种机电设备安装架
CN108457810A (zh) * 2018-04-05 2018-08-28 南京高传机电自动控制设备有限公司 一种厂区用风力发电机安装架中的安装座

Patent Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201368886Y (zh) * 2009-03-05 2009-12-23 九江整流器厂 一种元件专用测试夹具
CN201714605U (zh) * 2010-04-16 2011-01-19 辽宁中科天道新能源装备工业有限公司 风力发电机组轮毂装配结构
CN102337746A (zh) * 2010-07-27 2012-02-01 宝山钢铁股份有限公司 水上风力发电塔架基础和结构及其安装施工方法
CN201811876U (zh) * 2010-09-10 2011-04-27 攀钢集团钢铁钒钛股份有限公司 横截面样品粘合夹具
CN103476696A (zh) * 2011-01-26 2013-12-25 乌本产权有限公司 用于建立风力发电设备的塔的方法和装置
CN104005918A (zh) * 2013-02-27 2014-08-27 苏州工业园区欧霸动力设备有限公司 风力发电机安装架
CN104009432A (zh) * 2014-05-13 2014-08-27 镇江西门子母线有限公司 一种风能导电轨安装支架
CN104701794A (zh) * 2015-03-27 2015-06-10 国网辽宁省电力有限公司辽阳供电公司 可垂直安装的多功能过流夹具
CN205406241U (zh) * 2016-03-07 2016-07-27 国网山东省电力公司巨野县供电公司 一种具有固定装置的变压器安装架
CN206189033U (zh) * 2016-10-12 2017-05-24 广东溢达纺织有限公司 可更换车缝模具
CN206845393U (zh) * 2017-05-28 2018-01-05 柏小梅 一种风力发电机组用组装平台
CN207245942U (zh) * 2017-08-15 2018-04-17 浙江运达风电股份有限公司 新型变桨轴承加固环夹紧装置
CN207408080U (zh) * 2017-10-10 2018-05-25 曼胡默尔滤清器(上海)有限公司 一种用于滤清器滤芯测试的压边框架装置
CN207431797U (zh) * 2017-11-07 2018-06-01 江苏华祥机械制造有限公司 一种装夹不同的小型零件钻床夹具
CN108050020A (zh) * 2017-12-07 2018-05-18 王红燕 一种风力发电用的安装架
CN108000183A (zh) * 2017-12-11 2018-05-08 合肥挺泰环保科技有限公司 一种车床夹具锁紧装置
CN108180116A (zh) * 2017-12-22 2018-06-19 新昌县吉利标准件厂 一种风力发电安装支架
CN108457810A (zh) * 2018-04-05 2018-08-28 南京高传机电自动控制设备有限公司 一种厂区用风力发电机安装架中的安装座
CN108443662A (zh) * 2018-05-14 2018-08-24 安徽目然信信息科技有限公司 一种机电设备安装架

Also Published As

Publication number Publication date
CN109058052B (zh) 2020-08-21

Similar Documents

Publication Publication Date Title
US8083212B2 (en) Wind-turbine rotor-blade hoisting apparatus, method for attaching wind-turbine rotor blade, and method for constructing wind power generator
US20160040649A1 (en) Wind Turbine Blade Lowering Apparatus
EP2504571B1 (en) Floating vertical axis wind turbine module system and method
RU2560642C2 (ru) Ветроэнергетическая установка
JP6921086B2 (ja) マルチローター風力タービンの風力タービンコンポーネントを据付け又は撤去する方法
WO2003069156A1 (de) Windenergieanlage
CN102782311A (zh) 一种无吊车安装或拆卸风力涡轮机叶片的方法
CN103925172B (zh) 张力腿式海上浮动式风力机的整体安装方法
US20180363622A1 (en) Methods for mounting or dismounting a wind turbine component of a multirotor wind turbine
KR20190006986A (ko) 복수의 전력 변환 장치를 가지는 부유식 풍력 발전 장치
US20150275845A1 (en) Flow Power Plant
KR101338407B1 (ko) 풍력발전기 블레이드의 이동장치
US11181097B2 (en) Multirotor wind turbine with guy wires
CN109058052A (zh) 新能源风力发电设备的集成式固定安装架
CN110637156B (zh) 用于组装风力涡轮机的组装系统及方法
CN112012890B (zh) 连接组件、拉索式塔架以及风力发电机组
CN114033624B (zh) 一种抗台风风力发电设备固定底座
CN216812020U (zh) 塔架及风力发电机组
US20100180414A1 (en) Internal hinge vertical axis wind turbine erection method
CN217706205U (zh) 水中施工设备
CN115676625A (zh) 一种海上风电单桩桩顶替打法兰的施工方法
DE102020112997A1 (de) Gründung für ein Offshore-Bauwerk
JP2022140306A (ja) 風力タービン用のケーブル案内アセンブリおよび方法
DE102017006360A1 (de) Anordnung und Verfahren zur Herstellung eines Windgenerators mit fünf senkrechten, beweglichen Rotorblättern.
KR20220140308A (ko) 해상풍력발전기 설치용 부유식 구조물

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TA01 Transfer of patent application right

Effective date of registration: 20200731

Address after: Building 1, No.2 Shenyu Road, Changshu high tech Industrial Development Zone, Suzhou City, Jiangsu Province

Applicant after: Jiangsu Shiwo Precision Machinery Technology Co.,Ltd.

Address before: 262315 Xumeng Town Central Primary School, Wulian County, Rizhao City, Shandong Province

Applicant before: Li Huaqing

TA01 Transfer of patent application right
TR01 Transfer of patent right

Effective date of registration: 20230329

Address after: Building 4, No. 2 Jianye Road, High tech Industrial Park, Changshu Economic and Technological Development Zone, Suzhou City, Jiangsu Province, 215000

Patentee after: Pano (Changshu) New Energy Technology Co.,Ltd.

Address before: Building 1, No. 2 Shenyu Road, High tech Industrial Development Zone, Changshu City, Suzhou City, Jiangsu Province, 215500

Patentee before: Jiangsu Shiwo Precision Machinery Technology Co.,Ltd.

TR01 Transfer of patent right